MONTHYEARML24023A0392024-01-22022 January 2024 NEI Comments on the Information Collection Renewal for Domestic Licensing of Special Nuclear Material, Docket Id NRC-2023-0118 ML23355A1972023-12-14014 December 2023 NEI, Comments on NRC Draft Resolution of SFAQ 2022-02, SAE Program Requirements ML23219A1672023-10-25025 October 2023 Response Letter to Fee Exemption Request for Pre-Submittal Activities, Review, and Endorsement of NEI 20-07 ML23270B9002023-09-27027 September 2023 NEI Letter Request for an Extension of Comment Period on Proposed Revision to Standard Review Plan Section 15.0, Introduction - Transient and Accident Analyses, Docket Id NRC 2023 0079 ML23268A0102023-09-22022 September 2023 NEI, Fee Exemption Request for Endorsement, Review and Meeting to Discuss Draft Nuclear Energy Institute Technical Report NEI 23-01, Operator Cold License Training Plan for Advanced Nuclear Reactors ML23241A8612023-08-25025 August 2023 Consolidated Industry Comments to NRC Regulatory Issue Summary 2023-02, Scheduling Information for the Licensing of Accident Tolerant, Increased Enrichment, and Higher Burnup Fuels ML23236A4992023-08-24024 August 2023 Industry Feedback on Region II Fuel Cycle Facility Construction Oversight Workshop Held August 15, 2023, and Suggested Topics for Additional Public Meetings in Fall 2023 ML23256A1622023-08-0101 August 2023 Incoming NEI Letter Dated August 1, 2023 Regarding Increase in Fees 2023-2025 ML23206A0292023-07-24024 July 2023 Incoming Fee Exemption Request for Pre-Submittal Activities, Review, and Endorsement of NEI 20-07 ML23143A1232023-06-22022 June 2023 NRC Fee Waiver Request for Draft NEI 23-01 ML23200A1662023-05-30030 May 2023 NEI Proposed Metrics for a Performance-Based Emergency Preparedness Program ML23116A0732023-05-25025 May 2023 Letter to Hillary Lane in Response to a Request for a Fee Exemption for NEI 23-03 ML23135A7332023-05-0909 May 2023 NEI Comments on NRC Safety Culture Program Effectiveness Review ML23110A6752023-04-18018 April 2023 04-18-23_NRC_Fee Waiver for NEI 23-03 ML23110A6782023-04-18018 April 2023 Request for Review and Endorsement of NEI 23-03, Supplemental Guidance for Application of 10 CFR 50.59 to Digital Modifications at Non-Power Production or Utilization Facilities ML23110A6762023-04-18018 April 2023 04-18-23_NRC_NEI 23-03 Review + Endorse ML23107A2302023-03-31031 March 2023 NEI Letter, to Andrea Veil, NRC, Regarding Industry Recommendations for a 10 CFR 50.46a/c Combined Rulemaking ML23138A1662023-03-24024 March 2023 Transmittal of NEI 22-05 Revision a, Technology Inclusive Risk Informed Change Evaluation (Tirice) Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07 ML23083B4622023-03-24024 March 2023 Transmittal of NEI 22-05 Revision a, Technology Inclusive Risk Informed Change Evaluation (Tirice) Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07 ML23060A3272023-03-0101 March 2023 NEI, Wireless Cyber Security Guidance ML23060A2142023-03-0101 March 2023 NEI, Request for NRC Endorsement of NEI White Paper, Enabling a Remote Response by Members of an Emergency Response Organization, Revision 0 ML23023A2752023-01-23023 January 2023 Request for Extension of Comment Period from the Nuclear Energy Institute on PRM-50-124 - Licensing Safety Analysis for Loss-of-Coolant Accidents ML22348A1122023-01-17017 January 2023 Letter to Richard Mogavero Response to Fee Exemption NEI 08-09 Revision 7 ML22353A6082023-01-11011 January 2023 U.S. Nuclear Regulatory Commission Report of the Regulatory Audit of the NEI-Proposed Aging Management Program Revision to Selective Leaching Program (XI.M33) ML22349A1012022-12-12012 