ML18003B003

From kanterella
Jump to navigation Jump to search
Part 08 Enclosures (Rev. 1) - Part 8 - Enclosures - Geotechnical Exploration and Testing Data Report Appendix E.3 Packer Test Data Part 03 Pages E.3-101 Thru E.3-150
ML18003B003
Person / Time
Site: Clinch River
Issue date: 12/15/2017
From: James Shea
Tennessee Valley Authority
To:
Office of New Reactors
Fetter A
References
TVACLINCHRIVERESP, TVACLINCHRIVERESP.SUBMISSION.4, CRN.P.PART08, CRN.P.PART08.1
Download: ML18003B003 (50)


Text

{{#Wiki_filter:DOUBLE PACKER 130REHOLE PERMEAI31LITYTEST DATA SHEET, AMEC ENVIRONME:NTAL & INFRASTRUCTURE, INC, Page 1 of2 PROJECT NAME: Cll!Jgb River Sty)R P:rolect JOB,NO. 6468*13~1072 DATE: 'T -2¢* 13 B~ring N~ M P~40l *. Borehole Diam.eter, In~:..3,8

  • Total Boring Depth, Ft. 4'2..0 Gnd Elev, ft: 8lG5, 1*
  • Elev. Top of Casing, Ft. (Gnd Elev *!-Casing Height): 82,~,~Datum **

Casing Height above ground, P.t:.J....1-5 TEST ID: M ~* 41D \\ >!. 1> ' Test length: "1* S Test Section Depth (from Datum): From '::ioe,""t-5 To f:>l.o,'V':l

  • L!<~l--:. <b.~)

(A) Depthio Water.Table From Datum, Ft: ~.:;) \\ (B) Surface Gage Height Above Datum, Ft. \\.* ~rp (C) Distance Water Table to Center ofTestlnterval Ft. ~ ~ Test.WaterTemp:~. Baro Pressure, psi: 14.,"!>.4. Depth to Center ofT est Interval From Datum, Ft: 8'0*,';>$ Static water. pressure at center= (C*62.4/144) i* Bara"' 46 MAXIMUM TEST PRESSU~E,Po"' ((AtB*1]+ C"O.!:i7) [Po= 5~ J Test Pressure sequence:= 1/3 Po, 2)3 Po, Po, 112 Po, Po Sequence ID: A 8 C D E Po Values: 1/3 Po;,~;. 2/3 Po"'~; 1/2 Po"' * 'C.:":\\;- Add Appropriate.P9 value to statio pressure at centeroftest!nterval TEST NO.MP-4(1).1 c ~Sequence Na. ---:.':!?""'" __ Planned Center Pressure: __ e-=-\\,___ . Transducer Readings 8efore Packers Inflated: Top Transducer Readings After Packers Inflated: Top \\ 9 i 3-4--. ; Middle l ~\\B¢ ; Middle 4C;,:,.'~ \\. ' 8o!tom: .<\\~, \\\\ 48h <:;)':) : Bottom: ~ ..f\\£L MP~4c7l I ~3 f?E.<O~/IEN C1 1:\\ FLOW METER READING, Gallons 'Time, Minutes 'initial

  • Final Difference t;bS 1 :.>-~ \\ ~ 16 1 a *:t-c:..4*

fJ)/3\\ 'l.~\\ I))~ \\ e7teoA tt¢ 1:(,A (/) J?S~ '2.~'.. ~qJ \\'5":.\\(.,£\\ i~ "::f<cA C/>. .,lf>B '1 *~tp\\ fOW \\~'=l~A \\B '4Lt<\\ (jJ ¢'f/, 3 (£) \\ '3 (J \\ 'iY=t to l\\ \\6 *1t..A. (/) {j:.8\\ ~ \\~ lPW \\'Q":\\-£..4 \\ s "{loS . \\ Q}B\\ ~\\\\~¢ \\'?>~-t.,S \\8 11.:>'5 (/) 0?6 ~ ~c.\\ (,(J(I) \\13':':\\~S t 8 ':/<DS 0 (J!5\\ -~2-\\~IP \\ 8_]_(..,"5 l~Q 'N.)-&.S (/;J f/J8 1~'"6~~ tN \\ S '::l(pS . \\~ '"1,/oS (/.> <1>8~ ~~ *~1/) \\'Q "\\<.:.S \\U,loS C/) ~8 I :.,~ <f>l(

  • \\ f>"::\\tnS

~~ 1t'oS (/) fi>'B\\ *~t\\**~J

  • '"e;~.q~s......

......... (/; \\S ::J:(oS @$: ~c:, ~ IP</) ~'D":\\~S \\B ':it<..c.. I ¢8\\ '3'5\\ ?>!I \\~':J~{, '18 i(o(, (/) (t}8 \\ *~to\\ tPQJ \\ 8 *~H"C-. \\B 1-to(., ' (/) {/;8\\ 'J{:, ~ '3 ~ \\ '(ii-lol, \\8 '4U.. (/) (I)~~ "3~\\~lD " 'f> "\\~(,. 18 ilo(,. (./)

  • From Preliminary Boring Layout Survey Middle FLOW,gpm Transducer Surface Gage REMARKS Reading, psi Pressure, Rsl IS 13 (f16airJ loS £.., '~

I l-102.<rFI.!.!i t!: f.=(..t::.~ (/) ~2,42.

  • 2'5

(/) ":"+ >'1-8 z.s /,._,e. l"<.ltfi'.:.;Sc.~ PLo~ d) '11\\,.4'? zs cb' ";:\\~,~8 '5l.{J

z.

1*8/:)7_ "30 /I.J Cll.IF r.t$*~ f:ZLe::JW (/) =t8 8((}

  • 3 tP dJ 35
  • 84,rf)3 d>

8_l\\,(()C... '!) :s '/:;?_IECIUFAS(J t!:!Low c6 84.1.64 "55 cb Zl LV*\\ ~z d) 8$, ~(:,. "3'2... ... (J:/ ' ,.. ~ * ~ ** ~... 8/d l 3R "2_ 8d>.~(fj '3 '?... d> f}. ¢I {pf<_ . 3 \\ cb 81/J, 'l-=1* 31 (/) 8CJ>,G.,Z.

31

,cb . 8(/),7>'5 "51 f;;tJc (68r ~*t-: ss* s~,.. roi.A. 7R4.os "". 43t93

  • ~*

l"),84l 08l BBl 2.3 To~ . 7'R:.aAJ$' Fann Approved for'use on Clinch River SMR Project-J. A. Tice, Technical Lead

  • ~~.

~.-Z.¢ - 13 I. Clinch River D~ta R~port Rev. 4 CRP-1112.16 Page E.3-101 of 515

  • Form Rev 0- Reviewed by__.<;)"-"§?-,.::.. _fL"2--f/+-("; /J

DOUBLB PACKER BOREHOLE PERMEABILITY TEST DATA SHEET. AMEC ENVIRONMENTAL & INFRASTRUCTURE, INC. Page 1 of2 PROJECt NAME: Clinch River SMR Prolect . JOB.NO. 6468*13-1072 DATE: ":f.Z¢J 13 Borehole Qiameter, ln.:-3,.8

  • Total Boring Depth, Pt. 4'2.-d Gnd Elev,.Fl: 8 '2./5, 1*
  • Casing Height above ground, F.t:.1...1-5 Elev. Top of Casing, Ft. (Gnd Elev +Casing Height): 8:?~, 1-'3: Datum TEST ID:Mf* ?\\!D.\\

'Z.. '?, ' Test length: t'* 5. , l'estSection Depth (from Datum): From ':i-6,'¥5 To 5to,'Z"S. (TuL i ('L},<=5 ') (A} Depth to Water Table Prom Datum, Ft: ~.'"ill (B) Surface Gage Hetghf Above De~um, Ft. \\.~t/) (C)

