Letter Regarding Amendment No. 5 to the Susquehanna Ses Environmental Report Relating to Transmission Line Changes
ML18023A913
Person / Time
Site: Susquehanna  
Issue date: 06/30/1976
From: Curtis N
Pennsylvania Power & Light Co
To: Regan W
Office of Nuclear Reactor Regulation
References
Download: ML18023A913 (3)


Text

NRC Ff)IIM 195 C2.7Gf ~

U.S. NUCLEAR REGULAToflVCo MISSION 0

NRC DISTRIBUTION FoR PART 60 DOCKETMATERIAL DOCKET NU 50-38 388 TO:

C Hr, W, H. Regan, Jr',

FROM:

Pennsylvania Power& Light Co,.

Allentown, Pa, N. W. Curtis FILE NUMOER

EIIVIRO,

.6/30/76 DATE RECEIVED 7/2/76 DATE OF DOCUMENT PALETTE R

+ORIGINAL

,Qcor v DESCRIPTION 0NOTORIZED gVNCI.ASSIFIED i ~

PROP INPUT FORM ENCLOSURE'UMBER OF COPIES RECEIVED

'ne signed Ltr, concerning Amdt, No.

5 to the'Susquehanna Steam Electric Environmental Report,.

, PLANT NAME:

Susquehanna 1 & 2 (1-.P)

A~.CKyO DO NOT EMOVZ SAFETY ASSXGNED AD!

FOR ACTION/INFORMATION ASSX NED AD 7

2 76 RJL BRANC'H C IEF PROJECT MANAGER:

LXC~

ASST'

Parr Rushbrook 7

Re ai pRO F, -

NA Ba wa L

~

M. Duncan REG FILE INTERNALDISTRIBUTION SYSTEMS SAFETY HEINEMAN SITE SA ENV RO NAT S

X&E OFLD GOSSICK & STAFF MXPC CASE 1IANAUER IARLES SCHROEDER ENGINEERXNG I'IACCARRY KNIGHT SXHWEIL PAWLICKI

~ 'BENAROYA IPPOLITO KXRKWOOD OPERATING REACTORS NV 0

PROJECT MANAGEME BOYD P

COLLINS 110US TON PETERSON IIELTZ IIELTEMES SKOVIIOLT LPDR:

es

arre, a

TXC:

%z

~

ASLB!

~

  • rI'.N

~ REACTOR SAFEIIY ROSS NOVAK ROSZTOCZY CHECK AT&X SALTZMAN RUTBERG EXTERNAL DISTRIBUTION NAT LAB RL'G ~ VIE LA PDR CONSULTANTS OPERA N

C EISENIIU SHAD BAER BUTLER GRIMES BROOKIIAVI'.N ULRIKSON ORNL QL CONTROL NUMBER d'dew Nflc FOIlM I96 I2 7III

TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONEME (215) 821 ~ 5151

<0 Bicentennial Pennsylv ionia l6 JUN 50 1976,

~pC 0

C 9

50)our chillnan n td I dxirchiwnn.

Division of Reactor Licensing U.S.'Nuclear Regulatory Commission Vashington, DC 20555 Attn:

Mr. V. H.

Regan,= Jr., Chief Environmental Pro)ects Branch P4, I

0 SUSQUEHANNA STEAM ELECTRIC STATION TRANSMISSION LINE CHANGES ER 100450 FILE 991-2 PLA-115 c1set Nos.

50-387 50-388 LA zs,

.lf//g)

SJg(P Cf/g

Dear Mr. Regan:

Pennsylvania Power Ec Light Co. is submitting, under separate

cover, Amendment No.

5 to the Susquehanna Steam Electric Station Environ-mental Report.

This amendment deletes the Susquehanna-Frackville 500 KV transmission line and. describes two,new 500 KV transmission lines.

These new lines are the Sunbury-Susquehanna Line and the Susquehanna-Siegfried Line.

Construction on the Sunbury-Susquehanna Line and the Susquehanna-Siegfried Line is scheduled

.to start in

June, 1977 and. January, 1977, respectively, T

Very truly yours, t

4~8 ('.A" N. V. Curtis

'Vice President-Engineering 8 Construct'ion CTC:JV PENNSYLVANIA POWER 5