HNP-96-153, Forwards Rev 2 to Harris Unit 1 Cycle 7 COLR, Incorporating Requirements of TS 3.3.3.2 Re Movable Incore Detectors,Relocated from TS Amend 65 to Facility Operating Licensed by NRC on 960724

From kanterella
(Redirected from ML18012A362)
Jump to navigation Jump to search
Forwards Rev 2 to Harris Unit 1 Cycle 7 COLR, Incorporating Requirements of TS 3.3.3.2 Re Movable Incore Detectors,Relocated from TS Amend 65 to Facility Operating Licensed by NRC on 960724
ML18012A362
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/11/1996
From: Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18012A363 List:
References
HNP-96-153, NUDOCS 9609200196
Download: ML18012A362 (3)


Text

CATEGORY REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDE)

')ACCESSIION,NBR:9609200196 DOC.DATE: 96/09/11 NOTARIZED: NO FACIE:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROBINSON,W.R.

Carolina Power a Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Rev 2 to "Harris Unit 1 Cycle 7 COLR,"

incorporating requirements of TS 3.3.3.2 re movable incore detectors, relocated from TS Amend 65 to facility operating licensed by NRC on 960724.

DISTRIBUTION CODE:

AOOZD COPIES RECEIVED'LTR l ENCL J SIZE:

I TITLE: OR Submittal: General Distribution NOTES:Application for permit renewal filed.

DOCKET I 05000400 05000400 RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD ANN~

ILE CENTER ~0 NRRRR'DR'CH/EICB NRR/DSSA/SRXB OGC/HDS2 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

0 1

1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTETH CONTACT THE DOCUMENT CONTROL DESKI ROOM OWFN 5D-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:

LTTR 13 ENCL 12

L

'I

Carolina Power &Light Company PO Box 165 New Hill NC 27562 SEP 11 1996 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 William R. Robinson Vice President Harris Nuclear Plant SERIAL: HNP-96-153 SHEARON HARRIS NUCLEARPOWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 CYCLE 7 CORE OPERATING LIMITSREPORT - REVISIONS

Dear Sir or Madam:

In accordance with Technical Specification (TS) 6.9.1.6.4, Carolina Power &Light Company hereby submits mid-cycle revisions to the Harris Nuclear Plant (HNP) Cycle 7 Core Operating Limits Report (COLR).

Revision No. 2 incorporates the requirements ofTS 3.3.3.2, Movable Incore Detectors, which were relocated from the TS by Amendment No. 65 to the Facility Operating License issued by the NRC on July 24, 1996. These requirements are located in Section 4.0 ofthe COLR.

Revision No. 3 corrects an error in the V(z) curve (Figure 5 ofthe COLR) which was identified by Siemens Power Corporation during the design process for Cycle 8. While the existing curve would support cycle operation up to 11,000 Mwd/MTU,it would not be conservative for the entire operating cycle. The revised V(z) curve is applicable to the entire exposure range ofthe operating cycle.

Questions regarding this matter may be referred to Mr. T. D. Walt at (919) 362-2711.

Sincerely, LSR/lsr Enclosures c:

Mr. J. B. Brady, NRC Senior Resident Inspector Mr. S. D. Ebneter, NRC Regional Administrator Mr. N. B. Le, NRC Project Manager QQQl '/t 9609200i96 9609ii n', ~, (, PDR ADQCK 05000400 I

2I,( p~'DR ~

State Road 1134 New Hill NC Tel 919 362.2502 Fax 919 362-2095