  • Distance Water Table to Carter of Test Interval Ft.
  • 3:~ 1 ~

C?l TestWaterTem.p:-=._*. Baro Pressure*, psi: 14,*;,(Q Depth to CenterafTest'tntervaiFi'om Datum: Ft: 8'0*,~0 Static water pressure at center= (C*62.4/144) + Baro =, 4 o MAXIMUM TEST PRESSU~E,*Po"' ([A+a*1J + c*0.57) [Po"' 5 ';.> I Test Pressure sequence 7' 1/3 Po, 2i3 Po, Po, 1/2 Po, Po Sequence ID: A B C D E Po Values: 1/3 Po ;, _l§_;. 2/3 Po"' o 16 ; 1./2 Po= * ~;~ Add Appropriate P~ value to static pressure at center oflest fnterval TEST NO.MP-4t01 ;::~Sequence No. _k_ Planned Center Pressure: '::>~ . Transducer ~ead lngs Before Pa~kers Inflated: T~p. \\9 ;)'1:: ;. Middle 4t:;;.3> \\ * :' Bottom: -\\<7>, \\\\ TransducerReadlngsAfterPackerslnflated: Top ' I~,S(J} : Middle. 4B,<:)'? Bottom: 44;4> MP*40'l 1 ~0 SE.<OLI$/...t C.t;; 'Time, FLOW METER READING, Gallons Middle FLOW,gpm Transducer surface Gage REMARKS Minutes Reading, psi Pressure, psi Initial Final Difference (b8\\41t ~(/) I S."9 l..L. 8<?>.4 z. -:'11 ~~d"GJIA..I I 1->'-I~ASCl j.."t.o<.-~ Cb B ~ l\\ ?_*, ffli/J I 'B ":\\ lD <.. . \\'¢ ':\\(..(, ¢ (/) . (tl ::, '. 4 Z.l 7:><11 \\ IQ '::t-ls>~ \\8 _i-(t,~ ' cb ¢ ¢e~ Lt~'. tbc.l> \\ '0~1.,(., \\~ :f(..,l.a ¢ (/) ~ IPS't 4~' sifJ \\ '8 i:Cc.<o \\ 11

  • t~L, t:1>

(/) {htJ ~ 4&. \\!P_ (/) \\e "'\\tot... lB

t~G.

{/) C/> . 0e: 4£\\~ ~(f) \\ B ~<..~* \\B "~:\\~<.. rj) ¢ Qs~: 4<7:>\\(/J¢ _____1'6 *~to(.. \\8' 1-G.<.. (/) r/J !#'iS\\ 4S~ ~ ¢ \\8'1;(,(,. V3 _':].to(.. (/) (/J (/If~\\ 4,<.,~ cpr/). \\.B._~ 1 tl '1-~l.. (/) (/.> ~Ai.,\\~Cb t 8_~(.,(.. I 6 ':{~(, rb 0 (/JS: 4. "'!' Jp¢* . \\ _'Q~(c(, \\CO !:ttoL (/)

  • (/)

we: 4 i i. :~(Ji ". \\t;'~*~*i~ -~... \\ s ":;[.(,.(........ <6 .. rfj" ¢;3: 48\\ bkP { 'B ':\\(..,(., \\ 8 ".'f(d., r/J (/) <t>a \\ 48~ '?lrii \\ '6 -=llo~ I_B 1c..J.. cp ¢ t/J$!4~ t 3¢ ~ -~'---~ . tbB *:S~l ~(I) "'Fr6m Preliminary Boring Layout Survey Form Approved for'use on Clinch River SMR Project -J. A. Tlce, *Technical lead Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-102 of 515 8~ '33 A:dJ . 8~.44' . 4~ 8S>,l~ 40 /uOZ.I$/A1>~

  • J..1.oc,J t$_~** \\\\

4CJZ.<SA'i:.~ H..ov ~1...... 4>8 4G 98* '2-::t 4':} t:>jhGA 49 98 "'4-4c:? 98,~£\\-. 4C) "' '"':)8 +-\\ .. ~ **. ............ ~* *~ L\\<:> ~854 A'V SlB~.tJA A~ . eNo ' "fBo'f'?o,.._ 'Ji';!..A/.J~ 43:=J<;) 'T(:.p 7/e~.~.us "!.918/

  • Form Rev 0- Rev.iewed by 1r

I i I I

j.

i I l l I I I !

  • OOUBLB PACKER BOREHOLE P!:RMEABILITY TEST DATA SHEET,

AMEC ENVIRONMENTAL & INFRASTRUCTURE, INC, Page 1 of2 PROJECT NAME: Ql!nlfll RlverSMR Prolect JOB.NO.. 6498-13"1072 DATE: 1*2¢w I~ Boring N~ M P~4¢! Borehole Olameter, ln.: -3,.8

  • Total Borlng Depth, Ft. 4-Zeb
  • Gnd Elev:, Fl: ~*
  • Casing Height above grourrd, F.t:__L_1.5 Elev, Top of Casing, Ft. (Gnd Elev +Casing Height): az~

l 4-S.: Datum TEs*r ID: M P~ 40 I 'e. 1>

  • Testlength:
z. 5 Test Section Deplh (from Datum)
From -q.e,;vs To e(.h"2.?' (:r~L. ~ (t),C;,)

(A) Depth to Wat~r Table From Datum, Ft: "!},c;;,l (B) Surface G'aga Height Above Datum, Ft.~ (C) Distance Water Table to Center of Teat interval Ft. ~ ~ Test Water Temp:_-::__*. Baro Pressure*, psi: i 4., ~ (p, Depth to Center ofT est Interval From Datum, Ft: 8-e.*, ~(2). Static water pressure at center= (C*62.4/144) + Bare,. 4* 6 MAXIMUM TEST PRESSURE,*Po "' ([A+8*1l + c*o.57) (Po"' 5 ~ J Test Pressure sequence;= 113 Po, 213 Po, Po, 1/2 *Po, Po r::. '":\\_ Sequence 10: A 8 C D E Po Values: 1/3 Po ; -.1§__;. 2/3 Po"'~ ; 1./2 Po"' Add Appropriate. P'? value to static pres~ure at center of test fnterval 'f,EST NO.MP-401 c 1> Sequer~ce No. 'D Planned Center Pressure: f '3 . Transducer ~eadlngs Before Pa~kers Inflated: T~p \\ 9.~4-. ; Middle 4~.~ \\ * :: Bottom: Transducer Readings After Packers Inflated: Top ~ '?; 8C/>.; Middle 4t>,S~: Bottom: MP*4cJJ I Z-3

  • sefiJ~/IEM C/i!
  • n

'Time, FLOW METER READING, Gallons Middle FLOW, gpm Transducer Surface Gage REMARKS Minutes Reading, psi Pressure, psi Initial Final Difference 4:9 la,g.so~ ~8' S\\: '310 \\ B'i we::; 93,9l Dlfue(;o4,rQ',1:-"'"' <PB : '51. ~ (/Jll \\8 *;':\\-0.$ '~ *-=~:"s (/) <.;25 e*::han

~ 4

~~z* "!>lfi - \\ e~c..s \\-,< "?CDS (/; 86\\-, \\ :> 34-i~t 5'"3 l (/)(/ \\ B"::t-(o'S. y.* No., ?iSA.'DI/.4 0, ~ .. t:(-- z_q)- 1'3 ~g: 53! jl/) *\\ '0':\\.bS lB '::\\l..S (/; (/> 84* 2.':J- ~t\\ (b8t '5t'l \\ 1/Ji,J \\ s*~~s \\8 iCoS (/J (/> ~*~.Sl~ 34 ¢e>' .;}I ~L\\\\ ~ctl \\'B :tc.,s* \\8. ~s (b (/) ~'8,.{-\\1.- Zr (/)r:n ff:f5 t I{JifJ \\tf*'HoS * \\5* ':tl..S. rtJ (/J

