ML18017A412
| ML18017A412 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 01/11/2018 |
| From: | Xcel Energy, Northern States Power Co |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML18017A380 | List:
|
| References | |
| L-MT-17-075 | |
| Download: ML18017A412 (25) | |
Text
{{#Wiki_filter:1. THIS WAS REDRAWN FROM P & ID M-117 (NH-36243) REV. M4 AND INCORPORATES CHANGES AND AS BUILT INFORMATION BASED ON THE RECIRCULATION PIPING REPLACEMENT PROGRAM.
- 2. FOR SAMPLE SYSTEM DETAILS SEE M-185 (NH-36908).
REFERENCE DRAWINGS:
- 1. RECIRCULATION FLOW CONTROL F.C.D. (GE 729E203) 5828-APED-2A-7 & 8
- 2. RESIDUAL HEAT REMOVAL SYS. F.C.D. (GE 729E587) 5828-APED-10-5, 6 & 7
- 3. NEUTRON MONITORING SYSTEM IED (GE 728E993) 5828-APED-7-2 & 3
- 4. VARIABLE SPEED RECIRC. PUMPS
& M/G SET ELEMENTARY DIAGRAM This map/document is to assist employees in the performance of their jobs.
Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. MONTICELLO NUCLEAR GENERATING PLANT P&ID RECIRCULATION LOOPS NUCLEAR BOILER SYSTEM NORTHERN STATES POWER COMPANY Xcel DRR #MO-84-369. REF. 2
- 5. POWER RANGE NEUTRON MONITORING SYSTEM ELEM DIAGRAM NOTES:
V84-"-DCA PS 2-128A DCA CLOSE SHUT DOWN XR-6-2 DECONN. 2"-ECB 2"-ED XR-7-2 REW29-2"-ECB CONN. V83-"-ECB dPT 2-111B dPS 2-155B C18 A dPI 2-156B C04 E/S 2-161B B PUMP RUNNING INTERLOCK dPIS 2-136B C74 MO 2-53B BKR 4330 DCA HBB MV/I 2-150B C18 3/4"-DCA XR-14-2 TO RHR SYS INTERLOCK REF. 2 REF. 1 F.C.D M.G. SET INTERLOCK 6 1"-972 XFV-62 DC DCA DECONN. (TYP.) RECIRC. LOOP NH-36243-1 TE 2-107B 2" DCA CONN. (C,6) M-117 D129-3/4"-DCA X-32B X-32A 3/4"-DCA XR-11-2 3/4"-DBD XR-12-2 3/4"-19M3 XFV-61 1"-972 EF ECB DCA DBD XR-13-2 REW13B-19-1"-DCA SD-2-2"-DBD CRW SL14-"-HBB 3/4"-HBB V85-"-DCA T REC135 TR 2-167 C04 dPIS 2-139B 3/4"-19M3 X-32D dPIS 2-138B dPIS 2-137B C74 C74 TI 2-151B C04 DCA EF PUMP P-200B RECIRC. 12 ECB ED 1"-972 XFV-63 5 C74 CRW REW13B-21-1"-DCA XR-31-2-A RECIRC. LOOP (B,5) M-117 NH-36243-1 XR-5-2 3/4"-HB REW13B-5-1"-ECB PS 2-128B F.C.D. INTERLOCKS REF. 1 ISOLATION VALVES HS 4330 C04 COOLING M-121 NH-36247 (C,6) HS 4329 C04 C122 EF HBB SL18-"-HBB CRW REW13B-28"-DCA 3/4"-19M3 BKR 4329 MO 2-43B XFV-68 1"-972 DCA DCA X-51C DCA EF PUMP RUNNING INTERLOCK C73 V82-"-ECB T REC140 TT 2-157B RTD TE 2-125B T REC138 4 TE 2-125A TT 2-157A RTD 3/4"-ECB EBD ORW ECB XR-2-2 XR-1-2 3/4"-EBD REW13B-3-1"-DCA ECB 3/4"-ECB XR-1-1 XR-2-1 3/4"-EBD ORW EBD HBD 1"-972 XFV-60 REW13A-3-1"-ECB XR-31-1 EBD ECB XR-7-1 DECONN. CONN. 2"-EBD CRW XR-6-1 REW28-2"-ECB 2"-ECB (TYP.) dPIS 2-136A 3/4"-19M3 X-31D RECIRC. LOOP NH-36243-1 M-117 (B,3) ECB EF P-200A PUMP RECIRC. 11 REW13A-28"-DCA 3/4"-ECB ECB SL17-"-HBB CRW HBB XR-5-1 MO 2-43A BKR 3329 REW13A-1-1"-ECB HS 3329 C04 2" DCA X-31A X-31B D128-3/4"-DCA TR 2-167 C04 T REC134 dPIS 2-137A 3 C73 dPIS 2-138A C73 TI 2-151A C04 TO RHR SYS INTERLOCK REF. 2 dPIS 2-139A C73 RECIRC. LOOP M-117 NH-36243-1 (C,2) TE 2-107A MV/I 2-150A C18 3/4"-DCA XR-14-1 F.C.D. REF. 1 INTERLOCKS HS 3330 C04 SL13-"-HBB SD1-2"-DBD REW13A-15-1"-DCA CRW 3/4"-HBB XR-13-1 MO 2-53A DCA HBB BKR 3330 dPS 2-155A C18 2 REF. 1 F.C.D M.G. SET INTERLOCK DECONN. CONN. dPI 2-156A C04 XFV-58 dPT 1"-972 DBD 3/4"-DBD XFV-59 1"-972 3/4"-19M3 DCA DC ECB EF C58 XR-12-1 3/4"-DCA DCA XR-11-1 E/S 2-161A C18 2-111A 3/4"-CCA NH-36243 SYSTEM L O C C04 SX 3024 3/4"-130M3 3/4"-130M3 HWC-16 HWC-15 NX-32779-7 (H,13) TO CAV C D C217 C L O C C03 E 5 6 SHUT DOWN RETURN DC DB XR-15-2 3/4"-DBB REW22-1-1"-DCA C04 16A-S7 HS (B,4) DC DCD M-131 NH-36049-12 DC DCA 3/4"-130M3 (A,3) LT10-"-DC FT 2-110F APRM CH 3 C37 CE 3013 C57 AE 4292 M-128 NH-36254 (A,4) C217 C217 FT 2-110H APRM CH 4 C37 C57 CIT 3013 AIT 4292 C217 C217 DBB 1" DC ORW APRM CH 2 C37 FT 2-110D FI 2-159B C04 C57 C REC146 Ca REC151 FR 2-154 C04 FT 2-110B APRM CH 1 C37 C57 RHR SYSTEM XR-23 NH-36246 (D,1) M-120 TO CR-12-144 AC 1"-972 CV 2791 M-185 NH-36908 (D,7) " DC (2-40) NH-36254 M-128 XFV-72 SV 2791 1"-972 XFV-70 1"-972 1"-972 XFV-73 XFV-69 NH-36049-14 " DC (B,2) M-131 C04 16A-S8 HS X-41 SIGNAL ISOLATION F.D. 3/4"-19M3 DLA DCA EF ED DC DCA 18" DCA REW13B-17 -1" DCA REW13B-15 -1" DCA REW13B-28"-DCA M-128 NH-36254 TO REACTOR WATER CLEANUP (C,8) XFV-64 1"-972 C122 XDV-8 XFV-65 1"-972 TW20-16"-DLA 3/4"-19M3 RHR-6-2 L.O. " DCA VCA XDV-7 XFV-67 1"-972 RC-1 X-50B REW3-4"-VCA X-51B TE 4387 XE 4381 4" FE 2-109B " DCA X-50C SPARE TAPS REW22-1-1"-DCA REW23-1-1"-DCA REW21-1-1"-DCA REW20-1-1"-DCA " DC L O C C04 REW19-1-1" DCA X-52A SV 2790 3/4"-130 XR-24 TEST CONN. " DCD AC (2-39) DCD DC CV 2790 X-51E X-52B X-51D TEST CONN. TW40-4"-DBA REW32-1-"-DCD C DC DCD L O C C03 XR-35 DCD DCA XR-34 REW32-22" DCA 28" X-52D X-52C 3/4"-19M3 X-51A REW13A-9-1"-DCA TW30-16" X-51F RHR SYSTEM SHUT NH-36247 DOWN SUPPLY (D,6) M-121 4 BKR 3331 REW18-12"-DCA REW13A-28"-DCA REW14-12"-DCA REW15-12"-DCA REW16-12"-DCA REW17-12"-DCA BKR 4331 REW31-2"-ED BKR 3332 MO 4086 MO 4085B REW13B-1-1"-DCA REW31-2"-ED NX-32779-7 TO CAV SYSTEM 2"-19 XDV-4 HS 3332 C04 HS 4331 C04 HS 3331 C04 REF. 2 F.C.D. INTERLOCKS MO 4085A N-1B REW23-12"-DCA REW13B-28"-DCA XR-17 REW22-12"-DCA REW21-12"-DCA REW20-12"-DCA REW19-12"-DCA NUMBERING C.B. & I. NOZZLE N-2J N-2K N-1A VESSEL N-15 REACTOR N-2B N-2A N-2H N-2G N-2F N-2E N-2C N-2D REW13A-11-1"-DCA TW40-4"-DBA REW10-18" " DCA " DCA FE 2-109A SPARE TAPS REW13A-28"-DCA RHR-9 L.O. 3/4"-19M3 X-52F 18" DCA REW13A-28"-DCA REW32-22"-DCA REW17-1-1"-DCA REW18-1-1"-DCA RHR-6-1 X-52E REW17-1-1"-DCA DCA DC TW40-4"-DBA L.O. REW15-1-1"-DCA REW16-1-1"-DCA REW14-1-1"-DCA 2 3 dPIS 2-129D APRM CH 3 C37 APRM CH 2 C37 APRM CH 1 C37 XFV-76 3/4"-DBD XR-15-1 FT 2-110A 1"-972 XFV-77 C58 V84-"-DBD ORW DCA DBD 1" DC FT 2-110C C58 FT 2-110E C58 RHR SYSTEM SHUT DOWN RETURN NH-36247 (C,5) M-121 1"-972 FR 2-154 C04 DCA DC 1"-972 FI 2-159A C04 XFV-75 1"-972 XFV-74 1"-972 XFV-71 1"-972 XFV-66 C122 APRM CH 4 C37 FT 2-110G C58 dPIS 2-129A dPIS 2-129C C121 C121 dPIS 2-129B C122 INTERLOCKS TO RHR SYSTEM LPCI LOOP SELECT NH-36243 REV NX-7830-2-1 & 2, NX-7830-4-1 THRU 4 (GE 730E166) 5828-APED-2E THRU 12 NX-7831-22-1 & 2, NX-7831-21-1 & 2 MONTI CAD DWG ` ' M-117 NX-236544-1-10 THRU 13 SCALE: Energy sm 1 NONE NX-7905-6-1, 2 & 3 NX-7831-80-1 THRU 10 (GE 105E1503NF) SHT 10-13 AH 84 A B 1 (TYPICAL CLASS CHANGE LAST BLOCK VALVE) DB OR ED HB DN 5-1-09 MAC 5-1-09 AVW 7-13-09 BAL 6-15-09 JJP 6-11-09 RKJ 5-1-09 APPR: CHK: DWN: APPR: CHK: DWN: 78 EC 79 EC 10856 14391 AVW 2-27-09 BAL 2-26-09 JJP 2-25-09 BJR 3-11-08 RMG 3-12-08 JJP 3-5-08 A/R CHK: APPR: APPR: CHK: 77 EC DWN: DWN: 76 EC 13693 REVISIONS 01121715 11951 C D E 17902 APPR: DZ 5-23-11 CHK: DWN: BAL 5-23-11 JJP 5-23-11 80 EC SPECIAL CONCERNS ITEM SAFETY RELATED ELECTRICAL COLOR LEGEND ASME CLASS 2/QUALITY GROUP B SAFETY RELATED MECHANICAL QUALITY GROUP D ASME CLASS 3/QUALITY GROUP C ASME CLASS 1/QUALITY GROUP A 18123 APPR: MLW 3-20-14 CHK: DWN: BAL 3-20-14 JJP 3-11-14 81 EC 25011 APPR: RAD 1-28-15 CHK: DWN: BAL 1-28-15 JJP 1-28-15 82 EC PAGE 3 ADDED TO.PDF DOC. XR-31-2 XR-31-1-A XR-32-2-A XR-32-2 XR-32-1-A XR-32-1 XR-33-1-A XR-33-1 XR-33-2-A XR-33-2 23857 APPR: MJW 5-2-15 CHK: DWN: ESS 5-2-15 JJP 4-13-15 83 EC 25784 APPR: FM 6-18-15 CHK: DWN: BAL 6-8-15 JJP 6-3-15 84 EC 84 84
2-2A-F1F2 3/4"-19M3 XFV-78 XFV-79 UPPER 2-2B-J1J2 TO JCT. BOX A 6 B HF HF CLOSED COOLING WATER REACTOR BUILDING CW3-2"-HF CW4-2"-HF M-111-1 (B,5) NH-36042-2 2-2-23B FSL A L RECIRC. LOOP M-117 NH-36243 (A,6) HX. PUMP SEAL UPPER COIL REW13B-28"-DCA REDUCING PRESSURE PUMP SEAL HX. 5 4 3/4"-19M3 XFV-81 DCA TE 2-2-11B SV 2-2-11B AO REDUCING COIL HB PRESSURE FSH 2-2-21B CRW XR-29-2 3/4"-CCA 3/4"-CCA XR-30-2 REW13B-28"-DCA LT12-"-DCA HB REW13B-14-1"-DCA REW13B-23-1"-DCA (2-2-1B) P-200B 12 RECIRC. PUMP SC4-1"-DCA HB DCA LOWER PUMP SEAL CHAMBER CHAMBER PUMP SEAL V1B-"-DCA RECIRC. LOOP (A,5) NH-36243 M-117 DCA X-32F DCA DC 2-2-25B C57 PIT 1"-972 PI 2-2-33B C04 2-2-33A C04 PI 2-2-25A C58 PIT 1"-972 XR-10-4 3/4" 3/4" 3/4" 3/4" XR-10-2B 1"-CCA 1"-CCA XR-10-2 C D HB DCA VE 5603B 5603A VE 5603 REC127 V VM A H LOWER ORW 1"-CCA L38-12 LOWER BEARING T-208B OIL ADDITION RESERVOIR OIL (5 GAL) 4935B SV
- 2 MOTOR 4936B SV SLOPE 2-2-22B TE 2-2B-K TE LS LS H
A NH-36243-1 E 6 2-2B-F1F2 XFV-80 D135-"-HB D133-1"-HB V89-"-DCA V89-1"-DCA XR-9-2 1"-CCA X-32E XR-27-2 DCA DC 1" BKR.152-203
- 2 MOTOR LS LS A
L 2-2B-A1A2 TE 2-2B-H1H2 TE TE 2-2B-D1D2 2-2B-C1C2 2-2B-B1B2 TE TE TE 2-2B-E1E2 TE X-38B TE/G1,G2 LOWER GUIDE BEARING E/S 2-2-29 TE/H1,H2 UPPER SEAL CAVITY TE/J1,J2 LOWER SEAL CAVITY TE/K1,K2 BEARING OIL COOLING WATER TE/22 SEAL CAVITY COOLING WATER 2-2-24B C57 PIT C04 PI 2-2-32B C18 CONTROL ROD NH-36244 (A,2) DRIVE M-118 C04 2-2-32A PI 2-2-24A C58 PIT M-118 NH-36244 DRIVE CONTROL ROD (A,3) X-37B LIST OF PUMP & MOTOR THERMOCOUPLES (TYPICAL FOR EACH PUMP) TE/A1,A2 THRUST BRG. UPPER FACE (M-146 & M-147) TE/B1,B2 THRUST BRG. LOWER FACE TE/C1,C2 UPPER GUIDE BEARING TE/D1,D2 MOTOR WINDING `A' (R-244 & R-245) TE/E1,E2 MOTOR WINDING `B' TE/F1,F2 MOTOR WINDING `C' FROM TE (B,6) BOX JCT. 2-2B-G1G2 TE
- REC130-D1 REC131-D2 REC116-B1 REC117-B2 T
FROM TE (B,2) JCT. BOX (SEE BELOW) 2-2A-G1G2 TE
- TE VIBRATION SWITCH RESET REF. 1 INTERLOCKS F.C.D.
HS 5 2-2-31 THERMOCOUPLES RECORDED PER PUMP-MOTOR UNIT TE/F1 TR A TE/A1 TE/B1 TE/C1 TE/D1 TE/E1 H TE/G1 TE/K1 TE/22 TE/J1 TE/H1 4 UPPER THIS WAS REDRAWN FROM P&ID M-117 (NH-36243) REV. M2 AND INCORPORATES CHANGES AND AS BUILT INFORMATION BASED ON THE RECIRCULATION PIPING REPLACEMENT PROGRAM. REFERENCE DRAWINGS: RECIRCULATION FLOW CONTROL F.C.D. (GE 729E203) 5828-APED-2A-7 8C8 (DRAWING IS IN TECH. MANUAL NX-7831-411) 3 2 2-2A-J1J2 TO JCT. BOX PRESSURE REDUCING COIL DCA DCA HB CRW 3/4"-CCA XR-29-1 XR-30-1 3/4"-CCA DCA HBB HB 2-2-11A AO 2-2-11A SV REDUCING COIL PRESSURE TE LT11-"-DCA REW13A-28"-DCA V1A-"-DCA (A,3) RECIRC. LOOP M-117 NH-36243 HB X-31F DC DCA D132-1"-HBB P-200A (2-2-1A) REW13A-7-1"-DCA REW13A-5-1"-DCA 11 RECIRC. PUMP HB DCA PUMP SEAL CHAMBER CHAMBER PUMP SEAL LOWER SC1-1"-DCA HF HF CLOSED COOLING WATER CW4-2"-HF CW3-2"-HF M-111-1 NH-36042-2 (A,5) REACTOR BUILDING 2-2-23A L A FSL NOTES: 1. 1. NH-36243 RECIRC. LOOP PUMP SEAL UPPER HX. REW13A-28"-DCA PUMP SEAL HX. (A,2) M-117 1 A B XR-10-1 1"-CCA 1"-CCA XR-10-3 1"-CCA XR-10-2A D134-"-HB X-31E V88-1"-DC XR-27-1 DCA DC V88-1"-DCA 1"-CCA XR-9-1 V88-"-DCA 2-2A-B1B2 2-2A-H1H2 BKR.152-103 TE 2-2A-D1D2 MG CONTROL 01103 2-2A-E1E2 TE
- TE 2-2A-C1C2 TE TE C04 MOTOR
- 1 3/4" 3/4" 3/4" 3/4" 2-2A-A1A2 TE LS LS
- H A
A L DCA HB 5602A 5602B LOWER VE ORW VE 5602 REC126 V VM H A L38-10 SLOPE 4936A SV LS LS 2-2A-22A 2-2A-K TE TE LOWER BEARING RESERVOIR OIL ADDITION (5 GAL) T-208A 4935A SV OIL
- 1 MOTOR INTERLOCKS SWITCH RESET VIBRATION HS REF. 1 F.C.D.
3 2 C D REVISIONS 1 E DC 806 APPR: DZ 4-12-07 CHK: DWN: RLJ 4-12-07 JJP 4-2-07 76 EC DWN: CHK: APPR: 77 01059540 JJP 6-18-07 BAL 6-18-07 EAN 6-20-07 9741 EC A/R A/S M-131 NH-36049-12 (D,5) ENERGIZED WHEN B DRIVE MOTOR BREAKER OPEN (A,3) NH-36049-12 M-131 A/S DRIVE MOTOR BREAKER OPEN ENERGIZED WHEN A SPECIAL CONCERNS ITEM SAFETY RELATED ELECTRICAL COLOR LEGEND ASME CLASS 2/QUALITY GROUP B SAFETY RELATED MECHANICAL QUALITY GROUP D ASME CLASS 3/QUALITY GROUP C ASME CLASS 1/QUALITY GROUP A CHK: APPR: BJR 3-11-08 RMG 3-12-08 DWN: 78 JJP 3-5-08 11951 01121715 A/R EC 10856 APPR: MAC 5-1-09 CHK: DWN: DDW 4-30-09 JJP 4-28-09 79 EC NH-36243-1 MONTI CAD DWG ` ' This map/document is to assist employees in the performance of their jobs. Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. SCALE: NONE M-117 D Xcel NORTHERN STATES POWER COMPANY MONTICELLO NUCLEAR GENERATING PLANT Energy sm P&ID RECIRC LOOPS, PUMPS & MOTORS NUCLEAR BOILER SYSTEM REV 84 23704 APPR: BJR 3-13-14 CHK: DWN: BAL 3-11-14 JJP 3-11-14 80 EC
- NOTE 2 THE PRIMARY THERMOCOUPLE FOR THE B RECIRC #1 SEAL CAVITY FAILED A NEW WIRE WAS INSTALLED IN J10 SUCH THAT THE B RECIRC IS NOW FED FROM THE SPARE THERMOCOUPLE J2.
2. 25011 APPR: RAD 1-28-15 CHK: DWN: BAL 1-28-15 JJP 1-28-15 81 EC PAGE 3 ADDED TO.PDF DOC. 23857 APPR: MJW 5-4-15 CHK: DWN: ESS 5-4-15 JJP 4-13-15 82 EC XR-51 XR-50 XR-52 XR-53 RETIRED IN PLACE 26787 APPR: SJH 4-14-17 CHK: DWN: BAL 4-14-17 JJP 4-7-17 83 EC 7239A 7239B 7238A 7238B 7240A 7240B 7241B 7241A
- SEE NOTE 3
- SEE NOTE 3 26888 APPR: TKN 5-10-17 CHK:
DWN: BAL 5-1-17 JJP 5-1-17 84 EC 84 84 84
- 3. XR-27-1 AND XR-27-2 ARE IN-LINE STYLE CHECK VALVES PER EC26888.
SPARE 3-312 FE 3-208 CRD-16-1 FT 3-209 4199B FI 4200B 1-1/2"-19M3 1-1/2"-19M3 CRD-164 1 1/2" CST-146 PI 7334 INTERLOCK FROM CST'S M-108 RV 4952 TURBINE BUILDING NH-36039 HIGH POINT VENT HIGH POINT VENT A (A,5) (A,4) B FROM COND M-105 LINE NH-36036 (ORW) TO MVP ROOM C D 6 RV 3-14A ORW
- 12 FILTER CRD-61-2
- 11 FILTER CRD-61-1 CRD-58-1 CRD-175 CRD-174 CRD-173 CRD-1 PI 4953 PCV 4951 3x1 1/2" GB HB REACTOR BUILDING CRD-177 CRD-176 CRD-69 TO AI-162 (B-1)
ORW ORW CRD-59-2 CRD-57-2 CRD-59-1 A H C05 dPIS 7399 CRD-21 1"-130M3 CRD-141 CRD-142 1"-19M3 1"-130M3 NH-36242-2 TO BACKFILL NH-36245 NH-36245 (B,4) M-119 (E,5) M-119 CRD-15 CRD-57-1 CRD-60-1 1"-130M3 (D,5) SYSTEM M-116-2 dPIS 7398 A H C05 CRD2 -1"-DC 1D 0D CRD2 -1"-DC 1/2"-DC 1/2"-DC PI 3-236B YS 3-15B PI 3-236A CRD-2-1 SV 3-20 AO 3-20 C18A-4"-HB 1" CRD-2-2 CRD-58-2 ALT BORON C18-4"-HB CRD-60-2 C18B-4"-HB INT A PS 3-201A YS 3-15A C C05 PS 7400 L L PUMP A PS 3-201B C05 C CRD-52-2 INTERLOCK PUMP PS 7401 CRD-51 CST-157 CST-154 NH-36039 (D,6) M-108 FROM CONDENSATE SERVICE SYSTEM 2" 1" 0C CRD2 -1"-DC 1 1/2" 1C CRD2 -1"-DC (TYP) SW SW (TYP) CUNO FILTER PI 7333 CST-157-2 CST-157-1 STANDBY 2" 0B CRD2 -1"-DC 1B CRD2 -1"-DC 1" NH-36039 CRD-7-1 CRD10A-1"-DE 3-313 FCp B C C W R SEE REF DWG #3 AND #4 WATER PUMPS CONTROL ROD DRIVE 5 CRD-52-1 CRD-47-1 CRD-49-1 ORW CRD-46-1 PI 4375A CRD-50-1 4 CRD-6-1 CRD-45 3/4"-19 HYDRAULIC CONTROL UNITS DRIVE WATER HEADER HYDRAULIC CONTROL UNITS COOLING WATER HEADER CHARGING WATER HEADER HYDRAULIC CONTROL UNITS ACCUMULATORS 5600 CRD-49-2 CRD-54-2 CRD-48-2 11 CRD PUMP P-201A CRD-53-1 A C05 H C CRD-53-2 ORW CRD-48-1 B W C C 3B-S4A HS VC VS 5600 R INCREASER SPEED PUMP MOTOR BKR 152-506 CRD-47-2 ORW CRD-50-2 CRD-46-2 B C C W R PUMP CRD12-1 1/2"-DC 12 CRD PUMP P-201B HS 3B-S4B CRD8-2"-DC CST-147 C05 C RV 3-14B VC 5601 A H CRD5-1"-DC 1/8"/FT SLOPE 1/8"/FT SLOPE 0A CRD2 -1"-DC 1A CRD2 -1"-DC BKR 152-606 MOTOR 1/8"/FT SLOPE W R C C B VS 5601 INCREASER SPEED CRD-82-2 CRD1-2"-DE CRD-5-1 CRD1A-2"-DE CRD-4-1 CRD-3-1 CRD-3-2 CRD-5-2 CRD-4-2 CRD1B-2"-DE CRD-167 CRD-166 CRD-82-1 CRD-83-1 CRD-165 CRD-169 CRD-168 CRD-83-2 PI 3-223 FI 4909 HB DE (B,2) CRD-6-2 CRD-7-2 NH-36039 STORAGE TANKS M-108 RECIRC TO COND PI 4375B CRD10-1"-HB 3-24B RO DE HB M-108 (C,6) 3-306 C05 FI 3/4"-SP-110M1 XR-26-1 XR-22-1A XR-24-1 SUPPLIED WITH EQUIPMENT POST FILTERS (D,4) NH-36243-1 M-117 RECIRC PUMP TO #11 XR-25-1 XR-28 XR-23-1 ORW 3 XR-25-2 XR-23-2 ORW CRD-154 CRD-13-1 C 3/4" M130 PUMP TEST BYPASS S.W. CRD-13-2 CRD-12-2A L CRD-11-1 FILTER #12 3-24A RO T CRD100 TE 5046 CRD-95 CRD2B-2"-DC DE HB 2"-SP-110M1 CRD-10-2 DE CRD-99 CRD-98 CRD10A-1"-HB CRD-97 CRD-96 CRD2A-2"-DC DE CRD11-2"-DE dPIS 3-202 A H C05 DE DC F-200B (3-17B) CRD-156 VENT 1" M110 CRD-11-2 YS 3-18B CRD-12-2 C DE DC CRD-10-1 3/4"-SP-110M1 CRD-155 2"-SP-110M1 (3-17A) FILTER #11 VENT F-200A CRD-12-1A CRD-12-1 YS 3-18A 2"-110 CRD-8 FT 3-212 CRD-163 C05 A PI 3-234 FLUSH CONNECTION E/S 3-309 CRD3-2"-DC 3-310 FI 3-206 PT 3-205 XR-21 XR-22-1 RV 4201A FI 4200A 4199A FE 3-203 PI 4203A FR FT 3-204 ORW 3-302 C05 PI FCp 3-311 F CRD101 2"-19M3 RV 4201B XR-22-2 FR CRD-17 S.W. CRD-16-2 FI 3-301 FC PI 3-219 CRD-14 RO 3-28 3-308 PI 3-233 PS P CRD102 CRD-20 1"-130M3 CRD-143 AI-216-1 NH-36244 HYDRAULIC CONTROL UNIT (TYP FOR 121 UNITS) HIGH POINT VENT HIGH POINT VENT E 1"-JD CRD-42 (TYP) LOW POINT DRAIN NH-36245 NH-36245 1"-110 CRD-43 (E,4) M-119 (E,6) M-119 NH-36245 TO INDIVIDUAL M-119 (A,6) CRD23D-1"-DE 2D CRD2 -1"-DC 1/2"-DC 1/2"-DC DC DE AI-216-4 1/2" 6 1" 2C CRD2 -1"-DC CRD23C-1"-DE SW (TYP) (TYP) SW AI-216-3 1" 2B CRD2 -1"-DC CRD23B-1"-DE 1" AI-216-2 1"-JD 1" VENT AND DRAIN SOLENOID VALVES TO SCRAM DISCHARGE VOLUME 1"-CCD (B,3) NH-36245 M-119 CRD-148-2 VALVE PILOT AIR HEADER HYDRAULIC CONTROL UNITS SCRAM HYDRAULIC CONTROL UNITS EXHAUST WATER HEADER 1 1/2"-JD 1/8"/FT SLOPE CRD9-1"-DE 1/8"/FT SLOPE 2A CRD2 -1"-DC CRD23A-1"-DE 5 PI 3-220 PI 3-226 4 PS 3-230 3/4"-JD CRD-80-1 CRD-80-2 CRD-81 FE 3-213 DRAIN C292 C L AI-16-11 PS 4111 RV 7364B RV 7364A AI-16-8 PI 3-229 AI-16-10 L AI-16-9 3-142A ND AI-16-7 1 1/2"-259 CRD-79-1 CRD-79-2 1 1/2" A C05 L H SV 3 1" 1" 1 1/2"-259 AI-16-6 3-142B ND SV (D,6) CRD-40 CRD-29 3"-SpN10 INSTRUMENT AIR SUPPLY 1/2"-JD 100 PSIG CRD HYDRAULIC SYSTEM PROCESS FLOW DIAG. (GE 729E259) 5828-APED-3-21-2 NX-7866-32 FOR ADDITIONAL PIPING FOR TYPICAL INDIVIDUAL HYDRAULIC CONTROL UNIT SEE DRAWING No. M-119, NH-36245 ALL SCREWED CAPS MARKED S.W. MUST BE SEAL WELDED FOLLOWING FLUSH AND CHECKOUT TESTS. This map/document is to assist employees in the performance of their jobs. Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. NORTHERN STATES POWER COMPANY MONTICELLO NUCLEAR GENERATING PLANT Energy CONTROL ROD HYDRAULIC SYSTEM P&ID CRD HYDRAULIC SYSTEM F.C.D. (GE 729E449) 5828-APED-3-28 CRD6-1"-DE (SHOWN WITH AUTO AIR LOADING) NH-36243-1 M-117 TO #12 RECIRC PUMP XR-26-2 XR-24-2 XR-22-2A (D,4) PI 4203B 2 Xcel CRD-18-2 1"-130M3 L O C C05 CRD3B-1 1/2"-DC CRD-19 CV 3-19A 1/2"- 1/2"- FLOW CONTROL STATION CV 3-19B E/P 3-207B CRD3A-1 1/2"-DC AI-56 E/P 3-207A SET AIR AI-55 S.W. AIR SET HS 3B-S1 C05 L O C C05 CRD-18-1 CRD4-1 1/2"-DC CRD-27 3-23 CRD-24 3-21 3-305 FI 3-214 FCp C05 FI CRD5-1"-DC 1-1/2" 3"-SpN10 DC DE 1-1/2" dPT AI-20 PCV 1479 3-240 E/S 1/2"-73 REFERENCE DRAWINGS NOTES: PI 3-210 3. 2. 1. 1. 2. dPI 3-224 PCV 3-133 1/2"-73 AI-19 CRD-146 PI 3-228 3-211 3-303 C05 dPI (B-6) TO SV-3-20 AI-164 AI-162 1/2"-JD CRD-28 1"-110 HS 3B-S3 C05 1"-7 E/S 3-241 MO 3-20 CRD-22 BKR-4103 1-1/2"-19M3 CRD-23 1-1/2"-19M3 dPI 3-217 CRD-147 HS 3B-S2 C05 C216 3-304 dPI C05 BKR-4104 CRD-26 CRD7-1-1/2"-DE CRD-25 1-1/2"-19M3 MO 3-22 1-1/2"-7 3" DE DRAIN dPT 3-218 C216 S.W. SYSTEM FLUSH CONNECTION FI 3-216 STABILIZING FE 3-235 (NOT IN SERVICE) CRD-37-1 3-25A VALVE ASSEMBLY NE NH-36244 MONTI CAD DWG ` ' M-118 SCALE: sm NONE 1 REV 86 AL A (B,8) NH-36049-12 M-131 AIR SUPPLY STABILIZING CONNECTION SYSTEM FLUSH (NOT IN SERVICE) CRD-37-2 REACTOR CONTROL MANUAL VALVE ASSEMBLY REACTOR 100 PSIG INST 3/4"-JD M-116-1 PRESSURE 3-26A (C,6) NH-36242-1 AI-163 SEE NOTE 2 CRD-39-2 VENT CRD-38-2 DE DC 3/4"-7 CRD-36-2 3/4"-19M3 FILTER CRD6-1"-DC CRD-36-1 3/4"-19M3 FILTER 3/4"-DC CRD-41 CRD-39-1 CRD-38-1 3/4"-7 1"-110 DC DE NE ND ND S.W. 3-25B B C D CRD-31 CRD-30 3"-SpN214 3-140B CRD-62 CRD-63 3-140A AI-16-4 1 1/2"-259 1" 1"-110 AI-16-5 1 1/2"-259 VENT CRD-9 S.W. C292 ND 4110 SV ATWS ARI S32 HS 1" AI-16-3 ND C L SV C292 SV ND 2 1 1/2"-73 PROTECTION REACTOR CRD-65 CRD-64 7939 PCV AI-16-1 SYSTEM PI 3-227 AI-16-2 FILTER 3-27 AI-16 REVISIONS NH-36049-14 M-131 INSTRUMENT AIR SUPPLY 70-100 PSIG NH-36254 TO RWCU M-128 (D,8) 1 1/2"-73 AI-15 1 E 19070 APPR: JWP 9-13-12 CHK: DWN: BAL 9-12-12 JJP 9-11-12 81 EC CRD10B-1"-HB SPECIAL CONCERNS ITEM SAFETY RELATED ELECTRICAL COLOR LEGEND ASME CLASS 2/QUALITY GROUP B SAFETY RELATED MECHANICAL QUALITY GROUP D ASME CLASS 3/QUALITY GROUP C ASME CLASS 1/QUALITY GROUP A 25011 APPR: RAD 1-28-15 CHK: DWN: BAL 1-28-15 JJP 1-28-15 82 EC PAGE 3 ADDED TO.PDF DOC. 23857 APPR: MJW 5-2-15 CHK: DWN: ESS 5-2-15 JJP 4-13-15 83 EC SEE DETAIL A DETAIL A XR-21 XR-21A-4 XR-21A-3 XR-21A-5 DPI-2-1A XR-21A-2 XR-21A-1 F I L T E R XR-21B-4 XR-21B-3 XR-21B-5 DPI-2-1B XR-21B-2 XR-21B-1 F I L T E R F-18A F-18B 1/2" TUBE CRD-3-220 CRD-3-221 1" 26902 APPR: SHU 9-16-16 CHK: DWN: BAL 9-16-16 JJP 9-15-16 84 EC 26787 APPR: SJH 4-14-17 CHK: DWN: BAL 4-14-17 JJP 4-7-17 85 EC XR-21B-D XR-21A-D 26888 APPR: TKN 5-10-17 CHK: DWN: BAL 5-1-17 JJP 5-1-17 86 EC 86
- 3. XR-25-1 AND XR-25-2 ARE IN-LINE STYLE CHECK VALVES PER EC26888.
