HNP-98-166, Forwards Cycle 9 to COLR IAW TS 6.9.1.6.4.Rev Incorporates Changes Necessary as Result of Cycle 9 Core Changes.Previous Info Submitted to Staff with Regards to Cycle 8 Colr,Rev 1, Is Being Corrected
| ML18016A705 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 11/03/1998 |
| From: | Scarola J CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML18016A706 | List: |
| References | |
| HNP-98-166, NUDOCS 9811100364 | |
| Download: ML18016A705 (5) | |
Text
CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDE)
ACCESSION NBR:9811100364 DOC.DATE: 98/11/03 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION SCARO'uA,J.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
SUBJECT:
Forwards Cycle 9 to COLR.Summary of changes to COLR are contained in encl 1.
DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR L
ENCL i SIZE:
TITLE: OR Submittal: General Distribution NOTES:Application for permit renewal 'filed.
DOCKET 05000400
. T 05000400 RECIPIENT ID CODE/NAME PD2-1 LA FLANDERS,S COPIES LTTR ENCL 1
1 1
RECIPIENT ID CODE/NAME PD2-1 PD COPIES LTTR ENCL 1
1
'0 INTERNAL: ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 1
1 1
1 1
1 1
1 1
0 ILE CE NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT 1
1 1
1 1
1 1
1.
EXTERNAL: NOAC 1
1 NRC PDR D
E N
NOTE TO ALL NRIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE HASTE ~
TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 13
Carolina Power 8 Light Company PO Box 165 New Hill NC 27562 James Scarola Vice President Horns Nuclear Plant NOV - 3 1998 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEARPOWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 CYCLE 9 CORE OPERATING LIMITSREPORT SERIAL:
HNP-98-166
Dear Sir or Madam:
In accordance with Technical Specifications (TS) 6.9.1.6.4, Carolina Power & Light Company (CP&L) hereby submits the Harris Nuclear Plant (HNP) Cycle 9 Core Operating Limits Report (COLR).
This COLR revision incorporates changes necessary as a result ofCycle 9 core changes. A summary ofthe COLR changes is contained in Enclosure 1. Enclosure 2 contains a copy ofthe Cycle 9 COLR.
In addition to the Cycle 9 COLR revision, HNP is correcting previous information submitted to the staff with regards to the Cycle 8 COLR, Revision
- 1. By letter dated September 21, 1998, HNP reported that the previous Moderator Temperature Coefficient (MTC) Surveillance Limitof -36.4 pcm/'F was calculated using an analytical method that was not specifically reviewed and approved by the NRC. Additional research has determined that the original Cycle 8 MTC Surveillance Limit values were in fact, calculated in accordance with NRC approved methodologies. This incorrect information was caused by an internal mis-communication which has been resolved. HNP regrets any inconvenience to the NRC caused by erroneous information contained in the September 21, 1998 letter. The MTC Surveillance Limit included in the Cycle 9 COLR supersedes these previous versions.
Please refer any questions regarding this submittal to Mr. J. H. Eads at (919) 362-2646.
Si
- erely, James Scarola MSE/mse
Enclosures:
l.
Summary of Cycle 9 COLR Changes 2.
Copy of the Cycle 9 COLR 98iii00364 98ii03%
PDR ADQCK 05000440 P
PD~R 5413 Shearon Harris Road New Hill,NC Tel 919 362-2502 Fax 919 362-2095
Mr. J. B. Brady, NRC Sr. Resident Inspector Mr. Mel Fry, Acting Director, N.C. DEHNR Mr. S. C. Flanders, NRC Project Manager Mr. L. A. Reyes, NRC Regional Administrator
~
~
ENCLOSURE 1 TO SERIAL: HNP-98-166 SHEARON HARRIS NUCLEARPOWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 CYCLE 9 CORE OPERATING LIMITSREPORT
SUMMARY
OF CYCLE 9 COLR REVISIONS Section Descri tionof Chan e
2.2 2.3 2.4 2.6 2.8 4.1 Figure 2 Figure 5 Revised MTC Surveillance Limitfrom -37.65 pcm/'F to -37.8 pcmPF.
Revised the Shutdown Rod Insertion Limitfrom 225 steps to 222 steps.
Revised the Control Rod Insertion Limitfrom 225 steps to 222 steps.
Changed the maximum cycle energy ofthe V(Z) curve description from 513 EFPD to 489 EFPD.
Boron Concentration forrefueling changed from greater than or equal to 2300 ppm to greater than or equal to 2217 ppm.
At the beginning of the cycle, increased the requirement for the total number of detector thimbles required from 38 to 45. Additionally, at the beginning of the cycle, specified that detector thimbles be operable at either location J-10 or L-14. A detector thimble at one of the followinglocations must also be operable at the beginning of the cycle, N-S, H-6, or J-7.
Changed Figure 2 to reflect new rod parked position from 225 to 222 steps.
Changed Figure 5 to reflect new V(Z) curve.
ENCLOSURE 2 TO SERIAL: HNP-98-166 SHEARON HARRIS NUCLEARPOWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 CYCLE 9 CORE OPERATING LMITSREPORT to HNP Procedure PLP-106, "Technical Specification Equipment List Program and Core Operating Limits Report," Rev. 19