  • '":fBA'-

27 7:>t:CJl/5lJ,;Sti_ ):' L t.:J <.->, IPB~ '5'51 ~¢ \\<0"::\\(..S \\5 "":ft..S {j) tM3 S~\\ /PIP q:~ -=\\ (o.'5 lfJ '1~S (/) tt~~:t5ta*~~ \\ t'>~ G.S 15 "::/-(...<5 (j) (1>8 \\ ~"":\\-~ WJ ' \\ ~ 1-(:f.)' ~8 7G:5 t/J di~\\ cs*=il i/.0 -*. d3'=7~5...... tS ::f(o$ ....... (/; I>B' se,: ffli/J \\ 'D"7.\\lo~) te* ::TCo5 (/) ¢8' 5B131/J \\ 'a '1-Coc;) .. I 'B :;&15 (/.> l¢'3: ~{'3 \\ q?(J . \\ cYil.oS' t 8 l-t..S ¢ {/) '8 'f).,~ 1¢ \\ 'ei*G.S \\'i3.'=fU5 cp t/)'9 q)r/J: ¢1/] \\ CC.'1"'S. t e ~*c,s ¢ "From Preliminary Boring Layout Survey (/) ':/8,'23 ('/) ':14,$5 rp -:ts,ui& '(/; '*'t5, (1)5 ... d.>" ~ ** ~4.81-d.> 14;8b d> 'T$.(JJ/ (/) 't--4,*::r::e ((J '=t4.G,<6 .. c/J . -:p:s. (fl{e.

  • ¢9\\ 1/11 \\ (/;(/)

f.Jo"r7t.>M-. !Zl~ t <Vc p (/ r~....... Z7.f. 25 a:S 2S.. Z5 Z5 2:5 2.<5 zs.. 25 I:::.!.Jo 712Avr; . 4 ~ 1 (.,G. I <:1,8/ Form Approved for 'use on Clinch River SMR Project-J. A. Tice, Technical Lead

  • Form Rev 0- Reviewed by 'fi~ l~1~/}.

Clinch River Data Report Rev. 4 CRP-11'12.16 Page E.3-103 of 515

I

  • l '

I I I *. I i t ' I . I I t' i DOUBtS PACKER BOREHOLE PE!RMEABILITY TEST OAT A SHEET. AMEC ENVIRONMENTAL & INFRASTRUCTURE, INC. Page, 1 of 2 PROJECT NAME: £;linch River Sf\\18 Pro lee! JOB !'l0. 6468-13-1072 DATE: 1* 2¢* I?> Boring N~ M P~4~ l Borehole Olameter, tn.':-:3;.8

  • Total Boring Depth, Ft. 42/.b Gnd Elev, FL: 8/GS, 7*"

Casing Height above ground, F.t:..L..:t-5 Elev. Top of Casing, Ft. (Gnd Elev + Casing Height): 82.~ ~1-S.: Datum \\ TESTID:M?-4([)\\ ~ '?> 'Tesllenoth; t.5 (A) Depth to Water Table From Datum, Ft: ~~~ \\ (B) Surface Gage Height Above Da\\um, Ft. \\ St/) Test Section Depth (from Datum): From '16,'¥5 To Blo,?-5.JJ'<3t.- '!. (L) *.:5) .

  • Test Water Tem.p:-=:::::_
  • 13aro Pressure, psi: 14-, ~ (p Depth to CenterofTast Interval From Datum, Ft: 8~B0 (C)* Distance Water Table to Center ofT est Interval Ft 3-~.t;)~

Statlo water pressure at center= (G*62.4/1114) + Baro =. 4 0 MAXIMUM TEST PRESSURE,*Po "'([A+B*1] + C*().57) £Po"' 5 ~ ] Test Pressure sequence:= 1/3 Po, 2i3 Po, Po, 1/2 Po, Po Sequence ID: A B C D E Po Values: 1/3 Po~-\\~;. 213 Po=~; 1}2 Po"' ~ ":\\- Add A~propr1ateP~ value to statio pressure at centeroftestfnterval TEST NO.MP-401 c ~Sequence No. _:::E=--~ Planned Center Pi*essure: _ ___;::9:_9;:;:__ . Transducer ~eadings Before Packers lnHated: Top Transducer Readings After Packers lntlated: Top \\ 9,-,_~. ; Middle 4ts.~ \\ * ;. Bottom: \\ ~;~¢ ; Middle. A6,Cfl9 Bottom: MP*4(J) f ~3 SeQ LII:Et-1 C.E E.

  • rime; FL. OW METER READING, Gallons FLOW,gpm Minutes Initial Anal Difference (6')! 11!'13 : {/)(()

18_.)c...<5

  • ¢9ltP~*. *~</!

\\B"':'.\\C....5 \\ S ':f<..S ¢ .(/) ¢>'3; 0LI-\\ (/)((J \\~':\\t..:.S \\6 i-lo'5 ' rb. (/) (/)9: (jJ l't \\. ?> lfJ \\ !r~~..>s \\CO Cff..S (/) 0 (.t)9!<iJ'O\\(/)qJ . \\'B-::t~~ \\S 1-~S (tJ (/) ~')! lP~l1>(/) t <a ':J:C,S 'e 'q-t;,.% ¢ {/J (0~ \\ <tt.. 1, (/J(/) \\3':\\<...S. \\~ ':{CoS (!j (/) .t/>'7 ) /;t.,. t 1, (J tB *:::u..,?

  • \\9 ':1&4

)l'S' ~ l fJJ'~ "2.. C/>9 \\ <<:11\\ ({)((J \\ 8i-t.4 \\ R ""::!w4 0 (/) ¢";>! ¢1!3'1/J \\ 'B ":lt.A-

  • 'S '104

(/:, rb . (1:)~ l q;'8:.'>> iB'1*r.A \\8 1*(.,4 rj) (/.> <PCJ; tPa; 'W' . \\ '0'~(,4 l 'B ~{,J\\ (/; '</) ~ _.,,.. "(/> d>" ip~ : 6!i-}':"~'l(l *-. \\ s*-:\\ ~*1\\- \\'3 ::tL.,4 . 699 : l/J'? \\ -~~ I '8'7.\\Lq \\s ';J£.>t\\ (/> (f) 1ft-) I tP.t (/)¢ \\ t)'i£,,4- . \\\\j ':fLo4 f/J (/) $9) liJ): "31.4 I B "lt..,l\\: t B '>!-t.o4 ¢ ct> f.b9: t\\ ', It)\\() \\, ~1'tA l e 1-~L\\ (() (/) @':3\\ ~ \\ \\ '?_,() \\ 'C'1l>L\\. i8 "\\-l..L\\.. ¢ .. ¢

  • From Preliminary Boring Layout Survey Form Approved for Use on Clinch River SMR Project-J. A. ilce, Technical Lead Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-104 of 515 Middle Transducer Surface Gage Reading, psi Press(lre, psi 7f*4, '~Sl

~s S3~t..~ .'3 '5 '34*,~ "3S 84,'98 7>S 9~*28 44

  • 9 _.}, ':f i-L\\4

'34, lb2.. .44 r

  • ~":\\,( ~

4-:t 9":f.lll4 4'1- <;)*15,.42.... 41- '?8.6'7-4 '~ 9'?l(.ll9. 4~ -~. --*... ~ **. <)'?.' 15 A<;> <;':)'?'* 'Z4 49 9~, (/)~ 4';) '?'B,&I 4-lj '}'8,t..S 4'3* ' ":;)8,{,(, t.\\1!) REMARKS 'f.3et.lt)i-J 1/,->e.R.ItASd I:::'<., I,!)~ I """~(td. $ tf',,_ ' /i::t..J;;>l..J !A.J~A11!P PL.oc'-' q~ ~-z41-n /JJ<.t~rPAf# /.:'!'Lotv ~-. ---*~

I I I I i* I I DOUBLE. PACKER l30REHOLE PERMEABiliTY TE~T DATA SHEET, AMEC ENVIRONMENTAL & INFRASTRUCTURE, INC, Page 1 of2 PROJECT NAME: Clinch Rlver..§M.BJ:r.QL~ JOB ~0. 646B-13-.1Qll DATE: 1-Z¢* I~ Boring No ME>40!.

