ML18023A330
ML18023A330 | |
Person / Time | |
---|---|
Site: | Clinch River |
Issue date: | 07/20/2017 |
From: | State of TN, Dept of Transportation |
To: | Office of New Reactors |
Fetter A | |
References | |
Download: ML18023A330 (22) | |
Text
7/20/2017 TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status ANDERSON COUNTY I-75 No Projects Under Development in Anderson County PIN: 125064.00 NORTHBOUND EXIT RAMP 122-A AT SR-61(N CHARLES G SEVIERS BOULEVARD)-RAMP IMPROVEMENTS Length - 0.3 (Ramp Improvements)
The engineering is underway.
ANDERSON COUNTY SR-9 US-25W PIN: 083910.01 BRIDGE OVER CLINCH RIVER IN CLINTON, LM 10.71 Length - 0.4 (Bridge Replacement)
A contract for construction is scheduled to be let in the 4th Quarter Calendar Year 2017.
ANDERSON COUNTY SR-9 US-25W PIN: 122118.00 INTERSECTION AT SR-170 Length - 0.0 (Turn Lanes with Signal)
The engineering is underway.
Page: 1
7/20/2017 TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status ANDERSON COUNTY SR-61 No Projects Under Construction in Anderson County FROM NEAR SR-95 (OAK RIDGE TURNPIKE) TO NEAR SUZANNE DRIVE (SAFETY) LENGTH - 3.580 CONTRACT NO.: CNR224 LET TO CONTRACT: 6/23/2017 CONTRACTOR: ROGERS GROUP, INC.
BID PRICE : $995,685.50 EST. COMPLETION DATE: NOVEMBER, 2017 ANDERSON COUNTY SR-71 US-441 FROM KNOX COUNTY LINE TO SR-61 (RESURFACING) LENGTH - 4.910 CONTRACT NO.: CNR093 LET TO CONTRACT: 3/31/2017 CONTRACTOR: DURACAP ASPHALT PAVING CO., INC.
BID PRICE : $521,286.50 EST. COMPLETION DATE: JULY, 2017 ANDERSON COUNTY CONTRACT NO.: CNQ212 LET TO CONTRACT: 4/1/2016 CONTRACTOR: WILSON CONSTRUCTION GROUP LLC BID PRICE : $74,000.00 EST. COMPLETION DATE: MAY, 2017 Page: 2
7/20/2017 TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status BLOUNT COUNTY SR-33 No Projects Under Development in Blount County PIN: 118351.00 FROM OLD KNOXVILLE PIKE TO EAST LINCOLN ROAD Length - 0.6 (Intersection Improvements and Signals)
The right-of-way and/or utility process is underway.
BLOUNT COUNTY SR-33 US-411 PIN: 118422.00 INTERSECTION AT FOOTHILLS MALL DRIVE/MONTGOMERY LANE, LM 10.21 Length - 0.3 (Intersection Improvements)
The engineering is underway.
BLOUNT COUNTY SR-35 US-411 PIN: 113608.00 SEVIERVILLE ROAD(US-411/SR-35), FROM WASHINGTON STREET TO WALNUT STREET Length - 0.5 (Reconstruction)
The engineering is scheduled to begin in the 3rd Quarter Calendar Year 2017.
BLOUNT COUNTY SR-115 PIN: 101651.00 (RELOCATED ALCOA HIGHWAY), FROM HUNT ROAD INTERCHANGE, SOUTH OF AIRPORT ROAD TO EXISTING SR-115 AT SINGLETON STATION ROAD Length - 5.5 (Preliminary Engineering)
The environmental studies are complete.
BLOUNT COUNTY SR-115 US-129 PIN: 101651.01 (RELOCATED ALCOA HIGHWAY), FROM SR-35(HALL ROAD), SOUTH OF AIRPORT ROAD TO PROPOSED INTERCHANGE AT TYSON BOULEVARD Length - 1.3 (Widen)
The right-of-way and/or utility process is underway.
BLOUNT COUNTY SR-115 US-129 PIN: 101651.02 (RELOCATED ALCOA HIGHWAY), FROM PROPOSED INTERCHANGE AT TYSON BOULEVARD TO SR-162 (PELLISSIPPI PARKWAY) (IA)
Length - 2.4 (Construction-New)
The engineering is underway.
