ML18025A965

From kanterella
Jump to navigation Jump to search
Forwards LER 80-022/03L-0
Date released: 09/27/2018 Download: ML18025A965


LER 80-022/03L-0:on 800616,while Performing SI 4.1.A-14, Turbine first-stage Pressure Permissive & Pressure Switches PS-1-91 a & B Exceeded Limits.Caused by Setpoint Drift. Switches Recalibr
ML18025A966
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 07/14/1980
From:
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18025A966 (4)
Forwards LER 80-022/03L-0
ML18025A964
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 07/14/1980
From: Calhoun J
TENNESSEE VALLEY AUTHORITY
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18025A964 (2)