ML18005A006
| ML18005A006 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 12/11/1980 |
| From: | Miner S Office of Nuclear Reactor Regulation |
| To: | Varga S Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8012310259 | |
| Download: ML18005A006 (5) | |
Text
~8 Ilac>
P
~4 0
/p UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 December ll, 1980 Docket Nos. 50-315 and 50-316 MEMORANDUM FOR:
Steven A. Varga, Chief Operating Reactor s Branch 81, DL FROM:
SUBJECT:
Sydney Miner, Project Manager Operating Reactors Branch 81, DL FORTHCOMING MEETING WITH INDIANA AND MICHIGAN ELECTRIC COMPANY AND AMERICAN ELECTRIC POWER COMPANY TO DISCUSS THE UTLIMATE STRENGTH OF THE D.
C.
COOK CONTAINMENTS AND HYDROGEN CONTROL MEASURES Attendees:
Re vested NRC Partici ants T. Novak L. Rubenstein J. Knight S. Varga F. Schauer W. Butler S. Miner F. Rinaldi C. Tinkler G. A.'orstead (Consultant)
Time and Date:
10:00 am
'hursday, December 18, 1980 Location:
Georgian Room Hol iday Inn
- Bethesda, Maryland AEP R. Jurgensen S. Milioti "J. Castresana K. Vehatedt J. Stevenson (Consultant)
IKMEC B. A. Swensson
Attachment:
Agenda cc:
w/attachment See next page Sydney Miner, Project Manager Operating Reactors Branch N, DL
Meeting Notice 'for D.
C.
Cook. 1 8
2 2
December 11,.1980 Docket Files NRC PDR Local PDR NSIC TERA ORB1 Reading H. Denton E.
Case D. Eisenhut
'R. Purple T. Novak R. Tedesco GG. Lainas G. Zech S. Yarga T. Ippolito R. Clark R. Reid D. Crutchfield W. Russell J. Olshinski B. J.
Youngblood A. Schwencer F. Miraglia J..Mi 1 1 er J.
Wetmore B. Grimes H. Collins F. Pagano S.
Ramos PProject Manager OELD OSD (3)
S.
- Showe, ICE C. Parrish R. Fraley, ACRS (16)
Receptionist, Bethesda Program Support Branch Requested Staff Participants
Attachment AGENDA A.
10:00 am - 12:00 noon Containment Ultimate Strength 1.
Introduction 2.
Capacity of Equipment Hatch Cover 3.
Comments on the Harstead Report 4.
AEP Structural Analysis of the Containment Ultimate Strength 5.
Schedule for the structural Analysis Report B.
1:30 pm - 4:30 pm Hydrogen Control Heasures l.
Introduction
~ 2.
Research and Development Program on Hydrogen Control Measures 3.
Conceptual Design of the Distributed Ignition System 4.
Schedule for Submitting Designs and Installation of the Hydrogen Control Systems (Interim and Final)
Enclosure 2
ULTIf)ATE CAPACITY ANALYSES OF ICE CONDENSER AND liARV III CONTAINHENTS Detailed analyses are to be performed to assess the effect on containment integrity of a potential hydrogen burn.
Ultimate capacity of the containment should be evaluated using a finite element model.
Uniform static pressure capability should be calculated.
Dynamic local and overall pressure capability should also be assessed.
Based on the actual material strength variations indicated by mill test certificates and other uncertainities, the mean, an estimate of 'disperson, and lower and upper bounds of the containment capacity should be established.
The details of the analyses and the results should be submitted in report form.
The following information should be readily identifiable in the report:
1.
Design pressure; 2.
Calculated static pressure retaining capacity; 3.
Calculated dynamic pressure strength considering appropriate pressure time histories; 4.
The associated failure modes (axisymmetric burst-pressure,
- buckling, rebar yielding, penetration failure, closure failure, or others);
5.
The criteria governing the original design and the criteria used to establish failure; 6.
Analysis details and general results; and 7.
Appropriate engineering drawings adequate to allow verification of modeling and evaluation of analyses employed for penetrations.