BLOUNT COUNTY SR-115 PIN: 101651.03 (RELOCATED ALCOA HIGHWAY), FROM SR-162 (PELLISSIPPI PARKWAY) TO SOUTH SINGLETON STATION ROAD (IA)
Length - 1.3 (Construction-New)
The engineering is underway.
Page: 3
7/20/2017 TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status BLOUNT - KNOX COUNTIES SR-115 US-129 PIN: 100241.00 (ALCOA HIGHWAY), FROM I-140 (PELLISSIPPI PARKWAY) TO CHEROKEE TRAIL Length - 7.4 (Location and Environmental Study)
The environmental studies are complete.
BLOUNT COUNTY SR-115 US-129 PIN: 100241.01 (ALCOA HIGHWAY); PELLISSIPPI PARKWAY TO SOUTH OF TOPSIDE ROAD.
Length - 2.4 (Widen)
The engineering is underway.
BLOUNT COUNTY SR-115 US-129BP PIN: 118426.00 INTERSECTION AT SR-73 (US-321, W. LAMAR ALEXANDER PARKWAY), LM 11.32 Length - 0.0 (Intersection Improvements and Signals)
The right-of-way and/or utility process is underway.
BLOUNT COUNTY SR-162EXT PIN: 101423.00 (PELLISSIPPI PARKWAY), FROM SR-33 TO SR-73 (US-321)
Length - 4.4 (Stage Construction-New)
- The engineering is scheduled to begin in the 3rd Quarter Calendar Year 2017.
BLOUNT COUNTY SR-333 PIN: 125014.00 FROM WRIGHT'S FERRY ROAD TO TVA LAB ROAD Length - 1.0 (Turn Lanes)
The environmental studies are complete.
BLOUNT COUNTY SR-336 PIN: 101725.02 MONTVALE STATION ROAD TO SR-73(LAMAR ALEXANDER PARKWAY)
Length - 0.6 (Widen)
The engineering is underway.
BLOUNT COUNTY SIA PIN: 120064.00 INDUSTRIAL ACCESS ROAD(CUSICK ROAD) SERVING ALUMINUM COMPANY OF AMERICA IN ALCOA Length - 0.3 (Construction-New)
A contract for construction is scheduled to be let in the 4th Quarter Calendar Year 2017.
Page: 4
7/20/2017 TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status BLOUNT COUNTY SIA PIN: 123033.00 INDUSTRIAL ACCESS SERVING PROJECT PYTHON METEOR (Widen and Resurfacing)
The engineering is underway.
BLOUNT COUNTY SIA PIN: 124863.00 STATE INDUSTRIAL ACCESS SERVING DENSO (Construction-New)
The engineering is underway.
LOUDON - BLOUNT COUNTIES SR-73 PIN: 120536.00 FROM NEAR JACKSON BEND ROAD IN LOUDON COUNTY TO WEST OF BALDWIN ROAD IN BLOUNT COUNTY Length - 9.1 (Miscellaneous Safety Improvements)
The planning report is complete.
Page: 5
7/20/2017 TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status BLOUNT COUNTY SR-336 No Projects Under Construction in Blount County FROM NEAR REAGAN MILL ROAD TO NEAR MONTVALE ROAD (RESURFACE & SAFETY) LENGTH
- 7.700 CONTRACT NO.: CNR148 LET TO CONTRACT: 5/12/2017 CONTRACTOR: APAC-ATLANTIC, INC.
BID PRICE : $883,424.75 EST. COMPLETION DATE: OCTOBER, 2017 BLOUNT COUNTY SR-334 FROM SR-335 TO SR-333 (RESURFACE & SAFETY) LENGTH - 2.490 CONTRACT NO.: CNR164 LET TO CONTRACT: 5/12/2017 CONTRACTOR: APAC-ATLANTIC, INC.
BID PRICE : $274,942.50 EST. COMPLETION DATE: OCTOBER, 2017 BLOUNT - MONROE - LOUDON COUNTIES SR-33 FROM MCMINN/MONROE COUNTY LINE TO BLOUNT/KNOX COUNTY LINE (RSAR)
(MISCELLANEOUS SAFETY IMPROVEMENTS) LENGTH - 42.840 CONTRACT NO.: CNR131 LET TO CONTRACT: 3/31/2017 CONTRACTOR: HIGHWAY MARKINGS, INC.