  • Borehole Oiameter,ln.:-3;.8
  • Total Boring Depth, Ft. 4'2..4 Gnd Etev,fl: 8&/3,1*

Elev. Top bf Casing, Ft. (Gnd Elev +Casing Height): 8:&~, 4-S, Datum Casing Height above g ro~nd, F.t:Q5 TEST ID:Mf*4ibl 'i!'.. '?> ' Test length: l* 5 Test Section Depth (from Datum): From ~e,3::;:) To !;>t:o, -z..:;;,.J:r.. ~.. -:. (L),'5) (A) Depth to Water Table From Datum, Ft: ~ *$ \\' (B) Surface Gage HelghtAbove Oa~um, Ft. \\.<5(/) (C)

  • Distance Water Table to Center of Test Interval 'Ft. ~

~ Test Water Tem.p:...::=__ *. Baro Pressure, psi: 14.,~4 Depth to Center ofT est Interval From Datum, Ft: 8~ *.~$ Static _water pressure at center= (C"62.4/144) + Baro "' 4 6 MAXIMUM TEST PRESSUJ3E,*Po, ([A+B*1] + C*0.57) [Po= 5$ 1 Test Pressure sequence:= 1/3 Po, 213Po, Po, 1/2 *Po, Po Sequence 10: A B c D E Po Values: 1/3 Po,;,~; . 2/3 Po=~: 1/2 Po= 'G'~ A~d A~propriate. P?valu e to static pressure at center oftestlnter.:al TEST NO.,\\.\\P-4¢1 ;:- *~sequence No. _..:;;t:::::;;;c-__ Planned CenterPressura: --~.:.;;.

  • .....;*") __

. Transducer Readings Before Pa~kers Inflated: T~p .\\ 9 ;':Xf\\:. ; Middle 4i:s.5;> \\ *. ;. Bottom: *_._.,4;'--;);:..'.:..;\\'-'\\,___ Transducer Readings After Packers Inflated: Top I~,i3¢ ; Middle. 48, %S Bottom:

44 i 4B MP*4<7l I i!:3

.. S..e._(;>L/IEM c.re IE: / CoJ..~7'D ) FLOW METER READING, Gallons Middle

Time, FLOW, gpm Transducer surface Gage REMARKS Minutes Rea'ctlng, psi

~ressure, psi Initial Final Difference ¢9 *, n... ~. <Oifi l 'B"::\\.t..4 \\~ ':\\-<.oil. (j) (/;' '?8, (, '\\* 4 ;) ¢~111.\\o¢1 \\ '3 -~~it 11(1, ".:\\(.,<'\\ ¢ .(/) C}g, 7)QJ. t\\*';) ¢'7>'.. \\~ \\ (j/J ts *~<.A. \\8 ':!(~4 c/J. " ¢ 9~. 'H 4~ G~oJo .0'.:1 l /3 I 4'> 13o77l91-'- 7/eA..us* 4'3,55 ¢9: 14*\\ "31)) 7'....;.... U.4<J:) 0 L9,frz... / ~ ~...... .~... ****-***....

  • ~....
  • From Preliminary Boring Layout Survey Form Approved for'use on Clinch River SMR Project-J, A. Tlce, Technical Lead Clinch River Data Report Rev. 4 CRP-1'112.16 Page E.3-105 of 515 Form Rev 0 - Reviewed by

-~

l I I j* I I I I I I. I I I I 1 I I I I : i I I I I i i . I i I I I ! DOUBLEPACiaRBOREHOLEPERMEAB~ffYTESTDATASHEET Page2 BORJNG:MP~.'40/ DATE: i- ;'f!/- /3 ~)~\\. '=/* Z(/J~/-:3. DATACOLLECTEDBY: 1: M:cGrl.-t..- /.JIM 0oP;A.-f!J;;;, ~S\\JRE: Sf?- /111 /.llY!s. psi l '-:fo" I "'L I t:~li? TIME,~ SURFACE GAGE CENTER TRANSDUCER minute PRESSURE psi PRESSURE psi j ----- /I / \\1 ('"),.__ -~.. / // '--/ *"' G~ I~') j;:\\ * ":;{--\\':~-\\~ {. EQUIPMENT USED Transducers: Mini Ttol Serial Numbers: '3 *~ "5 B -~ (,. ( c.,;.. 12-IS ) -::,\\"5'36\\ (t..-Z.¢*1~) 142./4"Z- .J414 Surface Pressure Gage: 1\\J\\ \\L./ -* *;,. ~"-W:. '-\\ ~ t--A.. \\4-C:S ( C.,' 1\\- \\'~) N1-<12-c.c::.u~-tw Mv...t-: \\) ~A. \\t.J- <:t .( G:.- I ( -/3) Baromet.dc Probe: I Z I 31 5 * ( (.,- I 2 ~ 13 ) Flow Metex-:

  • Stop Watch: _L_~_8;;::;_;;:<...;;.__ _

_..(_;;;;t...o;;... ~__,\\"""'¢~..: \\,__}.._J..___ Date of Calibration: lr--~ I"' t:>\\~G; i.,J 'T H (; '5 IS

  • .Calibration due: '?os\\ T E7 s T IIV CA-t J=f LlE :S ~

)vJ,p~ 4¢1 Z3 (13) Z¢13 -{)1 ~ 'GIJ : <>> 9 ' z (P A* t.\\- \\1.../ 5 L. MP~4<b\\ c.*~ (B) z ¢r 3 -¢1-Zr!J () 9 I 'Z((JAL\\- EXC.E't... tv\\ p~ 401 2: -~ (T) Z(-113-tP't ~ Z(!J <Z>9, \\~, \\ L. w ;S'L. M p-L\\ctl ~ *~ (T)

2. (/)I "3 *-{flt - 'L<fl

<:bc;J,\\t,,-\\'2.._ G:>CCGL Jv1P-4cPI z~ (tv\\.)

2. ~/3 -OFf - Z<J

¢~,\\l-,~'5 l.f.fSL f/\\ p 'c L~(J) I ~ - ~ (M) 2~1 3 -(/)1- - 2(~ (/,1~,\\... 1,'35 e:x:c.e '- MP-4~1. 2 '3 (L) z.,.r;.,; 3 - mr- - 2 (/) <t\\';7>, \\':l,Qh7 LA--15'- . MP-4CJ)f 'l.3 (.L ) 2.(/) I 3 - (/Ft ~ 2 0 . Cb'7), lt;),(tl~ E.XC.cifL ~ L'7'28 (."6 -I~ 13') Form Approved for Use on Clinch River SMR Project-J. A. TJce; Technical Lead Form Rev 0- Reviewed by_C.,fl-__ 1_-z,/(~//J Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-106 of 515

Packer Test Worksheet Clinch River SMR Project AMEC Project No. 6468131072 18-Surtace Gage Height (ft) IMax Test Pressure (Po) (ps1) 1/3 Po (psi) 2/3 Po (psi) 1/2 Po (psi) Sequence A 1/3 Sequence B 2/3 Sequence C 1.0 SequenceD 1/2 Sequence E 1.0

  • Pipe Check (Estimate Only for Field Guidance))

