Ses Final Report of Reportable Deficiency Regarding Anchor/Darling Tilting Disk Check Valves
ML18025A664
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/15/1978
From: Curtis N
Pennsylvania Power & Light Co
To: Grier B
NRC
References
Download: ML18025A664 (3)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM

< RIDS)

DISTRIBUTION FOR INCOMING MATERIAL 50-387 8

DOCD ATE: 08/15/78 DATE RCVD: 08/22/7:

REC:

GRIER 8 H

NRC ORG:

CURTIS N

W PA PWR & LIGHT NOTARIZED:

NO DOCTYPE:

LETTER COPIES RECEIVED

SUBJECT:

LTR 1

ENCL 0 FURNISHING CORRECTIVE ACTIONS RE CONSTRUCTION DEFICIENCY INTERIM REPT INVOLVING THE FAILURE OF CERTAIN TYPES OF ANCHOR/DARLING TILTING DISC CHECK VALVES TO CLOSE BY GRAVITY WI.IEN SUCH VALVES ARE INSTALLED IN A VERTICAL RUN OF PIPING.

PLANT NAME: SUSQUEHANNA UNIT SUSQUEHANNA UNIT 2 REVIEWER INITIAL:

XJM DISTRIBUTER INITIAL:

DISTRXBUTIQN OF THIS MATERIAL IS AS FOLLOWS NOTES:

SEND I&E 3CYS FSAR & ALL AMDTS CONSTRUCTION DEFICIENCY REPORT

( 10CFR50. 55E)

(DISTRIBUTION CODE B019)

FQR ACTION:

INTERNAL:

EXTERNAL:

ASST DIR VASSALLO++LTR ONLY(i)

PRG MINER4+LTR ONLY< 1)

EG FXL LTR ONLY(i)

+LTR ONLY(2)

GOSSICK

& STAFF++LTR ONLY(1)

DIRECTOR DPM++LTR ONLY(1)

QAB4+LTR ONLY(1)

AD FOR ENGHLTR ONLY(i)

AD FOR PLANT SYSTEMS+4LTR ONLY(

SD>4LTR ONLY(i)

FERD DREHER/IE~ccLTR ONLY<1)

LPDR~S WILKES BARREi PA+4LTR ONLY(i)

TERA++LTR ONLY( 1')

NSIC~~LTR ONLY(1)

ACRS CAT 8++LTR ONLY<i&)

BR CHIEF LWR03 BC>+LTR ONLY(i?

LIC ASST LWR53 LA~~LTR ONLY<i)

NRC PDRcc<LTR ONLY<1)

OELD~~LTR ONLY(i?

MXPC4+LTR ONLY(1)

DEPUTY DIR DPM++LTR ONLY(i)

DIRECTOR DSScc+LTR ONLY<i?

AD FOR REAC SFTY++LTR ONLY(i>

AD FOR SY

& PROJ+4LTR ONLY<1)

K SEYFRIT/IE++LTR ONLY(1?

CONTROL NBR:

782M01>7 WiF. I THF END

+%%38%+

TWO NORTH NINTH STREET, ALLENTOWN, PA.

18101 PHONE:

(215) 821-5151 NORMAN W. CURTIS Vice Presiderrt-Engineering 8 Constrirction 821-5381 r

r t

August 15, 1978 Mr. Baize H. Grier Director, Region I U. S. Nuclear BegIxlatoxy Cczmission 631 Park Avemxe Eizxg of Prussia, Pez1nsylvazxia 19406 SUSQ3EHANNK STEM EL'ECTRXC STATION BEGABDZNG 2QZHDEg3KKZNG TILTING DISK CHECK VALVES DOCKER NOS:

50-387, 50-388 IZCENSE NcjS:

CPPR-101'PPR-102 ERs 100450/100508 PILE 840-4 PZA-280

Dear Mr. Gri.er:

This re1ates to a deficiency repox~le under the pm'.sion of 10CFR50.55(e).

Ghe initial advisory was given to Mr. Ebneter, NBC-Region I, by Mr. A. R.

Sab'ciL, PP&Ll during a telephone conversation on July 12, 1978.

The dt~iency involves the failure of certain types of Archor/Darling tilting disc check valves to close by gravity wi~ such valves are installecl in a vertical run of pipxzxg.

'Ihe safety implications arise frcmzL a systaIL's izxability to meet established design criteria by virtue of the inability of such valves to consistent1y close and thereby perfazm their intended safety functions.

this cozxLition was initxallyreported by Anctur/Darlizxg ureter 10CFR Part 21 as a generic problEzn.

The Anchor/Darlizg repcxrt was suhnitted to the Office of Izxspection are EnforcEzIIent (Rashizgton, D.C.) on May 23, 1978 axxl subsequently becazae the subject of NFC IE Circular No. 78-15.

An ixxvestigation was performed for the Susquehanna Project ard. it was detexmined that four (4) 3"-9005 tilting disc check valves had the potential for e5chibiting the above type of operating failure.

These valves have been ret1zrxxed to Anchor/Darling for m~icatxons.

Following the successful ccmpletxon of said modifications, they will be considered acceptable to meet th~ intended safety Questions when installed in vertical pipirg runs.

sy82340i87 PENNSYLVANIA POWER 8

LIGHT COMPANY

Mr. Boyce H. Grier August 15, 1978 r

Tb prevent recurrence, the fal1owing steps are bema taken:

1.

The field has been instxuc~ to test all tilting disc check valves to verify that the disc closes properly when oriented for installation in a vertical pipeline,

and, 2.

The Bechtel St-wctu Specifi'cation willbe revised to require that va1ves willclose by gravity when installed in lines with flaw vert~ally upward.

The installation and testing timetable willbe activities ~

te with c Very truly yours, N. W. Curtis Vice President-Engineering

& Construct ARS:meh cc:-

Mr.. Z.. G. Davis (15)

~ing Director Office of Inspection

& Enfarcanent U. S. Nuclear Regulatory Camission 20555 Mr. G'. HcDonaZB, Directnr (1)

Office of Management Xnfazmation & Pxogrxn Control U. S. Nuclear Eh~tory Camussion 2 555