BID PRICE : $898,833.10 EST. COMPLETION DATE: SEPTEMBER, 2017 BLOUNT COUNTY SR-33 INTERSECTION AT DEFOE CIRCLE AND OLD KNOXVILLE PIKE (INTERSECTION IMPROVEMENTS AND SIGNALS) LENGTH - 0.214 CONTRACT NO.: CNQ143 LET TO CONTRACT: 12/2/2016 CONTRACTOR: WHALEY & SONS, INC.
BID PRICE : $1,033,685.82 EST. COMPLETION DATE: SEPTEMBER, 2017 Page: 6
7/20/2017 TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status BLOUNT COUNTY SR-115 US-129 INTERSECTION AT LOUISVILLE ROAD, LM 13.02 IN ALCOA (PHASE II GEOMETRIC IMPROVEMENTS) (INTERSECTION IMPROVEMENTS) LENGTH - 0.133 CONTRACT NO.: CNQ145 LET TO CONTRACT: 12/2/2016 CONTRACTOR: APAC-ATLANTIC, INC.
BID PRICE : $365,646.20 EST. COMPLETION DATE: AUGUST, 2017 BLOUNT COUNTY SR-35 FROM SR-115 (US-129) TO NORTH OF ELLIS AVENUE (RESURFACE & SAFETY) LENGTH - 2.610 CONTRACT NO.: CNQ161 LET TO CONTRACT: 6/24/2016 CONTRACTOR: APAC-ATLANTIC, INC.
BID PRICE : $1,637,139.50 EST. COMPLETION DATE: MAY, 2017 Page: 7
7/20/2017 TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status BLOUNT - KNOX COUNTY SR-115 US-129 Under Development in Knox County No Projects PIN: 100241.00 (ALCOA HIGHWAY), FROM I-140 (PELLISSIPPI PARKWAY) TO CHEROKEE TRAIL Length - 7.4 (Location and Environmental Study)
The environmental studies are complete.
KNOX COUNTY I-40 PIN: 121441.00 INTERCHANGE AT SR-9/SR-168, EASTBOUND OFF-RAMP - EXIT 394(RAMP QUEUE PROJECT)
Length - 0.9 (Safety)
The engineering is scheduled to begin in the 3rd Quarter Calendar Year 2017.
KNOX COUNTY I-75 PIN: 121544.00 INTERCHANGE AT CALLAHAN DRIVE (SOUTHBOUND RAMP)
Length - 0.0 (Turn Lanes with Signal)
The right-of-way and/or utility process is underway.
KNOX COUNTY I-75 PIN: 114044.00 NEAR LM 10.56 (ROCKFALL MITIGATION)
Length - 0.0 (Safety)
A contract for construction is scheduled to be let in the 3rd Quarter Calendar Year 2017.
KNOX COUNTY I-140 PIN: 119730.00 (SR-162, PELLISSIPPI PARKWAY), WESTBOUND RAMP TO DUTCHTOWN ROAD (Intersection Improvements and Signals)
The engineering is underway.
KNOX COUNTY I-640 PIN: 119733.00 WESTBOUND EXIT RAMP AT MILLERTOWN PIKE(EXIT 8)
Length - 0.3 (Ramp Improvements)
The engineering is underway.
KNOX COUNTY I-640 PIN: 121619.00 INTERCHANGES AT MILLERTOWN PIKE AND WASHINGTON PIKE Length - 1.4 (Safety)
The engineering is underway.
Page: 8
7/20/2017 TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status KNOX COUNTY SR-1 US-11 PIN: 101623.00 BRIDGE OVER SOUTHERN R/R, LM 19.47 IN KNOXVILLE (BROADWAY VIADUCT)
Length - 0.2 (Bridge Replacement)
A contract for construction is scheduled to be let in the 4th Quarter Calendar Year 2017.
KNOX COUNTY SR-1 PIN: 122323.00 INTERSECTION AT NORTH WATT ROAD AND SOUTH WATT ROAD IN FARRAGUT Length - 0.4 (Intersection Improvements and Signals)
Locals are performing the engineering.
KNOX COUNTY SR-1 US-70 PIN: 106915.00 KINGSTON PIKE SIDEWALK IN FARRAGUT Length - 0.0 (Bicycles and Pedestrian Facility)
A contract for construction is scheduled to be let in the 4th Quarter Calendar Year 2017.
KNOX COUNTY SR-9 PIN: 120297.00 INTERSECTION AT SR-131 (RSAR)
Length - 0.0 (Intersection Improvements and Signals)
The engineering is underway.