December 2022 LTR-22-0343 Ellen Ginsberg, Sr. Vice President, General Counsel and Secretary, Nuclear Energy Institute, Expresses Concerns Related to Issuance of Regulatory Issue Summary 2022-02; Operational Leakage ML22336A0372022-11-16016 November 2022 Fee Exemption Request for NEI 08-09 Revision 7 - Changes to NEI 08-09 Cyber Security Plan for Nuclear Power Reactors ML22321A3152022-11-16016 November 2022 NEI Letter with Comments on Significance Determination Process Timeliness Review ML22298A2262022-10-25025 October 2022 Endorsement of NEI 15-09, Cyber Security Event Notifications, Revision 1, Dated October 2022 ML22298A2302022-10-17017 October 2022 Submittal of NEI 22-03, Draft Revision 0, Nuclear Generation Quality Assurance Program Description ML22207B6512022-07-26026 July 2022 NEI, Full Fee Exemption Request for Industry Guidance Proposal - Weather Related Administrative Controls During Transient Outdoor Dry Cask Operations ML22195A1662022-07-14014 July 2022 NEI, Draft G of NEI 99-01, Development of Emergency Action Levels for Non-Passive Reactors, Revision 7 ML22195A0202022-07-13013 July 2022 07-13-22 NRC Fee Exemption Request for NEI 21-05 Review ML22195A0672022-07-13013 July 2022 Fee Exemption Request for Review and Meeting to Discuss Draft Nuclear Energy Institute Technical Report NEI 21-05, Reporting Guidance for Licensees with Risk-Informed Licensing Bases ML22159A2772022-06-28028 June 2022 Response Letter to Richard Mogavero for Fee Exemption for the Nuclear Regulatory Commission Review Ad Endorsement of NEI 15-09, Revision 1 ML22153A2782022-06-0202 June 2022 Nie, Fee Exemption Request for Endorsement of NEI 15-09, Cyber Security Event Notifications, Revision 1, Dated May 2022 ML22154A2962022-06-0202 June 2022 LTR from R. Mogavero to M. Sampson Dated Jun 2 2022 Endorsement of NEI 15-09 Cyber Security Event Notifications Rev 1 Dated May 2022 ML22152A2712022-06-0101 June 2022 Digital Instrumentation and Control Common Cause Failure Policy Considerations, Revision 1 ML22143A9362022-05-20020 May 2022 May 13, 2022, Public Meeting on Draft Regulatory Issue Summary Operational Leakage, 87 Fed. Reg. 2361 (Jan. 14, 2022) (Docket Id NRC-2021-0173) ML22110A1752022-05-0303 May 2022 NRC Response to the Nuclear Energy Institute April 1, 2022, Letter, Regarding the Nrc'S CUI Implementation Plan ML22109A2082022-04-0808 April 2022 April 8, 2022, NEI White Paper on Digital Instrumentation and Control Common Cause Policy Considerations Version 2.0 ML22110A1782022-04-0101 April 2022 April 1, 2022, Letter from NEI Regarding Nrc'S Controlled Unclassified Information Program Implementation ML22048A5812022-02-16016 February 2022 NEI 22-02: Guidelines for Weather-Related Administrative Controls for Short Duration Outdoor Dry Cask Storage Operations ML22019A2922022-01-12012 January 2022 NEI, Submittal of Proposed Revisions to Aging Management Programs XI.M33, Selective Leaching and XI.E3, Inaccessible Power Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements ML21343A2922021-12-0808 December 2021 NEI, Transmittal of NEI 21-07 Revision 0-B, Technology Inclusive Guidance for Non-Light Water Reactor Safety Analysis Report: for Applicants Utilizing NEI 18-04 Methodology ML21337A3802021-12-0303 December 2021 NEI Technical Report NEI 17-06 - Guidance on Using Iec 61508 SIL Certification to Support the Acceptance of Commercial Grade Digital Equipment for Nuclear Safety Related Applications, Revision 1 ML21319A3522021-11-10010 November 2021 NRC NEI Fee Waiver Request Changes to NEI 10-04 and NEI 13-10, Dated November 10, 2021 ML21306A3652021-10-29029 