Text
NRC FOAM 195 IZ 7S)
V.S. NUCLEAR REGULATORY CO MISSION DOCKET NUMOEA 50-38 /388 TO:
'NRC DISTRIBUTION Fon PART 50 DOC!(ET MATERIAL FROM: PP&L ALLENTOWN, PA FILE NUMOEA OATE OF DOCUMENT 3-31-76 MR 8 Ii -RFGAN JR N
M CURTIS'ATERECEIVED 4-1-76
~ LETTER
+ORIGINAL QCOPV DESCRIPTION ONOTORIZED UNC LASS IFIE 0 PROP INPUT FOAM ENCLOSURE NUMBER OF COPIES RECEIVED 1 SIGNED LTR ltE OUR 10-8-75 I.TR.......ADVISING THAT STUDIES HAVE NOT BEEN COMPLETED TO IDENTIFY Tiff APPROPRIATE OPTION. FOR SUBMITTING TffE REQUEST-ED INFOR IAM APPENDIX I GUIEDELINES.......,.
EXPECT TO COMPLETE STUDIES NI.T.7-1-76 LANT NAME:4 EQ Egii&A6
~QKD SAFETY FOR ACTION/INFORMATION ENVIRO ASSXGNED AD:.
BRANCH CHIEF:
PROJECT MANAGER; LXC~ ASST.:
ASSIGNED AD:
9i MQOQQ BRANCH CHXEF; QG-R PROJECT IIANAGER:
LIC~
ASST'EG FI NRC PDR I & E GOSSXCK & STAFF ASE Ati PROJECT MiANAGEtIENT BOYD P.
COLLINS HOUSTON E
S INTERNALD ENG NFER N
KNIGHT SXHNEIL PAVLXCKX REACTOR SAFETY ROSS NOVAK ROSZTOCZY ISTRI BUTION ESC BENAROYA N
IPPOLXTO OPERATING REACTORS STELLO OPERATING TECH EISENHUT SHAO BAER SCIiWENCER ERNST BAT,r>RD SPANGLER SITE TECH STEP P.
HULIIAN SITE ANALYSIS VOLLIIER BUNCH J.
COLLINS PETERSON MELTZ HELTEMES SKOVHOLT LPDR TXC NS C
ASLB CHECK SALTZtQN
- RUTBERG, EXTERNAL DISTRIBUTION NATL LA REG.
V-XE LA COtt'. 'i.',. ANTS GRIMES SITE SAFETY & ENVIR ANALYSIS DENTON & MULLER BROOKIIAVEN NATL LAB ULRIKS ON (ORNL)
KREGER CONTROL NUi'ilBER I
rw l
~<<~
TWO NORTH NINTH SirTEETr ALLENTOWN, PA.
March 31, 1976 8g gOCtL<ek FiM Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 18101 PHONEt (215) 821 5151
,>>'1-1976 r
U' t"Uc"riO tC">SLATOLY
>Lett>Aclsstott Moil Section Bicentennial PQI111SVJVclIllh
~~6
- j(rrP.',
Sn )c>c>r d>i%Iron con ceil their ct>tldren.
ATTENTION:
Wm. H. Began, Jr., Chief Environmental Projects Branch 3
(O
.A cket Nos.
50-387 and 50-388 SUSCtUEEAHHA STEJRC ELECTRTU STATTOH n
e>caela COMPLIANCE WITH APPENDIX I GUIDELINES
- qP" "9 ER 100450 FILE 840-2 PLA-ill s
GT1,SS~~
5 o-.swan
~'ear Mr. Regan:
In an October 8, 1975, letter from Mr. Daniel M
w,
[@
p ions were described by which we could submit for NRC review and. approva t e means we propose to use to keep the levels of radioactive effluents from Susquehanna Steam Electric Station to unrestricted areas as low as is reasonably achievable in accordance with Appendix I guidelines.
One of the options required. submittal of the information identified in Enclosure 2 of that letter by March 31, 1976.
The second. option required that the information identified in Enclosure 1 be provided in our "Environmental Report Operating License Stage."
At the present time we have not completed our studies to identify the appropriate option for submitting the requested information.
We expect to complete these stuides and inform you of our choice of option by July 1, 1976.
This schedule was discussed in a phone conversation between Mr. Singh Bajwa (NRC) and Mr. W. E.
Barberich (PP&L).
Very truly yours, N.
W. Curtis Vice President-Engineering
& Construction WEB:AAW 33JS PENNSYLVANIA POWER 8
L I GH T COMPANY
F)i'/j