KNOX COUNTY SR-9 US-25W PIN: 110982.00 INTERSECTION AT WEST BEAVER CREEK DRIVE (RSAR)
Length - 0.0 (Miscellaneous Safety Improvements)
The engineering is underway.
KNOX COUNTY SR-62 PIN: 121821.00 INTERSECTION AT OAK RIDGE HIGHWAY, SR-162 AND GEORGE LIGHT ROAD Length - 1.0 (Turn Lanes)
The engineering is underway.
KNOX - SEVIER COUNTIES SR-71 US-441 PIN: 115662.00 (CHAPMAN HIGHWAY), FROM EVANS ROAD TO BURNETT LANE Length - 0.9 (Turn Lanes)
The right-of-way and/or utility process is underway.
Page: 9
7/20/2017 TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status KNOX COUNTY SR-71 PIN: 119668.00 FROM SOUTH OF SIMPSON ROAD TO HENDRON CHAPEL ROAD LM 1.00 TO LM 1.98 IN KNOXVILLE Length - 1.0 (Turn Lanes)
The engineering is underway.
KNOX COUNTY SR-115 US-129 PIN: 100241.02 SOUTH OF TOPSIDE ROAD TO NORTH OF MALONEY ROAD Length - 2.4 (Widen)
The right-of-way and/or utility process is underway.
KNOX COUNTY SR-115 US-129 PIN: 100241.03 FROM WOODSON DRIVE TO CHEROKEE TRAIL INTERCHANGE Length - 1.3 (Widen)
The engineering is underway.
KNOX COUNTY SR-162 PIN: 119719.00 INTERCHANGE AT HARDIN VALLEY RD.( LM 2.35 TO LM 2.95)
Length - 0.6 (Miscellaneous Safety Improvements)
The engineering is underway.
KNOX COUNTY SR-131 PIN: 119046.00 INTERSECTIONS AT FAIRVIEW ROAD AND THOMPSON SCHOOL ROAD Length - 0.2 (Intersection Improvements and Signals)
The right-of-way and/or utility process is underway.
KNOX COUNTY SR-131 PIN: 119390.00 INTERSECTION AT HARRELL ROAD/CARPENTER ROAD (RSAR)
Length - 0.0 (Intersection Improvements and Signals)
The engineering is underway.
KNOX COUNTY SR-131 PIN: 121616.00 HARDIN VALLEY ROAD TO SR-62(OAK RIDGE HIGHWAY) (RSAR)
Length - 1.8 (Miscellaneous Safety Improvements)
The environmental studies are complete.
Page: 10
7/20/2017 TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status KNOX COUNTY SR-332 PIN: 107777.00 (CONCORD ROAD), TURKEY CREEK TO NORTHSHORE DRIVE Length - 1.5 (Widen)
A contract for construction is scheduled to be let in the 4th Quarter Calendar Year 2017.
KNOX COUNTY PIN: 120056.00 CEDAR BLUFF ROAD, FROM EXECUTIVE PARK DRIVE TO NORTH PETERS ROAD Length - 0.4 (Intersection Improvements and Signals)
The engineering is underway.
KNOX COUNTY PIN: 041534.00 SEVEN ISLANDS PEDESTRIAN BRIDGE Length - 0.0 (Bicycles and Pedestrian Facility)
A contract for construction is scheduled to be let in the 3rd Quarter Calendar Year 2017.
KNOX COUNTY SR-131 PIN: 119053.00 AT GIBBS HIGH SCHOOL, LM 25.50 TO LM 25.60 Length - 0.1 (Turn Lanes)
The right-of-way and/or utility process is being performed by the local agency.
KNOX COUNTY PIN: 101008.00 PLEASANT RIDGE ROAD, FROM KNOXVILLE CITY LIMITS TO THE MERCHANT DRIVE/WILKERSON ROAD INTERSECTION IN KNOXVILLE Length - 1.6 (Widen)
The right-of-way and/or utility process is underway.
