Compliance with Appendix I Guidelines - Informing Requested Information Was Not Submitted Before Deadline
ML18025A585
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/31/1976
From: Curtis N
Pennsylvania Power & Light Co
To: Regan W
Office of Nuclear Reactor Regulation
References
Download: ML18025A585 (4)


Text

NRC FOAM 195 V.S. NUCLEAR REGULATORY CO MISSION DOCKET NUMOEA IZ 7S) 50-38 /388 FILE NUMOEA

'NRC DISTRIBUTION Fon PART 50 DOC!(ET MATERIAL TO:

~ LETTER MR 8 Ii -RFGAN JR ONOTORIZED FROM: PP&L PROP ALLENTOWN, PA N M CURTIS

'ATE INPUT FOAM OATE OF DOCUMENT 3-31-76 RECEIVED 4-1-76 NUMBER OF COPIES RECEIVED

+ORIGINAL UN C LASS IF I E 0 SIGNED 1

QCOPV DESCRIPTION ENCLOSURE LTR ltE OUR 10-8-75 I.TR.......ADVISING THAT STUDIES HAVE NOT BEEN COMPLETED TO IDENTIFY Tiff APPROPRIATE OPTION. FOR SUBMITTING TffE REQUEST-ED INFOR IAM APPENDIX I GUIEDELINES.......,.

EXPECT TO COMPLETE STUDIES NI.T .7-1-76 LANT NAME:4 EQ Egii&A6

~QKD SAFETY FOR ACTION/INFORMATION ENVIRO ASSXGNED AD:. ASSIGNED AD: 9i MQOQQ BRANCH CHIEF: BRANCH CHXEF; QG-R PROJECT MANAGER; PROJECT IIANAGER:

LXC ~ ASST.: LIC ~

ASST'EG INTERNAL D ISTRI BUTION FI E S NRC PDR ESC ERNST I & E BENAROYA BAT,r>RD N SPANGLER GOSSXCK & STAFF ENG NFER N IPPOLXTO SITE TECH ASE KNIGHT OPERATING REACTORS Ati SXHNEIL STELLO STEP P.

PAVLXCKX HULIIAN OPERATING TECH PROJECT MiANAGEtIENT REACTOR SAFETY EISENHUT SITE ANALYSIS BOYD ROSS SHAO VOLLIIER P. COLLINS NOVAK BAER BUNCH HOUSTON ROSZTOCZY SCIiWENCER J. COLLINS PETERSON CHECK GRIMES KREGER MELTZ HELTEMES SITE SAFETY & ENVIR SKOVHOLT SALTZtQ N ANALYSIS RUTBERG, DENTON & MULLER EXTERNAL DISTRIBUTION CONTROL NUi'ilBER I LPDR NATL LA BROOKIIAVEN NATL LAB TXC REG. V-XE ULRIKS ON (ORNL)

NS C LA ASLB COtt'. 'i .',. ANTS

rw l

~ <<~ PHONEt (215) 821 5151 Bicentennial TWO NORTH NINTH SirTEETr ALLENTOWN, PA. 18101

>> ~~6 PQI111SVJVclIllh March 31, 1976  :

j(rrP.',

<ek FiM 8g gOCtL Sn )c>c>r d>i%Iron con ceil

,>>'1-1976 r their ct>tldren.

U' t"Uc" riO tC">SLATOLY

>Lett>Aclsstott Director of Nuclear Reactor Regulation Moil Section U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Wm. H. Began, Jr., Chief (O .A Environmental Projects Branch 3 cket Nos. 50-387 and 50-388 SUSCtUEEAHHA STEJRC ELECTRTU STATTOH I GUIDELINES -----n e>caela COMPLIANCE WITH APPENDIX ER 100450 FILE 840-2 qP" "9 PLA-ill s o-.swan GT1,SS~~ 5 Mr. Regan: ~'ear In an October 8, 1975, letter from Mr. Daniel M w, [@ p ions were described by which we could submit for NRC review and. approva t e means we propose to use to keep the levels of radioactive effluents from Susquehanna Steam Electric Station to unrestricted areas as low as is reasonably achievable in accordance with Appendix I guidelines. One of the options required. submittal of the information identified in Enclosure 2 of that letter by March 31, 1976. The second. option required that the information identified in Enclosure 1 be provided in our "Environmental Report Operating License Stage."

At the present time we have not completed our studies to identify the appropriate option for submitting the requested information. We expect to complete these stuides and inform you of our choice of option by July 1, 1976. This schedule was discussed in a phone conversation between Mr. Singh Bajwa (NRC) and Mr. W. E.

Barberich (PP&L).

Very truly yours, N. W. Curtis Vice President-Engineering & Construction WEB:AAW 33JS PENNSYLVANIA POWER 8 L I GH T COMPANY