- SEE NOTE 3 86
3-127 A & B BOTTLE SIZE TYPE "G" NITROGEN ACCUMULATOR N CHARGING SYSTEM NO. A-2 SCRAM VESSEL REACTOR CONTROL UNIT ARE PREFIXED BY 3-13. NOTE: ALL EQUIPMENT NUMBERS WITHIN (CONTROL UNIT SUPPLIED BY G.E.) (TYPICAL FOR 121 UNITS) HYDRAULIC CONTROL UNIT 3/4"-JD SCRAM VALVE PILOT AIR CHANNEL A CHANNEL B DRIVE ROD CONTROL NH-36244 CONTROL UNIT M-118 TEST CONNECTION 127 CV CRD-114 A B 6 CONTROL UNIT TO HERE 4" OR 6"-DB SCRAM DISCHARGE HEADER CRD-116 "-JD CRD-112 TEST CONNECTION P5 3/4"-DC G.E. B. (E,3) (E,2) NOTE: VALVE IS A DUAL SOLENOID THREE WAY POPPET VALVE CONTAINED IN ONE VALVE BODY AND SCHEMATICALLY FUNCTIONS AS DEPICTED. L O C C05 EXHAUST 127 POS (E,6) NH-36244 M-118 G.E. B. NH-36245 TEST CONNECTION C D E B. HIGH POINT VENT 3/4"-460M3 CONTROL UNIT TO HERE G.E. CRD-102 P4 CRD-140 FOLLOWING BALL CHECK FLUSH INSTALL VALVE FROM N.E. X-38 SLOPE "/FT A THRU D 3/4"-DC P1 1"-DE EXHAUST WATER TEST CONNECTION CRD-105 "-DC ELEMENT 136 FILTER 121 SV 6 122 SV P2 CRD-137 CRD-103 (E,6) B. G.E. NH-36244 M-118 "-DC TO HERE 126 CV 1/2"-DC 5 TUBE FITTING N CHARGING SYSTEM 2 WITH CAP P6 129 LD ELEMENTARY PROTECTION FROM REACTOR EAST L H L C54 WEST L H L C72 CONTROL UNIT TO HERE LAH PAL C05 DIAGRAM N2 CRD-111 131 PI 130 PS L O C C05 H2O 126 POS 4 1"-DC ACCUMULATOR CHARGING WATER ACCUMULATOR 132 PSD CRW 125 (D,6) CRD-115 CRD-113 CRD-107 N2 NH-36244 M-118 G.E. B. 2444 PCV TO HERE CONTROL UNIT PCV 2445 CRD-138 CRD-104 1"-DC COOLING WATER "-DC TEST CONNECTION HIGH POINT VENT X-37 A THRU D SLOPE "/FT FOLLOWING INSTALL FLUSH 1"-DC INFORMATION TO POSITION TE SYSTEM POS DRIVES OTHER FROM CONTROL UNIT TO HERE B. G.E. CRD-139 1"-460M3 CRD-101 A H C05 1" CRD005 3-243 TSC 3-244 TR C59 C59 FILTER ELEMENT 134 G.E. TO HERE CONTROL UNIT 1"-DC DRIVE WATER (D,6) B. 5 120 SV 123 SV CRD-86 135 P3 WITHDRAW WITHDRAW INSERT INSERT SETTLE DIAGRAM ELEMENTARY CONTROL FROM MANUAL A H C05 ORW TO HERE CONTROL UNIT FILTER ELEMENT G.E. CRD-75 (D,6) M-118 B. NH-36244 4 3-32A CV PI L O C C05 3-32C CV L O C C05 CRD-84 PI "-CCD (TYP) This map/document is to assist employees in the performance of their jobs. Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. MONTICELLO NUCLEAR GENERATING PLANT AT CAP P6 REQUIRED TO HCU'S HOOK-UP AS TO INDIVIDUAL 3-29 SV SYSTEM PROTECTION REACTOR 3 VENT 2442 RV A & B BANKS (TYP) 2 CRD-201-1 1/4"- CRD-201-2 3-232B PI 3-232A PI 2443 "B" BANK "A" BANK RV SUPPLY CRD AIR HEADER 70 - 75 PSIG NH-36244 M-118 (E,4) CRD-203-2 CRD-202-2 1/4"- CRD-202-1 CRD-203-1 1/4"- 3/4"-73 CRD-76 AI-216-6 CO5 5A-S11 HS PI "-JD 2 SCRAM DISCHARGE PIPING CHANNEL B CHANNEL A ND 3-31A SV NE 3-31C SV NE NE 3-31B SV 3-31D SV NE CRD-77 CRD-78 SLOPE="/FT NH-36043 M-137 (E,4) CRD16A-2"-CCD CCD 1"-CCD (TYP) 7428G LS 7429A LS "-CCD (TYP) 7430A LS 7428H LS (TYP) 3-33A CV L O C C05 ORW 3" 3-33C CV L O C C05 PI CRD-90 CRD-88 7428A LS CRD16A-24"-CCD PI 7428B LS 3 TYP 15 UNITS CRD13A-4"-DB FROM HYDRAULIC CONTROL UNITS TYP 15 UNITS FROM HCU CRD15A-4"-DB CRD14A-6"-DB TYP 31 UNITS FROM HCU CRD17A-1" CCD (A,6) " DC " DC (A,6) " DC (A,6) SCRAM DISCHARGE HEADERS CRD16A-12"-CCD SLOPE="/FT L O C C05 L O C C05 NH-36044 M-138 CRD-91 CRD-89 PI 7428F LS NO. A-1 SCRAM 7428E LS PI 3-33B CV (E,4) CRW 3" 3-33D CV CRD16B-2"-CCD CCD 7428C LS CRD16B-24"-CCD 7428D LS 1"-CCD (TYP) (TYP) SCRAM DISCHARGE HEADERS ROD WITHDRAWAL BLOCK NO. B-1 SCRAM (A,6) " DC (A,6) " DC (A,6) " DC CRD16B-12"-CCD CRD14B-6"-DB CRD15B-4"-DB FROM HCU TYP 16 UNITS TYP 13 UNITS CRD13B-4"-DB CONTROL UNITS FROM HYDRAULIC TYP 31 UNITS FROM HCU 2 NH-36245 MONTI CAD DWG ` ' M-119 REV 1 P&ID CONTROL ROD HYDRAULIC SYSTEM NORTHERN STATES POWER COMPANY Energy Xcel sm SCALE: NONE 79 M A B CRD-87 NO. B-2 SCRAM C 7429B LS 7430B LS L O C C05 CRD17B-1" CCD CRD-85 PI PI L O C C05 3-32B CV CRD-74 ORW 3-32D CV DWN: APPR: APPR: CHK: DWN: CHK: 77 76 12044 JSO 3-25-09 KEC 3-25-09 JJP 3-25-09 EC REVISIONS JJP 3-5-08 11951 01121715 RMG 3-12-08 BJR 3-11-08 EC A/R C D E 20150 APPR: DAM 8-12-12 CHK: DWN: PEB 8-9-12 JJP 8-8-12 78 EC N.E. 117 SV 118 SV EXHAUST SPECIAL CONCERNS ITEM SAFETY RELATED ELECTRICAL COLOR LEGEND ASME CLASS 2/QUALITY GROUP B SAFETY RELATED MECHANICAL QUALITY GROUP D ASME CLASS 3/QUALITY GROUP C ASME CLASS 1/QUALITY GROUP A 25011 APPR: RAD 1-28-15 CHK: DWN: BAL 1-28-15 JJP 1-28-15 79 EC PAGE 3 ADDED TO.PDF DOC.
(B,2)(B,6)(C,2)&(C,6) (VLV POSITION INTERLOCKS) (A,3) L.O. L.O. BKR B1119 PUMP P17 TORUS C03 10A-S10B HS BKR 4323 OR REACTOR VESSEL LOW LOW LEVEL WITH REACTOR LOW R.H.R. SERVICE WATER AIR SET AI-636 TW19-14"-GE (10-65B) MO-14"-N138 NH-36049-13 4338 C03 10A-S13B HS BKR RV 2005 RV51-1 1/2"-HB WHEN SHUTDOWN CLG. SUCTION VALVE MO-1989 IS CLOSED (EXCEPT IN ASDS MODE) PERMISSIVE TO OPEN NH-36246 M-121 TO FR10-143 NH-36247 FROM E/S 7251B TO CROSS-TIE MO-14"-N26 (C,2) PS-10-118 TR-23-115 NH-36247 NH-36247 4328 TC's TO HS S81 C292 NH-36247 FI 4105 NH-36247 PS-10-122A A 10-132B 7188 C03 F RSW103 FI B M-121 M-121 C03 HS E/S 4099 FROM (B,2) FROM (C,6) FROM M-121 M-121 (C,4) (B,2) C D RHR103 F E dPY 4103 L O C C03 MO 2009 MO-10"-N138 PAS-57-4 RHR-46-2 SX 2898 RHR-5-2 14"-N26 HS S07 C292 FS-10-123A M-121 FROM E/S 4100 NH-36247 (D,2) dPIC 10-130B NH-96042-1 TW23-12"-GE TW22-14"-GE TW20-14"-GE R.H.R. SERVICE WATER (C,4) NH-36664 M-112 10-99B TE 10-93D SEE NOTE 6 SEE NOTE 6 ISO C292 4105 E/S 4101 FROM FY SW10-18"-GF C03 10A-S7 HS (10-20) HS S25 C292 XFER A H RHR105 PS 10-122B T C292 MO 2033 BKR 10-97B C129B FT RHR107 T RHR-38-2 6 C E/S 4101 A C03 L dPI 4103 10-130B1 dPI CRW C292 C03 10-96B RHR-37-2 M-112 NH-36664 TW20-14"-GE PI PI 10-115B RV54-4"-HB RV 4282 FE (C,3) TE 10-94D L.O. D190-1"-GE 1"-19 1"-130 RV54-2 1/2-HB C217 RHR-53-2 (B,7) HS 7188 C03 FT 10-109B 10-139B C03 FI ORW 1" FE 10-108B FE 10-110B FT14-40B FT10-97B FT 10-111B FI 4106 C292 ISO TO PAS SYS HS S25 C292 (10-34B) XFER C03 10A-S12B HS 4337 BKR FS 10-123B A L C03 HS S09 C292 FY 4106 C292 FROM FI 7188 C03 6 E/S 4101 FROM BKR C03 10A-S16B HS TE 10-94B POSITIONER TW20-14"-GE CIT 10-113B R.H.R. HEAT HS S10 C292 SW12-16"-GF dPC 4103 dPY 4109 C129B 10-91B dPT HS S25 C292 dPS 10-92B 4100 E/S ISO C292 C03 XFER E/S C292 4100 E/S C292 4100 CV 1729 CE 10-112B V128-1"-GE EXCHANGER NOTE 6 ORW SEE TE 10-93B C129B C217 E-200B 12 (10-2B) SV 1729 E/P 1729 AI-637 SET AIR AIRREG 1729 MO 2003 HS S25 C292 SEE NOTE 6 RSW101 10-117B RHR-4-2 14"-N26 A H C03 L.O. PI T 4210 C217 C XFER RHR109 L.O. C L O C C03 RHR-65-2 HS S25 C292 (10-39B) MO 2007 10-136B TW24-12"-GE HE GE XFER L O C03 FI C03 TW25-4"-GE HE GE TW24-12"-GE RHR101 F BKR C03 10A-S14B HS 4208 MO-12"-N26 (10-38B) MO-4"-N138 CONN. MO 2011 3/4" LEAK TEST TW23-12"-GE TW20-16"-GE REACTOR VESSEL LOW LEVEL INTERLOCKS (PERMISSIVE TO OPEN VALVES MANUALLY) DRYWELL HIGH PRESSURE AND AUTOMATIC VALVE ACTUATION SIGNAL (DRYWELL HIGH PRESSURE OR REACTOR VESSEL LOW LEVEL. SEE FUNCTIONAL CONTROL DIAGRAM FOR ADDITIONAL INTERLOCKS) VALVES MANUALLY) INTERLOCK (PERMISSIVE TO OPEN REACTOR VESSEL LOW LEVEL (CLOSE) M-114-1 NH-85509 FROM CONDENSATE SERVICE WATER HS S12 C292 LOOP "B" 3/4"-163 AI-610-2 ORW RHR-30-2 RHR-69-2 N.E. RHR-30-4 10"-N234 RHR-2-4 D81-2"-GE HS S08 C292 RHR-59-2 3/4"-19 D80-2"-GE 10"-N234 RHR-2-2 K-10B RHR AUX COMP AI-151 RHR-55-2 ENERGIZED WHEN RHR SW. PUMPS ARE RUNNING FE 10-121D FE 10-121B RHR-56-2 AI-243-2 AI-244-2 AI-638 5 AI-1088 NH-36664 (A,3) M-112 TW19 TW20 M-131 (A,6) A/S TW19-10"-GE 3/4"-163 AI-610-4 TW19-10"-GE A/S RHR-58-2 M-131 NH-36049-13 (A,6) RV 4908B FILTER ACCUMULATOR FS 10-121D RHR-3-4 10"-N26 NH-36049-13 C03 10A-S25B HS FS 10-121B 10"-N26 RHR-3-2 L L.O. (A,6) M-131 A/S T-75D L L.O. HS S25 C292 XFER 2"-19 2"-19 AI-645-4 3/4" RHR-68-2 RHR-67-2 5 LEAK CONN. TEST L.O. AIR SET (10-153D) L O C C03 7193 RHR-54-2 START & STOP RHR-57-2 B4454 PS DT ORW TW19-10"-GE C03 10A-S25D HS T-75B ACCUMULATOR (10-153B) SV 1995 N.E. TO A.C. INTERLOCK TW19-10"-GE PS 10-105B SV 1997 PS 10-105F CV 1997 L O C C03 CV 1995 NH-36247 MTR HTR L36-8 SEE TYP. DETAIL VENTS & DRAINS FOR PUMP 4 M-121 C129B BKR 152-604 P-202B (10-3B) P-202D MTR HTR L36-10 BKR 152-603 (10-3D) C129B SET AIR AI-645-2 14 R.H.R. PI 10-107B 12 PUMP PI 10-107D PUMP R.H.R. RHR-88-2 PS-10-119A,B,C,D LS-2-3-73A,B FROM CONDENSATE SERVICE WATER NH-85509 M-114-1 NH-36242-1 SC10D-2"-GE (A,3) (E,6)(E,2) M-116-1 FROM RHR-89-2 CGC3B-2"-CA GE RHR-90-2 NH-36258 FROM M-143 (D,4) CST-91 2"-130 (CLOSE) TW9 SC29B-2"-GE 4 98A THRU 98H TYPICAL OF 8 ( ) HE GE (MOV POSITION INTERLOCKS) TO A.C. INTERLOCK PS 10-105H (B,5) C03 10A-S2B HS (RECIRC) TW21-2"-GE (RECIRC) TW21-2"-GE TW17-14"-HE C03 10A-S3B HS TW15-14"-HE HS S25 C292 XFER TE 10-98A TO TR-4926 REACTOR WATER M-128 CLEANUP SYSTEM NH-36254 (D,2) PS 10-105D (CLOSE) TW25-4"-HE (OPEN) NH-36248 TW24-12"-HE M-122 CST-93 2"-130 (A,6) RHR-8-2 3"-N237 RO 2001 TD5-4"-HBD PI 10-106B RV 1993 M-143 (START ON HIGH DRYWELL PRESSURE NH-36258 (D,3) PI 10-106D RV 1991 TD5-5"-HBD 3 dPT 7845B BS F-4 RV49-1 1/2"-HB RO 1999 dPI 7846B RV47-1 1/2"-HB dPT 7845D ORW ORW HE GE FI 4"-237 DRW-109 4240 DRAIN DRW-111 1"-19 X-320A-D CONDENSATE STORAGE (TEST) NH-36039 M-108 SUSTAINED FOR LOW LOW LEVEL REACTOR VESSEL PRESSURE OR M-116 NH-36242 15 MINUTES RHR-1-4 14"-N29 14"-N29 RHR-1-2 NOMINAL) 1" 1" 4"-142 DRW-108 3/4"-19 DRW-110 RHR-18-2 20"-N29AB FROM (A,4) OPEN ON REACTOR LOW PRESSURE) (PERMISSIVE TO TW23-12"-GE X-211A X-210A MO-16"-NW123D (SEE NOTE 1) PS-2-3-52B TW20-16"-GE TW8 FROM M-116 NH-36242 (E,5) 3 BKR (10-27B) 4335 X-204A-D 10" MO 2013 DB GE REACTOR VESSEL R-200 (2-1) MO 4085B TW40-4"-DBA NOTES: VALVE MARK NUMBER WITH PREFIX "W" INDICATES ASA 600 LB VALVE RATED AT 1248 PSI/563°F PER MSS-SP-66. ALL MOV HAND SWITCHES INDICATED L.C. OR L.O. HAVE KEY LOCKS. ALL MOV'S INCLUDE HAND SWITCH & POSITION LIGHTS IN IN CONTROL ROOM. DRAIN CONNECTIONS ON RHR PUMP SUCTION & DISCHARGE TO BE PROVIDED WITH HOSE AND PORTABLE CONDUCTIVITY CELL TO FLOOR DRAINS. SEE NOTE 4 ON DWG. NO. M-121, NH-36247. COMBINATION TC/RTD PROBES. RTD'S TO LOCAL JUNCTION BOX ONLY (NJ5304). TE-10-93B-1 (TC), TE-10-93B-2 (RTD) TE-10-93D-1 (TC) (SPARE), TE-10-93D-2 (RTD) TE-10-94B-1 (TC), TE-10-94B-2 (RTD) TE-10-94D-1 (TC), TE-10-94D-2 (RTD) P&ID RESIDUAL HEAT REMOVAL SYSTEM This map/document is to assist employees in the performance of their jobs. Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. Energy MONTICELLO NUCLEAR GENERATING PLANT NORTHERN STATES POWER COMPANY D93-1"-HE DLA VALVE LEAKAGE TEST CONN. RHR-34 1"-19 RHR-74-2 MO 2023 C03 10A-S11B HS DRW-122 REMOVABLE SPOOL PIECES INSTALLED FOR TORUS DRAINING NH-96042-1 D82-3"-HE RHR-10-2 (C,3) TD5-4"-HBD TD5-3"-HBD TORUS RING HEADER XFER TW14A TW14A-20"-HE PIECE INSTALLED FOR REMOVABLE SPOOL TORUS DRAINING HS S06 C292 HS S25 C292 C03 10A-S4B HS L.O. C11 PAS SYS FROM TD5-3"-HBD HE (A,7) HBD (10-13B) MO 1987 TW27-20"-HE MO 1989 MO-18"-N29 RHR-13-2 1"-19 TW14A REW10 2 ORW (10-15B) 4321 PAS-57-7 1"-19 DRW-113 3"-N29AB C03 10A-S6B HS BKR POS 3140 X-224A MO-20"-N29AB B C D A REW10-18"-HE RHR-78-2 M-143 NH-36258 (D,5) RHR-77-2 3/4"-19 L O C C03 BKR 4339 C03 10A-S9B HS RHR-75-2 RHR-16-2 3/4"-130 D100-3/4"-GE D97-3/4"-DB MO 2015 C03 10A-S8B HS 3/4"-19 (SEE NOTE 1) SUPPRESSION CHAMBER TORUS MO-16"-NW14DU X-213A ORW BKR 4334 (10-26B) MO-10"-N26 RHR-76-2 MO 2021 X-29E TEST CONN. D58-1"-DCA VALVE LEAKAGE (10-25B) 3/4"-130 RHR-12-2 3/4"-130 RHR-11-2 RHR-31-2 X-13A RHR-33-2 1"-130 1"-CCA DB RHR-64 RHR-43 3/4"-130 AIR TEST CONN. RHR-17-2 3/4"-130 D180-1"-GE 2 (PERMISSIVE TO OPEN WHEN TORUS SUCTION VALVE MO-1987 IS CLOSED) DISCHARGE VALVE OPEN WHEN TORUS (PERMISSIVE TO MO-2007 IS CLOSED) V129-3/4"-HE RHR LOOP "A" NH-36247 M-121 FROM (B,5) 3/4"-130 RHR-48 Xcel 1. 3. 2. 4. 6. 5. 1"-CCA RHR-32-2 RHR-73-2 3/4"-130 RHR-24-2 3/4"-130 16"-NW14 RHR-6-2 SEE NOTE 1 TW20-16"-DLA RHR-25-2 INSIDE OF DRYWELL AO 10-46B DLA CRW DC DB DCA V34-3/4"-DB CLOSE 4" VENT L O C C03 BKR 4209 X-39A MO-10"-N26 (10-31B) RHR-50 TW23-10"-GE L.O. RHR-72-2 L O C C03 DLA 4331 4" BKR L.O. CO4 2A-S9B HS POS 2019 DBA DLA DCA M-120 MONTI CAD DWG ` ' SPECIAL CONCERNS ITEM SAFETY RELATED ELECTRICAL COLOR LEGEND ASME CLASS 2/QUALITY GROUP B SAFETY RELATED MECHANICAL QUALITY GROUP D ASME CLASS 3/QUALITY GROUP C ASME CLASS 1/QUALITY GROUP A JJP 11-18-10 BAL 11-30-10 AVW 12-1-10 17164 BAT 4-8-11 DDW 4-13-11 CVB 4-13-11 15557/16563 REVISIONS 17932 IRL 6-29-11 BAL 6-28-11 JJP 6-28-11 20263 KMF 6-27-12 BAL 6-22-12 JJP 6-21-12 JEB 5-1-13 BAL 4-29-13 JJP 4-29-13 NH-36246 SCALE: sm NONE 1 M-121 NH-36247 REACTOR RECIRCULATING PUMP P-200B (2-2-1B) RHR-70 NH-36247 RHR-71 M-117 NH-36243 (D,6) 18" M-121 (C,6) (E,6) CHK: APPR: CHK: DWN: APPR: CHK: DWN: 81 APPR: 80 APPR: CHK: DWN: 82 EC EC EC 20651 DWN: DWN: CHK: 78 79 APPR: 1 EC EC REV AV 86 A B C D E 21396 APPR: WMS 5-8-13 CHK: DWN: PEB 5-8-13 JJP 5-8-13 83 EC NOTE 7
- 7. SOLENOID VALVE SV-2017, ACTUATOR, LIMIT SWITCHES AND AIR LINES ASSOCIATED WITH VALVE AO-10-46B HAVE BEEN ABANDONED IN PLACE: REFERENCE EC21396.
25011 APPR: RAD 1-28-15 CHK: DWN: BAL 1-28-15 JJP 1-28-15 84 EC PAGE 3 ADDED TO.PDF DOC. 19671 APPR: MM 10-18-16 CHK: DWN: BAL 10-17-16 JJP 10-10-16 85 EC INTERNAL FLOODING RELATED. 8. (SEE NOTE 8) 86 LE RHR-B18 86 LE RHR-B4 LE RHR-B12 LE RHR-B11 86 86 27023 APPR: WMS 4-23-17 CHK: DWN: AJR 4-22-17 JJP 4-21-17 86 EC
LE RHR-A8-2 LE RHR-8-3 LE RHR-A14 LE RHR-A9 LE RHR-B15-A10 LE RHR-A16 LE RHR-A3 LE RHR-B6 X-50F REACTOR VESSEL R-200 (2-1) REACTOR RECIRCULATING PUMP P-200A (2-2-1A) L O C C03 X-12 RHR-20 3/4"-130 HE DB M-120 NH-36246 NH-36247 6 5 4 3 2 1 E D C B A E D A 6 5 3 4 1 2 B C REVISIONS MO 4085A VALVE LEAKAGE TEST 3/4"-130 RHR-19 MO 4086 MO 2029 MO 2030 FROM CNDS NH-85509 SERV WATER M-114-1 F RHR102 X-211B X-210B TORUS SUPPRESSION CHAMBER X-213B TORUS RING HEADER L O C C03 DC C DRW-123 ORW RHR-62 MO-20"-N29AB MO-18"-N14D5 MO 1986 (10-13A) REW10-18"-HE REW11-8"-HE TW28-20"-HE ORW RV56-1 1/2"-HB RV 2031 X-224B SC10B-2"-GE CST-89 2"-130 MO-18"-N14DU (10-17) (ISOLATION SIGNALS A,U) PS 10-118 M-120 TO ALARM REW10-18"-DB D99 D196-1"-HE RHR-13-1 1"-19 MO-18"-N29 MO 1988 (10-15A) TW28-20"-HE REW10 TW14B M-120 PUMPS B&D NH-36246 (B,2) SUCTION RHR L.O. M-135 EMERGENCY NH-36256 FUEL POOL COOLING HE PERMISSIVE TO OPEN WHEN TORUS DISCHARGE VALVE MO-2006 IS CLOSED MO-1986 IS CLOSED) SUCTION VALVE OPEN WHEN TORUS (PERMISSIVE TO PAS SYS FROM NH-96042-1 3"-N29AB RHR-10-1 L.O. RHR-1-1 14"-N29 14"-N29 RHR-1-3 (TEST) CONDENSATE NH-36039 STORAGE M-108 RHR-18-1 20"-N29AB C11 TW14B (START ON HIGH DRYWELL PRESSURE OR REACTOR VESSEL LOW LOW LEVEL WITH PAS-57-6 POS 3139 A B C D D83-3"-HE A/S AIR SET FILTER SV 1728 RHR-56-1 AI-243-1 RHR-58-1 RHR-57-1 RHR-54-1 RHR-55-1 AI-1087 (10-2A) E-200A EXCHANGER R.H.R. HEAT D184-1"-GE 1"-19 RHR-37-1 TE 10-93A 10-96A FE A C03 L C RV 4281 RV55-4"-HB C129A 10-117A PI PI 10-115A RHR-46-1 1"-130 V127-1"-GE CRW PS 10-122A NOTE 5 4" 4" TW40-4"-DBA TW40-4"-DBA DLA DB (10-18) L O C C03 POS 2018 M-117 3/4"-130 RHR-40 CRW RHR-9 18"-N14 RHR-25-1 3/4"-130 3/4"-130 RHR-24-1 V35-3/4"-DB AO 10-46A VENT 4" 4" RHR-73-1 RHR-72-1 L.O. M-117 (D,3) RHR-6-1 16"-NW-14 CRW DCA DLA DBA DLA DC DLA DB MO 2014 (10-25A) (10-27A) MO 2012 RHR-77-1 RHR-78-1 3/4"-19 3/4"-19 ORW PI 10-106C RV 1990 PI 10-106A ORW RV48-1 1/2"-HB 1" TW16-14"-HE dPT 7845A C129A dPI 7846A LOOP "A" DT AI-244-1 AI-153 NH-36049-13 M-131 (C,5) ENERGIZED WHEN RHR SW. PUMPS ARE RUNNING dPIC 10-130A C03 FROM E/S 7251A M-112 NH-36664 RHR SERVICE WATER CV 1728 TE 10-94A C129A RHR-38-1 C129A PI 10-99A WATER NH-36664 RHR SERVICE M-112 FT 10-97A E/S 10-145A FROM HS 7189 C03 C03 10-132A FI RHR104 T F RSW102 ACCUMULATOR T-75A T RSW100 K-10A RHR AUX. COMP. PANEL P73A BKR. #1 3/4"-163 AI-610-1 SET AIR L C03 C O CV 1994 RHR PUMP P-202C (10-3C) M-120 TO ALARM NH-36246 SEE DETAIL FOR PUMP VENTS & DRAINS AI-645-1 BKR 152-503 MTR HTR L35-10 MTR HTR L35-8 BKR 152-504 11 (10-3A) P-202A RHR PUMP L.O. L.O. D84-3"-GE RHR-47 3"-N26 10"-N26 RHR-3-1 RHR-2-1 10"-N234 L.O. RHR-4-1 14"-N26 L.O. 14"-N26 RHR-5-1 NOTES: VALVE MARK NUMBER WITH PREFIX "W" INDICATES ASA 600 LB. VALVE RATED AT 1248 PSI/563° F PER MSS-SP-66. 1. SEE DWG. No. 2. DELETED 3. TYPICAL SPEC. CHANGE AFTER LAST VALVE IN VENTS, DRAINS AND LEAK TEST CONNECTIONS. 4. 2. FROM PS 2-128A & PS 2-128B, PERMISSIVE TO OPEN 5. ISOLATION SIGNALS A,U 6. REFERENCE DRAWINGS: RHR FUNCTIONAL CONTROL DIAGRAM 1. RHR PROCESS FLOW DIAGRAM PUMP NUMBER P202B P202A P202C P202D SUCTION DRAIN DRAIN DISCHARGE DRAIN CASING VENT LEAKAGE SEAL VALVE No. LINE No. LINE No. LINE No. LINE No. LINE No. VALVE No. VALVE No. VALVE No. VALVE No. FIS No. RHR-44-1 RHR-44-2 RHR-44-3 RHR-44-4 D86-1"-GE D85-1"-GE D88-1"-GE D87-1"-GE RHR-36-1 RHR-36-2 RHR-36-3 RHR-36-4 D151-1"GE D137-1"GE D150-1"GE D138-1"GE RHR-23-1 RHR-23-2 RHR-23-3 RHR-23-4 D192-1"GE D194-1"GE D193-1"GE 195-1"GE RHR-35-1 RHR-35-2 RHR-35-3 RHR-35-4 V96-3/4"-GE V90-3/4"-GE V95-3/4"-GE V91-3/4"-GE 10-124-A 10-124-B 10-124-C 10-124-D RHR-22-1 RHR-22-2 RHR-22-3 RHR-22-4 D90-3/4"-GE D89-3/4"-GE D92-3/4"-GE D91-3/4"-GE SUCTION DRAIN CRW NOTE 2 DRAIN CASING DISCHARGE DRAIN SEAL PUMP SEAL LEAKAGE VENT COOLER SEAL CYCLONE SEPARATOR M-111-1 RBCCW FIS A C03 C NOTES:
- 1. VALVE CLASS 1"-19
- 2. VALVE FOR P202B (RHR-45-2) &
P202D (RHR-45-4) ONLY. 3/4"-130 RHR PUMP VENT & DRAINS DETAIL (TYP OF 4) RHR106 T TE 10-94C A H C03 TR 23-115 C21 M-120 FROM TE 10-93B-1, TE 10-94B-1 & TE 10-94D-1 & TE-2781B FROM TE-2781A M-135 3/4"-130 RHRSW-15 NH-36664 RHRSW PUMPS M-112 RHRSW-16 3/4"-130 RHRSW-17 8"-N234 3/4"-130 RHRSW-35 RHRSW-36 3/4"-130 VENT SW9-8"-GE P-109A & C C03 10-139A FI FT 10-109A FR 10-143 C03 M-120 FROM FT 10-109B NH-36246 FROM E/S 7251A TW30-14"-GE TW33-12"-GE TW22-14"-GE RV52-1 1/2"-HB RV 2004 1" TW36-4"-GE PERMISSIVE TO OPEN WHEN SHUTDOWN CLG. SUCTION VALVE MO-1988 IS CLOSED RHR100 F FE 10-108A FT 10-111A FE 10-110A FS 10-123A NH-36246 TO ALARM M-120 FI 10-136A C03 FROM E/S 7251A HS 7189 C03 FT 10-97A FI 7189 C03 MO 2006 (10-39A) L O C C03 TW35-4"-GE MO-12"-N26 TW34-12"-GE 1" NH-36242 FROM PS-2-3-52A M-116 (PERMISSIVE TO OPEN ON REACTOR LOW PRESSURE) M-114-1 SERVICE WATER NH-85509 NH-36258 M-143 2"-130 CST-95 SC10A-2"-GE SC10C-2"-GE CST-99 2"-130 NH-85509 FROM CNDS M-114-1 SERV WATER GE HE L O C C03 MO 2008 (10-34A) MO-10"-N138 HE GE RHR-65-1 3/4" LEAK TEST L O C C03 MO 2010 (10-38A) MO-4"-N138 3/4" L.O. (10-66) MO 2407 L O C C03 MO 2032 C A.C D.C (10-57) RHR-59-1 3/4"-130 RHR-67-1 RHR-68-1 RHR-69-1 (ISOLATION SIGNALS A,U) MO-4"-N26 TW37-4"-GE LEAK TEST CONN. (10-65A) MO 2002 MO-14"-N138 SX 2897 CE 10-112A TW22-14"-GE CIT 10-113A C RHR108 A H C03 TO PAS SYS NH-96042-1 TW30-14"-GE PAS-57-5 C C217 C217 C217 L.O. RHR-7 14"-N26 1"-19 RHR-41 FPW12-8"-GE 1" DRAIN TW29 TW30 FE 10-121A FS 10-121A L TW29-14"-GE TW29-10"-GE TW29-10"-GE SV 1994 PS 10-105A PS 10-105E PI 10-107A C129A (10-153A) TW31-2"-GE N.E TO A.C. INTERLOCK dPT 7845C C129A PI 10-107C RHR-3-3 10"-N26 TW29-10"-GE 10"-N234 RHR-2-3 PS 10-105G PS 10-105C L FS 10-121C FE 10-121C TW22-14"-GE M-120 ORW PC-35 1"-19 1"-19 PC-36 D95-1"-GE D96-1"-GE HC GE GE TO A.C. INTERLOCK SV 1996 SET AIR CV 1996 T-75C ACCUMULATOR RV50-1 1/2"-HB ORW RV 1992 1" TW31-2"-GE (RECIRC) TW34-10"-HE TW30-16"-GE TW35-4"-HE TW31-2"-GE (RECIRC) FUEL POOL EMERGENCY COOLING NH-36256 NH-36045 M-139 M-135 NH-36246 MO 2033 CORE SPRAY M-122 NH-36248 TW12 WASTE SURGE TANK CROSS TIE GE DB MO-16"-NW123D 3/4"-130 RHR-11-1 RHR-12-1 3/4"-130 (VALVE POSITION INTERLOCKS) TW30-16"-DB D98-3/4"-DB HE GE DCA DB 1"-CCA RHR-31-1 RHR-32-1 RHR-33-1 TW13 3"-N237 RHR-8-1 RO 2000 RO 1998 X-13B D57-1"-DCA VALVE LEAKAGE TEST CONN. MO-16"-NW14DU SEE NOTE 1 SEE NOTE 1 M-122 NH-36248 L O C C03 (10-153C) N.E. 3/4"-163 AI-610-3 AI-645-3 A/S HE GE TW18-14"-HE (MOV POSITION INTERLOCKS) C129A HB ED V45-3/4" INSIDE OF DRYWELL VALVE LEAKAGE TEST CONNECTION C SEE NOTE 6 DCA ED DLA 3/4"-130 RHR-26 RHR-27 VENT RHR-49 CRW X-17 RHR-75-1 MO-10"-N26 MO 2022 L O C C03 10" 3/4" GE X-39B RHR-76-1 RHR-17-1 RHR-16-1 VALVE LEAKAGE TEST CONN. 3/4"-130 3/4"-130 D101-3/4"-GE AIR TEST CONN. REFUELING SEAL RHR-74-1 MO 2020 TW33-10"-GE TW33-12"-GE RHR-63-2 RHR-63-1 (10-31A) MO-10"-N26 (10-26A) L O C C03 POSITIONER AI-634 AI-633 AI-635 NH-36042-2 (D,4) (D,6) (C,6) (D,6) (B,6) (B,4) (B,5) (B,4) (C,1) (A,4) (C,5) NH-36049-13 M-131 (B,2) (B,2) (C,6) (C,2) (B,6) (C,1) NH-36243 NH-36243 (C,4) (E,2) (A,4) (A,4) MO-4"-N26 10-92A dPS 10-91A dPT 3/4"-130 E/P 1728 M-122 NH-36248 TO FT 14-40A (A,2) (E,2) ORW PC-18 PC-1 (C,5) M-131 NH-36049-13 A/S (D,2) M-117 NH-36243 (C,5) (D,3) NH-36258 M-143 ON LOW PRESSURE. NOTE 5 HB MAIN LINE CLASS (C,3) ORW PS 7192 11 13 ORW ORW C03 16A-S9 HS BKR 3333 3309 BKR C03 10A-S11A HS C03 10A-S9A HS BKR 3339 C03 10A-S8A HS 3334 BKR C03 10A-S10A HS BKR 3335 BKR 3331 C04 2A-S9A HS C03 16A-S10 HS BKR 31307 C04 2A-S10A HS BKR 3332 C03 10A-S4A HS BKR 3321 BKR 3322 C03 10A-S6A HS C03 10A-S25C HS C03 10A-S2A HS C03 10A-S3A HS C03 10A-S16A HS C03 10A-S25A HS BKR 3336 BKR 31310 C03 16A-S14 HS C L O C C03 C03 16A-S13 HS BKR 4211 C03 10A-S13A HS BKR 3338 BKR 3337 C03 10A-S12A HS C03 10A-S14A HS BKR 3341 NH-36246 (B,6) NH-36256 (B,4)(C,6) RV 4908A (B,7) L.O. DRYWELL HIGH PRESSURE AND VALVES MANUALLY) INTERLOCKS (PERMISSIVE TO OPEN REACTOR VESSEL LOW LEVEL FROM (CLOSE) REACTOR VESSEL LOW LEVEL INTERLOCK (PERMISSIVE TO OPEN VALVES MANUALLY) (E,6)(E,2) NH-36242-1 M-116-1 (D,4) NH-36258 M-143 FROM PS-10-119A,B,C,D LS-2-3-73A,B (OPEN) FOR ADDITIONAL INTERLOCKS) SEE FUNCTIONAL CONTROL DIAGRAM OR REACTOR VESSEL LOW LEVEL. SIGNAL (DRYWELL HIGH PRESSURE AUTOMATIC VALVE ACTUATION (CLOSE) FROM CONDENSATE CONN. (CLOSE) M-120 RHR-53-1 3/4"x1/4" RHR-79 RHR-80 NX-7905-4 NX-7905-6-1, 2 & 3 FROM ABANDONED COMBINATION TC/RTD PROBES. RTD'S TO LOCAL JUCTION BOX (NJ5303). TE-10-93A-1 (TC), TE-10-93A-2 (RTD) TE-10-93C-1 (TC) (SPARE), TE-10-93C-2 (RTD) TE-10-94A-1 (TC), TE-10-94A-2 (RTD) TE-10-94C-1 (TC), TE-10-94C-2 (RTD) 7. 10-93C TE SEE NOTE 7 SEE NOTE 7 SEE NOTE 7 SEE NOTE 7 RHR-83-1 RHR-85-1 RHR-83-2 RHR-85-2 RHR-82 RHR-84 RHR-81 REW10-1" DC NH-36246 (B,6) X-204A-D X-320A-D (NH-36246) (B-6) SERVICE WATER M-114-1 FROM CONDENSATE RHR-87 RHR-86 SC29A-1"-GE REACTOR LOW PRESSURE OR REACTOR LOW LOW LEVEL SUSTAINED FOR 15 MIN.) (B,2)(B,6)(C,2)&(C,6) NH-36242 M-116 (ISOLATION SIGNALS A,U) M-112 NH-36664 (C,4) RV55-2 1/2-HB ORW CGC3A-2"-CA RHR-90-1 3/4"-19 GE RHR-89-1 RHR-88-1 NH-36247 MONTI CAD DWG ` ' This map/document is to assist employees in the performance of their jobs. Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. SCALE: NONE M-121 AV Xcel NORTHERN STATES POWER COMPANY MONTICELLO NUCLEAR GENERATING PLANT Energy sm P&ID RESIDUAL HEAT REMOVAL SYSTEM REV 89 1728 AIRREG 15557 APPR: VJK 4-7-11 CHK: DWN: DDW 4-6-11 BAT 4-3-11 80 EC 17932 APPR: IRL 6-29-11 CHK: DWN: BAL 6-28-11 JJP 6-28-11 81 EC 19350 APPR: SWK 4-18-12 CHK: DWN: PEB 4-17-12 JJP 4-17-12 82 EC TO PAS SYSTEM NH-96042-1 REW10-1"-HE SPECIAL CONCERNS ITEM SAFETY RELATED ELECTRICAL COLOR LEGEND ASME CLASS 2/QUALITY GROUP B SAFETY RELATED MECHANICAL QUALITY GROUP D ASME CLASS 3/QUALITY GROUP C ASME CLASS 1/QUALITY GROUP A 21396 APPR: WMS 4-19-13 CHK: DWN: PEB 4-19-13 JJP 4-19-13 83 EC NOTE 8
- 8. SOLENOID VALVE SV-2016, ACTUATOR, LIMIT SWITCHES AND AIR LINES ASSOCIATED WITH VALVE AO-10-46A HAVE BEEN ABANDONED IN PLACE; REFERENCE EC21396.
