MONTHYEARPLA-8141, Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-81412024-09-18018 September 2024 Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-8141 PLA-8142, Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-81422024-09-18018 September 2024 Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-8142 ML24260A2312024-09-17017 September 2024 Senior Reactor and Reactor Operator Initial License Examinations 05000387/LER-2024-002, B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor2024-09-16016 September 2024 B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24233A2192024-09-0303 September 2024 – Authorized Alternative to Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR 05000387/20240052024-08-29029 August 2024 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2024005 and 05000388/2024005) 05000387/LER-2023-004, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-08-26026 August 2024 Manual Reactor Scram Due to Degraded Main Condenser Vacuum 05000387/LER-2024-001, Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear2024-08-21021 August 2024 Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear IR 05000387/20240022024-08-12012 August 2024 Integrated Inspection Report 05000387/2024002 and 05000388/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) ML24197A0982024-07-15015 July 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000387/2024010 and 05000388/2024010 PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 ML24127A2262024-05-29029 May 2024 Issuance of Amendment Nos. 288 and 272 Adoption of TSTF-563 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) PLA-8123, Main Steam Isolation Valve Leakage2024-05-23023 May 2024 Main Steam Isolation Valve Leakage PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) IR 05000387/20240012024-05-13013 May 2024 Integrated Inspection Report 05000387/2024001 and 05000388/2024001 IR 05000387/20244042024-05-0707 May 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000387/2024404 and 05000388/2024404 ML24082A1372024-04-22022 April 2024 Issuance of Amendment Nos. 287 and 271 Adoption of TSTF-568, Revision 2 and Associated Technical Specification Changes PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) ML24092A4022024-04-0101 April 2024 Annual Financial Report (PLA-8098) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance ML24067A2512024-03-19019 March 2024 Authorized Alternative to Requirements of the ASME Code ML24044A2532024-03-14014 March 2024 Associated Independent Spent Fuel Storage Installation – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0077 (Security Notifications, Reports, and Recordkeeping & Suspicious Activity Reporting)) IR 05000387/20240112024-02-29029 February 2024 Commercial Grade Dedication Inspection Report 05000387/2024011 and 05000388/2024011 IR 05000387/20230062024-02-28028 February 2024 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2023006 and 05000388/2023006) ML24039A1882024-02-27027 February 2024 Issuance of Amendment Nos. 286 and 270 Changes to Technical Specifications for Control Rods ML24037A3072024-02-22022 February 2024 Summary of Regulatory Audit in Support of Relief Request 5RR-02 PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) IR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8088, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088)2023-12-0505 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088) PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) IR 05000387/20230032023-11-0303 November 2023 Integrated Inspection Report 05000387/2023003 and 05000388/2023003 2024-09-06
