Order (Adopting Proposed Transcript Corrections, Admitting Post-Hearing Exhibits, and Closing the Record of the Proceeding). (See Original Transcript in 12/18/17 Order @ ADAMS Accession # ML17352A750)
ML18018B345
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/18/2018
From: Annette Vietti-Cook
NRC/SECY
To:
SECY RAS
References
52-040-COL, 52-041-COL, Mandatory Hearing, RAS 54188
Download: ML18018B345 (8)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of FLORIDA POWER & LIGHT CO. Docket Nos. 52-040-COL 52-041-COL (Turkey Point Nuclear Generating Units 6 and 7)

ORDER (Adopting Proposed Transcript Corrections, Admitting Post-Hearing Exhibits, and Closing the Record of the Proceeding)

The Commission held an evidentiary hearing on the uncontested portion of the captioned proceeding at its Rockville, Maryland headquarters on December 12, 2017. The parties have provided proposed transcript corrections in accordance with the deadline previously set. The transcript corrections identified in Appendix A to this order are adopted.

In addition, the parties have submitted responses to the Commissions post-hearing questions. As directed, the responses were filed as new exhibits using the previously established numbering scheme. Neither party objects to the admission of these new exhibits.

Therefore, exhibits FPL-011 and NRC-012 are admitted into the evidentiary record.

The adoption of transcript corrections and the admission into evidence of the new exhibits completes the procedural activities that remained pending at the conclusion of the mandatory hearing. The record of the uncontested portion of this proceeding is therefore closed, effective as of the date of this order.

This order is issued pursuant to my authority under 10 C.F.R. § 2.346(a) and (j).

IT IS SO ORDERED.

For the Commission NRC Seal

/RA/

Annette L. Vietti-Cook Secretary of the Commission Dated at Rockville, Maryland, this 18th day of January, 2018.

APPENDIX A: Changes to the Transcript for the Turkey Point Mandatory Hearing December 12, 2017 Page Line Correction 5 14 Change "and" to "an" 5 19 Change "189(a)" to "189a."

6 19 Delete "duly been" 7 8 Change "51.07(a)" to "51.107(a)"

7 10 Change "102(2)(a)©" to "102(2)(A), (C)"

7 10 Change "©" to "(c)"

10 1-2 Change "may seat" to "may be seated" 12 15 Delete "give--"

12 22 Add "list" after "witness" 14 10 Change "witness" to "witnesses" 15 24 Delete "the" 19 12 Change "operating" to "uprate" 19 16 Change "operate" to "uprate" 19 18 Change "operates" to "uprates" 19 19 Change "530" to "520" 23 4 Change "present" to "presents" 25 22-23 Change "waste water" to "wastewater" 25 24 Change "panels" to "canals" 26 1 Change "permanent on" to "primarily an" 26 3 Change "reclaim" to "reclaimed" 26 19 Change "eroding" to "avoiding" 28 10 Change "laid out" to "lay down" 29 16 Change "or" to "of" 31 24 Change "up rates" to "uprates" 32 4 Change "grid to" to "grid's" 32 7 Change "Boda and" to "boaters in" 35 10 Change "impacts an" to "impacts to an" 36 5 Change "comment" to "commented" 36 12 Change "EPIS" to "EIS" 37 20 Delete "I---" and capitalize "my" 37 23 Change "between" to "--"

37 24 Change "." to "--" and lowercase "Between" 37 25 Change units, there to units. There Change "factors, obvious need for power, but" to "factors--obviously need 38 9 for power--but" 38 16 Add "?" after "construction" and capitalize "what" 39 5 Change "operate" to "uprate" 41 15 Change "referenced" to "reference" 41 22 Change "combine" to "combined" 44 7 Delete "the" 44 9 Delete ", you know,"

44 13 Delete commas in "And, knowing that,"

45 23 Change "sort of" to "is" 46 2 Delete comma after "And,"

46 20 Add "they're" after "although" 46 21 Change "those" to "the" 47 11 Change "sort of cooperation" to ", sort of, the cooperation" 47 21 Change "all the" to "up" 50 7 Change "combination" to "culmination" 53 6 Change "Corps is Jacksonville" to "Corps' Jacksonville" 53 9 Change "National Park Services" to "National Park Service" Change "the design center review approach" to "the design-centered 54 4 review approach" 55 3 Change "support" to "supported" 58 19 Change MR. to MS.