Length of Packer Assembly Average Length of Pipe Section Length of pipe to TOG !Number of Pipe Sections ength ot stickup above 1 ur..; trt) 233.45 116 144 48 96 72 center 1 est Pressures (psi) 164 212 260 188 260 13.29 21'.12 232.96 11.03 20.48 Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-107 of 515 1nt1at1on Pressure (psi) 214 262 310 238 310 Test Date Prepared By Checked By

Clinch River SMR Project Double Packer Borehole Permeability* Test Data Sheet AMEC Environment & Infrastructure, Inc. AMEC Project# 6468-13-1072 Boring: MP-401 Zone: Z4 237.0 feet to 244.5 feet below ground surface Transducer Location: Middle Sequence A 1/3 Po) Sequence B 2/3 Po Elapsed Time Flow Rate Elapsed Time Time (minutes) Pressure (psi} (gpm} Time (minutes) 15:18:00 0.0 no reading 15:29:30 0.0 15:18:30 0.5 no readlnQ 15:30:00 0.5 15:19:00 1.0 113.69 0 15:30:30 1.0 15:19:30 1.5 113.62 0 15:31:00 1.5 15:20:00 2.0 113.49 0 15:31:30 2.0 15:20:30 2.5 123.38 0 15:32:00 . 2.5 15:21:00 3.0 124.18 0 15:32:30 3.0 15:21 :30 3.5 135.08 0 15:33:00 3.5 15:22:00 4.0 141.14 4 15:33:30 4.0 15:22:30 4.5 157.25 2 15:34:00 4.5 15:23:00 5.0 162.10 0 15:34:30 5.0 15:23;30 5.5 165.15 0 15:35:00 5.5 15:24:00 6.0 165.10 0 15:35:30 6.0 15:24:30 6.5 165.25 0 15:36:0b 6.5 -15:25:00 -~*-- --."f.,Q.. -- - 165.33 0..* 15:36:30 - ""'7.0 15:25:30 7.5 165.69 0 15:37:00 7.5 15:26;00 8.0 165.28 0 15:37:30 8.0 15:26:30 8.5 ---1 65:35 0 -15~38:00 8,5 15:38:30 9.0 15:39:00 9.5 15:39:30 10.0 15:40:00 10.5 15:40:30 11.0 15:41:00 11.5 15:41:30 12.0 15.'42:00 12.5 15:42:30 13.0 15:43:00 13.5 15:43:30 14.0 15:44:00 14.5 15:44:30 15.0 15:45:00 15.5 SequenceD (1/2 Po) SeQuence E (Po) Elapsed Time Flow Rate Elapsed Time Time (minutes) Pressure (psi) (gpm) Time (minutes) 15:59:00 0.0 260.35 16:10:30 0.0 15:59:30 0.5 245.77 4 16:11:00 0.5 16:00:00 1.0 248.40 2 16:11:30 1.0 16:00:30 1.5 249.17 2 16;12:00 1.5 16:01:00 2.0 242.61 2 16:12:30 2.0 16:01:30 2.5 244.22 2 16:13:00 2.5 16:02:00 3.0 212.94 2 16:13:30 3.0 16:02:30 3.5 213.16 0 16:14:00 3.5 16:03:00 4.0 203.01 2 16:14:30 4.0 16;03:30' 4.5 201.38 0 16:15:00 4.5 16:04:00 5.0 201.89 2 16:15:30 5.0 16:04:30 5.5 190.86 0 16:16:00 5.5 16:05:00 6.0 190.60 2 16:16:30 6.0 "16:05:30 6.5 190.42 0 16:17:00 6.5 16:06:00 7.0 190.90 2 16:17:30 7.0 16:06:30 7.5 190.77 0 16:18:00 7.5 16:07:00 " 8.0 190.45 2 16:18:30 8.0 16:07:30 8.5 190.73 0 16:19:00 8.5 16:19:30 9.0 16:20:00 9.5 16:20:30 10.0 16:21:00 10.5 16:21:30 11.0 16:22:00 11.5 16:22:30 12.0 16:23:00 12.5 16:23:30 13.0 16:24:00 13.5 16:24:30 14.0 16:25:00 14.5 16:25:30 15.0 16:26:00 15.5 16:26:30 16.0 Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-108 of 515 Pressure (psi} 165.83 175.33 181.52 189.92 190.74 196.04 201.33 201.47 212.27 212.79 213.01 214.14 208.50 207.98 206.7.!1 209.74 209.50 2-1-1.2-1 211.12 210.95 211.52 211.18 211.10 210.02 211.22 214.78 215.02 214.95 214.54 214.73 214.97 214.98 Pressure (psi) 190.26 190.20 200.20 200.74 209.20 212.05 213.82 222.85 232.39 231.41 232.43 241.16 248.87 258.93 251.60 251.13 253.88 253.22 252.88 257.43 256.30 255.07 255.75 254.95 262.45 261.09 260.30 259.91 259.39 258.55 258.41 257.46 257.27 Flow Rate (gpm) 2 2 0 2 2 0 2 2 2 a 2 2 0 Prepared by: <!. 'PT"" Checked by: /)t'j_ Sequence C Po Elapsed Time Time (minutes) 15:47:30 0.0 15:48:00 0.5 15:48:30 1.0 15:49:00 1.5 15:49:30 2.0 1'5:50:00 2.5 15:50:30 3.0 15:51:00 3.5 15:51:30 4.0 15:52:.00 4.5 15:52:30 5.0 15:53:00 5.5 15:53:30 6.0 15:54:00 6.5 Date: Date: 4-8,_;t/- 4- -j,. 14-Flow Rate Pressure (psi) (gpm) 214.07 214.11 2 235.95 2 236.60 2 235.88 2 252.39 2 251.18 2 254.99 4 256.63 2 262.95 4 265.78 2 262.84 4 262.45 2 262.80 2 -*--- _2 *.15:5A:3.0 --.... 7.0 - -* 292.04 4 _ 0 15:55:00 7.5 261.03 2 2 15:55:30 8.0 261.46 4 2 1{5~6 :00 8,§ 261T76 2 0 4 0 2 0 2 2 2 0 0 2 a* 2 2 Flow Rate (gpni) 0 2 0 2 2 2 0 4 2 4 2 2 4 2 2 4 2 2 2 4 4 6 4 2 0 4 4 4 4 6 4 2

4,5 " 4 12.5 ~


~----*------

~ 2 "........,.... ~...... ~...... -................. ~..... ~.......................... ~...............,.... ~.............. ~~;........................................... ~......... !............................ 0.5 *~------------------~------------1------------~------------------------------------- ,,,,,,,,,,,.,,.,...,......................,~ ..... _~............ t.. *~""'"'"""~"'"~---*-t'"'"~ o.,o 1,0 2,0 3,0 ~1/'3Po 4.* 0 s*.o Elapsed Time (minutes) 6.0 7.0 8,0 9,0 Notest Test pressure aplHoxlrnatrey 1/3 of tl1e maxtrnum test pressur~*{llo), Flow rate ly~h;ally rnaasurel.l over a 30 secohd hHetval. L----~-------------------*------------- 4,............................ -.......................................................................... -.......... IY.I.. P.:~. Q!_..?... 9D.§!.L.I................................... _............. _..........................

