ML18024B052
| ML18024B052 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 09/26/1979 |
| From: | Lainas G Office of Nuclear Reactor Regulation |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7910150314 | |
| Download: ML18024B052 (2) | |
Text
gag flE0I P0 Cy 0
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 cek'e.W 5o/g.e p Pc o 4'36
++*++
SEP 2 tI 1979 MEMORANDUM FOR:
Darrell G. Eisenhut, Acting Director, Division of Operating
- Reactors, NRR FROM:
SUBJECT:
Gus C. Lainas, Chief, Plant systems
- Branch, DOR SANDIA TEST OF BROMNS FERRY CONNECTORS I received a call today from Matthew Chiramal and John Zwolinski who are our representatives for the subject test, Matt and John advised me that the pretest run indicated that the test facility could not duplicate the heat-up part of the test.
I was advised that there is a possible problem with the superheater or the regulating valve.
The facility is currently being inspected to determine the specific cause of the problem. 'f indeed the super heater is identified as the problem, it could result in a delay of about ninety (90) days.
In any event, it is doubtful that the test of the connectors can be completed by September 28, 1979, as currently scheduled.
cc:
V. Stello R. Mattson F. Schroeder S.
Hanauer B. Grimes E. Jordan D. Tondi M, Chiramal J. Zwolinski M. Butler R.
Denise
+c'P~
~ Gus C, Lainas, Chief Plant Systems Branch Division of'perating Reactors gmgTIRy P3:AT MISPUT.
~'tlo15o9 I~
~
4