60 15-16 Add commas after "Corps" and "Team" 62 5 Change "report" to "review" 62 22 Change "FIES" to "FEIS" 64 21 Change "202(2)(a)" to "202(2)(A)"

65 1 Change "and logic" to "in logic" 65 3 Change "©" to "(c)"

65 6 Change "avoidable" to "unavoidable" 65 9 Add comma after "productivity" 65 15 Change "©" to "(c)"

65 25 Change "102(2)(e)" to "102(2)(E)"

67 14 Change "you" to "your" 68 3 Change "for" to "to" 68 12 Add "the" after "to" 68 14 Delete "is" 68 17 Add comma after "statutes" and delete "of" 68 18 Add comma after "others" 68 23 Delete "a" 69 5 Change "lesson learned" to "lessons learned" 70 19 Add "I'm" after "what" 70 23 Change "ESPWR" to "ESBWR" 71 7 Add "it" after "to" 71 14 Change "had" to "have" 71 18 Change "2001" to "2011" 71 25 Add comma after "52" 72 1 Add comma after "methodical" 72 9 Add "in" after "And,"

73 13 Change "use" to "used" 74 4 Change "high level" to "high-level" 75 25 Change "described" to "scrubbed" 76 6 Change "as" to "Vogtle was" 80 6 Delete "to" 80 7 Change "merge" to "merger" 80 12 Change "and" to "of"

81 22 Delete "NRC does and" and capitalize "new reactors" 85 6 Change "paint" to "obtain" 85 11 Change maximal to maximum 85 19 Change "exceeding" to "exceedance" 86 10 Change "feels" to "fields" 87 4 Change "conservatism" to "conservative" 87 17 Change "their" to "the" 88 23 Add comma after "streams" 90 12 Change "official" to "surficial" 90 14 Change "includes and" to "includes an" 92 17-18 Change "in sites" to "insights" 92 24 Change "effluence" to "effluents" 93 22 Change "stuff" to "stuffs" 94 3 Change "effluence" to "effluents" 95 11 Change "with" to "will" 96 1 Change "II" to "2" 96 2 Change "national" to "natural" 96 6 Add comma after first "surge" Change "analysis used as the peak surge" to "analysis uses a peak 97 17 surge" 97 18 Change "occurs in" to "occurs at" 97 20 Change "that includes" to "it includes" 98 10 Change "and" to "in" 99 3 Change "Transit" to "trends at" 99 4 Change "Transit" to "trends at" 101 20 Change "boulder zone" to "Boulder Zone" 101 23-24 Change "boulder zone" to "Boulder Zone" 104 10 Change "primaries" to "parameters" 104 11 Change "abounding" to "bounding" 105 1 Change "boulder zone" to "Boulder Zone" 105 12 Change "boulder zone" to "Boulder Zone" 105 14 Change "boulder zone" to "Boulder Zone" Change "Accordingly, the staff determined that the maximum radionuclide concentrations at the receptor well and for this does analysis the staff" to "Accordingly, the staff determined the maximum radionuclide 105 15-17 concentrations at the receptor well. For this dose analysis, the staff" 106 6 Change "boulder zone" to "Boulder Zone" 108 7 Delete ", or, you know,"

108 18 Delete "and" 108 24-25 Delete "those testing,"

109 9 Change "By the" to "Department of" Change "environmental protection regulation" to "Environmental 109 10 Protection Regulation" 109 13 Add comma after "noted" 109 15 Add comma after "had" 109 17 Add "is" after "that"

109 19 Change "effluence" to "effluents" 109 20 Delete "yes,"

109 25 Add "we" after "where" 110 3 Change "service water" to "surface water" 110 14 Change "boulder zone" to "Boulder Zone" 110 23 Change "illusion" to "allusion" 111 9 Change "that" to "that the" 112 12 Change "Applicant" to "applicant" 112 18 Delete "sort of" 112 24 Add comma after "day" 113 2 Change "greater, a" to "greater or" 113 11 Change "predications" to "predictions" 114 21 Add ":" after "is" 115 4 Change "States, a" to " States at" 116 18 Change "operation" to "operating" 118 2 Delete second "is" 118 3 Change guidance, its to guidance. Its.