20651 APPR: CHK: DWN: JJP 4-29-13 84 EC BAL 4-29-13 JEB 5-1-13 25011 APPR: RAD 1-28-15 CHK: DWN: BAL 1-28-15 JJP 1-28-15 85 EC PAGE 3 ADDED TO.PDF DOC. 19671 APPR: MM 10-18-16 CHK: DWN: BAL 10-17-16 JJP 10-11-16 86 EC INTERNAL FLOODING RELATED. 9. SEE NOTE 9 SEE NOTE 9 27897 APPR: PY 12-13-16 CHK: DWN: BAL 12-13-16 JJP 12-12-16 87 EC 27023 APPR: WMS 4-23-17 CHK: DWN: AJR 4-22-17 JJP 4-21-17 88 EC 28692 APPR: MM 7-11-17 CHK: DWN: AJR 7-11-17 JJP 7-7-17 89 EC 89 PC-37 1 2 " HIGH POINT VENT LINE - SEE EC28692
E D c B A I CS-14-2 I 6 5 4 (OPEN ON AUTOMATIC INITIATION (NOTE 1)) FROM PS 2-3-52A (M 116} & PS 2-3-528 NH-36242 (PERMISSIVE ON LOW (C,2)&(C,6) REACTOR PRESSURE) REACTOR VESSEL (lot 116 }-------------------, INSTRUMENTATION NH-36242 I 'l' (E,2)&(E,5) 1 I REACTOR VESSEL I 3 (OPEN ON AUTOMATIC INITIATION (NOTE 1)) (M 116} NH-36242 (C,2)&(C,6) REACTOR VESSEL INSTRUMENTATION 'l' CONDENSATE SERVICE WATER (M 114 1} 1 INSTRUI.lENTATION I +-------------------------------------------"'-------*----------------*----------------*----------------... NH-85509 C292 C292 (A,5) ~ ~ S~2 3 NH-36664 C03 co,4) DO 1 8co3 8co3 1 i ~528 11~-~18 i I I 1 I C2921 I I C2921 XFER I I C03 I XFER I !59 11~-~1ss"'--1--ll ~~~ 11 (M-112) FT-10-978(---------, ~B 9 ~~¥~~ FT-10-1118,------1 i ~---------------@:-----r ~~ ~~-&r,.. "'.,., /---~:~~-~ ~ FROM E/S 4100 (-..------ 1 I ~292 I I \\~ I I I I ~~~~ I ~-19)! i ~ i~~ I rn'<~) I BKR 4324 ~38 I / NOTE 3 /l3/4"-1~ \\/ !I (14-::..128) v_ __ 'MO\\\\ I.~ I t MC \\' / CO(~ tPoS\\ BKR -:':'~ ~7q2 ~~;_'til ~ L7~~4 ~ ~..,~ ~8 TW7-11)"-lit (H-TW7-8"-ED L .. 1 IW/-0 "~ 2" r:;.;....;.;.....;;.;.. __ J=-ltlt-:~~~~g 1~ 40DlC~(~M0~~1~Y~:IJ111~~ ICS-1j-21/ L.O. I rL'E\\ GEIED P' ,_ 11 _ L8--N14J ~ ~ 6
- ['_I w
".FE" 0 ~ 4"- ED DLA DLA I ED rrn:A RV-42-2"-HB_/,., E ~ ~ ..., LT16-3/4" """- i-1~-: ~f-.!:!!:::!!+-*-+-~=--+.::::;.~= II] 4"- Sl! ~I ~ 8 ~ VALVE II__ -~ TEST CONN. t;j 'I L~-L4-21
- I 110 I
(\\ T , 1- *..L 'I / Ill CIIW I 2 !Pi\\ !PM 'Y f2: ~8 SC30-3/4" N'- ' 'I ([ _GE I HB_ ICST-100-11 ( 3/4' -19) w 0 -I ~8 REFERENCE DRAWINGS:
- 1. CORE SPRAY SYSTEM F.C.F. (GE153F722) NX-7833-1-2
- 2. CORE SPRAY SYSTEM F.C.D. (GE729E239) NX-7833-3 1
1/2"-H8 ORW ~ (CLOSE ON AUTOMATIC INITIATION (NOTE 1)) (CLOSE ON AUTOWATIC INITIATION (NOTE 1 ))
- 3. CORE SPRAY SYSTEM PROCESS FLOW DIAGRAM {GE161F301) NX-7833-4 I
I I I I BKR 3327 C03 I ( 1~) C03 /.\\f:l ~ I IJ MU \\\\ V\\, MU-O -N138) _c_ C19 C03 _B.27-R-C ~----* I:BES4A*--*--1~!H:;;~~-.. l3/4--* t\\. Jli!~.C121 L_ ________ _, __ ~~~~~~~><Ar--cr~~ IPI~ -~~ ~--c .-~~ = ~.,~, I '111 ~ ~B ~B l ~ 1 I I L _____ __ .....b.. AUTO 8LOWDOWN ~ AC INTERLOCK II PT ~.14-- ~~ ~ ~7i4 ll"-1. _<.vc <.r_
- .<f~
u--snJ IICS-1~~ GEII HE: ~ !!!!!!!!!!!!!!!!!!!!~i lW7-2"-GE~ (2'-130 ~ _(~~2_ ~ (FROM PRESSURE J I n TW8-8" -HE ABOVE CORE PLATE) 1W12-8" -HE ~ lT-19) r-~~~~~, "v va'S i INITIATION (NOTE 1) NH 36258 'j" \\\\?A54 ~ fLE\\ HE GE CS-10-11 [2'-130)
- 4. CORE SPRAY ELEMENTARY DIAGRAM (GE729E817) NX-7833-21-(1 THRU 5)
- 5. CORE SPRAY CHECK VALVE DESIGN SPEC. EB2FR01-01 FOR PIPE CLASS C03 C19
~A ~ I I _______ _j ~ PT \\' ~l1;~rtf=-<-'4'4C*.._--;*, AUTO 8LOWDOWN AC INTERLOCK 1-2"-GE 1--'-, I 11 OA) l2"-19J j::::::t,J~i-~11' ( (1~1~~n* 1L ~~)~ ~~r~~~-~---~i~,~~~~~-~~*~~~~~~~---i-------~------*-*=:-*----------*--*-------*i,'~-~~~~1~ij~~~M~OO~~~(M-1~)~ ~~PUMP
- ~
TW4-4" -HE HPCI (8,2)&(8,6) (D,3) MIN. FLOW FW6-2" -HE g"" C:03 ~---------..... *.(M 124) {M 126>-...... *-------- H~ ~ :;uo iE-!ljt*-tr~~5B NH-36250 -,., TORUS ACCESS HATCH NH-36252 2"-HE I-1!~5A*'-! ~ A. I
- 2 r--_
~ {8,5) .....-!;,_ ~nn.'!J lYPICAL OF 2 SPACED 180" APART {8,5) [ Ll ,.----.----1 -1 I fru\\_ 3/4---119; __ ! __. )lrV -v~8-*,"-GE V97-1" 314--119: sf~~~~~~K[E~ :"" OR rnniiNr. \\ CRW ~L ~076-~-GE RH~INTfST
- ~
1W24 TORUS SUPPRESSION CHAMBER // TW34 RH~INTfST 07;"-GE~ '-...!~ CRW ~rnniiNr. a:"" sf~!~~~KfER REVISIONS 76 EC10785 DWN: JJP 5-29-07 CHK: BAL 6-14-07 APPR: EAN 6-15-07 77 EC11310 A/R 01099604 DWN: JJP 8-16-07 CHK: BAL 8-20-07 APPR: JIH 8-20-07 78 EC11951 A/R 01121715 DWN: JJP 3-5-08 CHK: llJR 3-11-08 APPR: Rt.lG 3-12-08 79 EC12433 A/R 01125736 DWN: JJP 4-21-08 CHK: BAL 4-21-08 APPR: JIH 4-21-08 80 EC18998 DWN: JJP 10-31-11 CHK: BAL 11-1-11 APPR: Kt.lF 11-7-11 81 EC16693 DWN: JJP 3-21-12 CHK: PEB 3-21-12 APPR: KF 3-21-12 82 EC20651 DWN: JJP 4-29-13 CHK: BAL 4-29-13 APPR: JEB 5-1-13 83 EC21396 DWN: JJP 5-7-13 CHK: PEB 5-7-13 APPR: WMS 5-7-13 84 EC22928 DWN: JJP 12-2-13 CHK: BAL 12-2-13 APPR: WMS 12-2-13 85 EC25011 3 ADDED TO.PDF DOC. DWN: JJP 1-28-15 CHK: BAL 1-28-15 APPR: RAD 1-28-15 86 EC27023 DWN: JJP 4-21-17 CHK: NR 4-22-17 APPR: Wt.lS 4-23-17 87 6DOCEDI27833 DWN: JJP 8-3-17 CHK: BAL 8-3-17 APPR: RAH 8-3-17 (1 ,.-N-H.:...(J.:....~:....~6-4 ____.:..t.1~ /51\\. () t-~ ~~-316220?s---- *--~-----------f-"1 ___ _J __________________________________ ~--- r+---------
~HM_3~~'J I
II',H n IJ-____ _!1/J..""~*:s_ ____ N_:H(~~:.:_.~6!._l6-,4 1i~B C 1 -19 J ~..J. ~ ** ~...--'c 1 )I f I 11---, ~.1" '\\ 1 cs-1~ CORE SPRAY ,c I',. 8KR 152-505 CORE SPRAY 1 cs-1::;;I , 1 LJ/H~ l~~:B Moi~3~~TER .,..1.....--1< _19 ~ 1 ~ ~ t ~s~ER
4"'
~ 1 ll'"'t J Moi~~5~EfJER l~~~ l314"-t~, 1 A_ (w~lf~~JE) ~ l---vl s-7-21 @.349/cs @.35o;cs 1ft ~ ~ ~u-z26~ "-2o"~ ToRus RING HEADER @.349/cs 35o;cs ~~.... ~ (~-~~E) /a~oRw cRw CRW ORW rt~ 1-' fill ~L, ° CRW ~ ~~L i ~C03 CO~ t--- W9i liS i _3~-Hd ~03 C03~ t ~~ ~C06 CRW 0 Lffi fLE\\ k k L ~~ 8C03 L )----\\ )----\\ L 12-12"-HBI "=" ECCS AREA DRAIN -7 -7 t;it- -mEs3B ~._ ~-- ECCS AREA DRAIN PUMPS-1 00 GPM ""=~?--_j L ;-=~_j ~ ~, PUMPS-1 00 GPM C121 TW6 HB HE -3 lW6 12" HE ~D78-2"-HE
- 1 I CS 2 2 I y ( 2 -19 )
ORW EACH 'r ll 'r IORW 131 4 .BKR ~26 ""'C03 ORW 131 1( ~ l l C E::§§!l l3 237J (;i 1 1':-~J'A---~~ l3 237) / ~ '\\ / P-888 '\\ EILH P-88C BKR 4349 BKR 4350 BKR JJ21 BKR 3349 BKR 3350 ,.,.==.----.--.-.-----.1 (3 237JDRW 131 3 (14-78).. A .. L.~. ~-~- .. _.. (14-7A) (3 237JDRW 131 2 =c=/ / '"\\. t"'~M"'co-*-11"'2~--""""-N~: ~ I lin l~M"'C0,..---11,.,.-2'"' D79-2"-HE--... l1: I CS 2 1 I 1: I CS-3-1 I (1 ( 2 -19 ) lY/10 lc14 I HE I H8 'CRW) I~ 7 I~ 3/4'-19)1 TW10 12" HE -3 NOTE: 1. AUTOMATIC INITIATION OF THE CORE SPRAY SYSTEIAS OCCURS ON: A} HIGH DRYWELL PRESSURE OR B LOW LOW REACTOR WATER LEVEL AND LOW REACTOR PRESSURE OR C LOW LOW REACTOR WATER LEVEL FOR 15 MINUTES (NOMINAL).
- 2. SOLENOID VALVE SV-1755, ACTUATOR, LIMIT SWITCHES AND AIR LINES ASSOCIATED WITH VALVE A0-14-13A HAVE BEEN ABANDONED IN PLACE; REFERENCE EC21396.
- 3. SOLENOID VALVE SV-1756, ACTUATOR, LIMIT SWITCHES AND AIR LINES ASSOCIATED WITH VALVE A0-14-138 HAVE BEEN ABANDONED IN PLACE; REFERENCE EC21396.
COLOR I ElfNP ASME CLASS 1/0JALilY GROUP A ASI.tE CLASS 2/QUAUIY GROUP B -ASME CLASS 3/QUALITY GROUP C -oUAUJY GROUP D -SAFElY RELATED MECHANICAL -SAFETY RELATED ELECTRICAL This map/document is to assist employees in the performance of their jobs. M -122 Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. h-M""'O""N""TI-C""A""D,...,DW""G,......""'As""" P&ID CORE SPRAY SYSTEM S~CA~L~E:~NO~N~E~--------~R~~~8~7~ E D c B A 6 5 4 3 2 MONTICELLO NUCLEAR GENERATING PLANT fl Xcel Energy-NIKIIDIII SWES R.a OOIIPM'f ~H-3624~
AND C03 SE 7923 SPEED TURBINE MISC TURBINE INSTRUMENTATION 23A-S19 3x2 C28-2"-HE D45-3/4"-HE TW38-2"-HE CONDENSATE PUMP P-212 TO PT 23-83 VALVE (CLOSE) XFV-84 NH-36241 MAIN STEAM HPCI-10 3/4"-130 HPCI-23 HPCI-11 3/4"-130 HPCI-75 A 6 SUPPRESSION POOL LT29B-3/4"-HE V52A-2"-HE HPCI-65 B HPCI-66 LT29A-3/4"-HE 2"-130 3/4"-130 HPCI-67 X-217 HPCI-71 2"-130 HPCI-70 LT29C-3/4"-HE HPCI-68 3/4"-130 3/4"-130 HPCI-69 C D R-200 (2-1) REACTOR VESSEL HPCI-83 RS2-20"-HE X-221 D13-2"-HE X-222 2"-19 HPCI-16 HPCI-84 HPCI-85 HPCI-82 RS2-16"-HE 20"x16" L.O. PS2-18"-ED 2300B LEAKAGE HPCI PUMP 23A-S15 NH-36049-14 4 5 FULL OPEN (D,2) MO-2036 IS CLOSE WHEN OIL PUMP P-217 HPCI TURBINE AUX. (NOT SHOWN) HS dPIS 23-76A HPCI-14 2"-223 3/4"-130 HPCI-17 LT29-3/4"-HE TEST LEAKAGE VALVE LEAKAGE VALVE TEST 2"-223 HPCI-15 TEST LT28-3/4"-HB LEAKAGE VALVE 3/4"-19M3 3/4"-19M3 A H HPCI-9 16"-N237 RO 2040 C V52-1"-HE PS 23-86 1/4" X-49C X-49D M-115 (D,5) PSD 2039 PSD 2038 V52-16"-HE 1"-972 1"-972 XFV-85 C122 H TRIP HPCI-13 TURBINE TW38-2"-GE HPCI-28 2"-19 HPCI-27 HPCI-78 L L (BOOSTER) PS 23-68B PS 23-68D dPIS 23-76B C122 H C214 C214 NH-36250 HPCI-8 WATER SUPPLY COOLING HPCI-7 M-124 (C,2) C214 OR OR AND PS 23-68A (23-1) P-209 PS 23-68C L L C214 TEST TEST (A,4) COOLING WATER NH-36250 SV 2394A (OPEN) A/S ND DC M-124 (C,3) RETURN 3 TW39-2"-HE 2"-223 HPCI-20 TRIPPED HIGH LEVEL) LS-2-3-672 E&F (TRIP ON REACTOR LS 23-98 C28-1"-HE L O C TW38-2"-HE VALVE LEAKAGE RS2-18"-HE A H A H PS 23-97A PS 23-97B HPCI-24 C28-1"-HB SV 2394B M-131 A/S DC ND CRW PCV 3492 YS D13-3/4"-HB 2051 ST 2052 HPCI-25 C (23-40) LT31-3/4"-HE CV 2394B HPCI-80 HE GE L O C HE HB 2"-19 HPCI-12 D13-2"-HE HPCI-26 C HPCI-59 C120 C03 TO REACTOR RS2-16"-HE C120 PI 23-112 HPCI-60 VESSEL (MAIN) C19 Y80 CKT. 8 23A-S22 HS 23-110 E/S PT 23-95 PI 23-96 C120 C120 HPCI-58 PI 7252 HPCI-87 M-124 (B,4) NH-36250 TO PT 23-100 (C,2) FROM PS-23-84-A TURBINE TRIP (D,2) NH-36250 M-124 NH-36250 M-124 RV41-2 1/2"-HB ORW 3/4"-130 HPCI-21 RV41-1 1/2"-HE L O C L O C CV 2394A (23-39) RV 2056 D41-1"-HE HPCI-72 HPCI-96 D41-1"-HE HPCI-50 HPCI-49 TW38-2"-HE HS A H D49-3/4"-HE D50-3/4"-HE CONTROL SIGNAL OUTLET GOVERNING 1x3/4 FROM SPEED GOVERNOR D47-3/4-HE HPCI PUMP (23-2) S-201 DRIVE TURBINE D47-3/4"-ED RO 2412 18" ED D48-1"-HE HE PRESSURE NH-36242 (D,6)(D,3) M-116 HPCI-94 VESSEL FROM 3/4" HPCI-86 RO 2411 HE PI 7250 FILTER D45-3/4"-ED HPCI-48 HO 8 VALVE RO 2410 ED HE L O C NH-36249 E 6 GRAPHIC DISPLAY FE 3493 L O C C03 L O C CO3 4 MO-8"-N14D (23-16) M-143 NH-36258 OR HIGH DRYWELL PRESSURE HPCI INITIATED ON LOW LOW REACTOR WATER HIGH FLOW) (CLOSE ON 5 MO-8" PS18-8"-ED BKR 4342 TO MO-2061 & MO-2062 NH-36250 (23-15) 2300A M-124 (A,3) MO 2034 C 23A-S2 HS SLOPE OR (E,3)(E,5) M-116 NH-36242 (OPEN) AND H A C X-11 (D,3) (B,2) NH-36250 M-124 LT30-3/4"-ED FOR STARTUP TURBINE STEAM CONNECTION TEMPORARY HEATING BKR 31205 D.C. HPCI-1 HPCI-2 3/4"-130 3/4"-130 MO 2035 L O C CO3 L O C C03 23A-S3 HS C VALVE LIMIT FROM STOP & STEAM ADMISSION SWITCHES GRAPHIC DISPLAY 6" A H OIL COOLER TIS 7268 A L BEARING OIL PS 7311 A SLOPE (CLOSE) (B,2) A H dPS 7310 OIL TS 23-101 A-D H OR 7317 SCP 7923 SY TS 23-102 A-D H NH-36250 M-124 3 P&ID (STEAM SIDE) HIGH PRESSURE COOLANT INJECTION SYSTEM MONTICELLO NUCLEAR GENERATING PLANT NORTHERN STATES POWER COMPANY Xcel This map/document is to assist employees in the performance of their jobs. Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. 3/4 3/4 HPCI SYSTEM ELEMENTARY DIAGRAM HPCI SYSTEM FUNCTIONAL CONTROL DIAGRAM RO 2060 TX 2059 3x2 TW39-2"-HE LUBE OIL COOLER E-206 BKR 31202 HPCI-18 2"-223 2 INITIATION OPEN ON HPCI 23-115 (A,4)(C,1) (FROM TE's FOR TURBINE LUBE OIL ALSO SEE DWG's. BLOWER K-200 BKR 31201 GLAND SEAL E-204 CONDENSER GLAND SEAL TX 2057 THRUST BEARING, AND PUMP BEARING (3) TEMPERATURES) BEARING OIL, L.P. BEARING OIL, COOLER OUTLET, CASING (2), H.P. RO 2058 HPCI-64 HPCI-63 HPCI-19 LS 7314 LS 7313 2 PS 23-106 RO 2050 A H C120 D41-1"-HE HPCI-51 RR58-3/4" M-121 NH-36247 (C,2) START ON HPCI INITIATION 23A-S18 HS 1" AND HPCI-57 D45-3/4"-ED PS18-8"-ED HE RO 2408 D44-1"-HE D43-3/4"-HE HO 7 TURBINE TRIP STOP VALVE HPCI-47 RO 2409 L O C ED HE ED TR C21 SLOPE HPCI SYSTEM WATER SIDE REFERENCE DRAWINGS: 1. 3. 2. OG24-3"-HC M-143 NH-36258 (C,4) SLOPE OFF-GAS M-142 DISCHARGE) NH-36159 (STM PKG EXHR (B,6) MO-8"N14D (A,4) A/S CV 2043 NH-36049-14 M-131 L O C HPCI-73 1"-CCD-GB (OPEN) SV 2043 23A-S12 ND HS L O C MO 2036 BKR 31206 (23-14) DC 23A-S1 HS (23-53) ST 2045 HPCI-4 D12-1"-EF 1"-19M3 1"-19M3 HPCI-3 1/2"-19 HPCI-90 LS 23-90 A H PS18-8"-ED 8" SLOPE MONTI CAD DWG ` ' NH-36249 Energy sm 1 SCALE: NONE A M-123 83 REV W L O C HPCI-74 1"-19 D12-1"-EF VALVE TEST LEAKAGE NX-8292-12-1 THRU 7 M-124, NH-36250 NX-8292-15-1 THRU 3 LT32-3/4"-EF LT32-3/4"-EF (23-42) HPCI-6 3/4"-130M3 3/4"-130M3 HPCI-5 HS D12-1"-HS EF SV 2046B A/S FULL OPEN (D,2) HPCI-29 1/2"-19M3 SV 2046A CV 2046A DC NE EF L O C DC HS 23A-S11 NH-36049-14 (A,4) NE L O C A/S M-131 MO-2036 IS CLOSE WHEN CV 2046B B NH-36033 M-102 (TO CONDENSER) MAIN STEAM DRAIN (A,6) D C L O C STEAM LEAKAGE TS 23-104 A-D OR CLOSE ON SI 7317 C03 TS 23-103 H A-D H DETECTION TE 23-105 C03 23-111 PI A-D M-128 NH-36254 (D,1) TO TR-4926 CLEAN-UP SYSTEM REACTOR WATER 2 PS18-8"-ED PT 23-89 C120 PI 23-88 C120 JJP 8-27-10 BAL 8-30-10 KMF 9-2-10 16626 11951 REVISIONS JJP 3-5-08 RMG 3-12-08 BJR 3-11-08 DWN: 78 DWN: CHK: APPR: APPR: CHK: EC 1 77 EC A/R E 01121715 SPECIAL CONCERNS ITEM SAFETY RELATED ELECTRICAL COLOR LEGEND ASME CLASS 2/QUALITY GROUP B SAFETY RELATED MECHANICAL QUALITY GROUP D ASME CLASS 3/QUALITY GROUP C ASME CLASS 1/QUALITY GROUP A 19540 APPR: PEB 6-6-12 CHK: DWN: BAL 6-6-12 JJP 6-5-12 79 EC 23893 APPR: MLW 6-12-14 CHK: DWN: NJM 6-11-14 JJP 6-2-14 80 EC 25011 APPR: RAD 1-28-15 CHK: DWN: BAL 1-28-15 JJP 1-28-15 81 EC PAGE 3 ADDED TO.PDF DOC. 23705 APPR: TKN 5-14-15 CHK: DWN: BAL 5-8-15 JJP 5-8-15 82 EC SEE NOTE 1 NOTES: 1. HPCI-15 IS AN IN-LINE STYLE CHECK VALVE WITH A SOFT SEAT PER EC23705. 27893 APPR: BJR 5-12-17 CHK: DWN: BAL 5-12-17 JJP 5-12-17 83 EC 83 D41-3/4"-HE
MO-14"-N29AB (23-57) 23-81 TW1-14"-HE X-9A REACTOR CLEAN-UP SUPPRESSION POOL A X-204A-D X-225 6 X-320A-D RINGHEADER X-206B NH-36250 REACTOR VESSEL B C M-120 M-122 (C,4) (C,5) NH-36248 NH-36246 D E TW9-2 1/2"-HE TW24-12"-HE FW2B-14"-ED X-210A TW8-8"-HE X-206A (D,7) M-128 NH-36254 (2-1) R-200 6 HPCI-56 3/4"-130 HPCI-54 HS M-105 NH-36036(A,5) HPCI-100 3/4"-130 L.O. LT14-3/4"-HE MO 2061 23A-S14 LS 23-91B LS 23-91A 1/8 ORIFICE OR AND MO-2062 OPEN MO-2061 MO-14"-N29AB 5 A H C BKR. 31207 C O L FUEL POOL COOLING AND CLEAN-UP SYSTEM (CLOSE) MO-12"-NSp14DU LT13-3/4"-ED LEAKAGE M-122 NH-36248 (B,4) TW3-12"-ED REW6-3"-ED M-115 FEEDWATER (A,5) NH-36241 TW4-4"-HE 3/4"-130 HPCI-40 HPCI-41 3/4"-130 MO 2068 31211 BKR. O C L (23-19) D.C. SC16-8"-ED HPCI-55 3/4"-130 HPCI-95 23A-S6 D201-3/4"-ED TW50-3/4 VALVE TEST TW50-1/2 HPCI-106 HPCI-107 23-117 PI HPCI-108 HPCI ISOLATION HPCI INITIATION NOTE 1 HPCI-104 HB ED HPCI-105 HPCI-103 1/2" HPCI-102 3/4" HPCI-109 HPCI-101 AO 23-18 HS FPW13-6"-HB TEST LINE M-126 RCIC NH-36252 (E,5) M-108 (B,2) NH-36039 5 FW8-4"-HB HPCI-43 8"-237 HB ED SC16-8"-HB MO-8"-29 HPCI-81 14"-N237AB HPCI-31 VALVE TEST LEAKAGE D.C. (23-58) (CLOSE) HPCI-30 3/4"-130 4 (CLOSE) BKR. 31208 L C O MO 2062 D.C. 23A-S13 HS C03 C120 MLS 23A-S8 AI-248 HS 3503 L 23-119 CONTROL LOGIC TO TURBINE RO 2066 C03 FY HPCI-53 (23-20) MO 2067 23A-S7 31210 BKR. HS D.C. HPCI-52 O C L C Y80 CKT 3 23-108 FIC 4"-N237AB HPCI-42 FT 23-82 C03 INITIATION) (CLOSE ON HPCI FE 23-80 C120 E/P 3503 NH-36049-14 (A,6) A/S M-131 CV 3503 MO 2071 BKR. 31212 L C O O SC16-10"-HB T-71 TI 23-87 Y80, CKT. 8 M-123 NH-36249 23-108 FI F HPC100 RO 2908 FROM (D,4) 23A-S10 HS (OPEN) A L FS 23-78 C TW4-4"-ED ED HE PI SV 2065 AI-247 C120 L C O D.C. N.E. (A,3) (CV-3503 AND MO-2071 AND MO-2062 (A,3) FROM POS ON MO-2061 WHEN EITHER MO-2061 OR MO-2062 ARE FULLY OPEN) A/S M-131 NH-36049-14 RECEIVE A CLOSE SIGNAL, ACCUMULATOR 4 AI-611 3/4"-163 HPCI SYSTEM ELEMENTARY DIAGRAM HPCI SYSTEM FUNCTIONAL CONTROL DIAGRAM HPCI SYSTEM STEAM SIDE REFERENCE DRAWINGS: (MAIN) This map/document is to assist employees in the performance of their jobs. Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. MONTICELLO NUCLEAR GENERATING PLANT (MO-2063 RECEIVES A CLOSE SIGNAL, WHEN FROM POS ON MO-2061 AND MO-2062 (A,3) BOTH MO-2061 AND MO-2062 ARE FULLY OPEN) V93-3/4"-ED OPEN MO-2061 AND MO-2062 (A,3) NOTES: 1. SOLENOID VALVE SV-2069, ACTUATOR, LIMIT SWITCHES AND AIR LINES ASSOCIATED WITH VALVE AO-23-18 HAVE BEEN ABANDONED IN PLACE; REFERENCE EC21396. 2. HPCI-43 DISC TRIM IS STELLITE 21, REFERENCE EC23281. FROM dPIS 23-76 (VALVE CLOSURE ON HPCI STEAM LINE BREAK) M-123 NH-36249 (D,5) 1"-19 HPCI-46 M-108 NH-36039 (C,4)(C,3) L 3/4"-130 HPCI-61 2417 (OPEN ON CNDS STG TANK LOW LEVEL) FROM LS-23-74 AND LS-23-75 (E,2) TO MO-2063 (E,3), MO-2071 (D,4) AND CV-3503 (D,4) 3 3/4"-130 COOLING WATER ORW HPCI-44 HPCI-32 14"-N237AB 23-83 23-109 C03 PT PI TW4-4"-ED (23-41) CV 2065 2" C120 TW1-14"-HE HE HB 3/4"-130 TW39-2"-HE VENT DRAIN (D,4) D139-1"-HC A THRU D FROM PS 23-68 NH-36249 M-123 (A,3) NH-36249 RETURN V94-3/4"-HC M-123 VENT 1"-19 HPCI-35 CRW 3/4"-130 HPCI-79 3/4"-130 HPCI-88 3/4"-130 HPCI-89 HPCI-62 2416 MO-14"-N29AB 31209 BKR. NH-36039 C16-14"-HE L CONDENSATE STORAGE TANK M-108 11 T-1A 3 (A,4) HPCI-33 14"-N29AB (23-17) D.C. MO 2063 O C L.O. PX LS 23-74 2 12 CONDENSATE STORAGE TANK T-1B TW3-12"-ED ORW ORW (OPEN ON HPCI INITIATION) 23-84B 23-84A VENT 23-99 COOLING M-123 FROM TS 23-101 THRU 23-104 D140-1"-HC NH-36249 NH-36249 M-123 WATER CRW (C,4) 10" PX TW1-14"-HE C120 C120 C120 TW38-2"-GE (E,3) 23-100 P-209 (23-1) 3/4"-130 HPCI PUMP V92-3/4"-HC HPCI-34 PS PS PI L A A H C RV 2064 23A-S4 HS 1" A 23-75 LS OR L M-126 RV66-1"-HB (A,3) NH-36252 C120 L PT OR FROM E/S 23-110 M-123 (D,4) NH-36249 CRW HPCI-39 HPCI-38 D141-1"-ED 1"-19 1"-19 23-116 TURBINE TRIP NH-36249 (D,4) M-123 HPCI C 1"-19 HPCI-45 D142-1"-ED ORW NH-36252 C03 PI 2 M-126 (A,3) NH-36250 MONTI CAD DWG ` ' M-124 REV SPECIAL CONCERNS ITEM SAFETY RELATED ELECTRICAL ASME CLASS 2/QUALITY GROUP B SAFETY RELATED MECHANICAL ASME CLASS 3/QUALITY GROUP C ASME CLASS 1/QUALITY GROUP A P&ID (WATER SIDE) HIGH PRESSURE COOLANT INJECTION SYSTEM M-123, NH-36249 729E816 729E232 NORTHERN STATES POWER COMPANY Energy Xcel sm 1 SCALE: NONE COLOR LEGEND QUALITY GROUP D STEAM SUPPLY DRIVE TURBINE HPCI PUMP 8" 3/4"-130 3/4"-130 VENT HPCI-36 HPCI-37 (C,3) EXHAUST STEAM S-201 M-123 NH-36249 APPR: 77 CHK: APPR: DWN: DWN: 78 DWN: CHK: 76 APPR: APPR: CHK: DWN: 79 APPR: CHK: DWN: 80 APPR: CHK: DWN: 81 CHK: 1 JJP 8-20-10 STL 2-28-12 PEB 2-28-12 JJP 2-28-12 KMF 8-27-10 14179 BAL 4-5-11 JJP 4-5-11 KMF 4-7-11 16751 21396 WMS 4-30-13 PEB 4-29-13 JJP 4-29-13 BAL 8-27-10 EC EC EC DJP 4-14-07 11951 BJR 3-11-08 RMG 3-12-08 JJP 3-5-08 01121715 16624 JJP 4-14-07 MGH 4-14-07 REVISIONS A/R EC EC EC 811 85 Q A B C D E 20039 APPR: DJ 5-21-13 CHK: DWN: PEB 5-21-13 JJP 5-21-13 82 EC TDR N A D (OPEN) 25011 APPR: RAD 1-28-15 CHK: DWN: BAL 1-28-15 JJP 1-28-15 83 EC PAGE 3 ADDED TO.PDF DOC. 23281 APPR: TKN 4-14-17 CHK: DWN: BAL 4-14-17 JJP 4-10-17 84 EC NOTE 2 26208 APPR: WMS 5-3-17 CHK: DWN: AJR 5-2-17 JJP 4-27-17 85 EC AT 001 ED V134-1/2" HPCI-110 HPCI-111 V135-1/2" HPCI-112 HPCI-113 AT 002 ED HPCI-114 HPCI-115 AT 003 ORW V134-1/2" V136-1/2" 85 V134-2"-ED V136-2"-ED V135-2"-ED 3/4" 3/4" 3/4"
