NRC-HQ-25-14-E-0006/NRC-HQ-20-17-T-0001 M0002 Accordingly, the following specific change is to be made to the Task Order:

1. Optional Form (OF) 347, Block 17(i) GRAND TOTAL, delete in its entirety and replace with the following, "$204,004.00";
2. SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS:

A. B.1 PRICE/COST SCHEDULE, delete in its entirety and replace with the following, Total Cost Plus Fixed CLIN Description Est Cost Fixed Fee Fee Cost - Tasks 1 through 3, as described 00001 in Section C, below.

00002 Fee Option Cost CLIN - Continuation of work defined in Tasks 1 through 3, as described in Section C, below.

(This CLIN is Not Exercised on Task Order Award) 10001 Option Fee CLIN (This CLIN is Not 10002 Exercised on Task Order Award)

Total B. NRCB044 CONSIDERATION AND OBLIGATIONINDEFINITE-QUANTITY CONTRACT, delete in its entirety and replace with the following:

(a) The estimated total quantity of this contract for the products/services under this contract is

$204,004.00, of which the sum of represents the estimated reimbursable costs, and of which represents fixed fee.

(b) The Contracting Officer will obligate funds on each task order issued.

(c) The amount currently obligated by the Government with respect to this contract is

$166,481.00, of which the sum of represents the estimated reimbursable costs, and of which represents the fixed-fee.

(d) This is an incrementally-funded contract and FAR 52.232 Limitation of Funds applies.

(e) The Contractor shall comply with the provisions of FAR 52.232 Limitation of Cost for fully-funded task orders and FAR 52.232 Limitation of Funds for incrementally-funded task orders, issued hereunder.

FEE HOLDBACK TABLE 85.00%

15% (HOLD CLIN TOTAL FEE 85% LIMIT BACK)

Page 4 of 6

NRC-HQ-25-14-E-0006/NRC-HQ-20-17-T-0001 M0002 00002 10002 TOTAL (End of Clause)

3. SECTION C, DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK:

A. 6. LEVEL OF EFFORT, delete in its entirety and replace with the following,

6. REQUIRED LABOR CATEGORIES/LEVEL OF EFFORT The level of effort (LOE) for the review of the MURR license amendment is estimated to be 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> (Modification No. 1 adds 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> to the LOE), apportioned among the tasks as shown below. 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> of the 500 will be reserved for use if additional review is needed due to incomplete information from the applicant. The 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> will only be used as authorized by a technical direction letter to the contractor from the COR. The LOE for this task order takes into consideration the contractors knowledge gained through previous experience with research and test reactor (RTR) license amendment and/or license renewal reviews; and familiarity with the NRCs RTR license renewal review process. The estimated LOE shown above includes the level of effort needed to support the meetings and travel specified in this SOW.

Example Labor Categories/Level of Effort Table BASIC CLIN Estimated Mod. New Labor No. 1 LOE Labor Category Hours Total Project Manager 200 300 500 (PM)

Subject Matter 180 200 380 Expert (SME)

Administrative Support (ADMIN) 20 0 20 BASIC CLIN -

TOTAL ESTIMATED 400 500* 900 LOE OPTION CLIN 150 0 150 BASIC &

OPTION CLINS -

TOTAL 550 500 1050 ESTIMATED LOE

  • 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> will be reserved for use as needed. The 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> will be authorized by technical direction of the COR, and split between the PM and the SME per the COR.

B. TRAVEL/MEETINGS, delete in its entirety and replace with the following, Page 5 of 6

NRC-HQ-25-14-E-0006/NRC-HQ-20-17-T-0001 M0002 Trip purpose and associated task: The purpose of this travel would be to answer questions posed by NRC management, conduct a site visit, or attend a meeting or hearing on the on the LA review of the MURR facility.

Frequency: Three trips.

Destination: NRC HQ office complex or MURR site in Columbia, Missouri.

Number of Staff: Up to three (3) contractors staff.

Number of Days: Up to three (3) days.

All travel requires prior written approval from the COR.

$24,000 is estimated for this travel.

Contractor will be authorized travel expenses consistent with the substantive provisions of the Federal Travel Regulation (FTR) and the limitation of funds specified in this contract/order. All travel requires written Government approval from the CO, unless otherwise delegated to the COR.

Travel will be reimbursed in accordance with FAR 31.205-46, Travel costs and the General Services Administrations Federal Travel Regulations at:

http://www.gsa.gov/portal/content/104790.

All other terms and conditions remain the same.

[End of M0002]