ML18025A297
| ML18025A297 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 05/08/1975 |
| From: | Curtis N Pennsylvania Power & Light Co |
| To: | Butler W Office of Nuclear Reactor Regulation |
| References | |
| 840-2, ER 100450, PLA-66 | |
| Download: ML18025A297 (3) | |
Text
NIIC. DIB1 RIBUTION iOR PART.">0 DOCK ET~iriATER A L (TEI(rIPORARY FORfvl) 0 CONTROL NO: Wi~+V FILE.
F RONt. i'ennsylvania Power &Light Allentown, Pa.
Co.
Norman W, Curtis TO:
Dr, Halter R. Butler DATE OF DOC 5-8-75 ORIG 1 Signed DATE REC'D 5 12rr75 CC OTHER LTR TWX RPT XX'ENTAEC PDR SENT I.OCAL PDR OTHER CLASS UNCLASS XXX PROP INFO INPUT DESCR IPTION:
Ltr, advising will provide schedule for subm.
req. containment design inf, 6 Eval. by the we of 6 2 75o
~ ~ ~ o ~
NO CYS REC'D 1
ENCLOSURES:
DOCKET NO 5
387 388 PLANT NAIVjE.
S.
h 1 6 2
FOR ACTION/INFORI",]ATION VCR 5-14-75 BUTLER (L) copies CLARK (L)
W/ Copies PAIRR (Li Y(t/
i oples r'Ni t='L (LI W/ Copies SON(VENDER (L(
ZIE((ANN (L(
W/ Copies '/ Copies STOLZ (L)
DICKER (E)
W/ Copies W/ Copies
'II/hC<hi i A ii 1
vair.u-mr.i ics Wi Copies Wl Copies I'UHPLB (L)
YOUNGBLOOD W/ Copies W/ Copies REGAN (E)
W/ Copies LEAR (L)
, W/ Cooies Egi 'rg E
W/ Copies (E)
LICE~<SING PROJECT Yr~lAGER W/ Copies
-GFI N
R
+OGC, ROOM P-506A
" GOSSICK/STAF F CASE GIAMBUSSO
. BOYD f~(MOORE (L)
DEYOUNG (L)
SKOVIIOLT(L)
GOLLER!L) (Ltr) i". COLLINS DENISE q fiI:.G OPR
~ I=ILE 5 REGION (E) 1IP7.C STEE LE I EC}I AFVIEW SCHROEOER MACCARY KNIGHT oAWLICKI SHAO STELI.O HOUSTON NOVAK ROSS IPPOLI1 0 TEDESCO J.
C01.LlNS I AINAS BENAROYA VOLLfv1ER A/T I'D.
BRAIT((1A: I SALTZ'iAN ME LTZ LIC ASST DIGGS (L)
GEARIN (L)
GOUI BOURNE {L)
KREUTZER (E)
LEE (L)
MAIGRET (L)
REEO (E)-
SERVICE (L)
SHEPPARD (L)
SLATER (E)
S(LI ITH (L)
TEETS (L)
WI LLIAiViS(E)
WILSON (L)
INGRAM (L)
DENTON G R I f(tlES R.
GAfvlMI LL H.
KASTNE R E.
BALLARD P.
SPANG LE R J.
~M.
ENVIRO r~
S.
MULLER I'r1.
DICK LR S.
KiNIG HTON f~/i.
YOUNG B LOOD H.
BEGAN S.
PROJECT LDR G.
V.
HAR LESS R.
PLANS
~MCDOi~lA' CHAPi~.1AN DUDE (L;r)
E. COUPE PETERSON HARTFI""LD (2)
KLECKER EISEN HUT WlG G I N TON INTERiiALDISTR II3UTION EXTERNAL DIST IBUTION NATIONALLABS W. PENNINGTON, Rrn E-201 GT CONSU LTAI'IITS NE1ViViAfkK/0LUME/AG BA8 I AN
'~I LOCALPORE~
1 TIC (ABERNATISY)
('1)(2)(10) 1 NSIC (BUCfIAivAN) 1 ASLO 1
.1 Newton Anderson
. ACRS HOLDING/SENT 1 PD R.SAN/LA/NY 1 BROQKHAVEN:'l.'
LAB 1 G. ULRIKSON, O 1 AGMED (RUTr! Cv'S-" Ai')
Rrri B-127 GT 1 J. D. RUI'ANKLES, Rrn E 201 GT
PP@IL TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONEs t215) 821-5151 May 8, 1975 Docket Nos.
50-387 5O-388 Dr. Walter R. Butler, Chief Light Water Reactors Branch 1-2 Division of Reactor Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555 SUSQUEHANNA SES ADDITIONAL INFORMATION CONTAINMENT DESIGN ER loo45O FILE 840-2 PLA-66 y
1 t.
~s /
s C
Dear Dr. Butler:
You have recently transmitted. two (2) letters to us requesting additional information relative to the design of Mark II containments to account for suppression pool, hydrodynamic loads that occur during loss of coolant accidents (letter dated April 17, 1975) and safety/relief valve discharge events (letter dated April 23, 1975).
In response to these letters, we(will provide you with our schedule for submitting the requested.
containment design information and. evaluations by the week of June 2, 1975)
This schedule and a program for resolution of this matter is 'being developed in conjunction with other utilities owning Mark II containments and. the General Electric Company.
As discussed. with Mr. J.
M. Cutchin, the schedule for our response to Item 1 of your March 14, 1975 letter (regarding the design of wetwell to drywell vacuum breakers) will be included with the schedules mentioned above.
V ry tr y yours, Norman W. Curtis Vice President-Engineering 8 Construction CTC:JMR PENNSYLVANIA POWER 8
L I GH T COMPANY
y ry k h
'I C
k
~
k ~
y <<'Clf C
r "I
~
~
'h r
, Cf r
r
~
I h
~
F
~
V
~.
~
yy Cr r ~
Lh
~ '
~
~
r
~ r