U

.....,......, **** ~............... -...................... _,,..,.............. ;................................................. ~.... + .............................................................................................................................................................................................. l'"""'"'""""""'"""'-*'""'............................................................... - 3*,5 **...................................................................................................................................................................................................................... -..............................................................................................,,,_,,.,,,.,,,_,.,,,,._,................................ _ 3-................................................................................................................................................................................................................................................................,..,_.............................................................................................................................................. 1-2,5.. _,,...... -................................................,_,,.,...................................................................,............................................................................,_.............................................................................................,_,.,......................................................................... ~ ~ 2 lo.. ~.......,............. ""'"~'HO;H/h "'"" """"'"""'" MUUOH~""""' HUHH'"""""~ *- '"""'"".... "" '"'"""''" '"'"" ""'""'" """",,,....,.... ;...,,,:................ H~~ ..........,..... _,,.,,,,.,,, "'""'"''' *~**"*ii*HO"""MI""'""'""'""""'""""'""" 1.5................... _...................,.........................................,_................................................................................................. _.......................................................... _.......................................................................................................................... o.s. --*-


~-------*--- --*--

0................... ,,,,,,~.\\""""""' ' '""''''""I"'"'""'"'"" o.o 4.0 6.0 --2/3 Po 8.0 10.0 12.0 14.0 18,0 Elapsed Time (minutes) Noles: Test pressure a~pl'o:.tltnatnly 2}3 of tllo t'Jlll)<ll'num test pressure (Po), FloW

.,;.ra;..;.t*..oiYoc;Pic<'llly m~nsurad ovar a 30 second It!!_.~~~--*-~~~--~-~

Prepared by/Date: tHL \\ /ll/?; Checked by/Date: --j!1:J '/iv/. ~ Clinch River Data Report Rev. ~RP-1112.16 Page E.3-109 of 515

MP*401 Zone 4 4,5............................................................................................................................. ;..................................................................................................................................................................................................................... -............................. 4................... "'~""'""""*'"""'"""""'~"""'"""*""ri':'"""""""R"~'0000'*' 1.5.......................................................................................................................... "........................................................................................... -................................................................................ 1............................................................................................................................................................................................................................................................................................................................. 0,5 0...........................................,........ '~"\\""" uowo~"R""'"""',.'"")'"'"'""'"""" ~"""f'~"'"""'~""""""""'\\"""""""'"'""""~'~~j"~;o,,,,,,,,,,,,, ~,,w,.,,.,

    • ~'\\""~'"'"""" ""'"-'"'"4""-'"""""""'"""1 o.o 1.0 z.o s.o 4.0 5.0 Elapsed Time (minutes}

6.0 7,0

8.0 Notes

Test pr~ssure approximately at the maXImum hut prtt~sUtQ*!Pol, rtow rate typically mea5ured over a 3() second lntorv111. MP-401 Zone 4 4.5 -.-----------------------*- 3,5. 9,0 3 "...........................,.................................................,. __.... __...... _................................ __,, ___................. - .j2.S +-----~,-*--~----------------------------------~-------------------------~ ~ i 1.5 '.................. -......,............. 1...................... """'"'""'""'""'""'"""""'""""' o.s -............... __..................................... _.. ___..,,........... 0" 0,0 1.0 z.o 3,0

  • ----r---**

-~-.-----*----,--,--....... ---.--->------, 4.0 5,0 6,0 7.0 8,0 9,0 Elapsod Tim a (mlnutos) --1/2 Po Noto~~ Test pressurn approximately 1/i. of the tnA:<llllUtn t"ost pros'suro (Po), ...,........,..."~"-***.. ~*-----~.. -.......... -......... _.,..,, __ ~--*----*..... --H-..... ~*--..... - ............. ~.. ----.. -~.~Fiow.~~~P..~~~~.~!~.~;~:.. ?..::~~d_..l.~latval. --.. --~.. --... "~~...... Prepared by/Date: Checked by/Date: ~1-J c 1/;J/'-l[___., /Jet.) ~;..fLL 1/ Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-110 of 515

MP~401 Zone 4 7............................................................................................................................................................ _,.. _............................................................................................................... -........................................................................................ --Po Prepared by/Date: (!t\\J: I /t~~ Checked by/Date: -j;'6.J. 1 /;</- Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-111 of515 Elapsed Time (minutes) Notes1 Ta5t prassura approximately at the maximum test 11ressurc (Pol. flow rate' tVP!caUy llleasurad ovor a 30 second l11terval.

I ' I l I DOUBLE. PACKER BOREHOLE PERMEABILIIY TEST DATA SHEET AMEC ENVIRONMENTAL & INFRASTRUCTURE, INC. Page 1 of 2 PROJECT NAME: Clinch River SMR Profect JOB NO, 64§8-13-1072 DATE: 1 * " l'o loring NoMP*401 Borehole Diameter, ln.:-3,8 Total Boring Depth, Ft. 42-4<.t.. '2/S ~) Depth to Wa!l:lr Table From Datum, Ft: <"::>.¢<;,; {~ Surface Gage Height Above Da~um, Ft.~

  • Test Water Tern'p: *-q. S "'P. Sara Pressure, psi: ( 4, *~ 1-li.ltt~ *. L..

'519"' 1;:: Depth to Center ofT est lnte!Val From Datum, Ft:. :2AZ-.* Sdl (~ Distance WaterTabie to Center ofT est Interval Ft. ~":)'~.4<0 Static water pressure at center= (C'62.4/144) + Baro = 1.\\ (..., ~\\IXJMUM TEST PRESSURE, Po= ([A+B*1] + c*o.57) {Po"' IM 1 lest Pressure sequence~ 1/3 Po, i/3 Po, Po, 112 Po, Po Sequence ID: A 8 C D E POVaiues; 1/3 Po::.~; 2/3 Po=~; 1/2 PO"'

1 "Z.

Add Appropriate Po ~alue to static pressure at center of test (nterval TEST NO.Mf'"4@ ;:.\\-Sequence No. 1::,., Planned.Center Pressure: I f..o 4.

  • Trmsducer ~eadlngs Before Packers Inflated: Top 2/1, (p ;>. ; *Middle Traosducer Readings After Packers Inflated: Top f.(r~ '=f'l(;> : Middle M.P~4(J)I

~4-5Et4Jt.IIEN Cfi!f A F.LOW METER READING, Gallons II *z. 5$.; Bottom: 114:, ':'f(o : Bottom: Middle 1/(.,. I 3G, II '3,.'571-

Time, FLOW,gpm Transducer

. Surface Gage REMARKS Pressure, psi Minutes Initial Final Difference \\ ~\\ \\8\\ !/)(/) t 8 G:,~=>1- ~\\?\\\\'Ol-sri \\'5(.po~ \\?\\'\\<;;~~ lR<P 0 (o '1:. ~ \\6 <D1>~~ ¢ \\.:';)'\\ ~.~*,w \\8to;.1- \\'0 t.-.~'1 dJ \\S.l ZI.P: fi{J \\8 ~~>* \\<c ~~+ (~ \\61Z<<i: 3¢ ttl 4>~-:t Vi$ &,. '5'1** .(/)

'.eo '* z \\ ~ rtJ

'b~ \\8 (c.~"t (/J I':'> *z. \\ '. o¢ I 'Olo'?:i::t- ~B

  • (o'?>":/-

(/} lS \\ ?.Z!Wfl \\ '5\\a~'l- ~s Co~':> z f*.<;)'t 2.Z( '311 \\8 (,~~ \\.B w4(tl \\ I?\\ 2>~~ rtJ(fl \\8 G40 t9 (p4¢ q 1'5 \\ Zji 3ti . \\6 ~i~~ H3* irA(/) .. (/) ' '..... c..J.,;;¢q '15'~4-rt> ..... 18 CPl.\\CLl (/J I';) i ~~ \\ ~ 4ll> l8 ~1/) (/) \\'? \\ Z "5 ~ t/H.P \\ 8U\\Iil . t 0 l..sA. {/> c(J Po' z "5t ";,1/} \\BC.,L\\<1} \\8 ~40 r:(J t-r(J I? l 2<..:.. 'J/JIJ I ~CGA(/) \\B l.:.L.\\(8 r--- IS~ Zf.e \\ ~tl \\ 6&>1.>.</).. \\8 <dJ\\1/> C)

  • From Preliminary Boring Layout Survey Reading, psi

(/) '{,3Ef(iltl'l (/) . 1/'3,6:,'3) (lJ' P.us6ttN> /1-Jt.l$41) I! (/) 1/S,I.J:. 't-C!>. (/) 11'5 Lj.' t c/) r.e'3.~3 /P~ff/'AP<f C/J 1 z4. l8

  • r (tJ Z(//

,)'~5.~8 I A>t.d.dtlS if 4 l4\\ 1\\L\\. 4-<tl

z.