[Table view] |
Text
NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TFMPORARY FORiVi)
CONTROL NO:
FILE:
FROM. Pennsylvania Power>>c DATE OF DOC DATE R EC'D LTR TWX RPT OTHER Light Co. Allecitown, Pa N.H, Curtis 3 <<25 75 4-1-75 TO: ORIG CC OTHER SEiVT AEC PDR Hr, Halter R. Butler 1-signed SENT LOCAL PDR CLASS UNC LASS PROP INFO INPUT NO CYS REC'D DOCKET NO:
50-387 and 8S DESCR IPTIO!V: ENCLOSURES:
Ltr ref our 3-14-75 ltr >>
t'urn their schedule f!Iir 'c pons'o QubsCions.on A'mdt No, "16
~ ~ ~ ~ ~ h WWW~,v~
PLANT NAME: Buuehana 1 ad 2 FOR ACTION/INFORMATION "75 JGB UTLER (L) SCHWENCER (L) Zl Ei';IA>>VN (L) REGAN (E)
WQCopies W/ Copies W/ Copies lV/ Copies CLARK (L) STOLZ (L) DICKER (E) LEAR (L)
W/ Copies W/ Copies W/ Copies W/ Copies PARR (L) VASSAI I 0 II ) I(!>>>>! I!-4>> QV {Ei CDC I C' W/ Copies W/ Copies W/ Copies W/ Copies KNIEL (L) PURPLE (L) YOUNGB LOOD (E)
W/ Copies W/ Copies W/ Copies W/ Copies INTERN!AL DISl R I BUTION WIBC G~ PDR TECH REVIEW HROEDER DE iVToiV GRliViES LIC ASST A/T IND BRAITi':>>A>>V
~
R. DIGGS (L)
OGC, ROO>>'~i P-506A MiACCARY GAii'IMI L L H. GEAR IN (L) SA LTZ>>~ilAN GOSSI CK/STAF F KNIG HT KASTNE R E. GOU LBOUR NE (L) ME LTZ CASE PAWLICKI BALLARD P. KR UTZER (E)
GI 'I B USSO SHAO SPANGLER J.J.-E E (L) P 4'S YD STE LLO vVC MAIGRET (L) CDoiVALD
. CHAPMAN MOORE (L) HOUSTON ENVIRO S. REED (E)
~YOUNG (L) NOVAK '..vice LLER M. SE R V I C E (L) DURE (Ltr)
SKQVHOLT (L) ROSS DICKER S. SHEPPARD (L) E. COUPE GOLLER (L) (Ltr) IPPQ L ITO KNIGHTON M. SLATEER (E) PETERSON P. COLLINS TEDESCO YOUNGBLOOD H. S;vllTH (L) HART F I"-'- LD (2)
DENISE LONG REGAN S. TEETS (L) KLECKER I"-G OPR LAINAS PROJECT LDR EISENHUT G. Wl LLIAMS (E)
FILfa I EGION(2) BE iVAROYA V. WILSO!V (L) W I G G I N To iV T.R. WI LSoiV VOLLMER HAR LESS NGRAih'I (L)
STEELE EXTERNAL DISTRIBUTION LQCAL PD R Hi ll:s Barre, Pa 1 TIC (ABERNATHY) (l)(2)(10) NATIONALLABS PD R SAN/LA/i<Y 1 NSIC (f3UCHAiVAN) 1 W. PEiVNII"GTO>>V, Rrn E-201 GT 1 BROOKHAVEN i.'AT LAB 1 ASLB 1 CoiVSULTANTS 1 G. ULRIKSOI>>', C'x:! L 1 Newton Anderson N E WM A R>>4 / 0 L U i%I E /AG B A 8 I AN 1 AGMED (RUTH GUSS.">>IAN}
ACRS HOLDING(SENT Rrn B-127 GT 1 J. D. RUNKLES Ra> E.201 GT
I
~
J
TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONEs t2I5) 821 5151 C
o'2 l 1 Docket Nos. 50-387 5O-388
~
'CC@~4 March 25, 1975 ,File Cy.
Mr. Walter R. Butler, Chief Light Mater Reactors Project Branch 1-2 Division of Reactor Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555 SUSQUEHANNA STEQ1 ELECTRIC STATION =
g~~
SCHEDULE FOR RESPONSE TO QUESTIONS ON AMEND, NO. 16 gg, ZR loo45O FIXE 84O-2 )
PLA-58 I f.ls4Co
~~a,,% ~~OgP
Dear Mr. Butler:
Xn response to your letter of March 14, 1975, the information requested, will be sent on the folio Iing schedule:
- 1. Information on vacuum breakers - May 1, 1975
- 2. Response to NRC position on liquid radwaste - July 1, 1975
- 3. Response to NRC position on cable tray loading depth - May 1, 1975
- 4. Response to NRC position on seismic analysis methods - May 1, 1975 If you have any questions, please contact us.
Very truly yours, u G.~
Vice President - Engineering 8c Construction V
CTC:RMF 4 M t.l g P E N~~,VAN I A P OWE R TL 'L I'G H T.'COIA P ANY
4 4 I' l