ML18025A294
| ML18025A294 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 08/07/1975 |
| From: | Curtis N Pennsylvania Power & Light Co |
| To: | Butler W Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18025A294 (4) | |
Text
NRC DISTRIBUTION FOR PART 50 DOCK i-MATERIAL (TEMPORARY FORM)
CONTROL NO'll E
FROM: Penn.
Power 6 Light Co.
Allentown, Pa.
18101 TO:
DATE OF DOC 8-7-75 ORIG DATE R EC'D LTR 8-12-75 CC OTHER TWX RPT OTHER Dr. Walter R. Butler CLASS UNCLASS PROPINFO 1 si ned INPUT NO CYS REC'D SENT LOCALPDR DOCKET NO:
Jj5@~388 DESCRIPTION:
Ltr notarized 8-8-75 re our 2-18-75 ltr.....furnishing ifo on NRC staff position No, 1... ~
DISTRIBUTION PER M, RUSHBROOK 8-19"75 ENCLOSURES:
PLANT NAME:
Susquehanna Units 1 & 2 FOR ACTION/INFORMATION UTJ,ER (L) copies CLARK (L)
W/ Copies PARR (L)
W/ Copies KNIEL (L)
W/ Copies SCHWENCER (L)
W/ Copies STOLZ (L)
Mt/ Copies VASSALLO (L)
W/ Copies PURPLE (L)
W/ Copies ZIEMANN (L)
W/ Copies DICKER (E)
Mt/ Copies KNIGHTON (E)
W/ Copies YOUNGBLOOD (E)
W/ Copies REGAN (E)
W/ Copies LEAR (L)
W/ Copies SPIES Mt/ Copies LPM W/
opuses INTERNALDISTRIBUTION E
RC PDR 2) 45GC, ROOM P-506A GOSS I CK/STAF F CASE GIAMBUSSO BOYD MOORE (L)
Q5E YOUNG (L)
SKOVHOLT (L)
GOLLER (L) (Ltr)
P. COLLINS DENISE EG OPR ILE 5 REGION (2) 44IPC 1
TECH REVIEW CHROEDER MACCARY KNIGHT PAWLICKI SHAO STELLO HOUSTON NOVAK ROSS IPPO LITO TEDESCO S COLLINS LAI NAS BENAROYA
~VOLLMER DENTON GRIMES GAMMILL KASTNER BALLARD SPANGLER ENVIRO MULLER DICKER KNIGHTON YOUNGBLOOD REGAN PROJECT LDR HARLESS LIC ASST R. DIGGS (L)
H. GEARIN (L)
E. GOULBOURNE (L)
P. KREUTZER (E)
. LEE (L)
. RU3HBROOK(L)
S. REED (E)
M. SERVICE (L)
S. SHEPPARD (L)
M. SLATER (E)
H. SMITH (L)
S. TEETS (L)
G. WILLIAMS(E)
V. WILSON (L)
R. INGRAM (L)
H.
DUNCAN A/T IND
~
B RAITMAN SA LTZMAN ME LTZ PLANS MCDONALD CHAPMAN DUBE (Ltr)
E. COUPE PETERSON HARTFIELD (2)
KLECKER EISENHUT WlGGINTON EXTERNAL DISTR I BUTION LOCALPDR Wilkes Barre, Pa.
TIC (ABERNATHY)
(1)(2)(10) NATIONALLABS NSIC (BUCHANAN) 1 W. PENNINGTON, Rm E-201 GT 1 ASLB 1
CONSULTANTS Newton Anderson NEWMARK/BLUME/AGBABIAN
@AORS NHRH~/SENT OAYEEORY B PER M.
RBSHBROOK 8-19-75 1 P D R-SAN/LA/NY 1 BROOKHAVEN NAT LAB 1 G. ULRIKSON ORNL
~ h h
~ II ~
~
~
h F-
i
PERIL TWO NORTH NINTH STREET, ALLENTOWN, PA.'8101 PHONE~ (2)5) 821-5151 IRQgUlQ)8 QI 08CILEt August '7, 1975 Dr. Walter R. Butler, Chief Light Water Reactors Branch 1-2 Division at Reactor Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555 S~UEIIANNA STEAM ELECTRIC STATION
RESPONSE
TO NRC STAFF POSITION ZR 100450 FILE 840-2 Pra-78 ZS
~
~o~
P~
ZZ~.~g eI a
pt',S.
gW~;.;1PT 88I S.e.'iZR Docket Nos.
0- 8 50-c I j
'~II6>,
AU83,P ]g'g g=
Reference:
NRC Letter from Dr. W, R, Butler to Mr. N. W. Curtis dated, 2/18/75
Dear I.ML'. Butler:
The following is in response to the Staff's Position 1 in the above referenced, letters STAFF POSITION 1:
The proposed, change of the quality group classification of components in the liquid radwaste system (Item 11, Table A.2s3) from Group C to Group D is unacceptable.
We would, find, a change of the quality group classification of these components to "Quality Group D (Augmented.)" as described in Attachment A to be acceptable.
RESPONSE
The quality group classification of the components in the liquid, radwaste system will be changed. from Group C to Group D (Augmented).
This change willbe included, in a future PSAR Amendment.
Very truly yours,
'4';
W, Curtis Vice President - Engineering and Construction CTC:RMF SWORN TO AND SUBSCRIBED BEFORE ME OF 1975 Notary Public, gy commission Emsiresi gl~q(>"q PENNSYLVANIA POWER 8
L I GHT COMPANY 8572
~
~
r
~ ~
r ra
~
~
r I
~ 'f
~
~
U P PA' A
I F
r
~
~ ~
Ar r
r
-A
~
U 1
~
P U 'U II
~
~
I
~
I J
'I I
~
U
~ U A
~
~