U.S. NUCLEAR REGULATORY CC" 'IISSION NRC FORM 0-7G I )'RC DISTRISUTION FDR PART 50 DOCKET NIATER(AL DOCKET NUM R
387 388 FILE NUMBER TO:
MR W H 'REGAN JR FROM: PP&L ALLENTOWN, PA a
N W CURTIS'ATE OF DOCUMENT 3-31-76 DATE RECEIVED 4-1-76 LETTE R
+ORIGINAL QCOP Y DESCRIPTION 0 NOTOR IZED UNCLASSIFIED PROP INPUT FORM ENCLOSURE NUMBER OF COPIFS RECEIVED 1 SIGNED LTR RE OUR 10-8-75 LTR.......ADVISING THAT STUDIES HAVE NOT BEEN,COMPLETED TO IDENTIFY THI APPROPRIATE OPTION. FOR SUBMITTING THE REQUEST-ED INFOR IAW APPENDIX '. I GUIEDELINES.........
EXPECT TO COMPLETE STUDIES NLT 7-1-76 ruoe mm:4 vsIIIvaQsr nP, 0 ~Op gP)Q'gf
,Ij.CKNO%L<>8<D SAFETY
'ASSXGNED AD:
BRANCH CHIEF:
PROJECT MANaGER; LIC~ ASST FOR ACTION/INFORMATION ENVXRO ASSIGNED AD:
9e fJlPQR~
BRANCH CHXEF
~
E,GrR'ROJECT MANAGER :
LIC~
ASST'EG
'FILE I&E GOSSICK & STAFF AS PROJECT MANAGEMENT BOYD P.
COLLINS HOUSTON INTERNALD ENG NEER N KNIGHT SI}WEIL PAWLICKX REACTOR SAFETY ROSS NOVAK ROSZTOCZY ISTRl BUTION BENAROYA IPPOLITO OPERATING REACTORS STELLO OPERATXNG TECH EISENHUT SHAO BAER SCHWENCER ERNST BALLARD SPANGLER SITE TECH GAMMILL STEPP SITE ANALYSIS VOLI2iER BUNCH J ~ COLLINS PETERSON MELTZ HELTEMES SKOVHOLT LPDR TIC NS ASLB QR~QLDIKGL<E CHECK AT&X SALTZMAN RUTBERG EXTERNAL DISTRIBUTION NATL LA REG V"XE LA PDR CONSULTANTS GRIMES SITE SAFETY & ENV R
ANALYSIS DENTON & MULI.ER BROOKHAVEN NATL LAB ULRXKSON(ORNL)
KREGER CONTROL NUMBER R>9S ~
~
~
~
4
Cj TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONEs {215) 821-5151 Bicentennial March 31, 1976 g~tsU[E)plJJ Dppkpt FI~8 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 U.S. NUCEEAR REGULATORY cg COnsRS ISS ION Mall Sacllan ATTENTION:
Wm. H. Regan, Jr., Chief Environmental Prospects Branc asasa
~g Ess" 9
s gQ~
~O>"
- s. YEPCL~ SS n
g SUSQUEHANNA STEAM ELECTRIC STATION COMPLIANCE WITH APPENDIX I GUIDELINES ER 100450 FILE 840-2 PLA-ill ocket Nos.
50-387 and.
50-388
Dear Mr. Regan:
In an October 8, 1975, letter from Mr. Daniel 1 r, two options were described.
by which we could. submit for NRC review and. approval the means we propose to use to keep the levels of radioactive effluents from Susquehanna Steam Electric Station to unrestricted.
areas as low as is reasonab+
achievable in accordance with Appendix I guidelines.
One of the options required. submittal of the information identified. in Enclosure 2 of that letter by March 31, 1976.
The second option required. that the information identified. in Enclosure 1 be provided. in our "Environmental Report Operating License Stage."
At the present time we have not completed. our studies to identify'he appropriate option for submitting the requested.
information.
We expect to complete these stuides and. inform you of our choice of option by July 1, 1976.
This schedule was discussed in a phone conversation between Mr. Singh Bagwa (NRC) and. Mr. W. E.
Barberich (PPM ).
Very tru+ yours, kl.g N.
W. Curtis Vice President-Engineering 8 Construction WEB: AAW PENNSYLVANIA POWER 8
I. IGHT COMPANY