118 18 Change "MR. NAZER" to "MR. COMAR" 119 13 Add comma after "safety" 130 21 Change "see" to "seeing" 133 9 Change "long return trends" to "longer term trends" 135 23 Change "opportunity" to "opportunities" 136 18 Delete comma after "water" 137 21 Change "laterals" to "lateral" 138 23 Change "potential" to "additional" 139 8 Change "second group" to "second cut" 140 13 Change "salient" to "saline" 142 20 Change "as" to "ask" 145 23 Change "to" to "through" Change "border zone of the lower Florida" to "Boulder Zone of the lower 146 7 Floridan" 146 10 Change "border zone" to "Boulder Zone" 146 10 Change "a deep-set" to "a deep saline" 146 12 Change "border zone" to "Boulder Zone" 146 13 Change "Florida" to "Floridan" 146 16 Change "Florida" to "Floridan" 146 18 Change "planned" to "plan" 147 14 Change "based on part" to "based in part" 152 5 Change "Accessing" to "Assessing" 152 8 Change "Accessing" to "Assessing" 153 23 Change "were" to "or" 154 1 Change "suggests" to "suggest" 154 6 Change "applicants" to "applicant" 155 23 Change "much" to "muck" 157 11 Change "knowing" to "known" 166 6 Change "environment" to "environmental"

166 21 Add "to" after "down" 174 14-15 Change "section 5-2 and 7-2" to "section 5.2 and 7.2" 175 13 Change "that would occur, the" to "that would occur. The" 176 13 Add "at" after "looked" 177 22 Change "a" to "to" 177 25 Add "Mr. Doub--" after "out?"

179 8 Change "MR. KUGLER" to "MR. DOUB" 180 11 Change "AP 1000" to "AP1000" 181 12 Change "AP 1000" to "AP1000" 181 13 Change "AP 1000" to "AP1000" 181 17 Change "base load" to "baseload" 182 23 Change "finding" to "findings" 184 5 Delete comma after "Act" 184 6 Delete comma after "51" 185 24 Change "thank this moment" to "take this moment"

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

FLORIDA POWER & LIGHT COMPANY ) Docket Nos. M-52-040 and 52-041-COL (Juno Beach, Florida) )

)

(Turkey Point, Units 6 & 7) )

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing ORDER (Adopting Proposed Transcript Corrections, Admitting Post-Hearing Exhibits, and Closing the Record of the Proceeding) have been served upon the following persons by Electronic Information Exchange.

U.S. Nuclear Regulatory Commission Florida Power & Light Company Office of Commission Appellate Adjudication 700 Universe Blvd.

Mail Stop: O-16B33 Juno Beach, Florida 33408 Washington, DC 20555-0001 Nextera Energy Resources ocaamail@nrc.gov William Blair, Esq.

william.blair@fpl.com U.S. Nuclear Regulatory Commission Office of the Secretary of the Commission Florida Power & Light Company Mail Stop: O-16B33 801 Pennsylvania Ave. NW Suite 220 Washington, DC 20555-0001 Washington, DC 20004 hearingdocket@nrc.gov Steven C. Hamrick, Esq.

steven.hamrick@fpl.com U.S. Nuclear Regulatory Commission Office of the General Counsel Pillsbury, Winthrop, Shaw, Pittman, LLP Mail Stop: O-15 D21 1200 Seventeenth Street, N.W.

Washington, DC 20555-0001 Washington, DC 20036-3006 Patrick Moulding, Esq. Anne Leidich, Esq.

patrick.moulding@nrc.gov ann.leidich@pillsburylaw.com Maxine R. Segamick, Esq. David R. Lewis, Esq.

Maxine.Segamick@nrc.gov david.lewis@pillsburylaw.com Robert Weisman, Esq. Michael G. Lepre, Esq.

robert.weisman@nrc.gov michael.lepre@pillsburylaw.com Anthony C. Wilson, Esq. Timothy J. V. Walsh, Esq.

anthony.wilson@nrc.gov timothy.walsh@pillsburylaw.com Megan Wright, Esq.

Megan.wright@nrc.gov Susan Vrahoretis, Esq.

susan.vrahoretis@nrc.gov

[Original signed by Clara Sola ]

Office of the Secretary of the Commission Dated at Rockville, Maryland, this 18th day of January, 2018.