ML18023B279

From kanterella
Jump to navigation Jump to search
Letter in Reference to the Storage of Spent Fuel at the SSES at the Bell Bend Site and Expressing a Formal Objection to Such an Arrangement
ML18023B279
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 11/09/1978
From: Shortz S
- No Known Affiliation
To:
NRC/SECY
References
Download: ML18023B279 (12)


Text

FROM:

Nrs. Stanley Shortz-ACTION CONTROL COMPL DEADLINE ACKNOWLEDGMENT INTERIM REPLY DATES CONTROL NO 0 4 9 DATE OF DOCUMENT TO:

Secretary, HRC FINALREPLY 5 nv FILE LOCATION yp yg PREPAR F

SIGNATURE OF:

P CHAIRMAN P EXEQTgF DIRECTOR OTHER:

DESCRIPTION P LETTER P MEMO P REPORT P OTHER SPECIAL INSTRUCTIONS OR REMARKS Objection to storage of spent nuclear fuel at the Susyhfianna Steam and Electric Station at(the Bell Bend site DOCUMENT/COPY NO.

NUMBER OF PAGES POSTAL REGISTRY NO.

CLASS IF IEP DATA C LASSIFIGATI0 N CATEGORY P

NSI PRD P FRD SECY-78-1 644 ASSIGNE TO:

DATE INFORMATIONROUTING Smith O.~w DaVis LEGALREVIEW ASSIGNED TO:

DATE P

FINAL P

COPY NO LEGAL OBJECTIONS NOTIFY:

P EDO ADMIN& CORRES BR EXT.

COMMENTS, NOTIFY:

EXT.

JCAE NOTIFICATIONRECOMMENDED>

P YES P

NO NRC FORM 232 (11 75)

EXECUTIVEDIRECTOR FOR OPERATIONS PRINCIPAL CORRESPONDENCE CONTROL DO NO7 REMOVE 7HIS COPY

~

~

1 F

~

I

FROM

~;es. Sgag Shoriz ACTION CONTROL COMPI DEADLINE ACICNOWLEDGMENT INTERIIVI REPLY DATES CONTROL NOO 4 g j p DATE OF DOCUMENT TO:

$4cvki,et/ > f'".I~g FINALREPLY Ei I FILE LOCATIONI',/i>T +3 PRE f

SIGNATURE OF:0 CHAIRMAN Q EXECUTIVE DIRECTOR OTHFR: 0'IIMVE DESCRIPTION Q LETTER Q MEMO Q REPORT Q OTHER SPECIAL INSTRUCTIONS OR REMARKS

&$LACII,)0A tQ QCOtt'8-"~~ OF Sg&AC SUC)ClIP")

64 434 SJSQQI@~ftg y+~Q3 Qfg K)GC~Y'fc SC8i")65 QL Coo 4BH IJMIII,S'$+Q.

I F

DOCUMENT/COPY NO.

NUM8ER OF PAGES POSTAL REGISTRY NO.

CLASSIFIED DATA CLASSIFICATION CATEGORY 0

NSI 0RD 0 FRD SKV 78 'f6~A ASSIGNED TO:

DATE INFORMATIONROUTING LEGALREVIEW 0

F INAL 0

COPY Sn)ti'k

'4Vf S

ASSIGNED TO:

DATE NO LEGAL OBJECTIONS NOTIFY:

0 EDO ADMIN&CORRES 8R EXT.

COMMENTS, NOTIFY',I EXT.

JCAE NOTIFICATIONRECOMMENDED:T 0 YES 0

NO NRC FORM 232 I11-75I EXECUTIVE DIRECTOR FOR OPER'ATIONS PRON ClPAL CORRESPON DENCE CONTROL DO NO7 REMOVE 7H/S COPV

TO:

OCCV(~4"l"g ACTION CONTROL COMPI DEADLINE ACKNOWIEDGMENT INTERIM REPLY FINALREPLY FILE LOCATION, DATES CONTROL NO.O DATE OF DOCUMENT PRE A SIGNATURE OF:

Q CHAIRMAN P

EXECUTIVE DIRECTOR

~5 DESCRIPTION Q LETTER Q MEMO Q REPORT Q OTHER SPECIAL INSTRUCTIONS OR REMARKS 0$)kcl$93i C5 sRQl'BiJQ cf ~i4 BUc1cBP fdic) t}> 5<MQCttiMi&.5I.GaV<" Md kgb'$ C Stat)I".i~ a+ CRa flail Qe>~~ SNe DOCUMENT/COPY NO.