Page: 11
7/20/2017 TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status KNOX COUNTY SR-1 US-11No Projects Under Construction in Knox County FROM NEAR MORRELL ROAD TO NEAR NEWCOM AVENUE (RESURFACE & SAFETY) LENGTH -
3.010 CONTRACT NO.: CNR147 LET TO CONTRACT: 5/12/2017 CONTRACTOR: ROGERS GROUP, INC.
BID PRICE : $1,199,685.50 EST. COMPLETION DATE: SEPTEMBER, 2017 KNOX COUNTY SR-1 M17LTHQ_C47SR_TUNLCLN KNOX-HENLEY ST TUNNEL AND SMARTFIX I-40 RAMP - CLEANING (FY17) (MAINTENANCE)
CONTRACT NO.: CNR160 LET TO CONTRACT: 5/12/2017 CONTRACTOR: ETI ENVIRONMENTAL, INC.
BID PRICE : $116,999.00 EST. COMPLETION DATE: JUNE, 2018 KNOX COUNTY SR-168 FROM NEAR CINDER AVENUE TO SR-9 (RESURFACE & SAFETY) LENGTH - 4.400 CONTRACT NO.: CNR082 LET TO CONTRACT: 3/31/2017 CONTRACTOR: APAC-ATLANTIC, INC.
BID PRICE : $1,013,583.80 EST. COMPLETION DATE: AUGUST, 2017 KNOX COUNTY SR-332 FROM NEAR SOUTHERN R/R BRIDGE TO NEAR NORTHSHORE HILLS BOULEVARD.
(RESURFACE & SAFETY) LENGTH - 5.730 CONTRACT NO.: CNR083 LET TO CONTRACT: 3/31/2017 CONTRACTOR: ROGERS GROUP, INC.
BID PRICE : $825,302.45 EST. COMPLETION DATE: AUGUST, 2017 Page: 12
7/20/2017 TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status KNOX COUNTY SR-33 FROM NEAR EDINGTON ROAD TO NEAR DOYLE STREET (RSAR) (MISCELLANEOUS SAFETY IMPROVEMENTS) LENGTH - 0.440 CONTRACT NO.: CNR129 LET TO CONTRACT: 3/31/2017 CONTRACTOR: SUPERIOR TRAFFIC CONTROL, INC.
BID PRICE : $23,550.45 EST. COMPLETION DATE: OCTOBER, 2017 KNOX COUNTY PLEASANT RIDGE ROAD, FROM MERCHANT DRIVE TO WEST OF COUNTRY BROOK LANE IN KNOXVILLE (MISCELLANEOUS SAFETY IMPROVEMENTS) LENGTH - 1.230 CONTRACT NO.: CNR129 LET TO CONTRACT: 3/31/2017 CONTRACTOR: SUPERIOR TRAFFIC CONTROL, INC.
BID PRICE : $23,859.80 EST. COMPLETION DATE: OCTOBER, 2017 KNOX COUNTY SR-169 INTERSECTION AT WEISGARBER ROAD, LM 6.76 IN KNOXVILLE (INTERSECTION IMPROVEMENTS AND SIGNALS)
CONTRACT NO.: CNR035 LET TO CONTRACT: 2/10/2017 CONTRACTOR: SOUTHERN CONSTRUCTORS, INC.
BID PRICE : $878,268.90 EST. COMPLETION DATE: AUGUST, 2017 KNOX COUNTY OGLESBY ROAD (0D668), BRIDGE OVER I-40, LM 0.06 (BRIDGE REPAIR)
CONTRACT NO.: CNQ296 LET TO CONTRACT: 12/2/2016 CONTRACTOR: APAC-ATLANTIC, INC.
BID PRICE : $446,627.20 EST. COMPLETION DATE: AUGUST, 2017 KNOX COUNTY I-40 FROM HOLSTON RIVER BRIDGE TO SEVIER COUNTY LINE (RESURFACING) LENGTH - 9.990 CONTRACT NO.: CNQ296 LET TO CONTRACT: 12/2/2016 CONTRACTOR: APAC-ATLANTIC, INC.
BID PRICE : $7,945,759.35 EST. COMPLETION DATE: AUGUST, 2017 Page: 13
7/20/2017 TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status KNOX COUNTY VARIOUS LOCAL ROADS IN KNOX COUNTY (MISCELLANEOUS SAFETY IMPROVEMENTS)
CONTRACT NO.: CNQ334 LET TO CONTRACT: 12/2/2016 CONTRACTOR: SUPERIOR PAVEMENT MARKING, INC.
