ML18023B378
| ML18023B378 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 03/25/1975 |
| From: | Curtis N Pennsylvania Power & Light Co |
| To: | Butler W Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18023B378 (4) | |
Text
NRC DISTRI 'ION FOR PART 50 DOCKET MAT IAL (TEMPORARY FORivi)
CONTROL NO:
FILE'502 FROM.
Pennsylvania Power Light Co, Allentown, Pa N H. Curtis 3>>25-75 4-1-75 XX DATE OF DOC DATE REC'D LTR TWX RPT OTHER TO:
'r. Halter R. Butler CLASS UNCLASS PROPINFO ORIG 1-signed INPUT CC OTHER NO CYS REC'D 1
SLiUT AEC PDR SENT LOCAL PDR DOCKET NO:
50-387 nd 388 DESCRIPTION:
Ltr ref our 3-14-75 ltr furn their scheduRe fibr
', resPonse to Quesfions.on Amdt No, '16 ENCLOSURES:
PLANT NAME: 8usquehana 1 and 2
FOR ACTIOiN/liNFORfv1ATIOiN "75 JGB UTLER {L)
W@Copies CLARK (L)
W/ Copies PARR IL)
W/ Copies KNIEL (L)
W/ Copies SCHWENCER (L)
IV/ Copies STOLZ (L)
W/ Copies VASSAI.I0 <I }
W/ Copies PURPLE (L)
W/ Copies ZlEiblANN (L) lV/ Copies DIC~ER {E}
W/ Copies Kiglll H i Qhl (El W/ Copies YOUNGBLOOD (E)
W/ Copies REGAN (E)
W/ Copies LEAR (L)
W/ Copies cori c W/ Copies W/ Copies INTERf<!ALDISl R I BUTIOiU RC PDR OGC, ROOiVi P-506A GOSSI CK/STAF F CASE GI BUSSO YD MOORE (L)
~YOUNG (L)
SKQVI-IOLT(L)
GOLLER (L) (Ltr)
P. COLLINS T.R. W I LSON STEELE TECH REVIEW
'H flOEDE R MiACCARY KNIGHT PAW LICK I SHAO STELLO HOUSTON NOVAK ROSS IPPOLITO TEDESCO LONG LAIN AS BENAROYA VQLLMER DEiUTOiU G R liViES GAii'IMiILL KASTNER BALLARD SPANGLER EN'iflRO i~.vitJ LLER DICKER KNIGHTQN YOUNGB LOOD REGAN PROJECT LDR HAR LESS LIC ASST R. DIGGS (L)
H. GEARIN (L)
E. GOUI BOURNE (L) p.
K RE UTZE R (F )
J.~EE (L)
~MAIGRET (L)
S. REED (E)
M. SE R VIC E (L)
S. SHEprARD (I )
M. SLAI ER (E)
H. SivllTH (L)
S. TEETS (L)
G. WILLIAfvlS(E)
V.'ILSON (L)
R. INGRAi8 (L)
A/T IND
~
BRAITMAN SA LTZi~ilAiU ME LTZ P
NS CDQiUiALD CHApf<1AN DURE (Ltr)
E. COUPE PETERSON HARTFIFLD (2)
KLECKER EISENHUT WIGG INTON EXTERNAL DISTRIBUTION LOCAL p D R Hilks Barre, Pa 1 TIC (ABERNATHY)
(1)(2)(10) NATIONALLABS 1 NSIC (BUCHANAN) 1 W. PENNINGTQN, Rm E-201 GT 1 ASLB 1
CONSULTANTS 1 Newton Anderson NEWivIARK/BLUME/AGBABIAN ACRS HOLDING/SENT '
P D R.SAN/LA/iUY 1 BROOKHAVEN iilATLAB 1 G. ULRIKSOiU, ORUL 1 AGMED (RUTH GUSSMAN}
Rm B-127 GT 1 J. D. RUNKLES, Rm E.201 GT
~
I
~
~
~ ~
~
TWO NORTH NINTH STREETS ALLENTOWN'A 18101 Docket Nos. 50-387 50-388 March 25, 1975 P H 0 N E I t2 15) 8 21-515 I C-~'
6'
~Egjp~ "
~$'i OI 4'sggf
- TI4, Mr. Walter R. Butler, Chief Light Water Reactors Project Branch 1-2 Division of Reactor Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555 Re~hpa@
FIJo Gy.
SUSQUEHANNA STEAM ELECTRIC STATION SCHEDULE FOR RESPONSE TO QUESTIONS ON AMEND, NO. 16 ER 100450 FILE 840-2 PL@-58
<4pcD
Dear Mr. Butler:
In response to your letter of March 14, 1975, the information requested will be sent on the following schedule:
1.
Information 2.
Response to 3.
Response to 4.
Response to on vacuum breakers
- May 1, 1975 NRC position on liquid radwaste -'uly, 1, 1975 1$1 NRC position on cable tray loading depth - May 1, 1975 t
NRC position on seismic analysis methods - May 1, 1975 If you have any questions, please contact us.
Very truly yours, N, W. Curtis Vice President - Engineering 5 Construction CTC:RMF PENNSYLVANIA POWER IL I. IGHT COMPANY
tt
~
m k
P t
II t