Text
NRC Ff)IIM 195 C2.7Gf ~
U.S. NUCLEAR REGULAToflVCo MISSION 0
NRC DISTRIBUTION FoR PART 60 DOCKETMATERIAL DOCKET NU 50-38 388 TO:
C Hr, W, H. Regan, Jr',
FROM:
Pennsylvania Power& Light Co,.
Allentown, Pa, N. W. Curtis FILE NUMOER
- EIIVIRO,
.6/30/76 DATE RECEIVED 7/2/76 DATE OF DOCUMENT PALETTE R
+ORIGINAL
,Qcor v DESCRIPTION 0NOTORIZED gVNCI.ASSIFIED i ~
PROP INPUT FORM ENCLOSURE'UMBER OF COPIES RECEIVED
'ne signed Ltr, concerning Amdt, No.
5 to the'Susquehanna Steam Electric Environmental Report,.
, PLANT NAME:
Susquehanna 1 & 2 (1-.P)
A~.CKyO DO NOT EMOVZ SAFETY ASSXGNED AD!
FOR ACTION/INFORMATION ASSX NED AD 7
2 76 RJL BRANC'H C IEF PROJECT MANAGER:
LXC~
ASST'
Parr Rushbrook 7
Re ai pRO F, -
NA Ba wa L
~
M. Duncan REG FILE INTERNALDISTRIBUTION SYSTEMS SAFETY HEINEMAN SITE SA ENV RO NAT S
X&E OFLD GOSSICK & STAFF MXPC CASE 1IANAUER IARLES SCHROEDER ENGINEERXNG I'IACCARRY KNIGHT SXHWEIL PAWLICKI
~ 'BENAROYA IPPOLITO KXRKWOOD OPERATING REACTORS NV 0
PROJECT MANAGEME BOYD P
COLLINS 110US TON PETERSON IIELTZ IIELTEMES SKOVIIOLT LPDR:
es
- arre, a
TXC:
%z
~
ASLB!
~
- rI'.N
~ REACTOR SAFEIIY ROSS NOVAK ROSZTOCZY CHECK AT&X SALTZMAN RUTBERG EXTERNAL DISTRIBUTION NAT LAB RL'G ~ VIE LA PDR CONSULTANTS OPERA N
C EISENIIU SHAD BAER BUTLER GRIMES BROOKIIAVI'.N ULRIKSON ORNL QL CONTROL NUMBER d'dew Nflc FOIlM I96 I2 7III
TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONEME (215) 821 ~ 5151
<0 Bicentennial Pennsylv ionia l6 JUN 50 1976,
~pC 0
C 9
50)our chillnan n td I dxirchiwnn.
Division of Reactor Licensing U.S.'Nuclear Regulatory Commission Vashington, DC 20555 Attn:
Mr. V. H.
Regan,= Jr., Chief Environmental Pro)ects Branch P4, I
0 SUSQUEHANNA STEAM ELECTRIC STATION TRANSMISSION LINE CHANGES ER 100450 FILE 991-2 PLA-115 c1set Nos.
50-387 50-388 LA zs,
.lf//g)
SJg(P Cf/g
Dear Mr. Regan:
Pennsylvania Power Ec Light Co. is submitting, under separate
- cover, Amendment No.
5 to the Susquehanna Steam Electric Station Environ-mental Report.
This amendment deletes the Susquehanna-Frackville 500 KV transmission line and. describes two,new 500 KV transmission lines.
These new lines are the Sunbury-Susquehanna Line and the Susquehanna-Siegfried Line.
Construction on the Sunbury-Susquehanna Line and the Susquehanna-Siegfried Line is scheduled
.to start in
- June, 1977 and. January, 1977, respectively, T
Very truly yours, t
4~8 ('.A" N. V. Curtis
'Vice President-Engineering 8 Construct'ion CTC:JV PENNSYLVANIA POWER 5
LIGHT COMPANY 660~
/
,t lt 4 1f fr