ML18023A438

From kanterella
Jump to navigation Jump to search
U.S. Nuclear Regulatory Commission Approval and Proprietary Determination Letter for BWRVIP-183-A Report, BWR Vessel and Internals Project - Top Guide Grid Beam Inspection and Flaw Evaluation Guidelines
ML18023A438
Person / Time
Site: 99902016
Issue date: 04/02/2018
From: Dennis Morey
NRC/NRR/DLP/PLPB
To: Hanley T, Rouse D
BWR Owners Group
Holonich J
References
BWRVIP-183-A
Download: ML18023A438 (3)


Text

April 2, 2018 Mr. Tim Hanley, Chairman ATTN: Debbie Rouse BWR Vessel and Internals Project 1300 West W.T. Harris Boulevard (Building 1)

Charlotte, NC 28262

SUBJECT:

U.S. NUCLEAR REGULATORY COMMISSION APPROVAL AND PROPRIETARY DETERMINATION LETTER FOR BWRVIP-183-A REPORT, BWR VESSEL AND INTERNALS PROJECT - TOP GUIDE GRID BEAM INSPECTION AND FLAW EVALUATION GUIDELINES

Dear Mr. Hanley:

By letter dated January 19, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18078A320), the Electric Power Research Institute (EPRI) provided topical report (TR) BWRVIP-183-A, BWR [Boiling Water Reactor] Vessel and Internals Project, Top Guide Grid Beam Inspection and Flaw Evaluation Guidelines for approval by the U.S.

Nuclear Regulatory Commission (NRC). Also submitted was an affidavit executed by Steven Swilley, Senior Director and Deputy Chief Nuclear Officer, requesting that the information contained in BWRVIP-183-A be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations, Section 2.390 (10 CFR 2.390).

A nonproprietary copy of the document (ADAMS Accession No. ML18078A322) was also provided and added into the NRC Library in ADAMS.

Based on its review of the document, the NRC staff has determined that the report is acceptable to the extent delineated in the NRC staff safety evaluation transmitted by letter dated December 31, 2015 (ADAMS Accession No. ML15309A275). Appendix E of BWRVIP-183-A documents the changes made. The revisions to BWRVIP-183-A do not affect the NRCs accepted-for-use status.

With respect to the request for withholding the information in BWRVIP-183-A, EPRI detailed the reasons in its affidavit.

The NRC staff has reviewed your application and the material in accordance with the requirements of 10 CFR 2.390. On the basis of the statements in the affidavit, the NRC staff has determined that the submitted information contains proprietary, commercial information and should be withheld from public disclosure.

Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure under 10 CFR 2.390(b) (5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, the agency may send copies of

T. Hanley this information to its consultants working in this area. The NRC staff will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC staff.

You also should understand that the NRC staff may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions or require any additional information, please feel free to contact the Project Manager, Mr. Joseph J. Holonich, at 301-415-7297 or by via electronic mail at Joseph.Holonich@nrc.gov.

Sincerely,

/RA/

Dennis Morey, Chief Licensing Processes Branch Division of Licensing Projects Office of Nuclear Reactor Regulation Docket No. 99902016

ML18023A438; *concurred via e-mail NRR-106 OFFICE DLP/PLPB/PM DLP/PLPB/LA* DMLR/MVIB DMLR/MPHB* DLP/PLPB/BC (SSheng for)

NAME JHolonich DHarrison SRuffin DAlley DMorey DATE 03/22/2018 03/27/2018 03/29/2018 03/23/2018 04/02/2018