NRC FORM 195 I2 TG)
.t TO:
c Mr W
H. Regan, Jr, FROM:
Pennsylvania Power& Li,ght Co, Allentown, Pa, N, W. Curtis U.S. NUCLEAR REGULATO 1
NRC DISTRIBUTION FoR PART 60 DOCKET MATERIAL SION D
BER 50-387 388 FILE NUMBER ENVIRO DATE OF DOCUMENT 6/30/76 DATE RECEIVED 7/2/76
)!f1.ETTER OR IGINAL QCOP Y DESCRIPTION 0 NOTOR IZE D gUNC t.ASSI FIED PROP INPUT FORM ENCLOSURE NUMBER OF COPIES RECEIVED one signed Ltr, concerning Amdt. No.
5 to the Susquehanna Steam Electric Environmental Report, '
PLANT NAME:
Susquehanna i & 2 (i-.P)
DONOTR MOD@
SAFETY ASSIGNED AD:
BRANCH CHIEF:
Parr FOR ACTION/INFORMATION ASSI NED AD'276 RJL Re a
PROJECT MANAGER:
LIC~
ASST'
Rushbrook PRO E
~
Ba wa M. Duncan NRC PDR I & E OELD GOSSICK & STAFF MIPC CASE HANAUER A
ES INTERNALD SYSTEMS SAFETY HEINEMAN SCHROEDER ENGINEERING MACCARRY KNIGHT SIHWEIL PAWLICKI ISTRI BUTION BENAROYA IPPOLITO K RKWOO OPERATING REACTO S
PROJECT MANAGEME BOYD P
COLLINS HOUSTON PETERSON MELTZ HELTEMES SKOVHOLTI LPDR:
es
- azze, a
TIC:
NS
~
ASLB:
ACRS CYS HOLDING EN REACTOR SAFE%5 ROSS NOVAK ROSZTOCZY CHECK AT6c I SALTZMAN RUTBERG EXTERNAL DISTR IBUTION NAT LAB:
REG VIE LA PDR CONSULTANTS OPERA N
C EISENH SHAO BAER BUTLER GRIMES BROOKIIAVEN ULRIKSON ORNL CONTROL NUMBER 44ou NRC FORM 196 I
P 1PP t
~
~
P
~
~
sy ~
~-
~ '";,(1 P1
~ P
~ ~
~ ~
TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONEME (215) 821-5151 JUN 30 1976 pO ~gag
<et File h
Division of Reactor Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555 Docket Nos.
50-387 50-388 Attn:
Mr. W. H. Regan, Jr., Chief Environmental Prospects Branch P4 SUSQUEHANNA STEAM ELECTRIC STATION TRANSMISSION LINE CHANGES ER 100450 FILE 991-2 PLA-115 4g APgg~g SQPQP0 gp'e
Dear Mr. Regan:
Pennsylvania Power 8 Light Co. is submitting, under separate
- cover, Amendment No.
5 to the Susquehanna Steam Electric Station Environ-mental Report.
This amendment deletes the Susquehanna-Frackville 500 KV transmission line and describes two new 500 KV transmission lines.
These new lines are the Sunbury-Susquehanna Line and. the Susquehanna-Siegfried, Line.
Construction on the Sunbury-Susquehanna Line and the Susquehanna-Siegfried Line is scheduled to start in
- June, 1977 and January, 1977,'espectively.
N. W. Curtis Vice President-Engineering' Construction CTC:JW PENNSYLVANIA POWER 8