171'::?, ?-.-S 4(/) /tJc.te<$4$/.£ (/) llt>"Z,IW 48 Cb /ii>S,J5. 48 c!J .. **-... l(.o'O;t0 d) (/) dJ (/) tP - 1'51 z:rrz~ t5'!28(t1¢l 45 \\ ~s *z.s 48 tlJ>"5,i!t'3 L.\\8 \\ I.P?,<a., 4S

  • l ~l5, '28 48

. \\ toS,~') 4'B Gr:..D ""ifJ<>'F'?'(f)M.. 7/u.o.Jl .<: II{, 7S

  • r_,""

/'iieAA..>S' ..:. 2;r., r.t 3 P'LOW /-"'L (.)~ I=!' I..".....:} P't.o"'-" Forrn APProved for'use on.Clinch River SMR Project -J. A. Tlce, Technical lead Clinch Riv~r Data Report Rev. 4 CRP-1112.16 Page E.3-112 of 515 Form Rev 0- Reviewed by----- DOUBLE-PACKER BOREHOLE PERMEABILITY TEST OAT A SHEE!T. AMEC ENVIRONMENTAL & INFRASTRUCTURE, INC. . Page 1 of 2 PROJECT NAME: Clinch River SMR Pro lee! JOB NO. 6468-'13*1rill. PATE: 1* "I?> Boring No.MP~4{PI Borehole Olameter, ln.: -3, 8 Total Borfng Depth, Ft. 4'6¢ Gnd Elev, Ft: ~-

  • Casing Height above ground, Ft:.l....S£'

Elev *. Top of-Casing, Ft. (Gnd Elev +Casing Helgnt): 8Z~, 4S. Datum TEST ID:Mf*4/lH l!A-Tesllength: f* 5 Test Section Depth (from Datum): From 6/ "38,3§ To 2..4(o,f_,S c::,. :[-CJrDJ":! 4 :)":1. (A) Depth to Water Table From Datum, Ft: .1,<4S Test Water Temp: __ u_,.-, Bare Pressure, psi: (, '!J T, IJJ&.I.-1.- '3 S.. r= Depth to Cent~::rofTest lnteNal From Datum, Ft: ~4? .... c;5di (B) Surface Gage Height Above Datum, f:t.lQ.@ (C) Distance Water Table to Center ofT est lnteNal Ft. ~3'1,4-<0 Static water pressure at center= (C*62.4/144) + Baro== I \\ <.... MAXIMUM TEST PRESSURE, Po"' ([A+B-*'1] + C*O.S7) (Po"' {44. J Test Pressure sequence::= 1/3 Po, 2)3 Po, Po, 1/2 Po, Po Sequence ID; A B C D E Po Values: 1/3 Po.;,..+/-a_; 2/3 Po=~

1/2 Po==

'1- "Z. Add Appropriate P~ value to statio pressure at center-of test interval TES'r NO.Mf>-4@1 c A-Sequence No. 1::3 Planned Center Pressure: 'A\\ '6,; Transducer Readlngs Before Packers Inflated: T~p Z;t.4> ::2 ; Middle If Z

  • SS :. Bottom:

I /G, 34 /13, Sl~

  • Tran~ducer Readings After Packers Inflated: Top

~ ~' "qc,t.) ~ Middle J 14 * 'fCo : Bottom: MP*4r.7lL \\

z. t;.

_Se_()L/IE f..! c.re B..

  • Tlme, FLOW METER RE:A:DING, Gallons FLOW,gpm Minutes Initial Flnal Difference

\\0::.\\ "Z.-'7\\ 7JI./1 l'8<DL\\(f) 1\\....._.._ \\ ';) \\ ? tp_' (/Jff> \\ a£c.Am 18 (.q4\\ \\ "Z. \\ ";)_\\_ :3 qJ : *~ (£1 \\SL:A-\\ \\8 <o41.. 'Z IS i '\\ \\\\ f,!)IJl lrtl>l.oL\\-'1-t~ <..4'2-(il {/) V':;i ', ;, \\ \\ '"'b(IJ \\ 'B~L\\ (... U5 G.4~ t 'Z 10:0~~'2..\\~tl t B L>L\\~ \\'B C..4-l.\\ . I 'Z., I 'S( :.:n.*, 3!9 \\8~4-4 ' . \\B L.4l\\ (/; cp . l '5 ( 1>~ \\ (1)0) \\Bl.ol\\1\\ \\18 *t.AS \\ "l. IS~ 'b~'.~IP l&.,4'5 va t'.dlt> \\ z 1.. s r~4 ~ ¢tP ., \\ Bt.4<.. ~8 {...41:. \\ 2 \\ '5 \\ 'il\\ ', :w \\&bl\\i* t8 £o4::-r (j {./J \\ s '. *os \\ t\\1(17 _, ~~4'J~ \\B. ~4B \\ "Z. \\5l -~s-~ 3 {;,... -,~- LA5... "I B Lol~ "J ........... \\ -.. ""2... \\St 5/.e.', ¢1.1 \\ 'OitA'1 1 e *G>4.,

  • (/)

C/) IC;?\\ ~(;.t3(0 -- ~m - ~B ~~t/> \\ -z.. . I ?,.. ?> *:t \\ 0!P \\ 'QlD~fP \\ & <s:-S tfi (/) (1_() ) l"-?} '3~j"3IP \\_'B(.. t:;;C/J ~8 Co"S { I 2 IS\\~'3t@\\D I 5<,'5(* l8. C.0'5"Z.. \\ "2.-* ~*From Preliminary Boring Layout Sur.iey Form Approved for' use on Clinch River SMR Project-J. A. Tice, Technical Lead Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-113 of 515 Middle Transducer Surface Gage REMARKS_ Reading, psi Pressure, psi /&:,5,8"3 48 "{JI]j(JIIN P"<..o ~ow /,_,.(.,Uiil$1('

  • I '::fS, 3*5

.(t,.,S 18l.S'2... ~s I >Jt!..IM-iJ.$({' /ZL.C;i....:J \\ 8'? 92.. 7-S I e:;,f/), ~A- "::fS I ~c..tecasl(.C(....-1-J ~~~ \\-~l.,,tP4 - 85 2 (/)11'1. 8S I 1-JO!tff'ASI.f" ;:.*t_.al<./ Z¢(.LVf-85 2../ z.. z.::r 9$ 212*:t'3 95 213 (/)/ ':?'5 ZJ4,14 9S

  • btf."C.~~Pl.scr Pt...6~J

...... ~ -~ .... *** ~......, ~fl,e.s~ I f.J(._(Uf-A$11 f.;'LDW 2@':t,CJ8 <.?'3

<. @lJ> I i*Ll 9-4

'Zi/J'7~ lj4 1/Jt..~&;A-dli: r-tow ' ZtP9,"5f(/ '34 ~11.2..1 9'5 Form Rev 0- Reviewed by ____ . I I

  • I i

I DOUBLE PACKER BOREHOLE PSRMEABILITY TE:ST DATA SHEET, AMEC ENVIRONMuNTAL & INFRASTRUCTURE, INC. Page 1 of 2 I PROJECT NAME: Clinch River SMR Proiect JOB f'IO. 6468-13-1072 DATE: 1*

  • 1?:.*

Boring NoM p~ 401 Borehole Olameter, ln.: *3, 8 Total Borlng Dopth, Ft. 4f..(b Gnd Elev, Ft: ~-

