ML18025A587
| ML18025A587 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 03/23/1976 |
| From: | Curtis N Pennsylvania Power & Light Co |
| To: | Butler W Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18025A587 (3) | |
Text
U.S. NUCLL'AR REGUI ATORY COMMISSION DOCKET NUMBER FILE NUMOFR FROM:
DATE OF DOCUMENT 3-23-76
.'O:
.NRC Pa der
& Light Co Allentown pa N M Curtis DATERECEIVED I @LETTER I
BORIGINAL OCOPY QNOTORIZEO 5 UNC LASSIF)ED NUMSER OF COPIES RECEIVED one signed INPUT FORM PROP ENCLOSURE I DESCRIPTION Ltr per our request...... furnishing modific-ation to concrete specifications............
ACKNOVttLRDGED X)O @OT REMOVE J PLANT NA?IE:
<'usque'hana l & 2 SAFETY ENVXRO FOR ACTION/INFORMATION ASSXGNED AD:
ASSIGNED AD:
BRANCH CHIEF:
BRANCH CHIEF
~
PROJECT MANAGER.
- LXC, ASST'ROJECT MANAGER:
LXC~
SSTo:
INTERNALD ISTRl BUTION
~
'~I" S NRC PDR I &E ERNST BENAROYA ALA D SPANGLER'ED IPPOLITO GOSSXCK & STAFF ENG NEER N
SITE TECH GAIZXLL STEPP HULHAN SITE A'NALYSXS CCARY KNIGHT SXEI JEXL PAMLXCKX REACTOR SAPETY OPERATING REACTORS STELLO OPERATXNG TECH i<
HANA PRG JE'CT MANAGE?IENT EISEh',HUT VOLL1IER BOYD ROSS SHAO BUNCH J
COLLINS
- P, COLLINS HOJSTON PETERSON NOVAK ROSZTOCZY BAER SCHIIENCER KREGER CHECK GRIMES IIELTZ HELTE51E S AT.& I SITE SAFETY & FNV SECOVHOLT SALTZIIAN RUTBERG ANALYSIS DENTON & HUI.LER CONTROL NUMBER EXTERNAL ISTRIBUTION BROOKIIAVEiV NATL LAB ULRXKSON (ORNL)
NATL i<iB LPDR'3 REG, V-IE TXC LA PDR NSJC ASLB CONS ULTANTS CR QdkX59$$r.I, h ri
'4IIC FOAM 165 I2.76)
'-'RC FoRM 196 I2.76) 4 NRC DISTRIBUTION FQR PAii I 60 DOC I(ET MATERIAL
I
- TWO f4ORTH NINTH STREET NTOWN, PA.
18101 PHONEME (215) 821~5151 4
March 23, 1976 r
~4~0p g
RLECO'UUAY Director of'Nuclear Reactor Regula
@on Light Water Reactors Branch No. 1-2 U.S. Nuclear Regulatory Commission
" Washington, DC 20555 Attention,'alter R. Butler, Chief SUUKiAHNA STEAbI..ELECTRIC STATION MODIFICATIONS TO CONCRETE SPECIFICATIONS ER 100450 FILES 840-2, 150-1 PIA-10 Docket Nos.
50-0-38
~ an fj/p
Dear Dr. Butler:
I As per a telephone conversation between your Mr. S. Minor and our Barberich on 3/12/76, we would like to modify our proposed change was sent to you on 2/17/76 in PIA-104 to read. as f'ollows:
Mr.
W. E.
which A.
The last sentence of'his paragraph is deleted in its entirety and the f'ollowing sha11 be substituted,:
"Vertical joints shall be roughened,.
They shall also be thoroughly wetted immediately
.bef'ore placiTIg of new concrete."
This change willbe submitted in a future PSAR amendment.
Very truly yours, N.
W. Curtis Vice President
- Engineering 8e Construction NWC:CAW PENNSYLVANIA POWER 8
LIGHT COMPANY 34.03
~ '