E-205 MISC TURBINE INSTRUMENTATION C04 TURBINE TRIPPED LUBE OIL COOLER D15-3"-HE 3"-N29 RCIC-12 4263 RO TO PT 13-60 TO PT 13-65 3" STEAM CONNECTION TEMPORARY HEATING OG21-2"-HE NH-36252 NH-36252 FW9-2"-ED (13-13) HB TEST LEAK VALVE OG21-2"-HE ORW 2849 SV A 6 SUPPRESSION POOL X-219 RCIC-55 1 1/2"-130 V51A-1 1/2"-HE B (D,7) RCIC-61 1 1/2"-130 RCIC-57 RCIC-59 LT21B-3/4"-HB LT21C-3/4"-HB LT21A-3/4"-HB X-212 X-223 CRW RCIC-70 RCIC-60 3/4"-130 3/4"-130 RCIC-56 3/4"-130 RCIC-58 NH-36049-14 A/S M-131 DC ND RS3-8"-HE RCIC-72 5 TEST LEAK VALVE RCIC-19 3/4"-130 RCIC-54 LT21-3/4"-HE 4 C25-2"-HE ED HE H 4283 SV (D,7) L O C C03 RCIC-16 2"-19 RCIC-18 RCIC-66 RCIC-17 2"-223 RCIC-15 3/4"-130 L O C C04 C25-1"-HE HE L O C C03 2849 CV (13-12) LT22-3/4"-HE 2848 CV 2"-223 L O C C04 RCIC-63 13A-S12 NH-36049-14 A/S M-131 MO-2078 BEGINS TO OPEN (D,2) 2848 SV DC ND RCIC-11-2 CLOSE WHEN 3/4"-19 RCIC-11-1 3/4"-130 HS C04 VAC BRKR RCIC-62 A C04 13-72A PS C128 MO-2"-110 2095 PX MO-2078 (D,2) RCIC-96 RCIC-97 2094 RO 2097 RV VESSEL LOW LEVEL BKR 31107 (13-132) D.C. MO 2096 ORW VESSEL HIGH LEVEL CLOSE ON REACTOR OPEN ON REACTOR 13A-S8 HS 6008 PI C RCIC-94 RCIC-95 TURBINE TRIP C128 13-72B PS RCIC-26 2092 PCV 3/4"-19 RCIC-23 RCIC-24 3/4"-19 D15-1"-HE LT23-3/4"-HE TAPS ELBOW C D RCIC-73 RCIC-71 RCIC-10 REACTOR VESSEL (2-1) R-200 PS3 NH-36251 E 6 RCIC CONDENSATE M-126 RETURN C215 C215 NH-36252 V51-1"-HE 13-78 PS V51-8"-HE 2089 PSD 8"-N237 RCIC-9 1/4" 2090 PSD MAIN STEAM NH-36241 (D,2) M-115 C128 A C04 H 2"-223 C 2091 RO RCIC-14 (C,4) 1"-972 1"-972 MO-3"-N14 XFV-86 XFV-87 1300B X-49A 3/4"-19M3 1300A X-49B 13-83 dPIS C122 H OR 13-84 dPIS C122 H HIGH FLOW) (CLOSE ON C21 L L FW5-4"-ED FW5-4"-ED NH-36252 RS3-8"-HE M-126 WATER SUPPLY RCIC COOLING STORAGE TANK FROM CONDENSATE C17-6"-HE 13-71 PI PI 13-95 NH-36252 (B,3) C04 (B,2) 13-70 PT C128 TO REACTOR M-126 13-92 E/S C128 (C,2) M-126 (A,3) RCIC-2 3/4"-130 RCIC-1 3/4"-130 13-87C PS 13-87A PS AND 13-87B PS 13-87D PS L OR C215 L C215 OR LEAK TEST VALVE OIL PRESSURE M-126 LT19-3/4"-ED BEARING TURBINE 7318 PS 4 LS C04 L A A (OPEN ON PS17-3"-ED BKR 3340 (13-15) 2075 MO L C C04 O 13A-S1 C04 HS C GRAPHIC DISPLAY L C C03 O H C04 A C LOW LEVEL) REACTOR VESSEL NH-36242 M-116 (C,6)&(C,2) 5 X-10 (13-16) MO-3"-N14 (CLOSE) C03 2076 MO BKR 31104 D.C. C04 L C O C GRAPHIC DISPLAY L C O 13A-S3 HS C04 4 1"-19M3 3/4"-130M3 RCIC SYSTEM PROCESS FLOW DIAGRAM RCIC SYSTEM FUNCTIONAL CONTROL DIAGRAM RCIC SYSTEM WATER SIDE REFERENCE DRAWINGS: LT20-3/4"-EF BKR 31106 (13-32) 2082A CV 2082A SV 3/4"-130M3 RCIC-6 RCIC-5 D14-1"-EF 2098 TX 1 1/4" 3 RCIC-99 2099 PX CONDENSATE PUMP C04 13A-S14 HS P-210 2 C04 BKR 31101 DC 13A-S15 OG22-1 1/2"-HE 1 1/4" P-211 VACUUM PUMP C24-3"-HE BKR 31102 DC OG20-3"-HE HS BAROMETRIC CONDENSER D49-1"-HE 1"-19 RCIC-27 RCIC-98 RV61-1"-HE 6082 YS D15-3/4"-HE C04 C04 FW9-2"-HE A H C 7323 LS H A 7322 PS E-203 RCIC-21 RCIC-22 YS 4262 RCIC-20 1"-19 D40-1"-HE 2086 RO HE ED D37-1"-HE M-102 1"-19 RCIC-65 TANK VACUUM NH-36033 (A,6) TI PCV 20 TEST PI HS EF VALVE LEAK (D,7) NH-36049-14 M-131 A/S STEAM DRAIN CONDENSER) (TO MAIN D14-1 1/2"-HS L O C C03 D14-1"-HS 2082B CV (13-35) L O C C04 (13-34) A/S M-131 NH-36049-14 (D,7) 13A-S11 MO-2078 BEGINS 2082B SV DC NE C04 HS TO OPEN (D,2) CLOSE WHEN DC NE 1 M-126, NH-36252 729E242 729E951 A L O C C04 L O C C03 D14-1"-EF B PS17-3"-ED NH-36049-14 13-68 PT 2079 CV TURBINE TRIP CLOSE ON 2080 MO D38-3/4"-ED GOVERNING D38-1"-HE RCIC-46 (13-2) D39-1"-HE 8" RCIC-45 3/4" RCIC PUMP S-200 DRIVE TURBINE D38-3/4"-ED RO 2085 VALVE OIL PRESSURE FROM GOVERNOR CONTROL SIGNAL 7319 LP BEARING OIL TEMP 7320 HP BEARING OIL TEMP TIS A H C04 TIS H C04 A C04 C296 TRIP C04 8 HO C C L O L O C O L MECHANICAL TURBINE BEARING 7403 PI OVERSPEED 5 LS C04 LOCAL C L O C C296 O L MATCH VENDOR'S VALVE 2"-900# R.F. FLANGE TO MO-3"-N123 2079 SV ND (OPEN) C04 13A-S13 HS (D,6) A/S M-131 (13-131) D.C. BKR 31106 (B,5)(C,2) BKR 31103 2" D.C. THROTTLE VALVE TRIP 2078 MO 13A-S23 HS C04 VESSEL HIGH LEVEL 13A-S2 C04 HS PS17-3"-ED VESSEL LOW LEVEL OPEN ON REACTOR CLOSE ON REACTOR C04 13-94 PI FOR STARTUP SLOPE (CLOSE) A-D H 13-79 TS H 13-80 TS A-D OR AND 3 MONITORING STEAM LINE AREA 13-82 H A-D 13-81 TS TS OR H A-D 13-77 TE A-D CLEAN-UP SYSTEM REACTOR WATER TO TR-4926 NH-36254 (C,2) M-128 2 C A 3" 13-74 LS 1/2"-19M3 RCIC-28 RCIC-47 RCIC-64 1"-19M3 RCIC-3 2081 ST 1"-CCD-GB RCIC-4 3/4" 3/4" D14-1"-ED D14-1"-EF RCIC-100 1/2"-19 REGULATOR FISCHR TO TURBINE PS22-3/4"-ED C04 SLOPE C128 13-69 PI C128 3/4"-130 RCIC-29 H C D REVISIONS 1 E TURBINE SPEED SE 7925 7925 SCP 7321 SY C04 9957 A/R APPR: MH 2-26-07 CHK: DWN: BAL 2-6-07 JJP 2-5-07 76 EC 01054616 M-126 (D,4) NH-36252 TO CV-2104 TO CV-2104 NH-36252 (D,4) M-126 834 APPR: RES 8-14-07 CHK: DWN: BAL 8-14-07 JJP 8-14-07 77 EC C04 7321 SI CHK: APPR: BJR 3-11-08 RMG 3-12-08 DWN: 78 JJP 3-5-08 11951 01121715 A/R EC SPECIAL CONCERNS ITEM SAFETY RELATED ELECTRICAL COLOR LEGEND ASME CLASS 2/QUALITY GROUP B SAFETY RELATED MECHANICAL QUALITY GROUP D ASME CLASS 3/QUALITY GROUP C ASME CLASS 1/QUALITY GROUP A 23893 APPR: MLW 6-12-14 CHK: DWN: NJM 6-11-14 JJP 6-2-14 79 EC NH-36251 MONTI CAD DWG ` ' This map/document is to assist employees in the performance of their jobs. Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. SCALE: NONE M-125 Y Xcel NORTHERN STATES POWER COMPANY MONTICELLO NUCLEAR GENERATING PLANT Energy sm P&ID RCIC (STEAM SIDE) REV 80 25011 APPR: RAD 1-28-15 CHK: DWN: BAL 1-28-15 JJP 1-28-15 80 EC PAGE 3 ADDED TO.PDF DOC.
81 RCI-7 LE (13-39) D.C. MO 2101 31109 BKR 6"-N237AB FEEDWATER NH-36241 M-115 FW2A-14"-ED A B 6 TW34-10"-HE SUPPRESSION POOL TW13-2 1/2"-HE X-227 NH-36248 NH-36247 (C,4) M-122 (C,2) M-121 X-204A-D X-320A-D RINGHEADER TW12-8"-HE X-210B X-9B NH-36252 C D E REACTOR VESSEL (2-1) R-200 REACTOR CLEAN-UP M-128 NH-36254 (D,7) REW6-3"-DB 6 RCIC-49 D.C. C04 13A-S10 HS C04 13-91 FI RCI100 5 D200-"-ED RCIC-40 3/4"-110 TW5-6"-HE FW6-2"-HE CRW M-122 NH-36248 (B,3) RCIC-50 3/4"-130 3/4"-130 (A,2) ED HB (D,4) MO-6"-N29AB (13-41) 31108 BKR MO 2100 LEAKAGE RCIC-37 2"-223 TEST VALVE F 4 RCIC-31 FROM COND. STORAGE TANK) 6"-N237AB CONTROL LOGIC TURBINE IN PUMP SUCT. LINE (INTERLOCK WITH MOV TEST LEAKAGE VALVE 3/4"-130 RCIC-30 LT24-"-HE (M0-2102) (D,3) C04 13-102 FY C04 13-91 FIC TW5-6"-HE D.C. 2110 MO 3502 MO L O C C04 SC16-10"-HB (13-20) 31111 C04 13A-S6 HS BKR ACCUMULATOR AI-240 3/4"-259 LT25-"-ED RCIC-39 3/4"-110 VESSEL LOW LEVEL) (OPEN ON REACTOR FW5-4"-ED 3/4"-130 RCIC-48 13-22 AO C04 13A-S5 HS (13-21) MO-4"-N14D 31112 BKR MO 2107 MO 2106 T-73 RETURN LINE NH-36250 (E,5) M-124 HPCI 5 FW8-4"-HB FW8 FW5 HB ED 31105 BKR RCIC-38 4"-237 31114 BKR RCIC-69 RCIC-68 0-60 PSIG FW5-4"-ED AIR REGULATOR AI-222 C128 13-58 FT 13-56 FE C C-128 FS 13-57 A L C04 NH-36049-14 AI-612 (C,6) M-131 A/S C04 13A-S21 HS MO-6"-N29AB TW5 C17 MO-2078 CLOSE OR MO-2080 OPENS CV-2104 ON REACTOR VESSEL CV-2104 CLOSE SIGNAL FROM LOW LEVEL 2104 SV NE D.C. CLOSE OR MO-2101 (D,3) OPEN FULL LOW-LOW LEVEL OR MO-2100 (A,5) CLOSE ON REACTOR VESSEL C04 3502 HS C04 13A-S7 HS 4 RCIC SYSTEM PROCESS FLOW DIAGRAM RCIC SYSTEM FUNCTIONAL CONTROL DIAGRAM RCIC SYSTEM STEAM SIDE REFERENCE DRAWINGS: PUMP DRIVE TURBINE M-125 NH-36251 RCIC ED RCIC-36 1"-19 RCIC-43 3 FROM E/S 13-92 FROM LS-23-74 OR LS-23-75 (OPEN ON CNDS STG TANK LOW LEVEL) FW6-2"-HE NH-36251 RCIC COOLING NH-36251 WATER (C,4) M-125 13-59 13-60 C04 13-93 PI C-128 FW9-2"-ED C-128 PT PI 1"-19 RCIC-42 NH-36250 (E,2) M-124 (D,4) M-125 HE 2909 RO 2105 RO D156-1"-HE D156-1"-ED 1"-19 RCIC-35 FW5-4"-ED CRW D157-1"-ED 2 FW6-2"-ED L O C C04 (13-27) 2104 CV EXHAUST STEAM (A,5) ARE FULLY OPEN) (CLOSE WHEN MO-2100 & M0-2101 RCIC-32 COOLING TO PUMP BEARINGS CONDENSATE RETURN NH-36251 (D,5) M-125 13-86 TI C04 13A-S9 (D,4) HS RCIC PUMP (13-1) P-207 2520 PX 2519 PX RCIC-93 RCIC-92 RCIC-91 RCIC-90 3/4"-130 RCIC-44 RV73-1"-HE C25-2"-HE RCIC 2103 RV ORW C-128 6"-N29AB 13-66 PI 3 NH-36039 (A,4) M-108 (13-18) C17-6"-HE C17-6"-HE RCIC-41 HE HB D.C. MO-6"-N29AB MO 2102 31110 BKR CONDENSATE STORAGE TANKS VESSEL LOW LEVEL) (OPEN ON REACTOR C04 13A-S4 HS FROM E/S 13-92 NH-36251 3/4"-130 RCIC-33 RCIC-34 3/4"-130 V100-"-ED V99-"-ED ORW VENT A L A H 13-67A 13-67B PS C-128 PS C-128 C-128 13-65 PT C RCIC TURBINE TRIP C (D,4) C04 13-96 PI M-125 2 SPECIAL CONCERNS ITEM SAFETY RELATED ELECTRICAL ASME CLASS 2/QUALITY GROUP B SAFETY RELATED MECHANICAL ASME CLASS 3/QUALITY GROUP C ASME CLASS 1/QUALITY GROUP A 1 M-125, NH-36251 729E951 729E242 QUALITY GROUP D COLOR LEGEND A B S-200 SUPPLY STEAM DWN: APPR: CHK: APPR: DWN: CHK: 77 1 76 BJR 3-11-08 RMG 3-12-08 JJP 3-5-08 11951 01121715 A/R EC REVISIONS JJP 2-5-07 01054616 MH 2-26-07 BAL 2-6-07 EC 9957 A/R C D E NH-36252 MONTI CAD DWG ` ' This map/document is to assist employees in the performance of their jobs. Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. SCALE: NONE M-126 V Xcel NORTHERN STATES POWER COMPANY MONTICELLO NUCLEAR GENERATING PLANT Energy sm P&ID RCIC (WATER SIDE) REV 81 21396 APPR: CHK: DWN: BAT/JJP 4-1-13 78 EC AWL 4-1-13 SCP 4-1-13 25011 APPR: RAD 1-28-15 CHK: DWN: BAL 1-28-15 JJP 1-28-15 79 EC PAGE 3 ADDED TO.PDF DOC. 22787 APPR: WK 5-6-15 CHK: DWN: BAL 5-6-15 JJP 5-6-15 80 EC 26208, 27023 APPR: WMS 5-3-17 CHK: DWN: AJR 5-2-17 JJP 4-27-17 81 EC 81 AT 004 ED V133-1/2" RCIC-86 RCIC-87 V133-2"-ED 3/4"
(TEST) P-203A (11-2A) 1/2"-176Y XP-19-1 XP-19-2 1/2"-176Y P-203B (11-2B) (TEST) 42-3301/HS 42-4201/HS A B 6 NH-36241 (A,3) M-115 REACTOR VESSEL R-200 (2-1) NH-36253 2396 POS L O C C05 C D E XP-10 3/4"-130M3 XP-28 1 1/2"-19M3 XP-8 NUCLEAR BOILER DC ECB XP-9 3/4"-130M3 XP-26 XP-27 X-42 CH2-1 1/2"-DC XP-7 XP-6 CH19-3/4"-DC VALVE LEAKAGE TEST VALVE LEAKAGE TEST CH2-1 1/2"-DC NUCLEAR BOILER (C,5) M-116-1 NH-36242-1 XP-29 HIGH POINT VENT XP-30 6 XP-5 1 1/2"-19M3 1 1/2"-951M3 5 D61-1"-HC 4 CH2-1 1/2"-DC 1 1/2" (11-7B) ACCUMULATOR T-204B XP-4-2 1 1/2"-19M3 XP-24-2 1 1/2"-19M3 XP-3-2 D61-1"-HC 1/2" 11-39B RV DC HK XP-12-2 1/2"-65 XP-13 1 1/2"-130M3 CH3-1 1/2"-DC CH18-3/4"-DC CH2-1 1/2"-DC 1"-19M3 CH2-1 1/2"-DC XP-11-14A CH2-1 1/2"-DC 11-67A CH2-1 1/2"-DC 11-53 PI 11-67B L C05 CONTINUITY) CH2-1 1/2"-DC XP-11-14B (LOSS OF CONTINUITY) CH2-1 1/2"-DC L C05 C (LOSS OF CONTINUITY) RELAY CONT. C05 A C05 RELAY CONT. C05 5 2395 CV CH3-1 1/2"-DC XP-11-1 HC DC XP-11-2 (LOSS OF 1"-19M3 CH2 CH3 XP-23 3/4"-130M3 3/4"-130 XP-22 DB DC VENT ACCUMULATOR T-204A CLEANUP SYSTEM ISOLATION VALVES 1 1/2" 1 1/2"-19M3 XP-24-1 (11-7A) XP-4-1 1 1/2"-19M3 PI 11-65 C05 11-52 PT E/S 11-69 (E,3) FROM CH2-1 1/2"-DC XP-3-1 1 1/2"-951M3 D63-1"-HC HS HS 1/2" 11-39A RV DC HK (D,4)(D,7) NH-36254 M-128 1/2"-65 XP-12-1 D63-1"-HC CH3-1 1/2"-HK 1 1/2"-19M3 DEMINERALIZED L ON C05 XP-14 1 1/2"-19M3 WATER (D,1) HS 11A-S1 C05 L ON C05 1"-HJ 1"-276Y DM-53 CH3-1 1/2"-DC DC HK XP-21 4 HC HK DM-54 1"-176Y XP-15 1"-76Y DW-1"-HJ T-201 (11-3) TANK TEST CH3-1 1/2"-HK DC HK V REFERENCE DRAWINGS: STANDBY LIQUID CONTROL F.C.D. STANDBY LIQUID CONTROL PROCESS FLOW DIAGRAM THE TANK DIP TUBE SHALL BE INSTALLED TO READ THE ELEVATION OF THE TOP OF THE TANK OUTLET NOZZLE. THE SUCTION PIPING, PUMPS AND A SHORT SECTION OF DISCHARGE PIPING ARE INSULATED AND ELECTRICALLY HEAT TRACED. THE TEMPERATURE IS REGULATED BY CONTROLLERS TC-4437A THRU D. TI-4603 LOCALLY MOUNTED ON C69, AMBIENT AIR TEMPERATURE. STANDBY LIQUID CONTROL PIPING CH2-1 1/2"-DC FROM PUMPS TO DRYWELL PENETRATION X-42 AND TANKS (G.E. 153F757) 5828-APED-11-9) (G.E. 153F736) 5828-APED-11-8) (C,3) SA-3/4"-JB STANDBY LIQUID CONTROL TANK T-200 (11-1) This map/document is to assist employees in the performance of their jobs. Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. MONTICELLO NUCLEAR GENERATING PLANT RV29-2"-HK 2 1/2"-29M3 D65A-3/4"-HC DRAIN TO REMOVABLE CONTAINER 3/4" 3 D65B-3/4"-HC CH1-2 1/2"-HS D63-1"-HC RV29-2"-HK XP-2-2 CONTROL PUMP STANDBY LIQUID 12 DRIP PAN 1/2" D67-1"-HC 2 HOSE CONN. XP-25 NOTES: 2. 3. 1. 3. 11-45 LT SLC100 L 2 1/2"-29M3 DM-55 1"-276Y 7994 PI DEMIN. CH1-2 1/2"-HS STANDBY LIQUID CONTROL PUMP 11 DRIP PAN 1/2" (D,1) WATER 4437A TC RV29-2"-HK 2 1/2"-29M3 XP-2-1 DW8-1"-HS DM-56 1"-176Y HJ HS 11-59 TS C69 4437B TC TE 1"-76Y XP-20 HS HC D68-3"-HC XP-17 2 1/2"-29M3 RV29-2"-HK DW6-2 1/2"-HS 3 A/S C69 2 1/2"-237M3 XP-16 CH3-1 1/2"-HK DW6-2 1/2"-HS NH-36049-13 (D,3) M-131 INSTRUMENT AIR TO PT 11-52 (D,4) 11-55 FIC RV29-2"-HK 4599 PI 4437D TC LI 11-66 C05 C69 E/S 11-69 C19 C69 4267 LS C05 XP-1 4437C TC CH1-2 1/2"-HS 1. 2. 3/4"-176Y AS-22 HK 1"-176Y DM-52 JB 3/4"-263 AS-21 1"-276Y DM-51 TO A C05 GROUND HEATER 1 1/2"-HK 1 1/2"-76Y XP-18 HK HC HEATER SPARGER 11-47 LS (HEATER SHUT-OFF) A LOW LOW C05 TANK ON L LOCATED 7449 LT C69 7449 LI L ON OFF VENT C69 DW7-1"-HK HK HJ OR TE 11-50 TS 11-48 TIC C69 A H L C05 E/S 7449 C19 11-70 LS C19 2 11A-S2 HS C69 C NH-36253 MONTI CAD DWG ` ' M-127 REV 1 NF-156965 P&ID STANDBY LIQUID CONTROL SYSTEM NORTHERN STATES POWER COMPANY Energy Xcel sm SCALE: NONE 80 P A B NH-36039 AS-19 NX-7879-4 NX-7879-3-1 (E,4) TO 1044 PCV (E,2) NH-36049-4 M-131 (C,7) FROM WATER DEMINERALIZED M-108 C A H L C05 4603 TI DWN: APPR: APPR: CHK: DWN: CHK: 77 1 76 16884 IL 10-19-10 BAL 10-13-10 JJP 10-12-10 EC REVISIONS JJP 3-5-08 11951 01121715 RMG 3-12-08 BJR 3-11-08 EC A/R C D E 20168 APPR: JWP 9-13-12 CHK: DWN: BAL 9-12-12 JJP 9-11-12 78 EC SPECIAL CONCERNS ITEM SAFETY RELATED ELECTRICAL COLOR LEGEND ASME CLASS 2/QUALITY GROUP B SAFETY RELATED MECHANICAL QUALITY GROUP D ASME CLASS 3/QUALITY GROUP C ASME CLASS 1/QUALITY GROUP A 25011 APPR: RAD 1-28-15 CHK: DWN: BAL 1-28-15 JJP 1-28-15 79 EC PAGE 3 ADDED TO.PDF DOC. 25660 APPR: JCG 5-11-15 CHK: DWN: BAL 5-11-15 JJP 5-11-15 80 EC SAFETY-RELATED FLEXPRO STAINLESS STEEL FLEXICARB STYLE PN GASKET APPROVED 4. FOR USE RV-11-39 A & B INLET PER EC25660. 80 80 80 NOTE 4 NOTE 4
3025 SX NH-36243 M-117 (C,6) 12-96 PI RC-30 D162-1"-DBD RC-29 RV-67-1"-HBD RWC103 T V-109-1"-DBD 12-158 TI HBD DBD TRIP CLEANUP RECIRC. PUMPS P-204 A & B FROM MMS MONITOR NH-252182 (C,3) VENT & DRAIN DETAILS DETAIL 12-110 E/P RWC102 T C04 NH-36252 STANDBY LIQUID CONTROL ACTUATION LOW-LOW REACTOR WATER LEVEL HIGH DRYWELL PRESSURE TRIP CLEANUP RECIRC. PUMPS P-204A & P-204B REW3-4"-ED LT17-"-ED TW3-12"-ED HIGH RWCU ROOM TEMP. (C,1) VALVE CLOSURE SIGNAL HIGH RWCU FLOW (C,6) FW2B-14"-ED FROM RCIC M-126 RC-6-2 D NH-36045 TANK T-24 SURGE TANK TO WASTE NH-36045 COLLECTOR TO WASTE HOTWELL NH-36047-1 RECIRC. LOOP "B" FROM REACTOR FROM REACTOR VESSEL DRAIN A B C VALVE RC-87 ED RC-83 2405 MO LEAKAGE 2404 MO ED 16A-S15 2397 MO C04 HS RWN36-3"-HC M-139 (E,6) (E,6) M-139 T-23 RWN36-3"-HC D171-1"-HC D172-1"-HC D169-3/4"-ED D170-3/4"-ED D175-1"-DB 8 NH-36256 D159-1"-ED D160-1"-DB D158-1"-ED D161-1"-DBD D163-1"-DBD D162-1"-DBD DRAINS 1" M-135 (B,3) TO CST B-3204 (12-57) HC REW7-3"-HC REW31-2"-ED RC-104 RC-1 M-117 NH-36243 M-141 (C,5) TO HB (C,5) HC TO REACTOR NH-36241 NH-36243 (C,5) M-117 (B,4) M-115 3/4" ECD MO-3"-N14 2406 RV 3" B-3203 (12-56) HC TEST REW3-4"-EBD EBD ED EBD V130-1/2" (SS TUBING) V131-1/2" (SS TUBING) V118-1"-DB V114-3/4"-ED V101-1"-DB V102-1"-DB V103-1"-DB V109-1"-DBD V110-3/4"-DBD V111-1"-DB V112-3/4"-DB V113-3/4"-DB V117-3/4"-DB 12-108 PS D D C MO-3"-N14 12A-S3 DETAILS D C D B B B C220 HS F G F F B B H F H F 12-143 VENTS C04 FC H F F F C220 HIGH HIGH TEMPERATURE TO VALVE CLOSURE SIGNAL (TIS 12-157)(B,2) DEMINERALIZER DISPLAY GRAPHIC C04 12A-S2 RWN36-3"-ED HS C04 RC-105 RC-106 MO-4"-N14D (12-15) B-3328 C O C ED L C04 C03 O C L X-9A LEAKAGE 2403 CV (12-55) RC-36 2" VALVE TEST X-14 RC-35 OR NH-36254 NH-36241 TO REACTOR M-115 (B,3) 8 X-9B NH-36241 FEEDWATER M-115 (A,2) FROM SYSTEM 1" DB RC-7-2 3" DB (B,6) RC-39 12-68 RV 12-109 TE MO-2397 (D,7) MO-2398 (D,7) MO-2399 (D,4) CLOSE VALVES RC-11 RC-12 DBD 1"-130 3/4"-130 1"-130 3/4"-130 VENTS DRAINS 1"-19 1"-19 MO-3"-N123 C04 2402 RO DBD 1"-19 2403 SV 3/4"-130 1"-130M3 3/4"-130M3 1"-19 1"-19M3 1"-130 C DC DB 7 HB E HBD B DBD DB HB OR OR F HB C DB A C04 H L HB FROM FEEDWATER 3/4"-19M3 3/4"-223 12-114 PI 12-107 PS MO-4"-N14D NH-36253 (D,4) NH-36242 NH-36258 12-92 TE C220 FROM CAV NX-32779-7 SYSTEM 12-155 TI (D,14) L DISPLAY GRAPHIC M-127 M-116 M-143 C03 O C L C52 RC-103 1"-19 RC-86 RC-85 HWC-5 HWC-6 CO ED REW3-4"-DBD 2398 MO C04 O (12-18) D-31309 C C L SYSTEM NH-36241 (A,6) M-115 (C,6) C04 ED D.C. 16A-S16 HS 2401 MO FS TRIP CLEANUP RECIRC. PUMPS P-204A & P-204B 12-106 3/4"-19 3/4"-19 1"-19 1"-19 OR OR G HB ED HB D ED 12A-S1 HS OR OR SS TUBING DCD H 6 REW7-3"-ED 12-115 FI V111-1"-DB 6016 FE 3/4"-130 RC-78 REW30-3/4"-ED RC-94-2 TUBING (12-53) B-3201 6016A C304A 6016A 6016A C304A FIS FT FS C52 6016C C304C 6016C 6016C C304C FIS FT FS 3/4"-130 RC-79 ED RC-94-1 ED DBD DBD DB HB ED C04 12-105 FT 12-140 C219 C19 6016B C304B 6016B 6016B C304B FIS FT FS CV-2790 CV-2791 FI 6016D C304D 6016D 6016D C304D FIS FT FS ORW FROM MMS MONITOR NH-252182 (C,6) DCD L H DB CLEANUP FILTER DEMINERALIZER SYSTEM NH-36255 (B,3) M-129 (E,6) 1" HBD ORW HEAT EXCHANGER REGENERATIVE 3 SHELLS CLEANUP NX-32779-7 TO CAVS (I,6) SYSTEM RWC111 DO RWC112 DO REW4B-3"-EF ED EF RC-75 RC-8 3"-N14 1" DBD 12-104 FE RC-101 V114-"-ED M-117 M-117 REW3-4"-DBD (E,6) (E,6) 1" DBD RC-102 ORW REW3-4"-DBD 1" DBD RV-68-HBD RC-74 RC-20 DBD DBD ED RC-19 DB EF HBD CRW REW6-3"-DBD " DBD C04 C19 C217 B-3235 MO-3"-N123 SEE NOTE 2 3" ED 5 4141 DOIT C217 12-130 ES REW4A-3"-EF NH-36908 M-185 (D,7) 4141 DO REW5-4"-DBD DBD ED 2400 MO 12A-S4 HS D161-1"-DBD EF 12-113 PI REW4-4"-EF C219 CRW RC-32 13 RC-31 E-201 12-2 12 11 12-67 RV 1" DBD DBD ED DBD REW4-4"-DBD CRW DBD EF DBD 1" DBD FROM CRD NH-36244 RC-6-1 RC-7-1 3"-NW14 FROM HPCI NH-36250 7 3" DB DB ED 1" DB M-124 3" DB DB (D,1) M-118 DC LT18-"-DC DC RC-33 3/4"-130M3 6 DB HB V110-"-DBD L O C C03 2399 MO 1" DBD 1" HBD LEAKAGE REW6-3"-DC 3/4"-130 RC-34 VALVE TEST RC-14 RC-15 DC DBD B-4343 CS RC-40 MO-3"-NW123M3 (12-68) 16A-S17 C04 5 HS This map/document is to assist employees in the performance of their jobs. Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. MONTICELLO NUCLEAR GENERATING PLANT SYMBOL MEANS SUPPLIED BY HEAT EXCHANGER VENDOR(S). CHEMICAL CLEANING CONNECTION FOR DECONTAMINATION. REACTOR WATER CLEANUP FUNCTIONAL CONTROL DIAGRAM P&ID REACTOR WATER CLEANUP FILTER/DEMINERALIZER SYSTEM MO-2397 AND MO-2398 HAVE A 900# PRESSURE RATING. REACTOR WATER CLEANUP ELEMENTARY DIAGRAM REACTOR WATER CLEANUP PROCESS FLOW DIAGRAM RC-35 AND RC-36 HAVE A 1690# PRESSURE RATING. CLEANUP SYSTEM AREA STEAM LEAK DETECTION TYPICAL OF 8 117A THRU 117H NUCLEAR BOILER SYSTEM THRU 2-126D (4) (B,1)(B,6)(D,1)(D,6) FROM 2-126A ( ) STEAM LEAK DETECTION 6017C TE 6017C C304C REW3-4"-DB C04 RV70-1"-HB CR-12-133 TO CIT-3013 FROM V130-1/2" (SS TUBING) NON-REGENERATIVE HEAT EXCHANGER V117-"-DB DB C217 CLEANUP RECIRC. PUMPS (12-1B) RC-37-2 RC-38-2 P-204B RC-38-1 RC-37-1 (12-1A) P-204A REW3-4"-DBD 2625 PX CRW REW3-3"-ED 3"-N14 3"-N14 RC-2-1 NX-32779-7 (I,6) TO CAVS SYSTEM C217 2626 PX C217 3"-N14 RC-3-2 RC-96-1 C217 REW3-3"-ED RC-96-2 TUBING REW30B-3/4"-ED 3"-N14 RC-2-2 C52 REW3-4"-DBD ED ED ED DBD 12-100 CE 4 4143 PH 2627 PX 12A-S6 C04 HS RC-3-1 RC-95-2 REW30A-3/4"-ED ORW MONITOR NH-252182 FROM MMS (C,3) TUBING RC-27 RC-28 DBD HBD ORW REW3-4"-DB D175-1"-DB 12-156 TI 12-94 TE C04 C04 2624 PX RC-95-1 ED 12A-S5 HS ORW RC-23 RC-24 D159-1"-ED D158-1"-ED D172-1"-HC D170-3/4"-ED D169-3/4"-ED D171-1"-HC REW4-4"-DBD 12-118 CIT 4388 DH RWC110 DH V131-1/2" (SS TUBING) RWC104 C C217 4143 PHIT LEAKAGE 12 LEAKAGE B-2206 RC-91-2 RC-90-2 CRW CRW SEAL HC ED SEAL HC 12-144 C217 CR C04 RC-10-2 V113-"-DB RC-9-2 ST.SL. DB 2404 DC RO DB ORW V102-1"-DB " DBD RV69-"-HB RC-91-1 11 B-3206 RC-90-1 CRW ED RC-77 DBD ED 12-65 RV 1" DBD RC-76 ST.STL (TYP) ED HBD RC-10-1 V112-"-DB RC-9-1 ST.SL. DC DB RC-25 DBD ORW 2403 RO DC DB RC-26 " HBD ORW COOLING WATER 12-3 E-202 2 SHELLS CLEANUP ORW 12 11 V118-1"-DB RBCC-34 1"-130 RWC108 DH 12-87 PI REFERENCE DRAWINGS: NOTES: FROM 13-77A THRU 13-77D (4) RCIC SYSTEM 1"-130 RBCC-49 REW4-3"-DB NH-36255 (E,4) NH-36243 RC-17 (D,6) 3"-NW14 RC-5-2 RC-16 M-129 C217 M-117 4388 DHIT 3 3"-NW218 RC-4-2 1" DBD REW4-3"-DB DBD DB 6"x4" ST.STL 3"-NW14 RC-5-1 6"x4" RC-4-1 3"-NW218 ORW 1" 4. 1. 2. 3. 2. 3. 4. 1. (D,6) NH-36042 COOLING WATER M-111 NH-36042 (D,6) ORW CLOSE VALVES MO-2399 (D,4) MO-2404 (B,7) 12-131 PI 12-157 TIS C04 12A-S7 MO-2405 (B,7) TO CAVS NX-32779-7 SYSTEM (I,7) 12-97 TE C04 12-131 12-93 PT C04 C04 HH PI A A C52 HS 2 A H C04 NH-36251 M-125 (E,2) TIS TIS 6017A 6017A TE C304A NH-36241 M-115 STANDBY LIQUID CONTROL ACTUATION HIGH HIGH TEMP. TO DEMINERALIZERS (TIS 12-157) (B,2) HIGH RWCU ROOM TEMP. (C,1) VALVE CLOSURE SIGNAL 3/4"-130 RC-72 HIGH DRYWELL PRESSURE HIGH RWCU FLOW (C,6) LOW-LOW REACTOR WATER LEVEL 3/4"-130 4 RC-73 M-143 V103-1"-DB RC-21 NH-36253 (D,4) NH-36242 NH-36258 M-127 M-116 RC-22 12-64 RV 3 COOLING WATER M-111 12-117A TE 2 D EC 78 12704 NH-36254 MONTI CAD DWG ` ' M-128 SPECIAL CONCERNS ITEM SAFETY RELATED ELECTRICAL ASME CLASS 2/QUALITY GROUP B SAFETY RELATED MECHANICAL ASME CLASS 3/QUALITY GROUP C ASME CLASS 1/QUALITY GROUP A REV BAL 10-12-09 JJP 12-18-12 AWL 12-20-12 JRS 12-20-12 THRU 23-105D (4) FROM 23-105A P&ID REACTOR WATER CLEANUP SYSTEM CLOSE VALVES MO-2397 (D,7) MO-2398 (D,7) MO-2399 (D,4) (M-129) - NH-36255 (GE 730E718) NX-7880-7 (GE 719E567) NX-7880-3 NX-7880-11 M-117 M-117 NH-36249 M-123 (E,2) HPCI SYSTEM NORTHERN STATES POWER COMPANY Energy Xcel sm THRU 10-98H (8) FROM 10-98A 6017D TE 6017D TIS NH-36246 M-120 (A,3) RHR SYSTEM TIS 6017B 6017B TE C21 4926 TR A H C03 C304B CV-2790 CV-2791 C304D SCALE: NONE 1 QUALITY GROUP D COLOR LEGEND (E,6) (E,6) JJP 10-9-09 BH 10-12-09 17524 JRD 4-3-12 JJP 4-3-12 AWL 4-3-12 17525 18767 RWS 6-18-13 SLM 6-18-13 JJP 4-12-13 21654 DAJ 6-23-13 PEB 6-19-13 JJP 6-19-13 APPR: CHK: DWN: APPR: APPR: CHK: DWN: 81 82 EC EC DWN: APPR: CHK: CHK: DWN: CHK: DWN: APPR: 79 80 EC EC AH 87 A B C REVISIONS 01121715 1 RMG 3-12-08 JJP 2-25-09 AVW 2-27-09 BAL 2-26-09 13693 JJP 3-5-08 11951 BJR 3-11-08 DWN: CHK: APPR: CHK: DWN: APPR: 76 77 A/R EC EC 21610 APPR: JRD 8-20-13 CHK: DWN: SLM 8-20-13 JJP 8-20-13 83 EC 24195 APPR: AJW 6-23-14 CHK: DWN: BAL 6-23-14 JJP 6-20-14 84 EC 25011 APPR: RAD 1-28-15 CHK: DWN: BAL 1-28-15 JJP 1-28-15 85 EC PAGE 3 ADDED TO.PDF DOC. 25814 APPR: AJW 6-24-15 CHK: DWN: BAL 6-22-15 JJP 6-19-15 86 EC DBD HBD 28318 APPR: DAM 3-15-17 CHK: DWN: BAL 3-15-17 JJP 3-14-17 87 EC 87
1 "-HC RT36B-3"-HC RT37A-3"-HE SC12A-3"-ED (CV-4B) CONDENSATE CV 12-4-15B FR 12-4-97B 1/2" ED RV60-1"-HC NH-36049-16 SINK DE LAVAL IDENTIFICATION (TYPICAL) LS 12-4-80 HS 4134 RC-82-1 D202-1"-EF RC-81-1 dPIS 12-4-72A YS 12-4-54A C RWC105 NH-36255 M-131 NH-36049-16 (B,7) INSTRUMENT AIR NH-36045 PRECOAT RETURN LINE FROM FUEL POOL A B C D E HB 12-141A FI NH-36049-16 INSTRUMENT 12-4-50 RC-62 2"- 1/2"-19 CST-35 (B,6) 1"- RC-64 RC-63 FROM V-AC-21 NH-36261 M-149 CONDENSATE NH-85509-2 (A,6) (B,5) M-139 2" M-114-2 SERVICE (B,6) 6 ORW 12-4-11 D179-4"-HC NH-85509-2 M-114-2 CONDENSATE SERVICE 1"- CST-81 12-4-48 SERVICE CONDENSATE M-114-1 NH-85509 M-131 NH-36049-16 (C,4) INSTRUMENT SV 12-4-54A 12-4-54A C82 HS AIR (D,7) 2"-19 (300 GAL.) T-203 (12-4-6) CLEAN-UP PRECOAT TANK 12-4-12 CST-40 1/2"-130
"-HB RC-61 3"-
- D176-2"-HC 12-4-47 1"
AO 2"-HC 3425 FG PX 2892 PX 2893 3418 PX RT35-3"-HC S-202 (12-4-8) 12-4-47 C82 RC-92 4135 AO 12-4-62A AO 12-4-54A 12-4-46 RC-65 1/4"- 1"-HB A L C82 M-131 AIR (C,7) 12-4-88 RT36-3"-HC FG RC-80 C82 L 12-4-62A 12-4-62A SV HS SC19A-3/4"-HB L HE EF C RTA38A-3/4"-EF O O C RC-43-1 (CV-4A) CV 12-4-15A FR 12-4-97A 3"- 12-4-17A SV 12-4-15A RWC100 PROGRAMMER HS 12-4-15A PCV 12-4-15A F C82 M-128 NH-36254 (B,5) HEAT EXCHANGER TO REGENERATIVE FC 12-4-97A P/E 12-4-77A C82 PP REW4A-3"EF REW4B-3"EF TIMER C82 6 FE 12-4-74A FT 12-4-75A 3/4"- RC-56-1 12-4-63A FS 12-4-81A C82 L O C C82 PI 12-4-73A EF RC-55-1 3/4"-
- A H
C82 AO 12-4-14A CONDENSATE F.C. 1"-HC 12-4-24A PCV 12-4-118 dPT 12-4-69A RC-70-1 3/4"-130M3 dPIS 12-4-94A PI 12-4-78A RV 12-4-36 SV 3488 (CV-51A) RT36A-3"-EF AO 12-4-37A 12-4-61 TO WASTE PRECOAT TANK M-139 NH-36045 (B,5) BLDG 3"-237 REACTOR RADWASTE PROGRAMMER TIMER 12-4-89 PRECOAT PUMP CLEAN-UP (12-4-7) P-206 A L C82 A H C82
" SS TBG 4134 ORW ORW PI C82 1"-19 5
ORW 3"- 12-4-52 RC-59 RT35-3"-HC BLDG CH14-2"-HC PROGRAMMER CLEAN-UP (12-4-2A) HOLDING PUMP P-205A 3/4"-130 RC-84 12-4-41A 85 GPM MILLIPORE FILTER 12-4-56 (CV-52A) AO 12-4-32A RC-47-1 PX 2888 ORW PX 2889 1"-19M3 1"-19M3 3"- 3205 11 12-4-40A RC-53-1 AO 3488 RV59-"-HC RC-60 F.C. HC RT35A-3"-HC F.C. ED V43-"-HC ORW 3"- 12-4-33A RC-48-1 PI 12-4-79A 2"- TIMER C82 F.O. 2"-
"-HE 1/2"-130 D177-1"-HC D178-1"-HC SEAL LEAKAGE ORW 2"-
RC-57 NH-36039 RC-66 3/8" DEMIN M-108 (E,4) ED (CV-53A) 12-4-39A RC-54-1 12-4-38A ED EF 3"- F.C. EF AO ED 2" HC REW4A-3"-ED
"-ED (CV-7A)
REW4A-3"-ED RV57-1"-ED ORW RV TO PUMPS & SOLENOIDS M-139 NH-36045 (B,3) C82 CE 12-103A 12-129A CIT RC-42-1 12-4-26A 3"- REW12A-3"-EF C217 3026 SX C217 V41-"-EF REW4A-3"-EF ORW 3205 HS 3114 CI PROGRAMMER SIGNALS 5 C82 C82 RC-71-1 3/4"-130M3 A H C82 C82 PANEL LOCAL C82 dPS 12-4-82A (12-4-98) A CLEAN-UP F/D FAILURE C04 12-141B FI V55B-1"-ED 4139 12-4-30A F.C. (12-4-115) CLEAN-UP RESIN FEED TANK T-205 1"- 12-4-126 DM-261 PI 12-4-123 CST-144
"-HC "-HC 4
PI 12-4-124 12-4-22A RC-50-1 RC-88-1 12-4-13A (CV-3A) AO 12-4-20A RC-41-1 3"- 1/2"- ED HE EF ED RT37A-3"-HE 3"- HE ED V55A-1"-HC HC HC AO 12-4-120 (CV-10) EDUCTOR (12-4-117) S-203 (12-4-116) PI 12-4-125 RC-67 1 1/2"-19 RV60-1/2"-HC REW4A-3"-ED (CV-9A) AO 12-4-34A 12-4-87A FG RC-44-1 1"-* 12-4-35 ORW RV NH-85509 M-131 (C,7) NH-36049-16 INSTRUMENT SV 12-4-54B 12-4-54B C82 HS AIR M-114-1 SERVICE (C,4) 12-133 V54-1"-HC FG 12-4-71B SA5-1"-JB A C82 A H C04 12-4-28A (CV-14A) AO 12-4-42A RC-49-1 (CV-8A) FROM CR-12-144 11 (12-4-1A) CLEAN-UP FILTER/DEMIN T-202A 1"- NH-36254 M-128 JB EF F.C. (A,3) C AO 12-4-18A F.C. EF HC A C82 4 SV 12-4-15B RWC101 F PROGRAMMER HS 12-4-15B PCV M-131 NH-36049-16 12-4-15B (D,7) C82 CR C04 FC 12-4-97B P/E 12-4-77B C82 PP 12-129B 3113 TIMER C82 CI C82 C RWC106 CIT 217 INTERNALS REMOVED FROM PCV-12-4-66 UNDER WRA 77-0998. NOT ALL AO VALVES ARE EQUIPPED WITH PCV AND FLOW CONTROL VALVES. SEE AO VALVE TABLE. AO-12-4-44B AO-12-4-47 AO-12-4-120 AO-12-4-121 AO-12-4-41A AO-12-4-41B AO-12-4-42A AO-12-4-42B AO-12-4-44A AO-12-4-20A AO-12-4-20B AO-12-4-34A AO-12-4-34B AO-12-4-37A AO-12-4-37B AO-12-4-14A AO-12-4-14B AO-12-4-18A AO-12-4-18B VALVE NO. This map/document is to assist employees in the performance of their jobs. Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. MONTICELLO NUCLEAR GENERATING PLANT AS-47 RV72-1"-HCD LOKRING APPROVED FOR USE ON SENSING LINE EC22026. HS HS-12-4-39B HS-12-4-39A/ RT36B-3"-EF TYPICAL FOR AO-12-4-39A AND AO-12-4-39B PI 12-4-78B HB SC19B-3/4"-HB REW4B-3"-ED 1"-19M3 1"-19M3 RC-82-2 D203-1"-EF RC-81-2 3 AO 12-4-121 (CV-11) ORW 12-4-68 PI M-128 RECIRC. PUMPS FROM CLEAN UP (A,5) NH-36254 RT35B-3"-HC AO 12-4-62B AO 12-4-54B A L C82 INSTRUMENT M-131 AIR (C,7) AO 12-4-39B HC 1/2" ED (CV-53B) F.C. ED C82 L 12-4-62B SV 12-4-62B HS
"-HE L
HE EF C RT38B-3/4"-EF O O C AO-12-4-39B INSTRUMENT NH-36049-16 AO-12-4-39A/ L O C C82 AO (B,7) SV-12-4-39B SV-12-4-39A/ PCV-12-4-39B PCV-12-4-39A/ M-131 AIR PCV ED PP HB SV PROGRAMMER HOLDING PUMP TIMER (12-4-2B) 85 GPM P-205B (CV-52B) AO 12-4-41B 12-4-32B RC-47-2 ORW CLEAN-UP PX 2890 PX 2891 3"- 2205 12 RC-53-2 12-4-40B RC-54-2 AO 12-4-44A HC F.C. F.C. 3"- ED 12-4-38B (CV-6A) 3"- 12-4-33B PI 12-4-79B AO 12-4-37B 2"- RC-48-2 C82 F.O. 2"- (CV-51B) 3 YS 12-4-54B dPIS 12-4-72B C217 FE 12-4-74B FT 12-4-75B 12-4-63B RC-56-2 3/4"- 3"- 12-4-17B RC-43-2 FS 12-4-81B C82 L O C C82 12-103B 3027 SX PI 12-4-73B RC-55-2 3/4"-
- EF A
H C82 C217 CE HS 2205 12-4-26B RC-42-2 3"- REW12B-3"-EF C82 V42-"-EF REW4B-3"-EF ORW V55B-1"-ED dPT 12-4-69B RC-70-2 3/4"-130M3 dPIS 12-4-94B 12-4-14B (CV-7B) SC12-3"-HB PCV-12-FU53A/ PCV-12-FU53B C82 (BACK) AI-454-1-2/ AI-454-1-3 C82 (FRONT) PCV-12-F53A/ PCV-12-F53B SV-12-FU-53B 3"- 12-4-45 SV-12-FU-53A/ PROGRAMMER PROGRAMMER TIMER SV-12-F53B SV-12-F53A/ C82 SV HB ED TIMER C82 SV PCV PCV ED RC-58 RC-88-2
"-ED (CV-6B) 12-4-44B F.C.
AO ED EF SC12B-3"-ED 1/2"- 2" EF RC-41-2 12-4-13B 3"- NOTE 3 SEE F.C. 12-4-70 PI AO
- REW4B-3"-ED RV58-1"-ED ORW 12-4-24B 1"-HC RV M-108 NH-36039 (C,6)
FROM BACKWASH CONDENSATE 2. 1. 3. 2 C82 A/S NOTE: 3"- RC-50-2 12-4-22B RT37-3"-HE CST-117 SEE NOTE 1. DELAVAL IDENTIFICATION AO 12-4-20B (CV-3B) (TYPICAL) 12-4-66 PCV HE ED EF ED RT37B-3"-HE F.C. HE HC HC 1"-HC ED 12-4-28B C82 dPS 12-4-82B C82 A H C82 RC-71-2 3/4"-130M3 ORW 1 1/2" RV 3383 1" 12-4-86 12-4-42B (CV-14B) RC-49-2 (CV-8B) AS-24 12 (12-4-1B) CLEAN-UP FILTER/DEMIN T-202B 1"-* SA5-1"-EF 1"- 12-4-43 JB EF F.C. AO 12-4-18B F.C. EF HC 12-4-55 FILTER AO PI V54B-1"-HC 2 JCG 4-29-13 PEB 4-29-13 NH-36255 MONTI CAD DWG ` ' M-129 REV SPECIAL CONCERNS ITEM SAFETY RELATED ELECTRICAL ASME CLASS 2/QUALITY GROUP B SAFETY RELATED MECHANICAL ASME CLASS 3/QUALITY GROUP C ASME CLASS 1/QUALITY GROUP A TYPICAL FOR AO VALVES LISTED IN AO VALVE TABLE UNIT 1 REACTOR WATER CLEAN-UP FILTER/DEMINERALIZER SYSTEM P&ID HS-12-4-44B HS-12-4-47 HS-12-4-120 HS-12-4-121 HS-12-4-42A HS-12-4-42B HS-12-4-44A NORTHERN STATES POWER COMPANY Energy Xcel SV-12-4-44A SV-12-4-44B SV-12-4-47 SV-12-4-120 SV-12-4-121 SV-12-4-42A SV-12-4-42B sm PCV-12-4-44A PCV-12-4-44B PCV-12-4-47 PCV-12-4-42A PCV-12-4-42B NO PCV NO PCV HS-12-4-18A HS-12-4-41A HS-12-4-41B HS-12-4-20A HS-12-4-20B HS-12-4-34A HS-12-4-34B HS-12-4-37A HS-12-4-37B HS-12-4-18B HANDSWITCH HS-12-4-14A HS-12-4-14B RT37-3"-HE SV-12-4-14B SV-12-4-18A SV-12-4-41A SV-12-4-20A SV-12-4-20B SV-12-4-34A SV-12-4-34B SV-12-4-37A SV-12-4-37B SV-12-4-18B SV-12-4-41B SOLENOID VALVE NO. SV-12-4-14A 12-4-30B RC-44-2 1"- FG 12-4-87B (CV-9B) AO 12-4-34B F.C. PHASE SEPARATORS M-141 TO CLEAN-UP (E,2) AO VALVE TABLE NH-36047-1 PCV-12-4-14B PCV-12-4-18A PCV-12-4-41A PCV-12-4-34A PCV-12-4-34B PCV-12-4-37A PCV-12-4-37B PCV-12-4-18B PCV-12-4-41B PCV-12-4-14A NO. NO PCV NO PCV PCV NO. NONE NONE NONE YES YES NONE NONE SCALE: 1 NONE B,7 D,1 D,2 B,7 C,1 B,7 D,7 NONE NONE NONE NONE NONE NONE NONE COLOR LEGEND QUALITY GROUP D NONE YES YES NONE NONE NONE NONE NONE NONE NONE CONTROL VLV INST AIR FLOW NONE NONE EXH C,7 B,6 D,7 C,7 B,7 C,7 C,7 B,7 C,7 D,7 B,7 B,6 AIR ISOL VALVE REF DRWG. COORD YES YES NONE NONE NONE NONE NONE NONE NONE NONE NONE NONE INLET AO SV SV PCV PROGRAMMER FROM SERVICE AIR PI INSTRUMENT NH-36049-16 1"-HC PHASE SEPARATORS 12-4-71B L O C C82 FG M-131 AIR AO SA5-1"-JB V54-1"-HC 3111 RV C82 (NOTE 2) HS
- TO CLEAN-UP (E,2)
M-141 NH-36047-1 M-131 NH-36049-4 (A,5) ORW APPR: DWN: CHK: APPR: CHK: DWN: CHK: APPR: APPR: CHK: DWN: APPR: CHK: DWN: DWN: APPR: CHK: DWN: C82 TIMER 82 81 80 79 77 78 20192 KMF 2-19-10 BAL 2-18-10 JJP 2-16-10 15602 JIH 9-14-12 BAL 9-14-12 JJP 9-13-12 22026 JJP 4-29-13 EC EC EC 11100 MM 7-13-07 JJP 7-13-07 BAL 7-13-07 JJP 3-5-08 BJR 3-11-08 RMG 3-12-08 BAL 12-9-09 JJP 12-8-09 KEC 12-9-09 11951 01121715 A/R 9655 EC EC EC 1 REVISIONS A 86 P B C D E 19336 APPR: ERN 5-10-13 CHK: DWN: BAL 5-7-13 JJP 5-6-13 83 EC 25356 APPR: AJW 3-16-15 CHK: DWN: BAL 3-16-15 JJP 3-12-15 84 EC 25812 APPR: AJW 4-7-16 CHK: DWN: BAL 4-6-16 JJP 4-5-16 85 EC 24512 APPR: SJH 5-18-17 CHK: DWN: BAL 5-18-17 JJP 5-18-17 86 EC 86
L.O. PC-19-2 1" HK FROM P-7A & B RECIRC (B,5) ADJUSTABLE WEIR FPW17B-3"-MR 1"-130 4"-29 PC-31 1"-130 FPW3-4"-HC C66 CRW C66 CRW PC-26 8"-142 PS 2770 A 6 1" HC STRAINER PC-45-2 PX 3042 6"-29 PC-3-2 FPW1B-6"-HC L ORW PUMP P-7B ORW PC-46-2 1"-19 12 450 GPM COOLING WATER PI 7981 FUEL POOL 4302 B L PI 7980 HS 42-4302/CS-1 STRAINER 1"-HC PC-45-1 PX 3040 PUMP TRIP LS-2786B FPW1B-6"-HC (D,3) FROM TRIP L C66 PC-3-1 6"-29 FPW1A-6"-HC PUMP P-7A HS 42-4302/CS-2 ORW C66 1"-19 PC-46-1 L C65 L C88 C88 11 450 GPM COOLING WATER ORW FUEL POOL 3302 HS 42-3302/CS-1 TE 2781A PUMP TRIP LS-2786A (D,3) FROM PS 2769 TRIP L C66 (C,2) TO TR-23-115 NH-36247 M-121 HS 42-3302/CS-2 8"-237 PC-25 C66 L C65 L C88 C88 M-111 3/4"-130 PC-7-2 CW5-6"-HF TOP HEAT EXCHANGER PC-9-2 1"-19 TYP FOR 6 FUEL POOL HEAT EXCHANGER E-6B 5 4"-29 PC-5-2 FPW8B-4"-HC PC-4-2 4"-237 PX 2778 TI 2780 ORW CRW PX 2776 RV 1413 ORW 2" VENT ORW 4 NH-36042 A-D TYP FOR 4 FPW9B-4"-HC CRW A-F PC-12-2 4"-29 PC-11-2 1"-19 ORW VENT 12 3/4"-130 PC-8-2 TYP FOR 6 A-F 3/4"-130 TYP FOR 3 PC-10-2 A-C (C,6) PC-48 BOTTOM HEAT EXCHANGER TYP FOR 6 1"-19 PC-9-1 EXCHANGER E-6A FUEL POOL HEAT 4"-HC DRYWELL ORW FPW8A-4"-HC 3/4"-130 3/4"-130 PC-52-2 PC-6 4"-29 PC-52-1 "-HK ANNUNCIATOR (A,3) L C65 PS 2774 PI 2772 C66 L TO PC-47-2 HC (D,3) 10A-6"-HK TO FPW PC-4-1 4"-237 HC 1"HK PX 2777 4"-29 V40-3/4"-HC CRW ORW PX 2775 FPW8-4"-HC 2" VENT PC-5-1 4"-29 (A,3) ANNUNCIATOR L C65 C66 PS 2773 PI 2771 L TO PC-27 8"-237 PC-47-1 3/4"-130 ORW FPW4-2"-HC 2"-19 PC-28 DRYWELL CRW 4"-29 PC-7-1 FPW1-8"-HC V39-3/4"-HC ORW FPW11-6"-HK LI 2788 2" 1"-19 PC-49 CRW (C,6) PC-21 HK REACTOR BLDG CLOSED COOLING A-D TYP FOR 4 FPW9A-4"-HC 4"-29 CRW CW2-6"-HF PC-12-1 A-F 1"-19 ORW WATER PC-11-1 VENT 11 PC-8-1 TYP FOR 6 3/4"-130 A-F TYP FOR 3 3/4"-130 PC-10-1 A-C TE 2781B FI 2830 FPW9-6"-HC HC HC (C,2) NH-36247 TO TR-23-115 M-121 C66 C66 FI 2829 6"-142 L C65 6"-418M7 PC-22 NH-36042 CLOSED COOLING REACTOR BLDG CRW FS 2792 FPW7-4"-HC CW5-6"-HF CW2-6"-HF WATER M-111 H PC-50 L C65 FI 2793 TEST (A,3) FPW11-6"-HK ANNUN FPW11-6"-HK FS 2793 TO H C D 4"-HC PC-43 PC-44 1"-19 PC-24 2"-19 PC-23 FPW6-2"-HC ORW DRAINS LINER ORW 1"-19 MR FPW6-4"-HC HB D106-1"-HB 7,000 GAL/FT. 45'L X 19'W X 26' DP 583 GAL/INCH D105-1"-HB HB MR 160,000 GALLONS STORAGE POOL DRYER-SEPARATOR NH-36256 E FPW14A-2"-HC 2" 2" 2" 2" FPW14B-2"-HC 6 L (A,3) TEST FS 2789 FPW3-4"-HC FPW7-8"-MR FPW3-2"-HC FPW3-2"-HC FPW4-6"-HC FPW4-6"-HC FPW4-6"-HC FPW3-2"-HC FPW2-3"-HC PC-33 4"-29 FPW2-4"-HC FPW4-8"-HC FPW11-4"-HK FPW11-4"-HK FPW16-2"-HB FPW2-1"-HC FPW18-1"-HB TO ANNUN. (A,3) 1"-130 1"-19 PC-32 L C65 FRW2-3"-HC FPW3-4"-HC DRYWELL FPW2-1"-HC A HC MR B 625 GAL/INCH 32' DIA. X 27' DP REACTOR VESSEL 163,000 GALLONS 7,500 GAL/FT. REACTOR WELL FPW3-2"-HC ORW PC-42 FPW5-3"-HC FPW16-2"-HB ORW 3"-29 PC-30 PC-29 1"-19 HB MR MR HB HC MR 1"-19 FPW10B-6"-HK ORW LINER DRAINS HB D103-1"-HB D104-1"-HB MR 1" PC-41 1" 26' X 40' X 39' DP 647 GAL/INCH 2"-MR 7,769 GAL/FT. 303,000 GALLONS 22'-8" DEEP PC-20-2 6"-237 M3 A PC-20-1 6"-237 M3 GATES B FPW17A-3"-MR FUEL STORAGE POOL 2"-MR 2"-MR 2"-MR HC (TYP) MR 2" 2" 2" 2" 5 HC FPW14A-4"-HC HC MR (TYP) LS 2787 H FPW14B-4"-HC ANNUNCIATOR L C65 TO MR 4 N.D. PC-36 1"-DE FROM PS-2773 (B,5) 3 FROM FS-2793 (C,4) FROM FS-2792 (C,4) FROM FS-2789 (C,5) FROM LS-2787 (E,4) FROM LS-2785A (D,3) FROM LS-2784 (D,3) FROM PS-2774 (A,5) 2 4"-142F
- 4. PANEL C04 LOCATED IN MAIN CONTROL ROOM.