BID PRICE : $216,962.20 EST. COMPLETION DATE: JUNE, 2017 KNOX COUNTY SR-62 WESTERN AVENUE, FROM TEXAS AVENUE TO MAJOR AVENUE IN KNOXVILLE (RECONSTRUCTION) LENGTH - 0.800 CONTRACT NO.: CNQ297 LET TO CONTRACT: 10/7/2016 CONTRACTOR: JONES BROS., INC.
BID PRICE : $38,449,919.62 EST. COMPLETION DATE: MAY, 2020 KNOX COUNTY SR-131 BRIDGE OVER KERNS BRANCH, LM 23.86 IN HARBISON CROSSROADS (BRIDGE REPLACEMENT)
CONTRACT NO.: CNQ310 LET TO CONTRACT: 10/7/2016 CONTRACTOR: J & M GRADING DIVISION LLC BID PRICE : $2,917,277.65 EST. COMPLETION DATE: MAY, 2018 LOUDON - KNOX COUNTIES SR-1 US-70 (KINGSTON PIKE); INTERSECTION AT SR-2(LEE HIGHWAY) - DIXIE LEE JUNCTION (INTERSECTION IMPROVEMENTS AND SIGNALS) LENGTH - 0.327 CONTRACT NO.: CNQ313 LET TO CONTRACT: 10/7/2016 CONTRACTOR: WHALEY & SONS, INC.
BID PRICE : $3,496,631.16 EST. COMPLETION DATE: NOVEMBER, 2018 KNOX COUNTY SR-1 M16LTHQ_C47SR_TUNLCLN KNOX-HENLEY ST TUNNEL AND SMARTFIX I-40 RAMP - CLEANING (FY16) (MAINTENANCE)
CONTRACT NO.: CNQ201 LET TO CONTRACT: 5/13/2016 CONTRACTOR: DIAMOND SPECIALIZED, INC.
BID PRICE : $119,000.00 EST. COMPLETION DATE: JUNE, 2017 Page: 14
7/20/2017 TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status KNOX COUNTY SR-115 US-129 FROM NORTH OF MALONEY ROAD TO WOODSON DRIVE (WIDEN) LENGTH - 1.400 CONTRACT NO.: CNQ029 LET TO CONTRACT: 2/12/2016 CONTRACTOR: CHARLES BLALOCK & SONS, INC.
BID PRICE : $70,944,183.28 EST. COMPLETION DATE: NOVEMBER, 2019 KNOX COUNTY I-640 INTERCHANGE AT NORTH BROADWAY (PHASE II) IN KNOXVILLE (MODIFY INTERCHANGE)
LENGTH - 1.093 CONTRACT NO.: CNQ030 LET TO CONTRACT: 2/12/2016 CONTRACTOR: CHARLES BLALOCK & SONS, INC.
BID PRICE : $22,217,026.43 EST. COMPLETION DATE: JULY, 2018 KNOX COUNTY SR-33(MAYNARDVILLE HIGHWAY), FROM AFTON DRIVE TO EMORY ROAD; AND SR-71(NORRIS FREEWAY), FROM EMORY ROAD TO SR-33 (MISCELLANEOUS SAFETY IMPROVEMENTS)
CONTRACT NO.: CNN343 LET TO CONTRACT: 12/5/2014 CONTRACTOR: APAC-ATLANTIC, INC.
BID PRICE : $10,782,090.95 EST. COMPLETION DATE: APRIL, 2017 KNOX COUNTY SR-331 (TAZEWELL PIKE), INTERSECTION AT SR-131(EMORY ROAD) (INTERSECTION IMPROVEMENTS AND SIGNALS)
CONTRACT NO.: CNN282 LET TO CONTRACT: 10/17/2014 CONTRACTOR: CHARLES BLALOCK & SONS, INC.
BID PRICE : $5,196,569.50 EST. COMPLETION DATE: FEBRUARY, 2017 KNOX COUNTY KNOXVILLE ITS SYSTEM MAINTENANCE (INTELLIGENT TRANSPORTATION SYSTEM)
CONTRACT NO.: CNN348 LET TO CONTRACT: 10/17/2014 CONTRACTOR: STANSELL ELECTRIC COMPANY, INC.
BID PRICE : $2,894,000.00 EST. COMPLETION DATE: DECEMBER, 2017 Page: 15
7/20/2017 TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status KNOX COUNTY SR-33 FROM NORTH OF SR-71 TO UNION COUNTY LINE (RECONSTRUCTION) LENGTH - 6.220 CONTRACT NO.: CNM063 LET TO CONTRACT: 10/18/2013 CONTRACTOR: CHARLES BLALOCK & SONS, INC.