October 2021 NEI Letter from D. Young to NRC S. Atack to Cease Work on Draft D of NEI 20-05, Methodological Approach and Considerations for a Technical Analysis to Demonstrate Compliance with the Eligibility Criteria of 10 CFR 73.55(a)(7) ML21342A1682021-10-29029 October 2021 Letter from W. Gross to S. Atack, Endorsement of Nuclear Energy Institute 10-04, Identifying Systems and Assets Subject to the Cyber Security Rule, Revision 3, Dated October 29, 2021 ML21342A2032021-10-29029 October 2021 Letter from W. Gross to S. Atack, Endorsement of Nuclear Energy Institute 13-10, Cyber Security Control Assessments, Revision 7, Dated October 29, 2021 ML22081A2002021-10-29029 October 2021 NEI Backfitting Concerns with NRCs Developing Position on Protection of Dry Storage Systems from Natural Phenomena During Short Term Operations 2024-01-22
[Table view] |
Text
VICTORIA K. ANDERSON Technical Advisor, Risk and Technical Services 1201 F Street, NW, Suite 1100 Washington, DC 20004 P: 202.739.8101 vka@nei.org nei.org January 12, 2018 Mr. Sunil D. Weerakkody Chief, PRA Operations and Human Factors Branch Division of Risk Assessment Office of Nuclear Reactor Regulation Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Industry Comments on Revisions to IMC 0609, Appendix F, Fire Protection Significance Determination Process Project Number: 689
Dear Mr. Weerakody:
The Nuclear Energy Institute (NEI)1 is pleased to submit the attached comments regarding recently released draft revisions to IMC 0609, Appendix F, Fire Protection Significance Determination Process. 2 Given the increasing emphasis on consideration of risk insights in matters related to fire protection, particularly during the transition of many plants to risk-informed, performance-based fire protection programs under NFPA 805, the industry supports the enhancements to Fire PRA realism incorporated into this revision. Specifically, many recently-finalized methods, tools, and data related to Fire PRA were incorporated to more realistically reflect the impact of inspection findings evaluated using IMC 0609 Appendix F. While these changes will help better focus NRC resources on the most risk-significant findings related to fire protection, additional improvements to realism are available, and should be incorporated. The attachment to this letter details additional improvements that should be incorporated to best reflect the significance of inspection findings evaluated using this guidance.
1 The Nuclear Energy Institute (NEI) is the organization responsible for establishing unified industry policy on matters affecting the nuclear energy industry, including the regulatory aspects of generic operational and technical issues. NEI's members include all entities licensed to operate commercial nuclear power plants in the United States, nuclear plant designers, major architect/engineering firms, fuel cycle facilities, nuclear materials licensees, and other organizations and entities involved in the nuclear energy industry.
2 Inspection Manual Chapter 0609, Appendix F, main body, document date October 11, 2017, available under ADAMS accession number ML17089A417; and Attachments 1-8 with accession numbers ML17089A418, ML17089A419, ML17089A420, ML17089A421, ML17089A422, ML17089A423, ML17089A425, ML17089A426; and IMC 0308, Att. 3, Appendix F with accession number ML17144A273.
Mr. Sunil D. Weerakkody January 12, 2018 Page 2 We look forward to working with the NRC on continuing to improve realism in Fire PRAs in support of all regulatory activities. If you have any questions concerning the industrys comments, please contact me.
