ML18004A024

From kanterella
Jump to navigation Jump to search
Submittal of 10 CFR 72.48 Evaluation Summary Report for January 1, 2017 Through December 31,2017
ML18004A024
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/04/2018
From: Blome B
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
LlC-18-0001
Download: ML18004A024 (1)


Text

Omaha Public Power District January 4, 2018 Ll C-18-000 1 Attn: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555 Fort Calhoun Station Independent Spent Fuel Storage Installation NRC Docket No.72-054 10 CFR 72.48(d)(2)

Subject:

Fort Calhoun Station (FCS), Unit No. 1, 10 CFR 72.48 Evaluation Summary Report for January 1, 2017 through December 31,2017 In accordance with10 CFR 72.48(d){2) the Omaha Public Power District (OPPD) is submitting the summary report of changes, tests and experiments for the FCS Independent Spent Fuel Storage Installation (ISFSI) subject to evaluation in accordance with 10 CFR 72.48(c}(2). During the period of January 1, 2017 through December 31, 2017, there were no changes, tests, or experiments that required an evaluation to be performed under 10 CFR 72.48.

No commitments to the NRC are made in this letter. If you should have any questions, please contact Mr. Bradley H. Blome at (402) 533-7270.

Respectfully, Bradley H. Blome Director Licensing & Regulatory Assurance BHB/epm c:

K. M. Kennedy, NRC Regional Administrator, Region IV J. S. Kim, NRC Project Manager R. S. Browder, NRC Senior Health Physicist, Region IV 444 SOUTH 16TH STREET MALL

  • OMAHA, NE 68102-2247