Text

U.S. NUCLEAR REGULATORY COF Io NRC FORM 195 I2-TS)

NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL OOCKET UMBE7 g FIL BER PSAR/FSAR Ai%)T DIST".

TO:

Mr. Olan Do Parr FROM:

Pennsylavania Pwro

& Light Coi Allentown, P6 ~

N+ W~ Curtis OATE OF OOCUMENT OATE RECEIVEO 11/14/77 rPCETTE R 2foRIGINAL ElCOPY OESCR IPTION QNOTORI2ED

~NCLASSIFIEO PROP INPUT FORM ENCLOSU RE NUMBER OF COPIES RECEIVEO Concerns recent decision to install in I Susquehanna SES the two-arm steam quenching system designed by Kraftwerk Uniono ~ ~ ~ ~ ~ ~ ~ ~ ~

PLANT NAME: Susquehanna Units 1 &

2j'RJL 11/14/77 (1-P ASSIGNED AD!

LTR BRANCH CHIEF:

PROJECT bGQfAGER:

LIC v SST'TR FOR ACTION/INFORMATION R

G FIL R

LAINAS IPPOLITO INTERNALDISTR I BUTION ICE P.

COLLINS HOUSTON HELTENES CASE LTR)

MIPC LTR)

IGVIGHT LTR BOSNAK SIHIKIL PANLICKI ROSS (LTR NOVAK ROSZTOCZY CHECK TEDESCO LTR BENAROYA LPDR:

TIC NSIC ACRS 16 CYS SENT CA F.

ROSA GAS%ILL 2

VOLL~aKR (LTR)

BUNCH J.

COLLINS KREGER EXTERNAL DISTRIBUTION GCIR CONTROl NUMBER 773180141 M

~I 0

-/p fs h

~ 0 1

+~IIt~o~~lrHFILLLNW-TWO NORTH NINTH STREET, ALI.ENTOWN, PA.

18101 PHONE:

(215) 821-5151 NORMAN W. CURTIS Vice President. Engineering & Construction 821-5381 Director of Nuclear Reactor Regulation Attention:

Olan D. Parr, Chief Light Water Reactor Branch No.

3 U.S. Nuclear Regulatory Commission Washington, D.C.

20555 SUSQUEHANNA STEAM ELECTRIC STATION SRV DISCHARGE DEVICE ER 100450 FILES 840-2, 172 PLA-197

Dear Mr. Parr:

PPkL has recently made the decision to install in Susquehanna SES the two-arm steam quenching system designed. by Kraftwerk Union (KWU).

This quencher will undergo full scale testing -at the KWU testing facility prior to fabrication and.

installation.

To inform you of the key design features of the KWU Quencher, we would like to schedule a meeting with the appropriate members of the NRC staff during the week of November 28, 1977.

Please let us know which date is suitable for you.

Very truly yours, N.

W. Curtis Vice President Engineering 8 Construction sg/

773180i4i PENNSYLVANIA POWER LIGHT COMPANY

REC" IDEA QOC(lt<EHT I 4U IT e>~znv l4 e e >~

t