- 3. PANEL C88 LOCATED IN RADWASTE CONTROL ROOM.
- 2. PANEL C66 LOCATED NEAR FUEL POOL COOLING WATER PUMPS. (EL.985')
- 1. PANEL C65 LOCATED ON OPERATING FLOOR. (EL.1001')
A0-4"-418 PC-54 AO-6"-418 FPW13-4"-HB FPW13-6"-HB SYSTEM TROUBLE FUEL POOL COOLING FILTER/DEMIN NH-36257 SYSTEM M-136 A C04 HK FUEL POOL FPW10-6"-HK L O C C66 M-128 NH-36254 FROM R.W.C.U. (B,8) F.C 8"-29 PC-2 6"-256M3 PC-16 6-418M7 PC-15 HK HB AO 2783 F.C L O C C88 6"-29 L O C C66 CV 2782 ORW HS 2783 CST-158 CST-159 NOTES: TO WASTE SURGE TANK NH-36045 (C,6) M-139 M-131 NH-36049-13 (B,6) A/S H.C. EL 1001' 1"-7 CST-28 CST-29 M-131 NH-36049-13 (B,6) N.D. SV 2783 NH-36039 M-108 STORAGE TANK TO CONDENSATE (A,2) C66 HS 2782 E/P 7996 SV 2782 7996 LC C88 AIR SET C66 CST-30 1"-110 A/S 1 A 1 1/2"-HB 3238 PUMP P-85 DECONTAMINATION HIGH PRESSURE CHAMBER DAMP PCV RV 1"-HB 30GAL SUCTION TANK CST-26 1 1/2"-19 SERVICE BOX 1/2" HOSE EL. 1027' LANCE LCV CONDENSATE M-114-1 NH-85509 (E,4) FROM SERVICE B REW11-8"-HE TO RHR PUMP L C88 L C88 FPW1-8"-HC SC5-2"-HB LS 2786A LI 7453 PC-19-1 FPW10A-6"-HK PC-17 FPW10-10"-HK 6"-418 M7 6"-418 M7 FPW12-8"-GE HK GE 8"-26 PC-35 LS 2786B LL LL T-48A 11 (NORTH TANK) 228 GAL/FT. 4000 GAL L.O. SKIMMER TANK SURGE LS 2785B LS 2785A LT 7996 L C66 L L L C65 LS 2784 CST-33 2"-223 L C66 L C65 H CST-32 2"-130 TO PUMP P-7A TRIP (B,6) M-121 NH-36247 EXCHANGERS FROM RHR HEAT REMOVABLE SPOOL FPW12-8"GE (C,4) TO PUMP P-7B TRIP (B,6) PC-53 PC-1 8"-29 HC HE ADJUSTABLE WEIR TO ANNUNCIATOR (A,3) TO LC-7996 ON C88 NH-85509 M-114-1 (D,4) SERVICE PUMPS FROM CONDENSATE T-48B 4000 GAL 228 GAL/FT. (SOUTH TANK) 12 SURGE SKIMMER TANK MR HC PC-34-1 4"-29 3 2 NH-36247 SUCTION (B,6) M-121 REMOVABLE SPOOL C D REVISIONS PC-34-2 4"-29 1 E CHK: APPR: BJR 3-11-08 RMG 3-12-08 DWN: 76 JJP 3-5-08 11951 01121715 A/R EC SPECIAL CONCERNS ITEM SAFETY RELATED ELECTRICAL COLOR LEGEND ASME CLASS 2/QUALITY GROUP B SAFETY RELATED MECHANICAL QUALITY GROUP D ASME CLASS 3/QUALITY GROUP C ASME CLASS 1/QUALITY GROUP A NH-36256 MONTI CAD DWG ` ' This map/document is to assist employees in the performance of their jobs. Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. SCALE: NONE M-135 X Xcel NORTHERN STATES POWER COMPANY MONTICELLO NUCLEAR GENERATING PLANT Energy sm P&ID FUEL POOL COOLING & CLEAN-UP SYSTEM REV 79 T FPC103 T FPC104 22690 APPR: TM 10-1-13 CHK: DWN: BAL 9-26-13 JJP 9-24-13 77 EC 23419 APPR: DJS 2-25-15 CHK: DWN: AJR 2-25-15 JJP 2-25-15 78 EC LE 2789A TI 2779 RV 1412 2789A LI LE 2789B 2789B LI 28692 APPR: MM 7-11-17 CHK: DWN: AJR 7-11-17 JJP 7-7-17 79 EC 79 PC-37 PC-18 1 2 " HIGH POINT VENT LINE - SEE EC28692
2830 FIC 6"CV-52B FDPC-2-2 6"-237 RT16B-6"-HC 2833 CR 3PEN 2825 YS 2883 PX 2819 PI A H C88 A H C88 FDPC-5-1 3"-29 PC-51-1 ORW C88 A/S TIMER PROGRAMMER AO-2845 AI-297-1-1 3486 HS FROM (C,6) A/S C88 A B (A,5) 6 TO CR-2833 FPW9-6"-HC FROM PRECOAT TANK C217 HEAT EXCHANGERS FROM FUEL POOL NH-36256 M-135 (B,3) PROGRAMMER TIMER C88 FPC100 C F53A 2794 SX 6"CV-52A M-139 NH-36045 F.C. RT16-6"-HC 2803 AO O L C 6"-237 FDPC-2-1 ACCUM RT16A-6"-HC C217 2833A CE 2833A CIT (E,5) AO-2799 FROM (B,4) PI PCV NH-36257 C D E 2827 dPIS 2829 FE PI-4A 2829 FS C88 TO FI-2829 A L C88 53A1 PCV C88 BACK C88 FRONT AS-18-1 53A PCV C88 2817 HS TIMER PROGRAMMER C88 SV AI-297-6 TO AO-3484 (B,6) FU-53A SV A/S 2829 FIC C88 FIC-1A ToT 2829B FCp NH-36256 FQ-1A M-135 (B,3) C88 NH-85509 PILOT AIR HS 2845 (D,4) SV 2845 2845 AO RT34A-2"-HC 2"CV-57A F.C. C C88 L O 3/4"-HC FE-1A 4150B CST-143-1 2"-HB FS-1A SERVICE M-114-1 COND. L 2"-19 C88 HS 2829A FCp EXT-1A 2829 FT FT-1A 2831 PI 2"-HC PI-2A dPIS-1A HC HK 2829 CV PC-14-1 6"-418M7 (B,3) NH-36045 TO LIQUID RADWASTE M-139 CRW-102-1 (E,2) 2829 HS C88 2829 SV CV-4A M-135 NH-36256 TO FUEL POOL 6 C217 FPC101 C 2795 SX 4" F.C. 6"-HK A H C88 2833B CIT 2833B CE C217 C88 FPWB10-6"-HK A H C88 RT20-6"-HC AI-297-7-1 3485 HS (C,3) 3/4"-HC 5 ORW ALARM ON HIGH TEMP 5614 TS 3484 SV 3484 HS FDPC-9-1 AI-297-6-1 PROGRAMMER HS 2803 TIMER C88 3484 AO C L C88 O FDPC-9-3 3486 AO C88 AI-297-3 2803 SV A/S 3486 SV L C O C ORW 3/4"-HC TO PRECOAT TANK NH-36045 M-139 AO-2846 FROM (C,3) 6"-29 PC-13-1 CH30A-1"-HC HB 2797 PI PI-1A 6"CV-7A F.C. HC PI FDPC-1-1 1"-19 ACCUM HC HE 3/4"-HC PI TYPICAL FOR ALL VALVES 2649 ORW 4 DETAIL "A" FOR "AO" VALVES UNLESS OTHERWISE SHOWN HE FROM LIQUID 3485 AO 3485 FDPC-9-2 RADWASTE M-139 (C,5) NH-36045 CRW-101-1 SV C C88 L O AI-297-1 TO AO-3486 (B,6) HS 2799 PCV 2799 AO C88 L O C TIMER C88 PROGRAMMER 2799 SV A/S HB L (LIMIT STOP) SLUDGE TANK TO WASTE NH-36047-1 M-141 RT33-6"-HE (E,5) F.C. FUEL POOL FILTER/DEMIN T-47A (P.O. M16) 11 C HB FPW10A-6"-HK V37-3/4"-HC 3/4"-130 FDPC-7-1 F.O. HOLDING PUMP 2823 PCV 2823 HS AI-297-2 2823 SV C88 4150B P-55A FUEL POOL 11 AO FPW15A-2-1/2"-HB ACCUM PI L C88 PI-3A 2821 PI 2 1/2"-237 O C FDPC-6-1 FPW15A-3"-HK AI-296-2 SV 2817 A/S 2882 PX PROGRAMMER TIMER C88 HK HB YS-1A HK PCV 2817 AO PCV FDPC-4-1 6"-256M3 6"CV-53A CH29A-1"-HC FDPC-8-1 RT20A-6"-HC 2"CV-51A C FDPC-3-1 1"-19 FPW9C-6"-HC RT33A-6"-HE F.C. 2805 dPT RT20A-6"-HK ACCUM C88 L O PI F.C. HC HK ORW dPIS-2A dPT-1A 2805 dPIS C88 HC HE C88 A H 2815 PCV 6"CV-6A F.C. (B,6) CRS-1 (E,3) PI ACCUM AO SC13A-6"-HB 5 A/S C88 TIMER PROGRAMMER AI-296-4 HS 2815 C88 O L 2815 SV F.C. C LOCAL PANEL A C04 C88 F.P. TROUBLE C F.C. 6"CV-3A RV35-2"-HC RV35-1 1/2"-HC RT33A-6"-HE ORW 2807 C 2801 RV C88 L AO O L C88 O C AI-297-4 2807 PROGRAMMER C88 TIMER 2807 SV HS V78A-1"-HB A/S 1"CV-9A AO PROGRAMMER TIMER C88 2809 AI-297-5 2809 HS 2809 SV A/S C88 FIC-1B NOTE 1 2813 PS AO 2813 AI-296-1 PROGRAMMER TIMER C88 L C O 1"CV-14A C88 2811 AO A/S 2"CV-8A F.C. 2811 2811 HS SV C88 L O 4 TO LIQUID RADWASTE CRW-102-2 NH-36045 AI-296-3 2813 PROGRAMMER TIMER C88 PS-2A HS SV 2813 V53A-2"-HC (E,2) A/S HS 2830 C88 M-139 RV36-2"-HC RV36-1-1/2"-HC PS-2813 & PS-2814 ABANDONED IN PLACE UNDER WRA #72-00875. HS AI-297-10 2800 PROGRAMMER TIMER AI-296-7 AI-297-8 2808 HB HE 3/4"-HC 3 TIMER PROGRAMMER PCV ACCUM AI-297-12 A/S 2804 C88 PI L O C AO 2804 HS 2804 SV C88 AI-297-12-1 3487 HS C88 L C O FDPC-9-4 3487 AO 3487 SV 2 CH30B-1"-HC HB PI-2A 2798 PI FPW9D-6"-HC 5615 TS ALARM ON HIGH TEMP ORW C PC-13-2 6"-29 CRW-101-2 (C,5) NH-36045 1. NOTE: 6"CV-7B F.C. HC PI FDPC-1-2 1"-19 ACCUM FROM LIQUID RADWASTE M-139 2800 AO O C L C88 PCV F.C. AI-296-8 HOLDING PUMP 2824 PCV 2828 dPIS 2826 YS 2830 FE PI-4B FE-1B CST-143-2 RT33B-6"-HE 2"-HB NH-85509 AI-297-7 TO AO-3485 (A,5) A/S (D,4) HS 2846 2846 SV 2846 AO C88 2830 FS TO FI-2830 A L C88 ToT 2830B FCp NH-36256 FQ-1B M-135 (B,3) C88 FS-1B CONDENSATE SERVICE M-114-1 L 2"-19 C88 4150C HS EXT-1B 2830A FCp 2830 FT FT-1B 2832 PI 2"-HC ORW PROGRAMMER TIMER A/S RT34B-2"-HC HC HE 2"CV-57B F.C. L C O C88 3/4"-HC 2824 HS AI-297-11 2824 SV C88 4150C FUEL POOL P-55B 12 FPW15B-3"-HK PC-51-2 3"-29 FDPC-5-2 2820 PI 2885 PX PI-2B dPIS-1B HC HK 2884 PX A/S YS-1B HB HK HK 3 PC-14-2 6"-418M7 2830 CV 2830 SV CV-4B 4" F.C. 6"-HK FPC102 C A H C88 TO CR-2833 (E,5) 2833C CE 2796 SX C217 HB C217 2833C CIT C 6"CV-6B A H C88 2806 dPT CH29B-1"-HC FDPC-8-2 6"CV-53B 2"CV-51B F.O. AO FPW15B-2-1/2"-HB ACCUM PI C88 L PI-3B 2822 PI FDPC-6-2 2 1/2"-237 O C RT20B-6"-HC C FPW10B-6"-HK 2818 AO 6"-256M3 FDPC-4-2 V38-3/4"-HC FDPC-7-2 3/4"-130 ORW RT20B-6"-HK C88 O L F.C. HC HK 6"CV-3B FPW9D-6"-HC FDPC-3-2 1"-19 F.C. ORW 2808 C 2802 RV C88 L AO O FUEL POOL (P.O. M16) T-47B 12 FILTER/DEMIN dPIS-2B dPT-1B 2806 dPIS C88 HC HE TIMER PROGRAMMER C88 2808 SV HS C88 TIMER PROGRAMMER A/S PCV 2816 PI SC13B-6"-HB ACCUM AO AI-296-5 HS 2816 C88 O L 2816 SV PI-6 2834 PI F.C. C88 L O C 1"CV-14B AO 2812 C88 1"-263 AS-26 SC13-6"-HB PCV-1 2835 PCV 2 HC JB 2835 PI SPECIAL CONCERNS ITEM SAFETY RELATED ELECTRICAL COLOR LEGEND ASME CLASS 2/QUALITY GROUP B SAFETY RELATED MECHANICAL QUALITY GROUP D ASME CLASS 3/QUALITY GROUP C ASME CLASS 1/QUALITY GROUP A 1 C88 TIMER PROGRAMMER 2800 SV A/S F53B PROGRAMMER C88 TIMER C88 A/S A B C AI-297-9 2810 PILOT AIR SV AO 2810 V78B-1"-HB F.C. A/S C88 O L C 1"CV-9B PROGRAMMER TIMER C88 SV 2810 HS C88 BACK C88 FRONT 53B1 PCV FU-53B SV 2818 HS C88 PROGRAMMER C88 TIMER AS-18-2 53B PCV A/S SLUDGE TANK NH-36047-1 AS-45 1"-65 TO WASTE AI-296-6 2814 2814 PS 2814 AO 2"CV-8B 2812 F.C. 2812 HS SV A/S C88 L O V53-2"-HC V53B-2"-HC NOTE 1 2836 PI TIMER PROGRAMMER C88 PS-2B HS SV 2814 SA5-1"-JB PI-5 M-141 (E,5) BACKWASH CONDENSATE NH-36039 (C,6) FROM M-108 NH-36049-4 A/S (B,5) SERVICE AIR M-131 FROM DWN: APPR: CHK: 76 1 JJP 3-5-08 11951 01121715 RMG 3-12-08 BJR 3-11-08 A/R EC REVISIONS C E 17346 APPR: AVW 1-25-11 CHK: DWN: BAL 1-4-11 JJP 1-3-11 77 EC NH-36257 MONTI CAD DWG ` ' This map/document is to assist employees in the performance of their jobs. Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. SCALE: NONE M-136 N Xcel NORTHERN STATES POWER COMPANY MONTICELLO NUCLEAR GENERATING PLANT Energy sm FUEL POOL FILTER/DEMIN. SYSTEM P & ID REV 79 LOCAL LOCAL 23977 APPR: CWB 2-26-15 CHK: DWN: BAL 2-26-15 JJP 2-12-15 78 EC 2818 SV PROGRAMMER TIMER C88 POS PCV 26770 APPR: CWB 11-21-16 CHK: DWN: BAL 11-16-16 JJP 11-15-16 79 EC 79
CHANNEL A PRESSURE LOGIC HIGH DRYWELL A C05 APPROACH PT 2994B PT 2994A C04 L O C C04 L O C C03 D NOTE 8 P L O C C03 NH-36258 A B C C D C E M-131 NH-36049-14 (B,2) L O C C03 L O C C04 NOTE 8 NOTE 4 CV 2384 PS 4667 CV 2385 NOTE 8 HS S82 DWV-90 DWV-89 L O C C03 N2/AIR SUPPLY NH-36049-14 L O C C04 (B,6) T-RING M-131 C 6 LT38-"-HE NH-36049-14 AO 2896 LT39-"-HE 3/4"-19 L O C C03 L O C C03 ACTUATOR DWV-9 3/4"-19 L O C C04 F.C. DWV-10 C L O C C04 18Ø SUPPLY M-131 (B,6) C C SV 2896 PS 4672 PI 4672 ND CP5-2"-HE NH-36049-14 DWV-88 AIR SUPPLY (A,6) M-131 ND CP2-18"-HE DWV-86 ND N2/AIR SUPPLY CP5-18"-HE ND AO 2383 PI 4667 F.C. SV 2384 SV 2383 DWV-87 CP2-2"-HE XFER C292 F.C. SV 2385 C04 16A-S25 HS SUPPLY C04 16A-S20 HS NH-36049-14 T-RING NH-36049-14 (A,5) M-131 M-131 (B,6) AIR C04 16A-S21 HS C04 16A-S27 HS M-131 NH-36049-14 (B,2) ACTUATOR SUPPLY PS 4666 AO 2387 NH-36881 M-145 L O C C04 CP2-18"-HE NOTE 8 D P F.C. 18Ø NH-36049-14 (A,1) SUPPLY M-131 ACTUATOR (C,6) 6 N2/AIR SUPPLY ND C292 XFER PI 4666 AO 2386 PI 4671 PS 4671 ND SV 2386 NH-46162 (D,6) M-130 SV 2387 S82 HS NH-36049-14 T-RING NH-36049-14 SUPPLY ACTUATOR C04 16A-S24 HS (B,1) (A,1) M-131 M-131 C04 16A-S29 HS N2/AIR SUPPLY T-RING PRIMARY CONTAINMENT L O C C250 PRIMARY CONTAINMENT SUPPRESSION CHAMBER TE 2995F (TYP. OF TE4073-4080) PROTECTION SYSTEM LOGIC NH-36246 M-120 INTERLOCK FOR RHR SYSTEM TE 4247H1 CGC1-6"-CB X-47 L PCT115 PI 7251B ISO LY 7338B L O C C250 HPV1-8"-HE X-206D ES 7369 FROM E/S 4101 PY 7251B 7251B LS 2996A CO7 LS 2996B CO7 E/S C07C-5 CO7 L PCT112 5 LT 2996A A H L C04 H C258 7860B RM 50 PSIG 18" X 20" NH-116629 (C,2) 2996 E/S 4100 FROM M-131 NH-36049-4 (C,6) PCV 3078 SET @ LT 7338B L PCT113 CGC2B-6"-CB DWV-85 AS-191 X-205 LT 2996 C04 LI TABLE 1 SEE X-240 AS-36 PRESS TEST SERVICE AIR AIRLOCK C292 C03 PLR X-209B TE 4073A X-206F T PCT120 4072A A C05 C289A TY TYP. OF 8 X-207A-H PT 7348 1"-JB VENT X-206E X-206C POS 3000 PI 3077 A C04 LOCK AIR P PCT101 1"-JB 1"-156 DWV-27 P PCT103 AS-37 I/I E/S 4100 FROM PT 7251B POS 2999 X-2 X-48 TE 4247C1 X-29E X-29F E/S FROM X-25 7251B C56 PS 10-101B SEAL TEST CONN PS 5-12C E/S 4101 FROM CONTAINMENT LI 7338B C292 PRIMARY SYSTEM ISOLATION P PCT110 C292 C56 C56 5 PS 5-12D PS 10-119B PS 10-101D PS 10-119D C56 C292 C56 C56 CH B2 CH A2 4"x6" CGC1-4"-CB C03 LEVEL X-206G 2382A,B,C,E,F,G,H & K 18" VAC. BREAKER VALVE M-131 NH-36049-14 (B,4) AIR SUPPLY X-209C C289A 4072A TR 4072A C03 TI 4 (TYPICAL OF 8) X-50F TE 4247F1 DRYWELL TE 2995G C04 16A-S61 HS C04 16A-S60 HS SEL ONLY TEST SW X-26 X-32C C04 TE 4247A1 X-50E ALARM LS 2997 H A TE 4073B SV AO T PCT121 L PCT114 PT 7251A X-209A E/S 7251A N.D. X-209D TE 2995E 7251A M-123 NH-36249 (C,2) SEE DWG LT 7338A PLR FROM P D-124 X-202A-K X-230 X-218 X-206H PI 3051 TABLE 1 TYP. OF 10 SEE A H C05 23-115 P D-125 TR C21 2994 PR C55 C55 CH B1 CH A1 (D,3) M-121 NH-36247 PRIMARY CONTAINMENT ISOLATION & REACTOR A H C03 (E,4) P PCT109 C257 7860A RM FLOOD 4 C55 PS 10-119A PS 10-101A PS 5-12A PS 5-12B C56 PS 10-101C P PCT100 PS 10-119C C55 C55 PI 3050 C55 A H L CO5 PS 5-16 PI 4669 CP4A-20"-HE 3/4"-19 L O C CO4 This map/document is to assist employees in the performance of their jobs. Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. MONTICELLO NUCLEAR GENERATING PLANT CP1-18"-HE AO-2383 IS PROVIDED WITH A STANDBY VALVE TRAVEL POSITIONER WHICH IS LOCALLY CONTROLLED BY A MANUAL PNEUMATIC CONTROLLER FOR USE DPS-2572 AND DPS-2573 WILL OVERRIDE MANUAL CLOSING SIGNAL WHEN PRESSURE IN SUPPRESSION CHAMBER IS 0.5 PSI LOWER THAN ATMOSPHERE. ALL EIGHT VALVE CLOSED INDICATIONS IN EITHER ALARM CHANNEL MUST BE ENERGIZED OR BY-PASSED BEFORE THE RESPECTIVE CHANNEL ALARM ON PER MOD 81M041 VALVES SHOULD BE INSTALLED WITH FLAT SIDE OF DISC TOWARD CONTAINMENT AND SHAFT OF VALVE IN PLANE OF FIRST ELBOW TOWARD CONTAINMENT. DETAILED P & ID'S OF THE ALTERNATE NITROGEN SYSTEM/INSTRUMENT AIR SYSTEM CONNECTIONS TO THE AIR OPERATED VALVE ACTUATORS AND T-RING SEALS FOR THE PURGE AND VENT VALVES AND THE REACTOR BUILDING TO TORUS VACUUM BREAKER VALVES ARE SHOWN ON DRAWINGS NX-9769-17 L O C CO4 M-131 NH-36049-14 (B,5) L O C CO4 L O C CO3 C04 2994D PENETRATION DESIGNATION SPOTMOS DIV. II ACTUATOR SUPPLY CP1-18"-HE C04 16A-S22 HS PI 4665 SV 2381 PS 4665 NH-36049-14 SEE NOTE 7 COMMON DUAL ALARMS FOR dPS 2572 8 VALVES N2/AIR SUPPLY N2/AIR SUPPLY NH-36049-14 AO 2381 3 4072B (TYP. OF TE4073-4080) TR 4072B C289B 4072B TY TI C289B C03 L O C CO4 (B,2) NH-46162 A O C05 CP1-18"-HE A O C05 L O C C04 CGC2A-6"-CB E/S 7251A A H C04 FROM CP11A-1"-HE C ATMOS CP4-20"-HE L O C L O C CO3 (C,6) M-131 T-RING T-RING M-131 (C,5) SUPPLY ACTUATOR N2 MAKE-UP (B,2) NH-46162 M-130 PS 4664 M-131 NH-36049-14 (C,6) F.C. NOTE 8 CP11B-1"-HE C F.C. CP3-18"-HE NOTE 8 AO 2378 PI 4664 20" SV 2378 ND C04 16A-S23 HS SENSOR DESIGNATION 3 NH-36246 TE4080A TE4073A TE4074A TE4075A TE4076A TE4077A TE4078A TE4079A INITIATE LPCI M-130 N2 MAKE-UP SCRAM M-120 (B,3) TABLE 1 DESIGNATION PENETRATION INITIATE CORE SPRAY M-123 NH-36249 (E,5) X-231A X-238A X-232A X-233A X-234A X-235A X-236A X-237A NH-36247 INITIATE HPCI M-121 (B,5) ND SPOTMOS DIV. I TEMP. M-122 (B,3) NH-36248 DESIGNATION SENSOR TEMP. TE4078B TE4080B TE4079B TE4073B TE4077B TE4076B TE4075B TE4074B PS 4670 SV 2377 PI 4670 C04 16A-S30 HS CONTAINMENT L O C CO4 N2/AIR SUPPLY NH-36049-14 C04 16A-S38 HS PI 4668 M-131 NH-36049-14 (C,7) ACTUATOR LT35-1"-HE ATMOS 12" FLG DWV-7-3 1"-19 SYSTEM ISOLATION dPS 2573 & T-RING ACTUATOR (C,4) M-131 C04 16A-S37 HS SUPPLY S82 HS 2 AO 2377 F.O. AO 2380 F.O. TEST CONNECTION (TYP) " VALVE LEAKAGE AO 2379 F.C. SV 2380 NE PS 4668 C292 XFER A O CO4 PS 4669 LT37-"-HE A O CO4 DWV-7-1 NOTE 8 SV 2379 NE NOTES: DELETED DELETED AND NX-9769-18. C05 CAN BE RESET. DURING ILRT DEPRESSURIZATION. DELETED PER MOD 80M017. DELETED AS A RESULT OF MOD 81M041. dPT 2994C dPT 2994D dPI PRIMARY X-234B X-236B X-237B X-238B X-235B X-231B X-233B X-232B 2994C dPI C04 9. 5. 7. 6. 8. 2. 1. 4. 3. ND C 2 NH-36258 MONTI CAD DWG ` ' M-143 REV L O C CO3 FROM SECONDARY CONTAINMENT NH-36267 NH-36267 CONTAINMENT FROM SECONDARY VACUUM RELIEF VACUUM RELIEF AIR PURGE SUPPLY FROM REACTOR BLDG HVAC SYSTEM N2 PURGE NH-36267 M-130 NH-46162 (B,2) P&ID PRIMARY CONTAINMENT & ATMOSPHERIC CONTROL SYSTEM NORTHERN STATES POWER COMPANY Energy Xcel sm LT36-"-HE 18"-Sp418 DWV-7-2 3/4"-19 CP4B-20"-HE N2/AIR SUPPLY M-131 T-RING NH-36049-14 (B,5) (C,6) & T-RING M-131 N2/AIR SUPPLY ACTUATOR NH-36049-14 VAC DWV-8-2 DWV-8-1 20"Ø BRKR VAC BRKR P D CP10-12"-JB 20"Ø 18"Ø P D DWV-12 P D SCALE: 1 NONE M-155 (B,2) (B,2) (C,1) M-155 M-155 RMG 3-12-08 APPR: APPR: CHK: DWN: APPR: CHK: DWN: 77 78 12558 DCA 5-22-08 JT 5-22-08 JJP 5-20-08 01123311 16563 CWJ 4-26-11 DDW 4-26-11 JJP 4-25-11 EC A/R EC DWN: CHK: 1 76 01121715 JJP 3-5-08 BJR 3-11-08 11951 REVISIONS EC A/R 80 AR A B C D E SPECIAL CONCERNS ITEM SAFETY RELATED ELECTRICAL COLOR LEGEND ASME CLASS 2/QUALITY GROUP B SAFETY RELATED MECHANICAL QUALITY GROUP D ASME CLASS 3/QUALITY GROUP C ASME CLASS 1/QUALITY GROUP A 17430 APPR: JAZ 11-1-11 CHK: DWN: BAL 10-31-11 JJP 10-28-11 79 EC 28051 APPR: SJH 5-17-17 CHK: DWN: BAL 5-17-17 JJP 5-16-17 80 EC 80 80
V-EF-9 TO REACTOR BLDG MAIN PLENUM W & EMERG = 0 CFM (SEE NOTE 2 DWG M-155, NH-36267) S = 0-40,000 CFM V-MZ-1 S = 15,400 CFM W = 15,400 CFM A 6 V-MZ-4 B C BD EXHAUST SUPPLY F.D. FIRE DAMPER DUCT PASSAGE DAMPER FREE AIR INTAKE LOUVER BUTTERFLY SOLDERED DUCT BALANCING B.D.B.D VALVE OUTSIDE AIR DAMPER HELB DAMPER BACKDRAFT S HELB EQUIPMENT COIL COIL HEATING COOLING ZONE # S = -- CFM = SUMMER W = -- CFM = WINTER TAG NO. DAMPERS AXIAL FAN FAN CENTRIFUGAL MOTOR OPER BACKDRAFT DAMPERS BALANCE ROUGHING FILTER LEGEND C C V- -- - H C 1 S OR W EMERG. = 0 CFM W = 0 CFM S = 0-28,400 CFM NH-36263 DISCHARGE FROM V-FU-4 (HOT MACHINE SHOP) 1100 CFM - LO 2400 CFM - HI W = 18,000 CFM 4,750 CFM MIN. S = 0 CFM D E OPERATING WHEN tSS = 90° F 6 (SEE NOTE 2 DWG M-155, NH-36267) This map/document is to assist employees in the performance of their jobs. Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. MONTICELLO NUCLEAR GENERATING PLANT Energy AIR FLOW DIAGRAM - TURBINE BUILDING CABLEWAY BLOWOUT V-EF-12 B.D.D. tRS=104° F tRS=104° F 12 AC/HR tRW=60° F 3 AC/HR ELEV. 911'-0" CONDENSATE PUMPS 300 CFM PIPE AREA UNDER tRS = 130° F tRW = 100° F 1,600 CFM COND. RESIN tRS = 104° F tRW = 74° F PUMP 18 AC/HR 400 CFM B.D.D. BD tRW = 74° F tRS = 104° F 18 AC/HR tSW = 60° F tSS = 90° F BD 2 3 5,700 CFM 1,200 CFM PIPE WAY 400 CFM 5 3,300 CFM 2,400 CFM 1,200 CFM 400 CFM 200 CFM CLEAN R.W ELEV. 908'-0" 8 AC/HR SUMP 6,750 CFM 9,000 CFM 6 AC/HR ELEV. 911'-0" GLAND SEAL COND. AIR EJECTOR & SWITCHGEAR AREA ELEV. 911'-0" RAILROAD ENTRANCE ELEV. 935'-0" tRW = 100° F tSS = 90° F tRS = 130° F 6,500 CFM ELEV. 908'-0" COND. VACUUM PUMP tSW = 120° F BD 1 2,500 CFM 7,200 CFM DOOR (100 CFM EXFILTRATION) 1,900 CFM 70 AC/HR tRS = 96° F 2,200 CFM tRW = 60° F 11 AC/HR HATCH 6 AC/HR tRS = 104° F tRW = 70° F 13 AC/HR 13 AC/HR TANK ELEV. 908'-0" tRW = 74° F tRS = 104° F 3 AC/HR TANK VENT 2,200 CFM DIRTY R.W ELEV. 908'-0" 10 AC/HR 1,600 CFM SUMP TANK 550 CFM 1,200 CFM HATCH (TYP.) 4 COND. DEMIN. ELEV. 925'-0" PIPEWAY 4,750 CFM tRW=74° F SIDE OF CONDENSER NORTH TO 1,620 CFM (TYP.) HATCH PIPE TUNNEL BACKWASH RECEIVING CONDENSATE 250 CFM 22,000 CFM 104° F 140° F SAMPLE 1,200 CFM STATION 1,200 CFM 880 CFM 100 CFM DEMIN. VALVE CELLS EXFILTRATION TO COND. ELEV. 931'-0" GENERATOR 850 CFM 6,900 CFM 10,200 CFM 90° F 104° F B.D.D. V-AC-3A 150 CFM CFM 150 40 CFM C PANEL C V-AC-2 C C 90° F 2,200 CFM V-D-9302 NC, FC 7,200 CFM 9,000 CFM ELEV. 935'-0" SWITCHGEAR AREA NH-36267 M-155 tSS = 90° F tSW = 100° F tSW = 63° F tSS = 90° F C C H C V-CC-27 2 1 SUMMER VENT UNIT V-AH-1 HELB-9 tRS = 104° F tRW = 60° F 10 AC/HR HELB S = 0 CFM W = 13,500 CFM 5 TO SBGT ROOM VENT AREA 128.8 IN2 V-UH-1 C H 850 CFM ALONG WALL V-UH-20 THRU C H 20 UNIT HEATERS EXFILTRATION TO COND. 200 CFM DEMIN. TANK CELLS 4 EL. 951'-0" W = 3/4 AC/HR S = 5 AC/HR OPERATING FLOOR W = 5,000 CFM ELEV. 931'-0" ENCLOSURE PIPE & ELEC. 4.2 AC/HR NH-36035-2 TANK CELLS 3 AC/HR 3 AC/HR 3 TOTAL 100 CFM ELEV. 936'-6" CONDENSATE INFILTRATION DEMIN. VALVE CELLS ELEV. 925'-0" 2 AC/HR (TYP. FOR 8) tRW=60° F tRS=104° F 1,700 CFM 1,700 CFM 100 CFM V-EF-11 6,550 CFM 29,900 CFM INFILTRATION 200 CFM 40 CFM V-AC-3B 40 CFM B.D.D. CONDENSATE B.D.D. DEMIN. 2,400 CFM C C tRW = 60° F - 100° F V-AC-1 tRS = 125° F 5,200 CFM S 95° F 29,900 CFM V-EF-30 C C 125° F 2,000 CFM V-EF-26 B.D.B.D. BD 1,800 CFM MAIN FLOOR HATCH TO RIGGING TRAY 800 CFM S & W M-104-1 (C,2) 2,000 CFM 2 TO DILUTION AIR FANS BECHTEL JOB No. 5828 Xcel NORTHERN STATES POWER COMPANY tSS = 90° F TO NORTH SIDE 911' TUNNEL tSW = 86° F tSW = 60° F tSS = 90° F HELB-7 OF CONDENSOR BD tRS = 104° F tRW = 72° F EMERG. = 61,400 CFM 6,550 CFM S = 54,800 CFM W = 61,400 CFM 2,400 CFM 7,000 CFM 5,200 CFM VENTILATION NH-36267 STACK M-155 TO MAIN 5,200 CFM tRS = 104° F LUBE OIL COOLERS ELEV. 911'-0" RFW PUMPS 5.65 AC/HR tRW = 60° F ROOM OIL LUBE 2 1 HELB V-MZ-6 C H W = 1,000 CFM HATCH FROM WATER TREATMENT S = 6,000 CFM 3 W = 16,400 CFM tRS = 104° F tRW = 60° F S = 9,800 CFM AROUND TURBINE OPENINGS IN FLOOR CONDENSER AREA 8 AC/HR 37,000 CFM TO ZERO BD RIGGING 911' ELEV. tSW = 50° F tSS = 90° F NH-36267 tSS = 90° F tSW = 100° F M-155 SUMMER VENT UNIT S = 0 CFM ZERO TO 37,000 CFM NC, FC 7,200 CFM HELB-8 HELB N.C. N.O. 1 2 V-D-9303 2 TO REACTOR BLDG MAIN PLENUM S = 0-40,000 CFM W & EMERG = 0 CFM V-MZ-5 V-AH-2 tSS = 90° F SPECIAL CONCERNS ITEM SAFETY RELATED ELECTRICAL COLOR LEGEND ASME CLASS 2/QUALITY GROUP B SAFETY RELATED MECHANICAL QUALITY GROUP D ASME CLASS 3/QUALITY GROUP C ASME CLASS 1/QUALITY GROUP A NH-36263 MONTI CAD DWG ` ' SCALE: sm NONE 1 A REV 79 M-151 H W = 8,100 CFM S = 13,100 CFM S OR W EMERG. = 8,100 CFM tSW = 30° F tSS = 90° F B C REVISIONS 01121715 JJP 3-5-08 RMG 3-12-08 BJR 3-11-08 11951 16179 RKJ 12-6-11 DDW 12-6-11 JJP 12-6-11 16307,10915 AAR 6-6-13 BAL 6-6-13 JJP 6-6-13 EC 78 S = 44,200 CFM W = 44,200 CFM APPR: CHK: DWN: S = 0-28,400 CFM S OR W EMERG. = 0 CFM W = 0 CFM 77 APPR: CHK: DWN: 76 DWN: APPR: CHK: EC A/R EC 1 D E 22453 APPR: NTM 7-15-13 CHK: DWN: BAL 7-15-13 JJP 7-15-13 79 EC 79
3,400 CFM TEMP. RANGE 68° TO 90° F TEMP. <90° F, R.A. 500 CFM SHIPPING TRUCK AREA W.C.S.P.< AMBIENT P. tRS=104° tRW=50° V-D-69 V-D-70 PUMP RM. No. 2 A B 6 REACTOR BLDG. FLOOR EL. 962'-0" 1,050 CFM BDD NH-36266 C D E (SEE MECH. DWGS.) TANK VENTS FROM T-35 -0.25" W.C.S.P. WASTE SLUDGE CELL CLEANUP PHASE & REACTOR BLDG. FLOOR EL. 985'-6" -0.25" W.C.S.P. FILTER VAULT FUEL POOL No.11 700 CFM FUEL POOL No.12 FILTER VAULT -0.25" W.C.S.P. T-47B BD V-D-68 V-D-67 tRW=50° tRS=120° 417 200 CFM BDD T-47A 550 CFM 1,250 CFM tRW=50° tRS=120° T-27 V-D-66 311 tRW=50° V-D-65 100 CFM tRS=120° BD 418 BDD FILTER VAULT -0.25" W.C.S.P. FLOOR DRAIN BD tRW=50° 419 tRS=120° 100 CFM BDD T-202A RWCU FILTER DEMIN
- 1 -0.25" W.C.S.P.