CLASSIFIED DATA CLASSIFICATION NUMBER OF PAGES POSTAL REGISTRY NO.

ASSIGNED TO:,.

, DATE CATEGORY Q

NSI QRD Q FRD INFORMATIONROUTING hKV~Q iQO LEGAL REVIEW Q

FINAL Q

COPY ASSIGNED TO:

DATE NO LEGAI OBJECTIONS NOTIFY:

Q EDOADMIN&CORRES BR EXT.

COMMENTS, NOTIFY:

EXT.

JCAE NOTIFICATIONRECOMMENDED YES Q

NO NRC FORM 232 (11-75)

EXECUTIVE DIRECTOR FOR OPERATIONS PRINCIPAL, CORRESPONDENCE CONTROL DO /t/OT REMOVE THIS COPV

FROM:

)i'~ 5&f~)Q'Ftz ACTION CONTROL COMPL DEADLINE ACKNOWLEDGMENT INTERIM REPLY DATES CONTROL NOp 4 g g p DATEOF DOCUMENT TO:

t'~Cqry, ~1M; DESCRIPTION Q LETTER Q MEMO Q REPORT Q OTHER PRE R E'FOFt'SIGNATURE OF:

Q CHAIRMAN Q EXECUTIVE DIRECTOR HER: i"1 FINALREPLY F ILE LOCATION OT SPECIAL INSTRUCTIONS OR REMARKS A$4cWQA 'co sf41'@j78 of sgc'AC BQclMt'Q4t Gt. C1~ ~~" vHlktz>4 MQ1;4 QQC tkecttfc 5&ticvet. tate D<>g UM4 $)te DOCUMENT/COPY NO.

NUMBER OF PAGES POSTAI REGISTRY NO.

CLASSIFIED DATA CLASSIFICATION CATEGORY 0

NSI QRD Q FRD

'~Q+/~7'(+4

, ASSIGNED TO:

DATE INFORMATIONROUTING LEGALREVIEW Q

FINAL Q

COPY RAZ4 biiV55 ASSIGNED TO:

DATE NO LEGAL OBJECTIONS NOTIFY:

Q EDO ADMINLCORRESBR EXT.

COMMENTS, NOTIFY:

EXT.

JCAE NOTIFICATION RECOMMENDED.',

Q YES Q ND NRC FORM 232 I11 751 EXECUTIVE DIRECTOR FOR OPERATIONS PRINCIPAL CORRESPONDENCE CONTROL DO NOT REAfOVE?HIS COPY

II

~

l4

~ 4 F

II W

H g ~

E N

\\

I li I

l l.

I

FROM:

c f ag?m TO:

ACTION CONTROL COMPL DEADLINE ACKNOWLEDGMENT INTERIM REPLY FINALREPLY F I LE LOCATION DATES 04910 DATE OF DOCUMENT PREPARE F R SIGNATURE OF:

Q CHAIRMAN Q

EXECUTIVE DIRECTOR OTHER:

DESCRIPTION Q LFTTER Q MEMO Q REPORT Q OTHER SPECIAL INSTRUCTIONS OR REMARKS g~IQ$L+-P DOCUMENT/COPY NO.

NUMBER OF PAGES POSTAL REGISTRY NO.

CLASSIFIED DATA CLASSIFICATION CATEGORY Q

NSI QRD Q FRD ASSIGNED TO:

DATE INFORMATIONROUTING LEGALREVIEW 0

FINAL Q

COPY p

ASSIGNED TO:

DATE NO LEGAL OBJECTIONS NOTIFY:

Q EDO ADMINACORRES BR EXT.

COMMENTS, NOTIFY:

EXT.

JCAE NOTIFICATIONRECOMMENDED:

YES Q

NO NRC FORM 232 (11 751 EXECUTIVE DIRECTOR FOR OPERATIONS PRINCIPAL CORRESPONDENCE CONTROL DO NOT REMOVE THIS COPY

't I

~

'l P

il 4

r

'I II r

C t

I i

~ ~

~

~

~.

