Letter Regarding the SRV Discharge Device and Requesting a Meeting with Appropriate Members of the NRC Staff During the Week of November 28, 1977
ML18025A241
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 11/14/1977
From: Curtis N
Pennsylvania Power & Light Co
To: Parr O
Office of Nuclear Reactor Regulation
References
Download: ML18025A241 (4)


Text

U.S. NUCLEAR REGULATORY COF Io OOCKET UMBE NRC FORM 195 I2-TS) 7 g F IL BER NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL PSAR/FSAR Ai%)T DIST".

FROM: OATE OF OOCUMENT TO:

Pennsylavania Pwro & Light Coi Mr. Olan Do Parr Allentown, P6 ~ OATE RECEIVEO N+ W~ Curtis 11/14/77 QNOTORI2ED PROP INPUT FORM NUMBER OF COPIES RECEIVEO rPCETTE R 2foRIGINAL ~NCLASSIFIEO ElCOPY OESCR I PTION ENCLOSU RE Concerns recent decision to install in I Susquehanna SES the two-arm steam quenching system designed by Kraftwerk Uniono ~ ~ ~ ~ ~ ~ ~ ~ ~

PLANT NAME: Susquehanna Units 1 &

11/14/77 (1-P 2j'RJL FOR ACTION/INFORMATION ASSIGNED AD! LTR BRANCH CHIEF:

PROJECT bGQfAGER:

LIC v SST'TR INTERNAL DISTR I BUTION R G FIL LAINAS R IPPOLITO ICE F. ROSA GAS%ILL 2 P. COLLINS VOLL~aKR (LTR)

HOUSTON BUNCH HELTENES J. COLLINS CASE LTR) KREGER MIPC LTR)

IGVIGHT LTR BOSNAK SIHIKIL PANLICKI ROSS (LTR NOVAK ROSZTOCZY CHECK TEDESCO LTR BENAROYA EXTERNAL DISTRIBUTION CONTROl NUMBER LPDR:

TIC 773180141 NSIC ACRS 16 CYS SENT CA GCIR M

~ I 0

-/p fs h

~

0 1

+~IIt~o~~ lrH FILLLNW-TWO NORTH NINTH STREET, ALI.ENTOWN, PA. 18101 PHONE: (215) 821-5151 NORMAN W. CURTIS Vice President. Engineering & Construction 821-5381 Director of Nuclear Reactor Regulation Attention: Olan D. Parr, Chief Light Water Reactor Branch No. 3 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION SRV DISCHARGE DEVICE ER 100450 FILES 840-2, 172 PLA-197

Dear Mr. Parr:

PPkL has recently made the decision to install in Susquehanna SES the two-arm steam quenching system designed. by Kraftwerk Union (KWU). This quencher will undergo full scale testing -at the KWU testing facility prior to fabrication and.

installation.

To inform you of the key design features of the KWU Quencher, we would like to schedule a meeting with the appropriate members of the NRC staff during the week of November 28, 1977. Please let us know which date is suitable for you.

Very truly yours, N. W. Curtis Vice President Engineering 8 Construction sg/

773180i4i PENNSYLVANIA POWER & LIGHT COMPANY

REC" IDEA QOC(lt<EHT I 4U IT e>~znv l4 e e >~