MONTHYEARML24009A1092024-01-0909 January 2024 Acceptance of Westinghouse Electric Company, LLC Request to Exempt From10 CFR 70.50(b)(1) ML23355A1542023-12-20020 December 2023 WEC Acceptance 2023 DFP Surety Bond Change ML23184A1022023-06-30030 June 2023 Westinghouse Acceptance E-mail- Hematite Ash Part II ML23055A1872023-02-24024 February 2023 Final-NRC Doc Request - WEC FP IR 2023-001 ML23045A2042023-02-0909 February 2023 Email - RAI for Westinghouse Hematite Ash Part I EPID L-2022-LLA-0177 ML22320A0922022-11-0303 November 2022 Westinghouse Acceptance Email for Removal of Flywheel and Corrections to La ML22250A6642022-09-0707 September 2022 (External_Sender) Proposed Licenses Renewal for the Westinghouse Columbia Fuel Fabrication Facility ML22137A2752022-05-16016 May 2022 E-mail from Elizabeth Johnson, Sc Shpo - Re; Westinghouse Columbia Fuel Fabrication Facility (Cfff) Revised Draft Cultural Resources Survey Richland County ML22053A1432022-02-16016 February 2022 Email to P. Donnelly (Westinghouse) Acknowledging Receipt of 2022 ISA Summary ML21278A5242021-09-30030 September 2021 Stewart Review of Draft Environmental Assessment for Westinghouse Columbia Alternative Disposal Request ML21288A4082021-09-21021 September 2021 South Carolina State Historic Preservation Office Comments Westinghouse Columbia Fuel Fabrication Facility License Renewal Draft Environmental Impact Statement and Section 106 Review ML21288A2792021-09-20020 September 2021 Comment (15) E-mail Regarding WEC Cfff Draft EIS ML21257A4682021-09-13013 September 2021 Request for Additional Information Related to Westinghouse Electric Company, LLC, Exemption Request for Alternate Disposal of Specific Waste (Enterprise Project Identifier L 2021-Lla-0101) ML21252A0882021-09-0808 September 2021 Transmittal Email to Oglala Sioux Tribe Survey Methodology Survey Methodology to Identify Sites of Significance to the Oglala Sioux Tribe for the Crow Butte ISR Facility License Renewal ML21252A0862021-09-0808 September 2021 Transmittal Email to Crow Butte Resources, Inc., Survey Methodology to Identify Sites of Significance to the Oglala Sioux Tribe ML22164A9342021-08-17017 August 2021 WEC 2021 Donnelly ML21342A0402021-08-0606 August 2021 Transmittal to U.S. Fish and Wildlife Service of the Draft Environmental Impact Statement for the License Renewal of the Westinghouse Columbia Fuel Fabrication Facility in Richland County, South Carolina ML21342A0412021-08-0606 August 2021 Transmittal to U.S. National Marine Fisheries Service of the Draft Environmental Impact Statement for the License Renewal of the Westinghouse Columbia Fuel Fabrication Facility in Richland County, South Carolina ML21342A0392021-08-0606 August 2021 Transmittal to U.S. National Park Service of the Draft Environmental Impact Statement for the License Renewal of the Westinghouse Columbia Fuel Fabrication Facility in Richland County, South Carolina ML21342A0382021-08-0606 August 2021 Transmittal to U.S. Environmental Protection Agency, Region 4, of the Draft Environmental Impact Statement for the License Renewal of the Westinghouse Columbia Fuel Fabrication Facility in Richland County, South Carolina ML21194A1522021-07-12012 July 2021 E-mail from E. Malek, Westinghouse, to D. Tiktinksy, NRC, Westinghouse Columbia Facility Cultural Resource Survey Letter to Sc Shpo ML21166A1052021-06-14014 June 2021 Acceptance Review of Amendment/Exemption Request for Alternate Disposal of Wastes from Columbia Fuel Fabrication Facility Under 10CFR20.2002 ML21141A1502021-03-24024 March 2021 Additional Clarifications to Cfff RAIs 03/24/2021 ML21082A0492021-03-18018 March 2021 Clarifications to EIS RAIs for Cfff ML20252A1892020-08-28028 August 2020 Email Response to Pine Hill Indian Tribe Westinghouse Columbia Fuel Fabrication Facility License Renewal Application ML20226A2682020-07-31031 July 2020 NRC E-mail to M.Caldwell, Fish and Wildlife, Westinghouse Environmental Impact Statement (EIS) Scoping Process ML20226A3802020-07-31031 July 2020 NRC E-mail to Reese, Westinghouse Environmental Impact Statement Scoping Process ML20227A1152020-07-31031 July 2020 NRC E-mail to Catawba Indian Nation, Westinghouse Environmental Impact Statement Scoping