ML18023A900
| ML18023A900 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 08/29/1977 |
| From: | Curtis N Pennsylvania Power & Light Co |
| To: | Regan W Office of Nuclear Reactor Regulation |
| References | |
| PLA-190 | |
| Download: ML18023A900 (3) | |
Text
TO:
Mr. William H Regan, Jr'ROM:
Pennsylvanian Power & Light Compan Allentown, Pa Norman Wi Curtis
~ETTE A ORIGINAL Q COPY QNOTORI2EO
+NCLASSIFIEO PROP INPUT FORM U.S. NUCLEAR REGULATORY COMM N
NRC FoRM 195 I2-78)
NtC DISTRIBIITIDNFoe PART 50 DOCKET MATERIAL DOCKET NUMBER
"'ILE NUMBER ZA/UL~0 OATE OF DOCUMENT 8/29/77 OATE RECEIVED 9/7/77 NUMBER OF COPIES RECEIVEO e
OESC AIPT ION ENCLOSURE ACKNOWLZgeZg Anticipated Chemical Usage for Cleaning, Testing and Flushing-DO NOT REMOVE (l-P)
(3-P)
PLANT NAME: Susquehanna RJL 9/7/7'II C
5 FOR ACTION/INFORMAT N
ENSING ASSISTANT:
ASSIGNED AD:-
Ve MOORE LTR BRANCH CHIEF.
PROJECT MANAGER:
LICENSING ASSISTANT:
o Bo HARLESS INTERNALDISTRIBUTION STFMS SAFETY TTSO E ER PLANT SYSTEMS TEDESCO BENAROYA SITE SAFETY &
ENVIRON ANALYSIS DENTON & MULLER ENGINEERING IPPOLITO OPERATING REACTORS ENVIRO TECH ERNST BALLARD GBLOOD TZMAN BER EXTERNALDISTRIBUTION B
ER GR ME GAMMILL 2
SITE ANALYSIS VOLLMER BUNCH Je COLLINS CONTROL NUMBER NSIC IV J HANCHETT l6 CYS ACRS SENT CA NRC FOAM 195 {2.78)
TWO NORTH NINTH STREET, ALLENTOWN, PA.
18101 PHONEs (215) 821 5151 August 29, 1977 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Docket Nos.
50-387 50-388 Attention:
William H. Regan, Jr.
Chief Environmental Prospects Branch 3
SUSQUEHANNA STEAM ELECTRIC STATION ANTICIPATED CHEMICAL USAGE CLEANING, TESTING Ec FLUSHING ER 100450 FILE 991-2, 840-2 PLA-1 0 Dear Mr. Regan1 In accordance with the commitment made in Construction Permit Nos.
CPR-101 and 102 for the Susquehanna Steam Electric Station, attached for your review is the anticipated chemical usage for cleaning, testing and flushing.
May we have your approval to proceed.
Sincerely, Norman W. Curtis Vice President Engineering and Construction TEGsr'sg PENNEYIYANIA POWER A I I ONE COMPANY 77+5~~~7/