ML18017A156
| ML18017A156 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 04/30/1980 |
| From: | Curtis N PENNSYLVANIA POWER & LIGHT CO. |
| To: | |
| References | |
| PLA-478, NUDOCS 8005080287 | |
| Download: ML18017A156 (2) | |
Text
c r()
Elt+
1 0
REGUI ATORY IrtiFORMATION DISTR IBUTIOrir SYSTEM (RIDS) 0 >/I ACCFSSION NBR:8005080287' OOC ~ DATE: 80/04/30 NOTARIZED:
NO FACIL:50 87 Susquehanna Steam Electric Stationi Unit ir Pennsylva AUT
~
Susquehanna Steam Electric Stationr Unit 2F Pennsylva AUTHOR AFF ILI AT ION CURTIS>N,rRr.
Pennsyl vania Power 5 Light Co, REC IP ~ IVAME RECIPIENT AFFILIATION DOCKET 05000387 05000386
SUBJECT:
Interim deficiency rept re damage sustained by safety related cable during pulling activities originally reported 790717 'nvestigation in progress,Bechtel 5 util in process of finalizing agreeable plan to. deal w/deficiency.
DISTRIBUTIOR CODE:
B0190 COPIES RECEIVED:LTR j ENCL
+
SIZE:
TITLE: Conetructfon Deficiency Reoort (10CFR50,555)
INTERNAL:
~~EGAL 0
ILE 08 MPA 10 QAB 13F IELD COOR/IE 17 AO PLANT SYS 22 OIR DPr0l AO/RCI/IE AEOD GEOSC IEiVCES BR IaC SYS HR MECH ENG BR STRUCT ENG BR 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 ROTES:~M W~S SQ'K HEC IP IENT COP IES ID CODE/NAME LTTR ENCL ACT ION:
14 PM /Hl/r/Eg 1
1 20 LA l tc/R +3' 1
C de~fZS.
RECIPIENT IP CODE/NAME 15 BC ~uJR4f 3 AO fr QJQ 02 WRC PDR 07 EDO K STAFF 09 OEPY DIR DP l 11 STANDRDS DEV.
16 AO FOR ENGR 17 AO REAC SFTY 23 OELD AD/SITE TECH DIRECTOR DSE HANAUERBS ~
MATL ENG BR POKIER SYS BR COPIES.
LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1, 1
1 1
1 1
1 1
1 1
1 1
1 EXTERNAL: 03 LPOR 24 ACRS 1
1 1b 16 04 NSIC 1
1
>>98O TOTAL NUMBER OF COPIES REQUIRED:
LTTR 48 ENCL 46
TWO NORTH NINTH STREET, ALLENTOWN, PA.
18101 PHONE:
t21S) 821-5151 NORMAN W, CURTIS Vice President-Engineering 8 Constrvctren 821.5381 April 30, 1980 Mr. Boyce H. Grier Director, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 SUS9UEHANNA STEAM ELECTRIC STATION INTERIM REPORT OP A DEFICIENCY IN CABLE PULLING ACTIVITIES (STATUS UPDATE)
ERs 100450/100508 PILE 840-4/900-10 PLA-478
References:
PLA-383 dated July 17, 1979 PLA-429 dated December 10, 1979
Dear Mr. Grier:
The damage sustained by safety related cable during pulling activities and originally reported to the NRC in our PLA-383 under the provisions of 10CFR50.55(e) remains under investigation.
Bechtel and PPGL are in the process of finalizing an agreeable plan to deal with the cable pulling deficiencies.
We will advise the Commission of other detailq when the plan is finalized.
We expect to provide these details by August, 1980.
Very truly yours, N.
W. Curtis Vice President-Engineering it'onstruction ARS:mcb cc:
Mr. Victor Stello (15)
Director-Office of Inspection S Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Polg Sc'im Mr. G. McDonald, Director Office of Management Information s Program Control U. S. Nuclear Regulatory Commission Mr. Robert M. Gallo Washington, D.C.
20555 U.S. Nuclear Regulatory Commission P.
O. Box 52
,Shickshinny, Pennsylvania 18655 PENNSYLVANIA POWER 8
LIGHT COMPANY