BID PRICE : $29,986,969.69 EST. COMPLETION DATE: JULY, 2017 KNOX COUNTY SR-62 FROM WEST OF SCHAAD ROAD TO COPPER KETTLE ROAD NEAR I-75 (RECONSTRUCTION)
LENGTH - 3.900 CONTRACT NO.: CNJ363 LET TO CONTRACT: 12/10/2010 CONTRACTOR: APAC-ATLANTIC, INC.
BID PRICE : $31,422,740.72 EST. COMPLETION DATE: MAY, 2018 Page: 16
7/20/2017 TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status LOUDON COUNTY SR-2 US-11 No Projects Under Development in Loudon County PIN: 125200.00 SOUTH OF LOUDON MIDDLE SCHOOL TO NORTH OF CARTER STREET.
Length - 0.5 (Widen)
The engineering is underway.
LOUDON COUNTY SR-73 US-321 PIN: 103899.00 FROM SIMPSON ROAD EAST TO NORTH OF SR-2(US-11) IN LENOIR CITY Length - 1.4 (Widen)
A contract for construction is scheduled to be let in the 4th Quarter Calendar Year 2017.
LOUDON COUNTY SR-73 US-321 PIN: 115209.00 INTERSECTION AT SR-2(US-11) IN LENOIR CITY Length - 0.1 (Intersection Improvements)
A contract for construction is scheduled to be let in the 4th Quarter Calendar Year 2017.
LOUDON - BLOUNT COUNTIES SR-73 PIN: 120536.00 FROM NEAR JACKSON BEND ROAD IN LOUDON COUNTY TO WEST OF BALDWIN ROAD IN BLOUNT COUNTY Length - 9.1 (Miscellaneous Safety Improvements)
The planning report is complete.
LOUDON COUNTY PIN: 120048.00 KINGSTON STREET, INTERSECTION AT TOWN CREEK ROAD (RSAR)
Length - 0.0 (Miscellaneous Safety Improvements)
The engineering is underway.
Page: 17
7/20/2017 TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status BLOUNT - MONROE - LOUDON No Projects Under COUNTY SR-33 Construction in Loudon County FROM MCMINN/MONROE COUNTY LINE TO BLOUNT/KNOX COUNTY LINE (RSAR)
(MISCELLANEOUS SAFETY IMPROVEMENTS) LENGTH - 42.840 CONTRACT NO.: CNR131 LET TO CONTRACT: 3/31/2017 CONTRACTOR: HIGHWAY MARKINGS, INC.
BID PRICE : $898,833.10 EST. COMPLETION DATE: SEPTEMBER, 2017 LOUDON - KNOX COUNTIES SR-1 US-70 (KINGSTON PIKE); INTERSECTION AT SR-2(LEE HIGHWAY) - DIXIE LEE JUNCTION (INTERSECTION IMPROVEMENTS AND SIGNALS) LENGTH - 0.327 CONTRACT NO.: CNQ313 LET TO CONTRACT: 10/7/2016 CONTRACTOR: WHALEY & SONS, INC.
BID PRICE : $3,496,631.16 EST. COMPLETION DATE: NOVEMBER, 2018 LOUDON COUNTY SR-73 US-321 FROM SR-2(US-11) TO EAST OF LITTLE TENNESSEE RIVER (FT LOUDOUN/TELLICO CANAL)
(RECONSTRUCTION) LENGTH - 1.710 CONTRACT NO.: CNL139 LET TO CONTRACT: 6/15/2012 CONTRACTOR: CHARLES BLALOCK & SONS, INC.
BID PRICE : $69,361,720.70 EST. COMPLETION DATE: NOVEMBER, 2017 Page: 18
7/20/2017 TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status KNOX - SEVIER COUNTY SR-71 US-441 Under Development in Sevier County No Projects PIN: 115662.00 (CHAPMAN HIGHWAY), FROM EVANS ROAD TO BURNETT LANE Length - 0.9 (Turn Lanes)
The right-of-way and/or utility process is underway.
SEVIER - JEFFERSON COUNTIES SR-35 US-411 PIN: 101401.00 SIMS ROAD IN SEVIER COUNTY TO GRAPEVINE HOLLOW ROAD IN JEFFERSON COUNTY Length - 6.2 (Right-of-Way)
The right-of-way and/or utility process is underway.