No" J8-164 NRC SECRETARIAT Logg g Dare~tl 16 78 0 Commissioner XXIQ Exec. Dir./Oper.

0 Cong. Liaison O Public Affairs Date 0

Gen. Counsel CI Solicitor O Secretary Incoming:

M s St n e S

z From:

D 1

B 6

To:

Subject:

~

es

. at'xM e

en Date 0

Prepare reply for signature of:

Q Chairman Q Commissioner 0 EDO, GC, CL, SOL, PA, SECY 0

Signature block omitted 0

Return original of incoming with response X%K For direct reply'l For appropriate action 0

For information 0

For recommendation Suspense; Noy, N 29 R,,d, Ovi inal to Docket For the Commission:

CO bs

'Send three (3) copies of reply to Secy Mail Facility NRC+'t vc'Loaf EDO II~W; J, igtc ACTION SLIP

i ~ ~I ~ )S u 1

~ "K-T tl~J"O' y "9 5UQL JA RZD jul Box 2/6 Berwic~,

Pen"."- 18603 1

'November 3,

1978 Secretary, U. S.

5RC washington, D,G.,

Attn: Docketing 8c Service Branch 6 en-1 emen:

This letter is in reference to 'the.storage of spent nuclear fuel at the Susquehanna Steam and.

Electric Station at.the Bell Bend site.

This is my formal objection. to such an arrangerent.

On the 20th of Se'tember.

T. wrote a letter con-cerning this subject to hir.

Vim. H. Regan Jr., chief of environmental projects.

Xn respense to this letter, T. received a telehone call from a sh".

(Singhay) of the office..'t

~hat time ne assured me tha

~ the s-ent fuel would. be stored, at the site-only until it would be safe to ship it to a storage site.

This he said would be a maximum o'f Six months. Ihuing t'ris conver-sation i was informed tiat a team from the ibRC would.

be in this area to inspect the 'plant site on. the 17th and 18th of October and. they would. stop by our home d dis'cuss these issues with me.

yI On the ll~h of October a'ery. small article appeared in our local paper concerning the storage of tne spent fuel at the Bell Bend site.

This article couldn't have been any sm-lier.

Zn fact it contained three sentences.'o say the least it went unnoticed by the majority of ~he area residents.

However, when the team made their visit to our home, I questioned i. Singhay (who was accompanied by

~wo othe persons) and he informed me that the spent fue3.

wouk.d.

ind.eed'be'tored at the plant site for 10 years.

He d.idn't say it was pend.ing any certification. i.t was a d.e-finite statement that the fuel-would. indeed be stored there for tne 10 year.period...lt seems that this like all. the other things that PPEcL has decided. to do in tnis area will indeed be a 'reality.

Up.to

~his point the government has done nothing to protect the residents of this area.

Yie have received.

da~-ge to our properties during

~he construction of the pl~:, which I am sure the authorities were well aware of at she

>ice, but chose to ignor.

Our beautiful area has been desecrated by the sca=s of power lines in all

, ~;directions wzxh tne distinct possibility of more to co. e. All xnis for someon'e else's benefit.

P~~~: dice',

need the power

.ha

~ will be generated at -.his plan ~ for tnis a ea.

7ihy wasn' tris plant'onstructed in.he area

-.hat it would serve?

'iow the final destruction of this.. area by

.he storage of tnis spent fuel.

iso other area in tne U.S.

wants this spent fuel stored in their area and I sure the apparent apathy of the.people in this area gave assurance there would be no objection to this plan Tnis subject was brought to the ax-ention of tne area supervisors at their meeting last evening.

They'ere completely ignorant of the proposed plan.

think it is about xime the people in ti is area

"-re informed as to what is to take place.

'Ve live here and we are definitely effected by this decision.

the present time there are over 300 sites in the U.S.

wnere toxic chemicals and other dangerous m"-terials i ave been stored.

These sixes h=-ve be~ to m~e their presence known to the people who live there. i am not in favor of our area being added to that list.

I, Z would liLe a dei"i'zii;e statement on this issue.

Just what is going to be done with the spent fuel2

'7'here wi11 it be stored?

I'Very.

truly you s, cyMM Mrs. S.anley Snortz

~

~

~

~

l~