100 CFM P-55B W.C.S.P.< AMBIENT P. tRS=104° tRW=85° 500 CFM 411 BD 300 CFM P-55A PUMP RM No. 1 V-D-77 BDD
- 2 -0.25" W.C.S.P.
RWCU FILTER DEMIN 350 CFM T-202B 250 CFM V-D-78 tRW=50° tRS=120° 409 6 CFM P-33 P-56 300 CFM 1,100 423 V-D-75 300 CFM BD CFM 50 BDD 50 CFM 412 tRW=50° tRS=120° V-D-76 410 V-D-9101 FLOOR EL. 936'-9" V-D-9100 5 TIC 7927 HEATER 1,600 CFM CFM 50 dPI TS 7928 V-F-12 BDD CHARCOAL DEMISTER ABSOLUTE 600 CFM 2,200 CFM 4 ROOF EXHAUSTER (SEE NOTE 3) V-EF-52 4000 CFM O.A. M O.A. SHIPPING BLDG. M 200 CFM DRUM AREA STORAGE 3,600 CFM 5,600 CFM BD T-26 T-24 T-19 tRW=50° tRS=120° -0.25" W.C.S.P. TANK CELL COLLECTOR (SEE MECH. DWGS.) TANK VENTS PHASE CELL tRS=120° -0.25" W.C.S.P. CONDENSATE SEPARATOR tRS=120° tRW=50° -0.25" W.C.S.P. DEMIN. VAULT WASTE COLLECTOR PUMP RM No. 3 312 CFM 50 V-D-71 tRW=50° 420 100 CFM V-D-72 -0.25" W.C.S.P. WASTE COLLECTOR tRS=120° FILTER VAULT BD T-25 T-65 BDD BD BD 850 CFM 2,000 CFM 317 tRW=50° V-D-74 600 CFM V-D-73 420A BDD 100 CFM 550 CFM W.C.S.P.< AMBIENT P. P-32 1,400 CFM P-30 P-35 tRW=85° tRS=104° 5 BD BDD BDD 1,400 CFM BD CFM 850 550 CFM 1108 V-FU-1 1/2 SIZE FAN 5,600 CFM 5,600 CFM BD 4108 1/2 SIZE FAN 5,600 CFM V-FU-2 5,500 CFM EACH 1/2 CAPACITY 50 TO 400 CFM SEE NOTE 4 421 V-MZ-3 11,100 CFM BDD 4 11,200 TO MAIN EXHAUST PLENUM AIR FLOW B CFM 2214 CH. WATER V-MZ-3B BDD C H STM A V-MZ-3A 3214 BDD STM C C H SET @ 0.25" W.C.S.P. 310 CFM 1,700 50 CFM tRS=72° FILTER MAY BE REMOVED AND REINSTALLED BY PROCEDURE. REQUIRES SPECIAL PERMISSION TO RUN DUE TO CONCERNS OVER UNMONITORED HIGH RAD. LEVEL STORAGE DESIGNED FOR OPERATION AT HALF CAPACITY UNDER WINTER CONDITIONS OR AS REQUIRED UNIT V-MZ-3 AND MAIN EXHAUST UNITS V-FU-1 AND V-FU-2, THESE UNITS ARE AIR FLOWS SHOWN ARE SUMMER DESIGN FLOWS FOR AREAS SERVED BY MAIN SUPPLY INDICATES ITEM FURNISHED WITH PLANT OPERATING EQUIPMENT. 3 CFM 200 200 CFM INFILT. 641 CFM 11,200 CFM 4,600 CFM 880 CFM RADIOACTIVE RELEASES. IN THE INTERMEDIATE SEASONS. 3. 4. 2. NOTES: 1. BD 144 880 CFM 880 CFM 880 CFM 880 CFM BD BD BD BD BD 800 CFM 143 +0.25" W.C.S.P. COMPACTOR WASTE CFM 350 2 142 750 CFM EX. HOOD 140 800 CFM LOW RAD. LEVEL STORAGE -0.25" W.C.S.P. tRW=50° tRS MAX.=104° tRS=85° 4148 1,660 CFM CFM 1,800 CFM BD & WBDD (OPERATING GALLERY) tRS=72° 600 tRW=72° 910 310 V-MZ-2 100 TANK ROOM LAUNDRY DRAIN 0 MIN. 350 MAX. V-EF-13 H&V EQUIPMENT RM. No. 1 CFM 250 V-HC-4 600 CFM V-UH-21 300 500 CFM TEMP. RANGE 60° TO 74° F 350 CFM TEMP. RANGE 68° TO 100° F 1,700 CFM BD 700 CFM 400 CFM CFM 250 130 400 CFM BD 400 CFM CONTROL ROOM tRW=72° -0.12" W.C.S.P. tRS=104° tRW=55° TANK ROOM 148A H&V MECH. EQUIP. tRW=50° ROOM No. 2 CFM 300 CFM -0.25" W.C.S.P. 1,050 CFM tRS=104° BD STM 450 CFM BD 3 BARBER COLMAN No. 10, OR APP. EQUAL HIGH VELOCITY INDUCTION UNIT V-HC-1 TEMP. RANGE 68° TO 80° F 4 C BD BD 3 550 CFM 2 1 C BD BD H W.B.D.D. SET FOR 0.25" W.C.S.P. 400 CFM CH. WATER 148 BD 2213 H C C C STM H 149 BD C STM 6,800 CFM STM 800 CFM 250 CFM 50 CFM tRW=50° +0.25" W.C.S.P. tRS=104° CFM 150 100 HOPPER No. 1 tRS=104° tRW=50° -0.20" W.C.S.P. 250 CFM -0.20" W.C.S.P. tRW=50° tRS=104° HOPPER No. 2 2,000 CFM L29, CKT. 6 V-EF-16 CFM 50 600 CFM 50 CFM 1,800 CFM 100 W.C.S.P.> AMBIENT P. BD H STM C tRW=72° CORRIDOR tRS=72° CFM CFM 145A CFM BD 152 151 141 310 910 1,800 CFM 150 310 CFM CFM 910 CFM 910 CFM 70 CFM 70 CFM BD BD BD & BDD V-HC-2 TEMP. >90° F 500 CFM EXHAUST (SEE NOTE 3) BD & BDD V-HC-3 tRW=50° tRS=104° CENTRIFUGE No. 2 -0.125" W.C.S.P. -0.125" W.C.S.P. CENTRIFUGE No. 1 H MAX. 500 CFM MIN. 150 CFM 900 CFM 150 5,000 CFM STM C 322 CORRIDOR W.C.S.P.> AMBIENT P. 900 CFM tRS=72° tRW=72° 319 320 STM H 321 C BD 70 CFM 830 CFM 830 CFM 70 CFM 70 CFM 830 CFM 830 CFM tRW=50° tRS=104° BD 2 1 RADWASTE BLDG. EL. 935'-0" A B OR APPROVED EQUAL MFD. BY A.A. FILTER Co., "ROTOCLONE" TYPE "W" AS 7 1/2 HP No. 8 4122 V-CF-1 RADWASTE BLDG. EL. 947'-0" RAD. WASTE DRAIN SYSTEM TO CLOSED DM-256 800 CFM CFM 450 CFM 450 CFM DEMIN. WATER RADWASTE BLDG. EL. 965'-6" DWN: APPR: CHK: 1 76 REVISIONS 01121715 JJP 3-5-08 11951 RMG 3-12-08 BJR 3-11-08 EC A/R C D E SPECIAL CONCERNS ITEM SAFETY RELATED ELECTRICAL COLOR LEGEND ASME CLASS 2/QUALITY GROUP B SAFETY RELATED MECHANICAL QUALITY GROUP D ASME CLASS 3/QUALITY GROUP C ASME CLASS 1/QUALITY GROUP A NH-36266 MONTI CAD DWG ` ' This map/document is to assist employees in the performance of their jobs. Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. SCALE: NONE M-154 G Xcel NORTHERN STATES POWER COMPANY MONTICELLO NUCLEAR GENERATING PLANT Energy sm AIR FLOW DIAGRAM RADWASTE AREA REV 77 77 441 CFM BD MACHINE SHOP HOT 441 CFM INFILT. 77 15644 APPR: CB 10-13-11 CHK: DWN: AWL 10-12-11 JJP 10-12-11 77 EC
dPT 1800 XJ 1160 1 "-65 1 "-65 CW-42 TANK T-63 VACUUM CONTROL SW-75-1 SW-75-2 C101 (NOTE 1) GATE ISOLATING CW-51-2 VENT NH-36489 VENT A B C N.W. N.W. D TE 5011 8 CW-51-1 10" EPA HOT WATER SPARGER LINES M-800-1 NH-36489-2 (B,8) (B,5) 1" CW-52-2 2 1/2" 1" 2 1/2" CW-52-1 T CWT101 CW-16 36"-456 TT 5011 RTD CW-12-2 CW-12-1 A L C06 A L C06 FOR 4 C.W. GATES PUMP P-50B BKR 2120 WATERBOX SCAVENGING SEPAR T-62B WATER 12 N.W. CONTROL CIRCUIT M-811 NH-36665 (A,4 & A,7) PUMP TRIP C 12 PI 2479 5" 5"- 1 "
PUMP P-50A BKR 3120 WATERBOX SCAVENGING V26 V46 ATMOS WATER SEPAR T-62A 11 N.W. ATMOS 8 11 PI 2478 5"- 5" 1 "
L CWT110 C101 SW-76-2 C06 1853A LS TDR 95-34 5"-54 CW-11-2 1 "- SW-77-2
C101 LS 1853B LT 1853 SV 1910 C06 C06D-2 E/S
1 "-65 SW-78-2
1 "-65
C06 1853A LI 5"-54 CW-11-1 SW-77-1 1 "-
6"-54 SV 1909 CW-43 1 "-65
SW-78-1 SW-76-1 1 "-65
CW-116 CW-118 VRV 1913 CIRCULATING WATER PUMP TT 1808A RTD 36" DE-ICING LINE S-100B - BKR-2314 S-100D - BKR-2315 CW GATE (TYP OF 2) MOTOR OPERATED 7 6 SWB-6A & 6B STILLING WELLS T CDR105 TT 1805 T-221 TX 1812 AI-812-2 AI-812-1 AI-811-1 AI-811-2 TT 1806 T CDR106 TX 1811 M-110 NH-36041 (E,5) FIC 1853 SERVICE WATER SW-74-2 1 "-65
LI 1853B YS 1908 C101 SW-74-1 1 "-65 CS 42-3120 CS 42-2120 LG 1917 PS 1916
YS 1907 PS 1915 7 PI 1914 CW-117 T-220 MO 1157 HS 1157 L O C C06 RTD RTD L O C 3117 BKR V25-6"-JB XJ 1161 90" N.W. dP CDR100 C06 1801 dPI C06 C06E-4 E/S dPT 1801 TX 1814 6 XJ 1817 & O/L CWT132 MO 1851 TE 5044 SX 1845 HS 1851 5044 12 BKR 152-405 P-100B VC 5611 VS 5611A T TT VS 5611B CW-113 5 XJ 1849 CWT130 TE 5042 T TT 5042 TE 5040 5040 CWT119 TT T MV/I C101 MV/I C101 POS 1851 PI 1847 BKR 1331 78" TE 5034 CWT108 T MV/I C101 RTD LP CONDENSER T CDR103 L CWT109 TDR 95-33 (NOTE 2) BYPASS 4"-54 CW-9 CW-10-3 A C06 C06 CW-44-2 A H C06 C06 152-405 CS C 4"-54 CW-10 C C06 1852A LS A TRIP C06 C06 43-102 CS PUMP TRIP C L A VAR 1861 VAR 1859 CW-10-9 TT 1808C (WEST) CW-10-7 CW-10-1 CW-91 2" 4" 4" TT 1808B RTD CW-10-8 CW-10-2 1" 1" 1" 1" 1808D RTD TT RTD C06 1852A LI LT 1852 CW-44-1 LS 1852B L O C C06 90" C101 90" C101 C06 C06D-1 E/S 4" 4" LI 1852B PT 5303 C101 90" C06 1800 dPI (EAST) CW-90 C06 C06E-3 E/S 12 E-1B 5 dP CDR108 2" XJ 1838 2" VAR 1856 HP CONDENSER CW-10-12 1" (A,8) M-800-1 NH-36489-2 This map/document is to assist employees in the performance of their jobs. Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. MONTICELLO NUCLEAR GENERATING PLANT CV 2589 D21-08 CKT CIRCULATING WATER PUMP A TRIP C06 CW-9-12 CW-10-6 CW-9-6 (C,5) NH-36489-2 M-800-1 4 STILLING WELLS (NOTE 1) ISOLATING S-100C - BKR-1315 MOTOR OPERATED (TYP OF 2) S-100A - BKR-1314 108" 108" GATE C06G-1 E/S C06 CW GATE VENT 108" SWB-5A & 5B BKR 152-305 P-100A 11 VC 5610 VS 5610A CW-9-2 CW-9-8 1" CONDENSER WATER BOX VAR 1858 C101 P CWT100 FIC 1852 4" 3116 BKR HS 1156 MO 1156 CW-9-1 L O C C06 AI-813-1 AI-813-2 AI-814-2 AI-814-1 CW-9-3 4" L O C CW-92 1" CW-9-9 CW-9-7 VAR 1860 4" 4 CW-47 TR 1804 90" C20 VAR 1855 TIMER M-131 NH-36049-3 (B,3) A/S PUMP-DOWN C 1" HS 2589 N.D. A H C06 SV 2589 CW PUMP CW-8 TRIP 1" CW-46-1 1" 90" 1" VAR 1857 CW-9-11 CW-10-5 CW-9-5 1" 1" VAR 1854 4" (C,1) & O/L CWT129 TE 5041 TT 5041 C101 MV/I XJ 1848 3 MO 1850 SX 1844 HS 1850 CWT131 MV/I C101 T TE 5043 TT 5043 VS 5610B CW-112 MV/I C101 CWT118 T TE 5039 TT 5039 T 78" PI 1846 POS 1850 BKR 2316 NH-36664 (B,6) SYSTEM WATER M-112 RHR SERVICE TE 5033 RTD CWT107 T SW6-24"-JF M-800-1 (B,8) NH-36489-2 dPT 1799 TT 1807B CW PUMP TIMER M-131 NH-36049-3 (B,3) POT 1155 L O C C06 D11-08 CV 2509 ATMOS C06 152-305 CS C 1" 4" 2" 2" HS 2509 90" L O C C06 SV 2509 N.D. MO 1155 C06 1155 POI HS 1155 CKT L O C TRIP 6" T CDR104 CW-9-10 CW-10-4 CW-9-4 4" 1" 4" 1" 1" 3 C06 C06E-2 E/S dP CDR109 C06 1799 dPI CW-46 TT 1807A RTD CW-45-2 NH-36046 DISCHARGE RADWASTE M-140 INTERLOCK TO A/S BKR 3115 78" INT N.F. INT. L.F. XJ 1159 PX 1862 108" C06 POI 1154 C L O CW PUMP TRIP M-131 NH-36049-3 (C,3) TIMER A/S TT 1807C RTD RTD CW-10-11 (WEST) HS 2590 SV 2590 N.D. 1" CV 2590 D21-08 CKT TX 1813 NH-36489 MONTI CAD DWG ` ' M-800 REV CLOSED CYCLE SEQUENTIAL BYPASS SWITCH. DISCHARGE STRUCTURES. INTERCHANGEABLE USE AT INTAKE AND TWO CONCRETE GATES PROVIDED FOR P&ID CIRCULATING WATER SYSTEM Energy NORTHERN STATES POWER COMPANY 2 NOTES: Xcel 1. 2. sm 1 SCALE: NONE dPT 1798 dP CDR110 C06 1798 dPI C06 C06E-1 E/S L O C C06 PX 1864 CW-45-1 HS 1154 MO 1154 BKR 3108 POT 1154 6" PX 1863 XJ 1158 78" INT. L.F. INT N.F. HS 2510 N.D. CW-10-10 E-1A CV 2510 D11-08 CKT 1" 11 ATMOS 2" 4" SV 2510 2 1" (EAST) TIMER M-131 NH-36049-3 (C,3) A/S CW PUMP TRIP XJ 1818 TX 1815 T CDR102 TX 1816 SERVICE NH-36041 (E,3) SYSTEM WATER M-110 TT 1810C TT 1810D TT 1810B TT 1810A SERVICE SYSTEM NH-36041 M-110 (E,6) WATER SW4-12"-JF SW8-14"-JF 20" RTD RTD RTD RTD T CDR101 TT 1809B TT 1809A TT 1809D TT 1809C RTD RTD RTD RTD REVISIONS 1 85 T A B C D CW-120 CW-119 SPECIAL CONCERNS ITEM SAFETY RELATED ELECTRICAL COLOR LEGEND ASME CLASS 2/QUALITY GROUP B SAFETY RELATED MECHANICAL QUALITY GROUP D ASME CLASS 3/QUALITY GROUP C ASME CLASS 1/QUALITY GROUP A 18765 APPR: JCG 8-13-13 CHK: DWN: BAL 8-12-13 JJP 8-7-13 83 EC 24667 APPR: BJR 5-21-15 CHK: DWN: BAL 5-20-15 JJP 5-19-15 84 EC PI 1855 PI 1854 PI 1861 PI 1857 PI 1860 PI 1856 PI 1858 I-CWT-R-1858 TYGON TUBE USED FOR WATERBOX LEVEL INDICATION PI 1859 I-CWT-R-1859 TYGON TUBE USED FOR WATERBOX LEVEL INDICATION TYGON TUBE USED FOR WATERBOX LEVEL INDICATION TYGON TUBE USED FOR WATERBOX LEVEL INDICATION 23363 APPR: JCG 4-20-17 CHK: DWN: BAL 4-20-17 JJP 4-20-17 85 EC 85 2" 1 "
PT 5304 COOLING TOWER PUMP PI 1867 NH-36489-3 POS 1871 C06 2" DRAIN (TYP) CW-19 2"-65 BKR 152-802 P-101B COOLING TOWER PUMP BKR 5106 RTD TO COOLING TOWER PUMPS MOTOR CIRCUITS MO 1872 HS 1872 CW-50 PI 4837B M-800 NH-36489 (A,2) A 8 108" (NOTE 1) P-134B GATE ISOLATING C06 C06G-3 E/S P CWT117 3" 12" PI 1868 PT 5305 NH-36489-2 B C D FROM DIRTY DRW-62 M-800 NH-36489 (B,2) VAR 4836B NH-36046 M-140 SYSTEM (B,1) RADWASTE M-800 NH-36489 (A,8) 10" PUMP TRIP C06 C POS 1872 L O T CWT102 TE 5048 RWN28-2"-HC 3/4"-19 DRW-56 CV 3374 N.E. 8 SV 3374 N.E. CV 3375 SV 3375 HS C102 MO 1871 HS 1871 CW-49 PI 4837A MO 1874 C XJ 1870 5104 7 6 T CWT125 TT 5030 TE 5030 TE 5026 T CWT121 TT 5026 TT 5028 T CWT123 TE 5028 C102 MV/I C102 MV/I A C102 VC 5613 VS 5613A 12 VS 5613B C T CWT106 TE 5032 C102 MV/I RTD TRIP & O/L 5 SLUICE GATE S-103B BKR 108" ISOLATING (NOTE 1) P-134A GATE 12" 3" C06G-4 CWS-1 1 1/2" E/S P CWT116 C06 FI 2895 COOLING TOWER (D,2) AIR SYSTEM M-131 NH-36049-17 SEE NOTE 3 FIC 1875 M-131 NH-36049-17 (D,5) LI 1875B C06 1875A LS LT 1875 LS 1875B HS C06 66" A802 C84B C L L CW-37 L C06 C06D-3 E/S L CWT111 108" C102 C06 1875A LI C102 C102 N.E. 3377 CV AI-784-2 C102 C A AI-784-1 C102 HS 1874 DRW-57-1 3/4"-19 A L C06 C102 C CV 3376 3/4"-19 DRW-57-2 AI-783-2 C102 N.E. C102 DISCHARGE STRUCTURE 3377 SV 7 A C06 NH-36049-17 (D,5) HS C102 M-131 3376 SV C84B TROUBLE C06 A FAN TROUBLE 6 FI 2474 VAR 4836A NH-36489 HS C06 O L C DRW-60 2"-130 DRW-61 2"-130 AI-783-1 C102 C102 2"-130 DRW-59 DRW-58 2"-130 C102 HS 1900 M-800 (A,4) M-800 NH-36489 (A,8) 10" FI 2476 C MO 1900 L O C C06 FI 2475 84" 5001 FI 2477 BKR 2" 2" 2" 2" FAN TROUBLE (COMMON FOR E-100B FANS) FIC 2467 TX 1878 VS 1890 THRU 1898 C06G-5 2389 C06 L CWT113 LT 5202 LI B6 E/S C06 TRIP HS B6 C06 C HS TYP FOR 9 FANS TRIP A C102 TOWER 60" 60"-455 CW-4-2 RTD T CWT115 TE 5036 96" E-100B 2"-65 CW-20 B6 5 COOLING 12 L CWT112 B5 This map/document is to assist employees in the performance of their jobs. Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. MONTICELLO NUCLEAR GENERATING PLANT MO 1873 C XJ 1869 4 VS 5612B T CWT122 TT 5027 TE 5027 C102 BKR 152-702 TT 5029 T CWT124 TE 5029 C102 MV/I 11 P-101A (B,7) M-800-2 VS 5612A VC 5612 A C102 TE 5031 T CWT105 TT 5025 T CWT120 TE 5025 MV/I C102 MV/I RTD & O/L TRIP 3 TT 5013A RTD 1 1/4"-JB* (TYP) TE 5013A NH-46144 TO SAMPLING M-158 SYSTEM (C,7) SLUICE GATE S-103A CANAL TO RIVER BKR 5103 TT 5013C TE 5013C TT 5013B TE 5013B RTD TT 5013D TE 5013D RTD RTD S-106A DRAIN GATE 60"-455 SLUICE GATE SEE NOTE 3 S-105A 60" CMP 60" CMP 54" CMP 18" CMP 54" CMP C84B A702 BKR 5105 C O L 66" C C06 HS L S-105B SLUICE GATE C L C102 L TO CANAL ONE OR MORE FANS RUNNING ONE OR MORE FANS NOT RUNNING 3377-1 COOLING TOWER FANS K-100K THRU N AND P THRU T K-100A THRU H AND J 60" TX 2473 LS 3377-2 CW-3-2 60"-455 S-106B DRAIN GATE A L C06 LS 4 L C06 L C06 C06 L OVERFLOW 78" 3376-1 LS LS 3376-2 TX 1877 A C06 C06 L L 18" CMP STOP LOG SLOTS (TYP) SCREEN (TYP) HS HS 1873 L C06 O C 84" L BKR 5002 C MO 1899 C C06 O 1804 TR C20 T CWT103 HS 1899 C102 60" 60" TOWER E-100A 2" DRAIN (TYP) 60" CW-4-1 2"-65 CW-18 2"-65 CW-17 COOLING 11 3 FIC 2466 LT 5201 CW-3-1 60"-455 RTD TE 5035 T CWT114 TX 2472 C06 2388 LI B5 E-100A FANS) (COMMON FOR FAN TROUBLE TYP FOR 9 FANS TRIP VS 1881 THRU 1889 B5 C06 C06G-2 E/S HS C102 TRIP A C C06 HS NH-36489-2 MONTI CAD DWG ` ' M-800-1 REV 2 1 CLASS JB OR HDPE (REF EC 21637) CLOSED CYCLE SEQUENTIAL BYPASS SWITCH. USE AT INTAKE AND DISCHARGE STRUCTURES. TWO CONCRETE GATES PROVIDED FOR INTERCHANGEABLE CIRCULATING WATER SYSTEM P & ID NORTHERN STATES POWER COMPANY Energy Xcel sm NOTES: 3. 1. 2. SCALE: NONE 81 A A FI 2894 C84B COOLING TOWER AIR SYSTEM M-131 NH-36049-17 (B,6) 2 DWN: APPR: APPR: CHK: DWN: CHK: 77 76 12799 JCG 7-1-08 BAL 7-1-08 JJP 7-1-08 EC REVISIONS 1 01121715 JJP 3-5-08 11951 RMG 3-12-08 BJR 3-11-08 EC A/R B C D 11603 APPR: JCG 11-16-12 CHK: DWN: BAL 11-14-12 JJP 11-14-12 78 EC HS 1873-1 SPECIAL CONCERNS ITEM SAFETY RELATED ELECTRICAL COLOR LEGEND ASME CLASS 2/QUALITY GROUP B SAFETY RELATED MECHANICAL QUALITY GROUP D ASME CLASS 3/QUALITY GROUP C ASME CLASS 1/QUALITY GROUP A 21637, 18765 APPR: CWB 8-6-13 CHK: DWN: BAL 8-6-13 JJP 8-6-13 79 EC SWB-7A SWB-7B SWB-8A SWB-8B
- SEE NOTE 3 22533 APPR: JCG 5-12-14 CHK:
DWN: BAL 5-12-14 JJP 5-12-14 80 EC HS 1874-1 21202 APPR: JCG 10-19-15 CHK: DWN: BAL 10-16-15 JJP 10-13-15 81 EC 81 81 81 AI-786-1 C102 AI-786-2 C102 AI-785-2 C102 AI-785-1 C102
EMER GEN. FP-196 FP-199-2 FP-126 8 A B 7 6 RADWASTE BLDG L.O. HYDRANT VALVE DETAIL 1 ELEVATION VIEW STREET OPERATOR 'T' HANDLE ACCESS FOR DRAIN HYDRANT VALVE GRADE HANDWHEEL FOR FP-146 FP-147 L.O. FP-148 L.O. L.O. FP-187-1 FP-187 M-134 NH-36048 (C,3) M-134 NH-36048 (B,3) FP-194-1 FP-194 FP-194-2 14 26 SWITCH YARD FP-229 FP-232 FP-198 18 FP-198-2 20 FP-200-2 FP-198-1 FP-228 FP-200 L.O. FP-200-1 FP-162 L.O. L.O. TO SAB 24 FP-38 FP-161 FP-227 FP-290 FP-49 FP-114 FP-230 L.O. L.O. FP-187-2 7 FP-37 ACCESS SECURITY FACILITY FP-36 L.O. FP-231 19 L.O. M-134 NH-36048 (A,8) M-134 NH-36048 (A,8) GUARD HOUSE DRAIN FP-32-1 5 4 3 FP-196-1 FP-196-2 16 25 FP-191 FP-191-2 FP-199-1 FP-199 FP-35 FP-291 11 FP-33 FP-20 L.O. L.O. FP-34 FP-191-1 STREET OPERATOR FOR VALVE SPRINKLER ALARM VALVE POST INDICATOR VALVE DELUGE VALVE S D (SEE DETAIL 1) HOSE HOUSE ON GROUND LEGEND FP-193-1 FP-219 NH-36048-2 L.O. SEE DWG FP-193 FP-193-2 FP-31 13 FP-32 NH-36516 Energy Xcel NORTHERN STATES POWER COMPANY 2 1 FP-197 MONTICELLO NUCLEAR GENERATING PLANT This map/document is to assist employees in the performance of their jobs. Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's. FIRE PROTECTION SYSTEM YARD AREAS sm FP-195 FP-29 FP-195-2 FP-195-1 15 L.O. FP-30-1 DRAIN FP-30 17 FP-197-1 FP-197-2 ASME CLASS 2/QUALITY GROUP B ASME CLASS 1/QUALITY GROUP A M-810 MONTI CAD DWG ` ' SPECIAL CONCERNS ITEM SAFETY RELATED ELECTRICAL SAFETY RELATED MECHANICAL QUALITY GROUP D ASME CLASS 3/QUALITY GROUP C NONE SCALE: COLOR LEGEND REV 84 S A FP-28 B FP-189-1 FP-189-2 FP-150 FP-184-2 NH-36516 C FP-185-2 FP-185-1 5 FP-183-1 FP-183-2 3 D 8 SODIUM HYPOCHLORITE BLDG L.O. RECOMBINER BLDG L.O. FP-39 FP-185 FP-183 FP-41 L.O. FP-40 STORAGE TANK STORAGE TANK CONDENSATE CONDENSATE CO2 & STOR. H2 FP-42 L.O. FP-181-1 FP-181 FP-181-2 1 DIESEL GEN FP-44 M-134 NH-36048 (C,1) BLDG L.O. L.O. L.O. FP-43 FP-45 7 ADMIN M-134 NH-36048 (B,8) BLDG REACTOR BLDG TURBINE BUILDING ADMIN BLDG ADDITION SECURITY 9 M-134 NH-36048 (C,1) HEATING BOILER BLDG FP-156 EFT L.O. 4 FP-184-1 SWITCHGEAR M-812 NH-36666 (D,6) (D,1) TURBINE BLDG ADDITION TANK L.O. DIESEL FIRE PUMP STRUCTURE INTAKE FP-15 FP-182 2 NON 1E 13.8KV ELEC ROOM FP-182-2 DIESEL GEN FP-182-1 6 COOLING TOWER FP-24 FP-122-1 FP-124-1 FP-118-1 FP-120-1 WAREHOUSE 1 & 2 FP-127 FP-19 L.O. FP-189 S FP-151 L.O. FP-149 L.O. L.O. FP-184 FP-18 L.O. FP-127-1 FP-186-2 FP-186 FP-16 FP-21 FP-17 L.O. L.O. L.O. FP-22 FP-186-1 6 5 PEB/TSC
- 12 4
FP-188-2 FP-188 FP-23 FP-188-1 SEE NOTE 1 8 3 FP-192 TOWER FP-121-1 FP-119-1 FP-125-1 FP-123-1 COOLING L.O. FP-124 D D L.O. FP-116 FP-120 FP-118 FP-122 D D L.O. L.O. L.O. FP-125 L.O. D D FP-121 FP-119 FP-123 L.O. L.O. D D FP-115 L.O. 10
- 11 12 FP-26-1 FP-192-2 FP-192-1 DRAIN FP-190-1 FP-25 FP-190 FP-190-2 FP-24-1 DRAIN FP-26 2
EC 17089 80 APPR: CHK: DWN: FP-27 NEO 12-27-11 PEB 12-27-11 JJP 12-27-11 C REVISIONS APPR: CHK: DWN: 79 CHK: DWN: APPR: 78 CHK: APPR: WMS 10-9-09 TJF 5-18-11 WGN 5-21-11 15270 WMS 5-21-11 EC JJP 10-8-09 RMG 3-12-08 14085 BJR 3-11-08 DDW 10-9-09 EC CHK: APPR: 77 DWN: 76 DWN: AJM 7-12-07 11951 AJM 7-12-07 JJP 7-9-07 JJP 3-5-08 01121715 EC A/R 906 1 EC D DWN: CHK: APPR: 81 BAT 11-6-12 AWL 11-6-12 TJF 11-6-12 15645 EC ROOM 23478 APPR: AJR 3-27-15 CHK: DWN: DAM 3-27-15 JJP 3-27-15 82 EC FLEX STORAGE BUILDING FP-275 L.O. FS 7973 PI 7973 FP-276 FP-282 FP-283 FP-284 FP-285 FP-286 DRAIN EXTERNAL WATER SUPPLY (INTAKE) FP-287 SPRINKLER RISER 24364 APPR: DAM 7-7-15 CHK: DWN: AJR 7-7-15 JJP 7-7-15 83 EC 27067 APPR: MM 12-5-16 CHK: DWN: BAL 12-2-16 JJP 11-29-16 84 EC 84 NOTE 2 NOTE 2 NOTES:
- 1. FLANGED CONNECTION FOR STORTZ COUPLING.