SEVIER - JEFFERSON COUNTIES SR-35 US-411 PIN: 101401.01 (NEWPORT HWY.), SIMS ROAD IN SEVIER COUNTY TO SR-92 (DICKEY ROAD) IN JEFFERSON COUNTY Length - 3.8 (Construction-New)
The right-of-way and/or utility process is underway on the section from Sims Road to Grapevilne Hollow Road.
SEVIER COUNTY SR-71 US-441 PIN: 104959.01 SR-35/338(US-411) TO MACON LANE Length - 1.2 (Reconstruction)
A contract for construction is scheduled to be let in the 4th Quarter Calendar Year 2017.
SEVIER COUNTY SR-73 US-321 PIN: 100989.00 BUCKHORN ROAD TO SR-416 (PHASE 2)(EPD)
Length - 1.4 (Widen)
The engineering is underway.
SEVIER COUNTY SR-338 PIN: 119670.00 (BOYDS CREEK HWY), INTERSECTION AT PITNER ROAD, LM 0.95 Length - 0.2 (Intersection Improvements and Signals)
The right-of-way and/or utility process is underway.
SEVIER COUNTY SR-339 PIN: 111888.01 JONES COVE ROAD TO WILHITE ROAD (PHASE 2)
Length - 5.7 (Miscellaneous Safety Improvements)
The right-of-way and/or utility process is underway.
Page: 19
7/20/2017 TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status SEVIER COUNTY LIC PIN: 121634.00 WINFIELD DUNN PARKWAY/SNYDER ROAD, FROM NORTH OF LENZ DRIVE TO NEAR HARDIN ROAD IN SEVIERVILLE Length - 0.4 (Realignment)
A contract for construction is scheduled to be let in the 4th Quarter Calendar Year 2017.
Page: 20
7/20/2017 TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status SEVIER COUNTY SR-9 US-25WNo Projects Under Construction in Sevier County FROM KNOX COUNTY LINE TO JEFFERSON COUNTY LINE (RESURFACE & SAFETY) LENGTH -
2.910 CONTRACT NO.: CNR137 LET TO CONTRACT: 5/12/2017 CONTRACTOR: CHARLES BLALOCK & SONS, INC.
BID PRICE : $381,669.71 EST. COMPLETION DATE: OCTOBER, 2017 SEVIER COUNTY SR-73 US-321 FROM BLOUNT COUNTY LINE TO NEAR WALDEN CREEK ROAD (RESURFACE & SAFETY)
LENGTH - 8.200 CONTRACT NO.: CNR165 LET TO CONTRACT: 5/12/2017 CONTRACTOR: CHARLES BLALOCK & SONS, INC.
BID PRICE : $1,038,669.71 EST. COMPLETION DATE: AUGUST, 2017 SEVIER COUNTY SR-449 (DOLLYWOOD LANE), INTERSECTION AT SOUTH RIVER ROAD IN PIGEON FORGE (RSAR)
(MISCELLANEOUS SAFETY IMPROVEMENTS)
CONTRACT NO.: CNR129 LET TO CONTRACT: 3/31/2017 CONTRACTOR: SUPERIOR TRAFFIC CONTROL, INC.
BID PRICE : $4,686.80 EST. COMPLETION DATE: OCTOBER, 2017 SEVIER COUNTY SR-71 US-441 FROM BON AIR DRIVE TO KING BRANCH ROAD (RSAR) (MISCELLANEOUS SAFETY IMPROVEMENTS) LENGTH - 4.710 CONTRACT NO.: CNR129 LET TO CONTRACT: 3/31/2017 CONTRACTOR: SUPERIOR TRAFFIC CONTROL, INC.
BID PRICE : $21,242.90 EST. COMPLETION DATE: OCTOBER, 2017 Page: 21
7/20/2017 TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status SEVIER COUNTY SR-66 FROM SR-338 W(BOYDS CREEK HIGHWAY) TO SR-139(DOUGLAS DAM RD.) (WIDEN) LENGTH -
2.210 CONTRACT NO.: CNL041 LET TO CONTRACT: 2/10/2012 CONTRACTOR: SIMPSON CONSTRUCTION COMPANY, INC.
BID PRICE : $32,517,493.62 EST. COMPLETION DATE: NOVEMBER, 2016 Page: 22