Process ML20121A2592020-04-30030 April 2020 Westinghouse License Renewal - ISA Review- Conference Call Summary Dec 2017 ML20091L4452020-03-27027 March 2020 Email from K. Taylor, SCDHEC, to J.Quintero, NRC Regarding Extending Comment Period for Westinghouse Draft EA ML20014E6722020-01-14014 January 2020 1-14-20 Email Acceptance for Review of Westinghouse Electric Company Topical Report WCAP-18443-P/WCAP-18443-NP, Revision 0, Qualification of the Two-Dimensional Transport Code Paragon2 ML19322A0082019-12-19019 December 2019 Final Safety Evaluation Transmittal Email WCAP-16097, Revision 4, Common Qualified Platform Topical Report ML19343A0552019-12-0909 December 2019 12-9-19 Email Transmitting Cover Letter for Request for Additional Information Westinghouse Electric Company Topical Report WCAP-16045-P-A, Addendum 2, Revision 0, and WCAP-16045-NP-A, Addendum 2, Revision 0 Updated Nexus Cross-Section Meth ML19325D7312019-11-21021 November 2019 11-21-19 Email Acceptance for Review of Westinghouse Electric Company Request to Modify Safety Evaluation Report on Wcap-12472-P-A, Beacontm Core Monitoring and Operations Support System. ML19311C5912019-11-0707 November 2019 11-07-19 Email Transmitting Cover Letter for Request for Additional Information Westinghouse Electric Company Topical Report WCAP 16747 P/Wcap 16747 Np, Appendices C and D, Polca T: System Analysis Code with Three Dimensional Core Mode ML19295C9792019-10-22022 October 2019 Transmittal Email Draft Proprietary Safety Evaluation for WCAP-16096, Rev 4 ML19219A2422019-07-16016 July 2019 Email to Sc Shpo/Department of Archives & History Regarding Nrc'S Preliminary Determination Regarding Historic and Cultural Resources at Westinghouse'S Columbia Fuel Fabrication Facility ML19191A0742019-07-10010 July 2019 NRC to NMFS, Update on NRC Review of Westinghouse Cfff License Renewal ML19178A0102019-06-25025 June 2019 Email to Fws Requesting Reconcurrence on ESA Findings for WEC Cfff LRA ML19038A2112019-02-0707 February 2019 NRC Acceptance of Westinghouse January 2019 Updated Integrated Safety Analysis (ISA) Summary ML19031C9162019-01-31031 January 2019 U.S. Nuclear Regulatory Commission Acceptance of the Fundamental Nuclear Material Control Rev. 43 and Emergency Plans Rev. 18 for Formal Review ML19031C6572019-01-31031 January 2019 U.S. Nuclear Regulatory Commission Acceptance of Westinghouse 10 CFR 70.72 Facility Change Report Summarizing Changes Completed within 2018 ML19077A2082019-01-29029 January 2019 Email: NRC Request for Clarification on Westinghouse Electric Company Request to Release Additional Funds from Financial Assurance for Cfff ML18352B1042018-12-21021 December 2018 Summary for Pre-Application Call with Westinghouse Cfff for Removal of the Administration Building from the Controlled Access Area ML18323A0992018-11-14014 November 2018 Westinghouse Pre-Application Meeting Request for Proposed Change to the Controlled Access Area ML18138A2302018-05-0909 May 2018 Email to Westinghouse - License Transfer FRN ML18117A1302018-04-27027 April 2018 Email from SCDHEC Dated 042718 Regarding Comments on the Draft EA for Cfff License Renewal ML18025A3182018-01-24024 January 2018 NRC Email to Furtak NMFS 012418 2024-01-09
[Table view] |
Text
Quintero, Jessie From: Quintero, Jessie Sent: Wednesday, January 24, 2018 4:51 PM To: 'Sarah Furtak - NOAA Federal' Cc: Grange, Briana
Subject:
NRC's Response to NMFS Questions re: Consultation No. SER-2017-18839 (Westinghouse License Renewal)
Attachments: NRC Responses to NMFS Questions regarding SER-2017-18839.pdf
Dear Ms. Furtak,
With this email, the U.S. Nuclear Regulatory Commission (NRC) staff is providing responses to the National Marine Fisheries Services (NMFS) questions submitted to the staff on December 12, 2017, related to the Westinghouse Electric Company (WEC) Columbia Fuel Fabrication Facility (CFFF) proposed license renewal (NMFS Consultation No. SER2017 18839). The NMFSs questions with the NRC staffs responses are attached. Our response includes reference to a figure of the discharge piping. However, the figure is proprietary and should remain nonpublic. Therefore, that figure will be sent under separate email with password protection.
