Letter Regarding Transmission Line Changes and Amendment No. 5 to the SSES Environmental Report
ML18023B503
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/30/1976
From: Curtis N
Pennsylvania Power & Light Co
To: Regan W
Office of Nuclear Reactor Regulation
References
Download: ML18023B503 (4)


Text

NRC FORM 195 I2 TG)

.t TO:

c Mr W

H. Regan, Jr, FROM:

Pennsylvania Power& Li,ght Co, Allentown, Pa, N, W. Curtis U.S. NUCLEAR REGULATO 1

NRC DISTRIBUTION FoR PART 60 DOCKET MATERIAL SION D

BER 50-387 388 FILE NUMBER ENVIRO DATE OF DOCUMENT 6/30/76 DATE RECEIVED 7/2/76

)!f1.ETTER OR IGINAL QCOP Y DESCRIPTION 0 NOTOR IZE D gUNC t.ASSI FIED PROP INPUT FORM ENCLOSURE NUMBER OF COPIES RECEIVED one signed Ltr, concerning Amdt. No.

5 to the Susquehanna Steam Electric Environmental Report, '

PLANT NAME:

Susquehanna i & 2 (i-.P)

DONOTR MOD@

SAFETY ASSIGNED AD:

BRANCH CHIEF:

Parr FOR ACTION/INFORMATION ASSI NED AD'276 RJL Re a

PROJECT MANAGER:

LIC~

ASST'

Rushbrook PRO E

~

Ba wa M. Duncan NRC PDR I & E OELD GOSSICK & STAFF MIPC CASE HANAUER A

ES INTERNALD SYSTEMS SAFETY HEINEMAN SCHROEDER ENGINEERING MACCARRY KNIGHT SIHWEIL PAWLICKI ISTRI BUTION BENAROYA IPPOLITO K RKWOO OPERATING REACTO S

SITE SA ENV RO N

PROJECT MANAGEME BOYD P

COLLINS HOUSTON PETERSON MELTZ HELTEMES SKOVHOLTI LPDR:

es

azze, a

TIC:

NS

~

ASLB:

ACRS CYS HOLDING EN REACTOR SAFE%5 ROSS NOVAK ROSZTOCZY CHECK AT6c I SALTZMAN RUTBERG EXTERNAL DISTR IBUTION NAT LAB:

REG VIE LA PDR CONSULTANTS OPERA N

C EISENH SHAO BAER BUTLER GRIMES BROOKIIAVEN ULRIKSON ORNL CONTROL NUMBER 44ou NRC FORM 196 I

P 1PP t

~

~

P

~

~

sy ~

~-

~ '";,(1 P1

~ P

~ ~

~ ~

TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONEME (215) 821-5151 JUN 30 1976 pO ~gag

<et File h

Division of Reactor Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555 Docket Nos.

50-387 50-388 Attn:

Mr. W. H. Regan, Jr., Chief Environmental Prospects Branch P4 SUSQUEHANNA STEAM ELECTRIC STATION TRANSMISSION LINE CHANGES ER 100450 FILE 991-2 PLA-115 4g APgg~g SQPQP0 gp'e

Dear Mr. Regan:

Pennsylvania Power 8 Light Co. is submitting, under separate

cover, Amendment No.

5 to the Susquehanna Steam Electric Station Environ-mental Report.

This amendment deletes the Susquehanna-Frackville 500 KV transmission line and describes two new 500 KV transmission lines.

These new lines are the Sunbury-Susquehanna Line and. the Susquehanna-Siegfried, Line.

Construction on the Sunbury-Susquehanna Line and the Susquehanna-Siegfried Line is scheduled to start in

June, 1977 and January, 1977,'espectively.

N. W. Curtis Vice President-Engineering' Construction CTC:JW PENNSYLVANIA POWER 8