Letter Regarding Modifications to Concrete Specifications with the Objective of Improving the Schedule and Cost Considerations
ML18023A700
Person / Time
Site: Susquehanna  
Issue date: 02/17/1976
From: Curtis N
Pennsylvania Power & Light Co
To: Butler W
Office of Nuclear Reactor Regulation
References
Download: ML18023A700 (5)


Text

U.S. NUCLEAR REGULATORY COMMISSION NRC;Fo~ 195 (2'76)'

<," i NRC DISTRIBUTION FOR PART 60 DOCKET MATERIAL DOCKET NUMBER So'- 3av(

s FILE NUMBER TO Mr Butler FROM:

Penn Power

& Light Co Allentown, Pa N

W Cuttis DATE OF DOCUMENT 2-17-76 DATE RECEIVED 2-20-76

@LETTER

{gOR IGINAL QCOPY DESCRIPTION QNOTORIZEO SUNG LASS IF I E D PROP INPUT FORM ENCLOSU RE NUMBER OF COPIES RECEIVED one signed Ltr furnishing info & proposed changes modifications to concrete requirements in ACI 318-71..... ( one cy rec')

DIST PER LPM MINOR 3-8-76 novo',ZMOVH

'ACKNGWLZDGZP

'PLANT NAME:

Susqueahnna 1 & 2 SAFETY FOR ACTION/INFORMATION ENVIRO 3-8-76 eh f ASSIGNED AD:

BRANCH CHIEF:

PROJECT MANAGER;

LIC, SST.:

Ml~O ASSIGNED AD:

"RAN" CH "

PROJECT MANAGER :

LIC~ ASST' L

NRC PDR I&E 4,

GOSSICK & STAFF N

PROJECT MANAGEMENT BOYD P.

COLLINS HOUSTON'ETERSON MELTZ HELTEMES SKOVHOLT LPDR'IC ASLB SE INTERNALD IST EN INEER N KNIGHT SIHWEIL PAWLICKI REACTOR SAFETY ROSS NOVAK ROSZTOCZY CHECK AT&

I'ALT ZMAN RUTBERG EXTERNAL DISTRIBUTION NATL LAB

'REG, V-IE LA PDR CONSULTANTS R I BUTION BENAROYX IPPOLITO OPERATING REACTORS STELLO OPERATING TECH EISENHUT SHAD BAER SCHWENCER GRIMES SITE SAFETY & ENV R ANALYSIS DENTON & MULLFR BROOKHAVEN NATL LAB ULRIKSON(ORNL) e ERNST ALLARD SPANGLER SITE TECH GAMMILL STEPP HUUIAN SITE ANALYSIS VOLLMER BUNiCH J ~ COLLINS KREGER CONTROL NUMBER

AC4JQVVLEDGED Bicentenm9

~~~iVBII~

l6 TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONEs (215) 821

~ 5151 February 17, 1976 DQ NQT.PKMQyg Director of Nuclear Reactor Regulation Light Water Reactors Branch No. 1-2 U. S. Nuclear Regulatory Commission Washington, DC 20555

~ezurazo File Cy T Docket Nos.

50-387 50-388 50 ypurdddnn ca n cdl thcirchiMnn.

ATTENTION:

Walter R. Butler, Chief SUSQUKQSNA STEAM ELECTRIC STATION MODlFICATIONS TO CONCRETE SPECIFICATIO ER 100450 FILES 840-2, 150-PLA-104 gp FEB 2 01978 k Sec@ ~

h~.>e> Ckfk etg ttg ~

r,"'~~otgp6 ~

<<VH)0' Qfrli tg lcN

Dear Dr. Butler:

We are modifying certain concrete requirements in ACI 318-71 with the ob)ective of improving our schedule and cost considerations while retaining a high level of construction quality.

We are submitting this change together with supporting )ustification for your review.

PROPOSED CHANGE 811 The requirements of ACI 318-71, Paragraph 6.4.1 are modified. as follows:

A.

The last sentence of this paragraph is deleted in its entirety,and the following shall be substituted:

"vertical points shall be thoroughly wetted immediately before placing of nev concrete".

The purpose of this change is to delete the present ACI 318-71 Code statement requiring unnecessary cement coating of vertical construction points.

The inclusion of this provision in the ACI 318-71 Code and other industry standards is intended to ensure adequate bond betveen existing concrete and a nev placement.

This method has been included in various industry specifications for many years as a standard procedure to ensure that there is adequate cement paste along the vertical face of a construction )oint to bond the old, concrete with the new.

We believe that this practice is unnecessary for the Susquehanna Pro)ect since the procedures employed. on the Prospect ensure a vertical construction

)oint which is at least as good as, and in many cases is superior to, those made folloving the old. practice of coating with neat cement grout.

PENNSYLVANIA POWER L I GH T COMPANY

<6es

/

t

PLA-104 Page 2

Our present procedures require that all vertical construction points shall be roughened and thoroughly wetted before placing of new concrete.

In addition, the placement is consolidated by mechanical vibrating equipment to ensure complete contact of the wet concrete with the face of the formed

)oint, so that the required bond willbe developed. between the two placements.

We have obtained opinions from several experts in the field of concrete design and construction and all of them support this procedure as the preferred method of developing bond at vertical construction points.

Among these are Mr. Lewis H. Tuthill-Concrete Engineering Consultant, Mr. Fritz Kramrisch-Chairman ACI 318 "C"-Subcommittee, Mr. Richard D. Gaynor-Vice President of Engineering and Research, National Ready Mixed Concrete Association.

We intend to impelement this change on March 5, 1976.

This change willbe submitted. in a future PSAR Amendment.

If you have any questions regarding this

change, please contact us.

Very truly yours, N.

W. Curtis Vice President-Engineering and Construction Sworn to and Subscribed before me 976 Notary Public My Commission Expires:M~~~y