- 2. FP-192 AND FP-27 HAVE BEEN REPLACED PER EC27067.
84
NE 36640 2 -~- 1 -*ii~-=-*aovMcc-e33--- "(I:: - ~ DG INLET I
- 142-480V MCC 842 I
I I~ I I I RECPT. I I I~J +/- I I RCP-3315 IRCP-33151 = f 1 2 3 4 ,.----- L 1,L2,L3 G
- 6
- 12 I [Q!.Q J 150A Ill AWG AWG I
( I Q.1.Q. I II J) 50A II I I D10 I Ql. T I J) J) J) ~~~A I L1 L2 L3 G I Pt Nl I I Ole. c I ISCHEME 83315 e.~315 L,_2 L~ 1 I scHEME R3315J Tl~~o~A.,.tJ
- SCHEME 64205 6~::LI L2 L.S I #143-48(
MCC 843 I I 1~411~ I I I LI,L2,L3.--., I I ~
- 6 AWG I
t t t NOTE 21f'-M..-'-O....,1 I 1 ) I) I)~~~ l B<ISIJ ¢ ¢ I I Ll l2 L~ SCHEME 84315 '-- _D20 f- ___ 1- ________ 1 I ..L 400A TIME DELAY -, ALARM-~ ~ - - - - - - _, L -- r- -- ~- _j /,6 y--.. r SHUNT -~ A -:ARM -..-J- -
- DWG E-3£ r---+---+---+-
.. ----\\--t-
- "it-t-t--,
.L /so\\ A l l ZOO A owe E-S2 I L1 L2 L3 L1 L2 L3 L ~ ~ '3-; ~
- OO-O-eM
- l
!lO MV 114_BATTERY 040 FCR INTE~NAc WIRIN~ ~tE BATTERY CHARGER02.0 FOR INTERNAL WIRING &EE 2!,2 FOi.,~~~~ le-L,s;::_;;.:}EE cl, cl, 1 ~ ~~~ c~~~'[¥.::ffY~-j.-f-+=._.,1JX:=~73_IB-I,-2 200- O-eog:a ~ UNoi'/:tiAGE --c:>-+-"' -ljX-9173-18-1,-2 ALARM rowe. E*Se*l Y...--!-411 &HUI'IT A [ 200 A 'SO I*W BATTE~P~~¢"GER --.o--t-!"l.:e-.,I, l;-;~_ 1, ?~;;- '-u=-~ , 01 n ~ ~ ~ P! N! OR HIGH VOLTAGE 1
- 14-125\\1 MillRY CHARGER.!liQ P""
N<IOR ~~'(\\j,~AGE 11 UNDERVOLTAGE 80 AMPS , """"I Oil (~~~':'(~) I . J PT BO AMP NT
- 12-125V BATIERY CHARGER D20 80 AMP
'---""";;-=-~ - - - - I DG INLET I RECPT. I RCP-4315 IRCP-43151 I 1 2 3 4 v-L1,L2,L3 G I
- 6
- 12 I
,-,L_-, AWG AWG I I D2o I I L1 L2 L3 G I L 1-f-
- "' '3 -:: '="
I I I N N N 00 00 00 t; ~ ~ <( I I ~E~ R~5_j NOTES: I. GROUND DETECT0!1 (GCR -1 ~ GDR -2.) AND DWN: JJP 8-14-08 VOLTAGE RELAYS (BVR-1 & BVR-2) ARE CHK: PEB 8-15-08 INSTALLED ADJACENT TO DISTR. PANELS APPR: RES 8-15-08 AND WIRES AS SHOWN. ~EC12877 e.. MANDATORY ROUiiNG 'i>EPARATION OF" 'i>CHEME BSSIS fRtll'wl SCHEME B'l3lS DWN: JJP 12-5-08 !.. ~EE 5.HEET ~ !'OR fU!;e TYPE ( APPLICATIONS
- 4. & -COMPUTER INPUT BATXXX -COMPUTER POINT :IO (SEE DWG. NE*36723)
CHK: RES 12-9-08 I APPR: MFP 12-10-08 78 EC 13284 r-- DWN: JJP 4-8-10 CHK: BAL 4-8-10 APPR: RES 4-8-10 OR HIGH VOLTAGE I I ~ ~ '- __ L, ( +) ( _) O_e_l (C013*A*I<;) -<:>-+~~- -.J ~T( +) ' T( _) <~~~~) ~r.J ,'(-) r'(+) S~e: NF*3<.109,/l-----1-'-'---t'-'-------------------------' SEE "N"I"o-3,6,*?,,(ul"9--7"---~-~------'"o;;;;::::;::;:::::;:;;;:::~ ~c., !ill 1- ~
- - - - - -... -,~ -
Q.!.!.. 0~0 SEE Nr-3~'70'1' C40 -D-<21)-!...I...--{1COO:::nAI--f"---+----+---1"--!11=00:nA-.-;-,Illeo-l ~EC25350 DWN: NJM 4-6-15 CHK: AJR 4-6-15 APPR: NJF 4-6-15 IL r 020 L---------------------<::"P-5~ ~:$~ ; i ~($> P& P6 ~$~ : i ~~$~ P8 w w w w L-------------------------<:>1-1!5 I '-B-l- ~,:::: Nr. -D---------------------o-N& ~ J... . ~ : Na-o------' ALARt.IS llWG c>~'3 01 I COM + ~II 125V OC SUS '4: 6ROUND FAULT N_of uDR*I G* - NOTE I-{ -== Oil COM
- 11 125V DC BUS
+ VOLTAGE HIGH/ NC NOTBVR-1 LOW ~ II'II-125V DC BUS I ~~ ~~ -~ -~ I , ~ I -1r11- ____,~-!-* '"--rr::::J ....-nJ-*....--'-----, ~------------~~6~-~:*4-~'~~~~~6~--~ 16-: '6 .--------------;:~ 1 Y4:::D--L ..... _ +-+-'"-lo ........ ~-?w!o---7----, 011 125V DC DISTRIBUTION o2'
- y or-n_j_
".....: y; I ~*~ ... v SJN SP============= SP 1N I . r"',:'- I 'f ~...., ~ ~ C2.B9A C.O'+ ~.---0-<2.1)-1;-......-i[:J]--f~---4----+-*-_. I~ l -~ BATIOI BAT/02 C I~ i ~ ~~ ...t. ~Y NOTEY NOT£'-1 ,..,ly.....,;..
- ~
I #11-125V DC DISTR. PANEL D11 T I
- 1;:::-;25V DC DISTR. PANEL D21 I SEE SCHEDULE SH. 3 FOR SWITCH I
NIOI SEE SCHEDULE SH. 3 FOR SWITCH & FUSE RATINGS PANEL ARRANGEMENT Ff N'7 PIO I & FUSE RATINGS PANEL ARRANGEMENT I~ CIRCUIT~-~----- _I ~C.JB.CllJI !::!Q'L------ 0111 r-- - -- - - -
- o o:
I ~ ~ I
- ~*
~: I~ -~1 I #111-125V DC DISTR. PANEL D111 I TURS. BLOt:io. EL. 911 WE'i>T 0211 r---- -- ----,
- o,. "o:
- ~*
~:: I~.~ I
- 121-125._V_D_C_D-IS-T~R..... -PANEL D211 I
I SEE SCHEDULE SH. 3 FOR SWITCH TURI!I, BLOG. EL
- 8 !!1'5 WEST ii'I2-125V
+ " GDR-2 ~ ~ NOTE 1-{ + ~ : 13'/R*Z.T_No DC BUS ALARMS !lWG C'-'?.'3 CCII\\ oe1
- 12-125V DC BUS GROUND FAULT
~ NO ca.. ne1
- 1e-1~SV DC l!IU'!I t
VOc TAC.E: f< I CioH/ NC. LoW S C H E M E D I ( rxCitPT AS NOTE"O ) I SEE SCHEDULE SH. 3 FOR SWITCH 1 & FUSE RATINGS PANEL ARRANGEMENT L J. (JSC,Ul.T liP'S.. _ _ _ _ _J l I & FUSE RATINGS PANEL ARRANGEMEN~ & CIRCJ!JI NO'S. _ SCHEME 0 2 ( E:)(CEPT A'i> NOTED) l r 500 MCM r!iOO M CM PI, Ill I P2,N2. llli 01 I l~oaC}---J!:.._1[o~z~a]l 1 r !lOO MC~o~ ( soo MCM ~ P!,W! P4,N4 lc_,_~c='t~--rl ~~-~c~2~1-~~l lf"f5.N5 It-P7,N7 lr'P6,N61r P6,N6 rPIO,NIO r P8,N8
- 2 AWG 250 MCM 62 AWG
- 2 AWG 250 MCM
- 2 AWG 1'2.LQ_._t....,1 12!!.! I I..Qill.
I I e!o!.! I I DlO I SCHEME Dl SC.HEMI!. U MANDATORY ROUTIN6 '!olP,.IitfliiON 0~ ~CHEM&: Cl FRO~~! oa,
- t This map/document is to assist in the performance of their jobs.
Your personal safety is provided for. -~;_--._~~!~9 safety practices, procedures and ~m
- as described in safety manuals and SPAR's.
125V DC DISTRIBUTION ELECTRICAL SCHEME ~EC23475 DWN: JJP 4-9-15 CHK: BAL 4-9-15 APPR: DJS 4-9-15 L f----------l<oll.....- E 110 2 CAD DWG F I SCAI F: NONE I REV 80 MONTICELLO NUCLEAR GENERATING PLANT "(l X eel Energy NE-36640-2
L PERMANENT NOTE: NE-36640-3 ANY ADDITIONS OR CHANGES TO THIS DRAWING MUST ALSO BE MADE ON NH-105940 FOR USE WITH SPARE GENERATOR TRANSFORMER INSTALLATION
- 11-125V DC DISTRIBUTION PANEL ill1 (F.P. #5828-E12-1)
- 12-125V DC DISTRIBUTION PANEL D21 (F.P. #5828-E12-1)
- 111-125V DC DISTRIBUTION PANEL ill11 (F.P. #5828-E12-2)
- 121-125V DC DISTRIBUTION PANEL D211 (F.P. #5828-E12-2)
SCHEME CKT NUMBER NO SRAWJITINCGH FUSE AMPS DESCRIPTION LOC. ~~~~OGN WIRE SCHEME CKT SRAWTITINCGH FUSE AMPS DESCRIPTION ~~~I]NIJNG WIRE SCHEME CKT SRWAJITINCGH FUSE AMPS DESCRIPTION SR~]IJNNG WIRE SCHEME CKT SRAWTITINCGH FUSE AMPS DESCRIPTION SREPO~~IKIINGN WIRE AMPS NOTE 2 N0T'E'~1 SIZE NUMBER NO AMPS NOTE 2 LOG. NoTE-1 SIZE NUMBER NO AMPS NOTE 2 LOC. NOTE-SIZE NUMBER NO AMPS NOnE 2 LOC. NOTE-1 SIZE ~ D~1~~1~1~00~~1~00~~1~111~--~11:2~~1!"~'~~CI~~~~~~~~~~~~~~~~2~D~2--~1-r~1~00~r-1~00~~b12~-7.12~5V~M~IT~ER~Y~CH~~~G~ER~------------r----+---r~#~2_,rD~I11~11~0J11+~21-r-3~0-r-~15 __ r.C~IIR~C~WMT~IEEIR~c~'c"I~:"~R~ELLA~~-------------r-~8B~O+.h/'rrT\\~H~11~0 D21101 1 30 15 CIRCWMERc,cl1c"RELA~ E60 H10 Dl 2 100 100 114-125V OAI 12 D2 2 100 100 14-125V BAITERY CH~GER
- 2 30 30 SPARE 54\\
D21102 2 30 30 1R RES TRANS cv"TROL X03 D11105
- 6 D11003
~~~~~~~~~~~p~ 2_,~,,A~11A~1oo1o~D~2~,o~3~3-+~~~~~3~o-+R~~~~~~~p~uM~P~M~G~s=u~G~-~w=o~B~oo=N~TR=~~P~N~L=~~1~M~-~~1=B~~~-~~~~B+D~,,~oo++',~o~~D~,1~1111ooo~3~~~~~~~~~~~*~,u~~~~~~;~~~N~~~~8~~~~~~~~~~~~~~~~~o~ 3 ~~s-l D1104 4 30 30 FIRE eKe tLIIUN C20 10 D2104 4 30 30 INSTRUMENT LAB J265A
- 10 D11104 4
30 30 INTAKE CIRC WATER PANEL C101 _11_10 D21104 4 30 30
- I-MAIN TRANS C LA"INt C-520 X01
- 10
~D~J11; 11*0~5~=5t~::::j3~oo::::::::t::::~3~.0c::::::::~~D;IIV ~I~A~TW~s;~~~l
- T 9-95 D2105 110 r;D,;;2-;o10;;-5+5:'---l---'3;;;0-t---';3;;;-0-+.'R0::EA:c;;CT;;O:;:cR~&'--C;';;0:7:N1:::;A;;-;IN;-;;ME::;-;NT:;-;;cCLc;;G-c&:-;;:IS"'OL-. ""'BE;::-N""CH-;--;;:BO:;-;A;:;;RD;--+.::;C;;:;0::;-3 '--t-:;-D:-::11""05:+--+#1;-;;0---i D11105 5
30 15 TRANS CONTROL X02 D21102 H6 j D21105 5 30 15 SPARE l.-"1 Di-H111~06t-f-l6-~ 30-+~3*-0---tiR~EAC:lT~ORi,;WliT~RCLFANuR~~LJPc.;i&"c!i;;REE~'CIRC,.:B~E:IN~CH~BOAR~D--+tiC~04--fD:=:2'~11110~6f,1~0 D2106 6 30 30 DIV II ATWS CABINU 9-96 D1105
- 10 D11106 6
30 15 OPTICAL ISOL 1v I I C243A
- 10 D21106 6
30 15 SPARE
- 10
~ 'oi111!oJ:7iiiE7~3~o~~~3,co~~P~LLA~~NT~!iAr~llll~~no~Ns~IIR~ENc~v"!"cu~c~~~~~~~~N311~'o6tili-~~~o~eD~21~o7~~7-r~3~o~r-7.3o~-r.R~EA~~~o=R~co7N~TR~oL::.::B=EN~c~H~Bo=A~RD~~~------r-c=o75-+----r~#~1o~~D~11ti111~oJ;7~7~j6~o~~~6o~~~~o~11~-4BWI3w~~ADjc~t"~'~~~~~~~~~~B1~~~~16~ D21107 7 60 60 WADe""'"" B2 r6 D11 OB B 30 30 BENCH BOARD C06 10 ~D~2~1 o7B -+--:B-+~30~~~3~0-+F:'='EE:::,DW:::-,A=:JE'::-R -=&'-'C;.::O;_;:ND:.:;ENc:,:SA::.::T==-E -:;:B::-EN'7CH~BO::,:~:;::D:._ ___ +-7.C0~6---I--=-:--:-:-:-I-+.#1~0~ D111 OB B 60 60 " LOAD c<N 1 "" B3 '6 D211 OB B 60 60 " LOAD c<N 1 <K B4 '6 D1109 9 30 30 UK_!_AUX. POWER BENCH~ COB D2109 10 D2109 9 30 30 GENERATOR & AUX. POWER BENCH BOARD COB D1109
- 10 D11109 9
60 60 LOAD C325 16 D21109 9 60 60 111 LOAD L~K C326 r6 D1110 10 30 30 ARHitfoRESPRAY & AUTO BLOWD~RElAY~ C32 D2112 110 r;D,;;2,;.:;11:::CO-t-710;;-t----;,30;;-+-~3;;;0--t-;C;;;:GC,;;;S:::,DC,;'IV;:-;I,..::I :...:..:::.:.::....:...:.:.:..:::.:....::=c:....:::::.::.::::..._ ___ t---;C,;;:2B:;;'5;;-B-t-;;DC:C11C7147t--+#1;-;;0---i D1111 10 60 60 "' 110 .OAD~:;;;-:~D~BY-"-"'(NCO.:.:TTIE'-'3'-L-) __ -+-.;;;:,.B4-t.,-;;-:-,.,-,t---'irl~6 D2111* 10 60 60 "' 111 .OAD---cEtillR~~~:m2(NCO!ITTTIEJ3Ll==:t~~Bic3b::::t::tl~t::16 D1111 11 30 30 . ~ISOL AND PROT SYS VERT BOARD C15 D2111 10 ~D""2::-;11,:-1 -t-:-;11;-+-__,3~0~r-7.30~--t-;CiT.HAiiiNN;i'EL"n'B'n.P;i;'RI;;;;,~A,:o;RY,..;IS;;,;,OL<i<. i-'i;AN"-;D _,.REA;riC,._,TOi.;;R,;;;PRi;i;OT'n.. SYS~V;,;;ER,_T-ii;BOA<i:iR;i-Dt=C,;-;1,;,7 ;-;;-t--;;.,D1:-;-11:-;,1t---'i;#~1 0~ "'-D:;-i11111111# 1--;-, 111;-t---:6frl0--t---f,;;- 60 __ t-i;i;JIE~SEL~ GEN~'f;c111;,-~~iifrif'-'cp~ANEoiLi'-__________ t-~C91---t;D~2111.,-:it 1---Jj;;/6----j D21111 11 60 60 JIESEL GEN 112 CONi'R(iL PANEL C92 D1111 r6 t-iD~111~1
- 1u2~11:2ttJ3~0+=~3.0C~~R~CII~C~
REoiLA~YV~EEIRTLTIICA~L~BOAR~DD=======t:JC~3fi::::OO+==-wt10~ I-:D~21::-;1::-2 +-'-;12:-+-~3~0~r-7.30:..._-+-:C:-cHA:::-NN::-:EL=B,...,RH:-:'R,""C,-;:OR,-E S_PRA_Y_&_A_liTO_B_LO_WD_OWN __ RE_lAY_VE_RT_._BO_AR_D t,C:,;.337-';/,;.;C3:-7:2+-=-'D1~11:.:.0t---'i;#~10~ ~~D~11
- 1B 111m2!12E61EO=t=t60=~DI~IE ~SEL~
GEN~1=12~wN"~'"cu~cP~ANEoiL~===~=E!:C92=tD~2~1111~1:12EG163 D21112 12 60 60 DIESEL GEN 111 CONTROL PANEL C91 D11112 r6 f-f1113 13 30 30 GEN PROT. CAB. C254 10 r;D;;;-21;-;1:;-3 +-:;-C13-+~3;;;0---II-7.30;-+,R~ADC:;;W'7,AS7.-';TE;,;;P,;;cAN;:;=E-;cLS:..._ ________________ ---f'B'-'4A-f-/.:.:CB:..::4E'I--;c;c;c-;-;;t--'f,#7i10rl D11113 13 60 60 4.16 KV IIUN BOX A10 16 D21113 13 60 35 4.16 KV UN BOX A20 r6 'ARE
- ----ll-;;-;-
- ;--t----lh=--i r;D:;;;2-;-:11C:'-4-t-:1~4+--'3;;;0-t---';3;;;-0-+.A;;,;JW;c:S-;'IN:::;V7,ERT7-EC::R';;'B=:--;;;;-;;;;:;---------t----:1,-:;;;--+-"D-'-'11_.::16't--T,#1;-;;0---i D11114 111 LOAD B9 16
>PARE B7 16 ~m=H~j~+~~=l~~~~~NE:~UIUT~TIR@j:OcN[~~
- ) CC OL C U
C13 1!0 D2115 15 30 30 HPCI RELAY VERTICAL BOARD C39
- 10 h~~;~H~~~~~~=~=j~==~~*;p~~~E::::::~;;z/~\\~~~::::::::::::::::::::::::~"~/'~'\\~~d;::::+===~===~~~==~~~~+j~~;!;PA~RE===?~/=B=\\~===~~/~\\~t:::=+:=+=~
rr WS ""'"""A D2114 10 D2116 16 30 30 TURBINE PLANT INST. VERTICAL BO~D C20
- 10
>E'~E /B4\\ /B4\\ iE'ARf /' /B4\\ b~ttl~111!j7}117tt::::~30::::t::::::::1~5::::j~I~~~ISOLLA~TTI~IIO~N~~.L~~ERillEILA~Y~~NEEIT.::::IL::::::::::::::::::::::::::::::::t::::~c41::::j~D211ttll7tl::::!1~0rQ~2~16T*~17~~30~~-1~5--~0~UT=B7.M~RD~ISO~LA~TI=07.N~~~~~E~R~E~=y~~~NE=L--------+-C=2=92~~D________________ -t~~~~~~~~) 17 100 70
- ~Rf
) ~ D11118 II! Tl I BO~D 31 '6 D2120 20 60 60 TURBINE-GENERATOR MUER & RELAY BOARD C31
- 6 b-'
SWG INC W 3)
- +/-Q!!_
16 116-SWGR MOB I BENCH BOA )7 '6 D2119 19 60 60 TURBINE BENCH BOARD C07 H6 f-C 5-' SWG ~ JOB 16 7 115-' SWGR IANU"T (NOTE 3) A30B B i~~~~"'1lJ,,'BH~~3o§~1E5§jolvE"Iu~NDE~R~voL~TA~,r.F~iGND2.~DEl~RiEILA~Yi~~~E~-~i~i~,8 4r.';<;;wrr70 '<,,,'-!,'+.-,B;;-+----;:;3o;;-+--c,::;;5_~o:c:;VE:;;;R/su;c:N:;;;DE~R;;;-vo;:-:;L;;;;rA::;:;GE~,..::GN.:.::D.:.... "'Du:.:..:-~R::::ELA::..:Y'-------t----;;:-=-+-----l----'ll#1;.;-4---i ~D~,,$.111~11B~1~B::::~,oo:::::t::::::::7~o~=4t~,3~-4.. $,,,6~KV~swG~R~~:;;:=:;:::::::::::::::::::::::::::::::::::::t~A3oo7~~D 22 1~ 111t 8 ~1~o D2111 B IB 100 70 114_4_16Kv swGR Mo7 ~ NCY L 1
- s1 D2121 21 30 30 SPARE
~~~~S~=t~~3~~-M~~~~~E::x~cl ~~~N~~~-c========1~~~304~=li~~~=ilt63
- PARI 5H'z' 22 60 5
COMPUTER INPUT MT. 101 l"~o\\:"'5,* 2 22 60 5 COMPUTER INPUT BAT. 102 ~D11122 22 100 100 DIESEL \\IVK 11 FIELD Fl, C91 D21122 12 D21122 22 100 100 DIESEL 11v" #12 FIELD Fl. C92 D11122
- 2 h~~1~112~3~23+=~6o::::f::::::::6~ao::::::::~#~111k~-1~3i..B~KV~SWG~R~&2~RR!E:~ILAYIIN~G::::::::::::::::::::::::::::::::::::+~1~4~D211~23~'~6rD~2~12=3~23~~60~~-6~0--~#~112~-~1~3.~BKV~SW~G:.:..:R~&~1R~R~E~~Y~IN.:.::G __________ ~15~2-~2~01~D~11~23+~#~6~~--~--~--~-------I~S~~C7-E------------------------+------I--~~~
S~CE rD1124 24 60 30 AUTC IKANo~tK RELAYS C31 !8 24 60 60 SPARE PACE 0ACE SPACE SPACE 'ACE PACE I 01[ SIT Sll 21 2B 200 200
- 11 1-1 JTION PANEL SPACE
'ACE PACE NOTE: CURRENT ONC~<;T DZilB LIMITE.D TO ZOO AMP:. DUE TO FIREP!~OOFII\\IG OF CONDUIT. SE.E. ENGINEERING E.VAUJA.TION Bb-0"+4 NOTES:
- 1. MANDATORY ROUTING SEPARATION FROM SCHEME NUMBERS LISTED.
- 2. MAIN BATIERY FUSES SHALL BE DUAL ELEMENT TIME DE~Y.
SPACE SPACE SPACE SPACE SPACE SPACE D2( SIT Sll 2 2B 200 200
- 121-125V-DC DISTRIBUTION PANEL cP,I>I *10.\\WIO I !Wl I 4 I C92 I SCHEME 021105 TYPICAl.. 61-0CK OIAIORAM FOR Al..l.. D211Y.X
~Cl1EMES ( 'l.l!E TASLE l'OR LOC. ~0'$ t C.OMDIICTOR Sl~ES) SCHEME 011103 T'!'PIC.Al BLOCK DIAGRAM TYPICAL PANEL ARRAKC.EMENT CKT I CKTZ...- REVISIONS 84 EC21152,21159 DWN: BAT 5-23-13 CHK: SMA 5-23-13 APPR: CTP 5-23-13
- 3. FIELD TO DISCONNECT STAND-BY 125 VDC CONTROL POWER TO 4KV BUS AND TAPE THE LEADS. THIS DELETION IS PER AEC/DRL-GE-NSP AGREEMENT AT WASHINGTON MEETING DATED 11-4-69. THE STAND-BY SOURCE LEADS NOT TO BE CONNECTED WITHOUT EXPRESSED ORDERS FROM P~NT SUPERINTENDENT.
TYPlC.,a.L 'BLOC..K DIAc:;RAM FOil ALL D2.1l'.Y.. FOil.._LL 0111'1-X SCHEME,S 1 lP,,N *10 AWG, SCHEMES El'.CEPT 02112 ~ 0211~ BELOW. (SEE' TABlE FOR LOC. NOS i "I o""'z,_1...,f-+-{l+-IIB 1 SCHEME 02.103 cse.e. TA.Bi..e. FoR L-oc. No*s e cot<oucToFt $\\'!ES) coNC>UcTOR SIZEs) FOR sc~EME& C.KT3 CKT 5 C:I<T4- .A TYPICAL FOR CIRCUITS 100/>. OR LESS This map/document is to assist employees in the performance of their jobs. E 11 0 S H 3 Your personal safety is provided for by using safety practices, procedures and [9.U I SP FOI'. SCHEME. DII2Y SCHEME 01103 TYPICAL 81-0tl< DIAGRAM FOR Al..l.. OIIXY. SCHEMES. (SEE TABLE FOR LOC. !40's f CO>IOUCTOR SIXES) ONLY
- FOR BLOCK DIAG-OF 50/EME. 2{)216, SEE DW6. E-'1/b D-tuo9 \\ o-Z.H09 SEE m-36640-9 P, H *to AV:Go).,
(P, N *to AWG FOR CABLE BLOCK DIAGRAM IOZI Hc84-A ~~ lc84-B I SCHEME 02113 I 021 1-f-1 C33 f+l n 2 ISC.l1EME 02.112 SEEDWGE-211 SHT12(NE-93503) P,N *IOAwr;,--:5
- c.P,NI *IOA\\HG
(*SCHEMES D11111, D11112, D21111 & D21112 CONTINUED ON E-103, SH 3)
- 60 AMP. TR60R GOULD-SHAWMUT OR EQUIVALENT.
v -.----v--*r-l---;;t:-;:K;:;;T;-;;z;-;;.=---t~.--- TY PI C A L F 0 R ~.-__-:..:.:...:-=:..._-l C.\\RCUITS MORE THI\\N IOOA equipment as described in safety training programs, manuals and SPAR's. h-M"'O"'N"'TI,...,-CA"D""D"'W""G~Yrl SCHEMATIC DIAGRAMS 125, 250 & 24 VOLT DC SYSTEMS MONTICELLO NUCLEAR GENERATING PLANT SCALE: NONE REV 84 fl Xcel Energr NE--36640--3 NORT 1E~r1 s-ATES POVIER CCkiPAfiY
NE-36640-4
- 13 -?.50V BATTERY 7'1e. AH 8 HRS r-----1: I I fit 1'1-------1 I?.SV. TAP
~--------~------------~ D"?A ~ D~f:1 ~ 1~-.Zs5o Y 1: 1'2.<::1 v t?l-061'~1!3UfiON (L.I-I~NN~II 1) ('St.I-\\~M~ "SI-\\OWN 01'--\\ OWb. t-110,"51-\\, 4A, 4es,4-?) 1() tKT. ll1! a, f'Af-l~lt \\?'?I S!i>~ £1*110, '?If. 4 ~ (11/G- -:;toto4o-4 B) ~ DW? i¢1 ____ 3 I~ I I I I ~~ ~~ r 1£JJ:ll f,.l~}-125'/. DC DISTR. PANEL 033 I jSEE SCHEDULE THIS SHEET FOR-I SWITCH $ FUSE RATIN(15. PAtiEL ~RRA\\\\C.EMENT_! ~lAC'::_!' ~O_:__j
- 13-250V DC DISTRIBUTION PANEL D31
&tHEME CKT BREIIKeR NO NO AF Ar D'3 I 400 ~2~ 5 /50 as 03106 6 /"SS as 7 /50 03 8 ISO /00 9 400 150 0~110 10 400 03111 11 4co 0.311;!. It 400 2.ZS 13 400 2.50 14- '5CHEM£ C.KT 5WIT(.H FUSf. RAliW NO. NO. RI\\Tit\\G AMPS AMPS DESCRIPTION \\'l? 'I ~Mf~R'f t:I-\\A~t;.f{ 4< 0'34 i'Z?v.~A1'1"EI~'i C.I1Af6-ef( ~9!52 81\\TT!RV GHARGE!R ilp 54 81\\TIEAY GHARG~R II- 0 ?"3 SPARE PLAI'\\T E.VACUATION ~IREN POWI!Q, ~PARE. SPAR~ It HII - 25QV. MCC (R<:.I c.) DIVI::.ION :t 12.0 VAt. UP5 Y71 SPARE A SPACE DESCRIPTION LOC. WIR~ SIZE 0~4 "J-'1\\t/o D~'l 'l** Yo Q<;!.<)- - D!J?> 1"11 Yo N31o6 #IO (#1/0 r-A 0313 a~o Met~ '( 11 2.1JOM<.M I 1)33 I 51{;::/Y&) SCI-!EME £13303 WlRS: MANDATORY ROUTII-Itl LOC. ~IZE SEPARATION R!QUIP.eMENT 03301 I 30 ~0 ~*131-Z!SOV OC MCC 0311 "~riO 1-:o-3a_o_2+-2.-t---,-3o---,-+--3-o-* ~i33 -isov oc Mcc -~~~-,o-t------------1 tJ330J 3 30 30 eCCS ANAL04 Tfi?IP tWIT (,?())A "10 NOTES
- r. Sr!.PARATION SHAL.LBE 11-l'ACCQRQANCE WITH DESIGN SPEC. NSP!JS-03'1.
Da 9 PAN!;'- ARRAN61!ME'Nl" CKl" I I Cl<:r ~ CKT~ Ci<T4 CKT ~ Ctc:r 10 GKT7 Clc-ra ~ N, PI @(If t:JAWG) I o3~ 1-- j1333oo I 5CI-/E/'1E 03305
- BLOGK OIAG>RAM.i!OB sc~sM~:: o-a~os-REVISIONS
~EC20129, 20056 DWN: JJP 7-25-12 CHK: BAL 7-27-12 APPR: NJF 7-30-12 This map/document is to assist employees in the performance of their jobs. E 11 Q S H 4 Your personal safety is provided for by using safety practices, procedures and equipment as described in safety training programs, manuals and SPAR's, MONTI CAD DWG K 250V DC DISTRIBUTION & PANEL SCHEDULE D31, D33 SCALE: NONE I REV 76 NE-36640--4 MONTICELLO NUCLEAR GENERATING PLANT 1J, X eel Energy ~ORTHER~< s-,\\TES PO'IIER COMPNW}}