Sincerely, Victoria K. Anderson - Detailed Comments on IMC 0609, Appendix F c: Mr. Russell N. Felts, NRR Mr. Michael X. Franovich, NRR Mr. Jay E. Robinson, NRR Mr. Christopher G. Miller, NRR NRC Document Control Desk
Mr. Sunil D. Weerakkody January 12, 2018 Page 3
Attachment:
Specific Comments on IMC 0609 Appendix F, Fire Protection Significance Determination Process Attachment Page Comment Recommend adding discussion of FAQ 14-0009 guidance for modeling MCC fires to relevant sections, including the discussion of separation and distance of targets from the individual MCC buckets in the determination of ZOI and Main Document N/A time to damage.
Recommend more realistically crediting Very Early Warning Fire Detection Main Document N/A Systems.
Main Document N/A Recommend including explicit credit for very low hot work.
In Step 1.4.8-A, the criteria should be two or more redundant components.
If the component impacts are functionally equivalent, then it should be Main Document 11 considered a single impact. It is unclear of the purpose of the separation term.
In Step 1.4.8-B, the criteria should be two or more redundant components.
Main Document 11 If the component impacts are functionally equivalent, then it should be considered a single impact.
Main Document 11 In Step 1.4.8-C, better define single fire scenario.
Recommend removing conservative factor of 2 and 4 for wall corner effects within 2 (analyst can optionally neglect wall effects). Note that the latest 3 93 NRC testing showed that the effect is significantly overestimated until within 6 inches of wall.
Fire PRA FAQ 13-0005 should be followed for self-ignited cable fires, such 3 7 that damage is limited to the tray of origin.
5 3 Recommend mentioning the electrical fire split fraction for pump fires here.
Recommend incorporating the method for oil fire spills involving very small 5 3 oil spills provided in NEI letter dated June 21, 2012 (ML12171A583) page 4 Discuss how fires spreading into vertical tray stacks affect the radiant ZOI and damage to targets that may be in cable trays or conduit located radially 5 6 from the fire.
Self-ignited cable fires. Section does not clarify that this only applies to 5 6 thermoplastic cables. Attachment 3, page 75 and Attachment 4, Page 1 only show TP cable, but it is never explicitly stated.
Recommend mentioning sensitive electronics and their lower damage criteria 6 1 in the opening paragraph along with TS and TP cables.
Recommend more clearly addressing damage to targets that are not the first 6 N/A tray in a stack of trays.
Recommend using the damage temperature from FAQ 08-0053 or KATE-Fire 6 1 not used for Kerite cable
Mr. Sunil D. Weerakkody January 12, 2018 Page 4 These figures should have figure numbers so that they can be referenced as 7 11-17 needed.
Recommend mentioning the effect that spread to secondary combustibles 7 4 can have on HRR and thus detection timing.
It would be clearer to define the variable "t" visually in the equation as it is described in the paragraph below the equation to ensure the net time 7 6 available for suppression is accounted for properly. Similar to the way it is defined in Table A7.2 The new guidance for manual detection timing by General Plant Personnel, in Step 2.7.2, is ambiguous. It states that detection by plant personnel can be assumed but does not provide guidance on what time should be assumed 7 N/A nor does it provide a bounding alternative for assumed manual detection timing. More guidance is needed for manual detection to ensure consistent application.
The guidance in this section states that "fire detection time is 5 minutes if the fire area is continuously occupied" This is different than the Fire PRA method in NUREG/CR-6850, appendix P, table P-1, sequences A through E, which states prompt detection is applicable when an area is continuously occupied. NUREG/CR-6850 page P-6 defines prompt detection as prompt detection assumes a negligible time to 7 3 detection.
The time to peak HRR of most fire profiles is 12 minutes. Recommend 8 25 including these sprinkler activation tables for time up to 12 minutes.
8 N/A Recommend including the HRRs in the tables along with D and V values.
Recommend including the HRRs in the tables along with the ignition source 8 N/A classification.