HNP-98-011, Forwards Rev 0 to Procedure HNP-IST-002, Shearon Harris Nuclear Power Plant,Ist Program Plan - 2nd Interval. Plan Describes Tests Required to Verify Operational Readiness of Class 1,2 & 3 Pumps & Valves
| ML18016A303 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 01/27/1998 |
| From: | Robinson W CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML18016A304 | List: |
| References | |
| HNP-98-011, HNP-98-11, NUDOCS 9802040404 | |
| Download: ML18016A303 (5) | |
Text
CATEGORY 1 REGULA Y XNFORMATION DISTRIBUTIO SYSTEM (RIDS)
'9 ACCESSION NBR:9802040404 DOC.DATE: 98/01/27 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH N'~2fE
~
AUTHOR AFFILIATION ROBINSON,W.R.
Carolina Power
&. Light Co'.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards Rev 0 to Procedure HNP-XST-002, "Shearon Harris Nuclear Power Plant,IST Program Plan
- 2nd Interval." Plan describes tests required to verify operational readiness of Class 1,2
& 3 pumps
& valves.
'OCKET 05000400 DISTRIBUTION CODE:
A047D COPIES RECEIVED:LTR i
ENCL J SIZE:
TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code GL-89-04 NOTES:Application for permit renewal filed.
E 05000400 G
RECIPXENT ID CODE/NAME PD2-1 LA FLANDERS,S COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1
1 PD2-1 PD 1
1 COPIES LTTR ENCL 1
1 INTERNAL: ACRS E
CE R
RES/DET/EIB EXTERNAL: LITCO ANDERSON NRC PDR 1
1 1
1 1
1 1
1 1
1 1
1 AEOD/SPD/RAB NRR/DE/EMEB OGC/HDS2 RES/DET/EMMEB NOAC 1
1 1
1 1
0 1
1 1
1 D
U E
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US'TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER. OF COPXES REQUIRED: LTTR 14 ENCL 13
I 4
r r,
Carolina Power & Light Company PO Box 165 New Hill NC 27562 William R. Robinson Vice President Harris Nuclear Plant JAN 27 1998 SERIAL: HNP-98-011 10 CFR So.ssa United States Nuclear Regulatory Commission ATTENTION:Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEARPOWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 INSERVICE TEST PROGRAM PLAN - SECOND TEN-YEARINTERVAL
Dear Sir or Madam:
In accordance with 10 CFR 50.55a(f)(5)(i), Carolina Power &Light Company (CPEcL) hereby, submits the Harris Nuclear Plant (HNP) Inservice Testing (IST) Program Plan for the second ten-year interval. The second ten-year interval willbe in effect from February 2, 1998 through and including May 1, 2007. The IST Program Plan has been prepared in accordance with the requirements of the American Society ofMechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI,Division 1, of the 1989 Edition, as required by 10 CFR 50.55a(f)(4)(ii).
The Plan describes the tests required to verify the operational readiness of Class 1, 2 and 3 pumps and valves that are required to shut down the reactor to the cold shutdown condition, maintain the reactor in the cold shutdown condition, or mitigate the consequences of an accident.
The enclosed IST Program Plan includes the followingfour reliefrequests which require NRC approval, pursuant to 10 CFR 50.55a:
pump relief request AF-PR1 (Section 4.4 of the Plan), and valve relief requests CB-VR1, CE-VR1, and IA-VR1 (Section 5.4 of the Plan). In addition, Section 5.4 of the Plan includes the followingfive valve relief requests which are approved for use as specified in NRC Generic Letter 89-04, "Guidance on Developing Acceptable Inservice Test Programs:" CC-VR1, CC-VR2, CT-VR1, MS-VR1, and SI-VR1.
The enclosed Program Plan also contains valve test deferral justifications, as allowed by the ASME Code (OMa-1988, Part 10, paragraphs 4.2.1.2 and 4.3.2.2). Cold Shutdown Justifications are presented in Section 5.5 of the Plan and Refueling Outage Justifications are presented in Section 5.6 of the Plan. These test deferrals comply with the recommendations ofNUREG-1482, "Guidelines for Inservice Testing at Nuclear Power Plants," where applicable.
9802040404,980127 AoaCK OS000e00 P
PDR IIIIIIIIIIIIIIIIIIIIII[
lIIIlll 5d13 Shearon Harris Road New Hill NC Tel 919 362-2502 Fax 919 362-2095
Document Control Desk SERIAL: HNP-98-011 Page 2 One significant change in the testing requirements involved the addition of valves in the second ten-year interval IST Program that were not part ofthe first interval IST Program. During preparation of the second inter val Plan, an engineering review identified testing requirements for valves that were not included in the first interval IST Program.
Operability determinations have demonstrated that these valves were capable ofperforming their design functions. The inclusion of these valves in the second interval IST Program willcontinue to ensure their operational readiness.
Questions regarding this matter may be referred to Mr. J. H. Eads at (919) 362-2646.
Sincerely, AEC/aec Enclosure c:
Mr. J. B. Brady (NRC Senior Resident Inspector, HNP)
Mr. L. A. Reyes (NRC Regional Administrator, Region II)
Mr. S. C. Flanders (NRR Project Manager, HNP)
Mr. E.B. Dayton (Authorized Nuclear Inservice Inspector)
Mr. J. M. Given, Jr. (State ofNorth Carolina)
~1