The NRC staff submitted a Biological Evaluation to the NMFS on August 15, 2017, that contained the NRC staffs analysis of the impacts to the shortnose sturgeon within the Congaree River as a result of the proposed continued operation of the CFFF for an additional forty years. The primary pathway for CFFF operations to affect the shortnose sturgeon is through the discharge of liquid effluent directly into the Congaree River, 3.5 miles downstream of the CFFF property. CFFF liquid effluent is a combined stream of treated sanitary waste and process wastes and is permitted through the South Carolina Department of Health and Environmental Control (SCDHEC) under the conditions of National Pollutant Discharge Elimination System (NPDES) Permit No. SC0001848.
WEC releases stormwater into upper Sunset Lake through one combined outfall that is permitted through an SCDHEC issued Industrial Storm Water General NPDES Permit (No. SCR000000). Storm water from the CFFF site does not directly flow into the Congaree River, and therefore, potential effects to river water quality are minimal.
Although groundwater contamination has been detected at the CFFF site, it is contained within the site boundary and is expected to remain within that boundary for the foreseeable future. WEC maintains an active environmental monitoring program in accordance with SCDHEC and NRC requirements. The monitoring required as part of the NRC license includes fish and river water sampling. If in the future, monitoring trends indicate that contamination is increasing or moving offsite, the SCDHEC could require corrective actions or additional remedial measures in order to ensure that environmental impacts are minimized.
Based on the staffs Biological Evaluation and the above considerations, the NRC staff has determined that continued operation of the CFFF under the terms of a renewed license may affect, but is not likely to adversely affect the shortnose sturgeon. The NRC has provided supplemental information, including the enclosed responses that further supports this determination. Additionally, as indicated in the NRC staffs responses to the NMFSs October 12, 2017, requests for additional information, the NRC has made a no effect determination for the Atlantic sturgeon and its critical habitat because neither the species nor its critical habitat occur in the action area.
The NRC staff has provided to the NMFS its August 15, 2018, Biological Evaluation; responses to the NMFSs September 22, 2017, October 12, 2017, and December 12, 2017, requests for additional information; copies of WECs Environmental Report; copies of the NPDES permit and permit rationale; as well as various figures and other relevant information. The NRC staff believes this information is sufficient to allow NMFS to complete its review of the proposed CFFF license renewal. Therefore, the NRC respectfully requests that the St. Petersburg NMFS field office provide their 1
concurrence on the NRCs not likely to adversely affect determination for shortnose sturgeon within 30 days of the receipt of this email.
If you have further questions, please contact either me or the staff biologist, Ms. Briana Grange (Briana.Grange@nrc.gov).
- Thanks, Jessie Muir Quintero
Jessie Muir Quintero Project Manager, NMSS/FCSE/ERB U.S. Nuclear Regulatory Commission Phone: 301.415.7476 Office: TWFN 4D56 Mailstop: TWFN 4B16 Email: Jessie.Quintero@NRC.gov