Text
ACCESSION NBR FACIL:50 259 50-260 50 296 AUTH'AidE lUiILLSPL ~
"i'EC IP ~ NAME DENTOIVgH.R,
~
REGULATORY IiVFORMATION DISTRIBUTION SYSTEM (RIDS)
'8007220522 DOCS DATE; 80/07/16 NOTARIZED'O Browns Ferry Nuclear Power Stationg Unit 1P Tennessee Browns Ferry Nuclear Power Stationi Unit 2< Tennessee Browns Ferry Nuclear Power Stations Unit 3P Tennessee AUTHOR AFFILIATION Tennessee Valley Authority RECIPIENT AFFILIATION Of f ice of iVuc1 ear Reactor Regul at i oni Director DOCKET 05000259 05000296
SUBJECT:
Requests extension until 800811 for performing manual lt automatic scram requrired by IE Bulletin 80 17 'xtension needed because of current heat wave
~
OISTRISUTION COOK:
ASSIS COPIES RECEIVES:LTR L ENCL Jg SIZE:
TITLK: General Distribution for after Issuance of Operating Lic iVOTES:
RECIP IEiVT ID CODE/iVAME
~CTION:
IPPOLITO,T.
05
- CLARKgR, INTERNAL D/D IR P HUTS F AC S
IEE 12 0
10 FILE 01 COPIES LTTR ENCL 1
12 1
RECIPIENT ID COOK/NAi'hK CLARKPR ~ J ~
0IRP HUH FAC SFY NRC PDR 02 OR ASSESS BR 19 COPIES LTTR ENCL 12 1
EXTERNAL: ACRS NSIC 20 04 16 1
1 LPDR 03 JUL 25 1980 TOTAL NU1BKR OF COPIES REQUIRED:
LTTR 51 ENCL
400 Chestnut Street Tower II July 16, 1980 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Denton:
In the Matter of the Tennessee Valley Authority Docket Nos.
50-259 50-260 50-296 Action item 2 of the Office of Inspection and Enforcement Bulletin 80-17, dated July 3, 1980, requires that one manual and one automatic scram be performed and that certain data be taken for each unit at the Browns Ferry Nuclear Plant within 20 days.
The 20-day time period started at 12:Ol a.m.,
on July 8, 1980.
By letter from J.
P. O'Reilly to H.
G.
Parris dated July 8, 1980, we were informed that if the scram tests required by the bulletin would cause a severe impact on power reliability to promptly notify the NRR Licensing Project Manager.
This letter is to formally request an extension to the time for performing the bulletin item 2 scram tests until August ll, 1980.
The reasons why this extension is needed are outlined below.
Because of the heat wave being experienced by the country at the present
- time, TVA is in a very critical situation in meeting the daily power system load demands.
These daily load demands are consistently running extremely high.
An all time record high for total TVA system load occurred today.
With each subsequent day of continued high temperature system load increases.
The problem is so severe that TVA has declared that a condition of power emergency exists in the TVA region and has asked for voluntary energy conservation by power consumers.
The next step under consideration is interruption of the power supply to large industries.
The problem of high system demand is compounded by several of'VA's larger coal fired generating units being out-of-service for unscheduled maintenance and repair.
TVA has 'cut the power supply to DOE and has been purchasing as much power from.neighboring utilities as there is to be purchased.
However, the high loads being experienced by neighboring utilities make the continued purchase of electricity uncertain.
Removing a Browns Ferry unit from power operation to perform the bulletin item 2 tests at this'ime very probably would result in the forced interruption of industrial loads and reduction of system voltage to meet the remaining demand.
800 728()gg&
Q
Mr. Harold R. Denton July 16, 1980 We request an extension of the deadline for performance of IE Bulletin 80-17 Action Item 2 scram tests on units 1 and 2 until August 11, 1980.
If this extension can be granted, TVA will take the following compensatory actions on units 1 and 2.
1.
Provide continuous monitoring of the six-inch scram discharge volume low points by use of installed ultrasonic sensors.
The continuous monitoring capability will be provided by July 28, 1980.
2.
Provide a positive atmospheric vent for east and west scram discharge volume vent piping.
Vents to be provided by July 28, 1980.
3.
Provide instructions to operating personnel that specify actions to be taken when water is detected in the scram discharge volume.
These actions are similar to those taken in returning unit 3 to service and are documented in a July 15, 1980, letter from J.
P. O'Reilly to H. G. Parris.
Should the present heat wave abate ox sufficient coal fired generation become available we would perfoxm the Action Item 2 tests as soon as practical.
We request that you inform us of your position regarding this matter as expeditiously as possible.
In order to comply with the 20-day requirement for scram testing of unit 1 and 2, we would be required to begin testing on the first unit the evening of July 18 to take advantage. of the reduced load situation over the weekend.
Your cooperation is greatly appreciated.
Very truly yours, TENNESSEE VALLEY AUTHORITY
. M. Mills, nager Nuclear Regulation and Safety cc:
Mr. James P. O'Reilly, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303