  • Casing Height above gto~nd, Ft:..:L.::f5

. Elev.' Top of Casing, Ft. (Gnd Elev + Casing Haight):. 8'&~, '\\.'3= Datum ~ ~o,'f'; 11.\\t'\\k'J TESIID: Mf-4!DI '2:.,... Test l~ngth: =f.S TestSectionDepth(fromDatum): From. 2.?>8,3'5 To 2A~ 1 2.'5 (A) Depth to Water Table From Datum, Ft: 51<4$.* * (B) Surface Gage Height Above Datum, Ft. _h5_.@ Test Water Temp: *-q. '8 "'P. Baro Pressure, psi; r 4 I;, 1: IJJc:.t..'-

  • '5 ':'.)" r::

Depth to CenterofTesllnterval From Datum, Ft: 'i!..4~.S(/) (C) Distance Water Table to Center ofTest Interval Ft. ;2.3~.4'5 StatlcWat~r pressure at center:o:.(C62.4/144} + ~aro =* II <..t. MAXIMUM Ti::ST PRESSURE, Po"' ((A+B*1J.+ c*o.S7) [Po"' f4A 1 Test Pressure sequence;= 1/3 Po, 2/3 Po, Po, 1/2 Po, Po Sequence !D: A B C 0 f: Po Values; 1/3 Po= _1:.8_; ~/3 Po=~; 1/2 Po" ~ 'Z Add Appropriate Po value to static pressure at center of test interval t.l t,'S'-' 11.\\11\\l'l TEST NO.Mf>-4¢1 c 1 Sequence No. 13 Planned Center Pressure:. p f ?._, Transducer Readings Before Packers Inflated: Top 2'/'1, <9 :2. ; Middle I t'Z

  • SS :' B~ttom:

1/1_,., ~(p '13, s*t-Transducer Readings After Packers ln~ated: Top Z'i\\ *:1-f/): Middle { 14, 7-~ : Bottom: MP*4<ll I i?:4 ~,,~? ) '6 (,

1.
  • N'SE(>)i/GM C~

CoM?"' T.:::> FLOW METER READING, Gallons Middle 'Time, FLOW, gpm Trarisducet Surface Gage Minutes

  • Reading, psf Pressure, psi Initial Flnal Difference

<.6 t ~Y5.P/._~\\{l \\ '{) (.,.'Q-z. I 8 (.;CS "2.* ¢ 21 u 'Z. 9S l~i ~c:;} \\ 1)1) \\ ~(..,t"QZ... \\B lt>CS~ Z,.* 4

  • 21(~, 9-S

.-;,s \\'5 ~ ~ ~ '..'~IP \\1)6<;;)'\\ \\'6 L,~l\\ (/) (j). iQl\\,~2 CJS REMARKS -*-~ \\'51 A,cP~ (/>(j \\. SGo':iL\\ ~8 l..tSS l z 1St 4Cbt6<fl \\ ~(g~)<o 18 <i--SS Cp c/>. 1'5 ~: 4\\ ~ IPlP \\8 ~~"6 t8 &,S<.t, .1 z.. ICi>', A\\~~ t'OG::~. [8 &~*q... \\

2.

IS'. 41-!,CN \\ B <o51*. !8. C..'58 I -z. IS\\ A-'2.\\ ~(j) 't)6'5S It\\ 0'5~ (/> rP lu\\.1.\\-~~<tl"' t '3 Ct>~?> reo t,S5 d

  • (/>

\\'Si.4;,~'3_~ \\'()(,:,55 t'i3 6.'5 ';) t z_ 1'5 ~ L\\t\\~cPdl'

  • ~Bi.!>S":>

lB. Cos 'J c~ cp A1.(~*1i ..... -:.. I

  • z.*

i;) l \\ s 1£,'5") 18 &:,t.I/J IC5\\ 4"i>(~(l) If>~&,(# 15* G..t.l I '2..- 15:45 *45 /'5!41A * - ~~

  • From Preliminary Boring Layout Survey Form Approved for'use on.Clinch River SMR Project -J, A. lice, Tech.nlcal. Lead Clinch River Data Report Rev. 4 CRP-'1112.1.6 Page E.3-114 of 515 21[,16 S)S 2./i,-/(fl

'3<5 '2.11/)_//)2.... ~"5 lJJc.tl.(i'tJ.:J iJ' p(...o.)V 2-'~/J.t?..

?,
;2.

':)'8 / Z/4?B

JfJ

/?.,/~,,402.. ';Ja* 214.~'5 ':78 ~~.~ 7-1'"13 ' " ~ . 21LI.S4 ~* '3 "4a'3_. '3":> ... "'2/4.~1 9":) 2.14.'~*)8 9~ euo 'Bt>7'?.3,..... /£A.<JS tfl,()ft} fol~ .'TkAA.J S. 21-,'::f(p Form Rev o-Reviewed by_S1L_J __,_z.-_,_(IJ/tr I I I I I l I I DOUBLE{ PACKER BOREHOLE PERMEABILITY TEST DA1'A SHEE.T AMEC ENVIRONMENTAL & INFRASTRUCTURE, INC. Page 1 of 2 PROJECT NAME.: Clinch Blver SMR E'folec\\ JOB.NO. §468-13-1072 Boring N~MP~401 1;3orehole Diameter, lo.: *3.8 Total Boring Depth, Ft. 4'0<4 God l;lev,Fl: 8R>'5, 1* *

  • Casing Height above ground, Ft:J....].5 Elav. Top of Casing, Ft. (God Elfllv + Casing Height): 82.~, 4s. Datum

~~ 1"~1!1111 TESTID:Mf-l\\1{[1 >t"' Testlength:. "f.5 ,Test Section Depth(frorilDaturn): From 2-o'B,;tS To c4Ca.'2.'5 (A) Depth to Water Table prom Datum,.Ft: <:?,cps Test Water Tem.p:. *~*ffop Sara Pressure, psi;...L4.Lll 1JJ lll..l- '5 9"' 1= (B) Surface Gage Heigh! Above Datum, Ft. t rS<t:J-Depth to Center ofT est Interval From Datum, Ft: ~0!\\?.,.Sc?l (C) Distance Water Table to Center of Test Interval Ft. ~ :> ~.4-<0 Static water pressure at center,. (C62.4/144) + Baro = I \\ <.... MAXIMUM TEST PRESSURE, Po'"' ([A+B*tJ + c*0,57) [P.o"' /4A 1 Test Pressure 'sequence ;z 1/3 Po, 213 Po, Po, 1/2 Po, Po Sequence 10: A 8 C D E Po Values: 1/3 Po,;, 4-8 ; 2/3 Po<=~; 1/2 Po"' ':t "Z.. Add Appropriate P~ value to statio pressure at center ofteat !n.terval ~111' TEST NO.MP,4¢!_Ef Sequence No. C Planned Center Pressure: pt'D<i) Transducer ~eadlngs Before Packers Inflated: Top T ransd ucar Readings Alter Packers I nil a ted: Top 167, <a '3. ; Middle R.J 1 * 'f(IJ ; Middle 1 t c:, s% ; Bottom: I/G..3Ga /13,5]- I /4,. ":f(p : Bottom: M.P*L/.(J) I

a:

~~ v\\1 '6 \\ 1'., 11 c '.Sc

    '.;) I J-:.~~'>'J <f' ;::;_" Vl 1'5~ ASti/Jr,f> \\tl,~c.,4 IS /.:.(.,'$ I z.. I ""6:. 4-5 \\'31,0 ~
    • 8~<o'5 1'13 <.,M.,
    \\.
    z.
    \\ 'i> ~ _4 ':;) ' 0W l S.to<o~ \\8 f..r:,f.r.,"!'f l 2-1<5~ At:l~3¢ I 'S~L.'T-. l'B L..&8 \\ "2...- I "5 I Sdl ¢<JJ \\f:>~(., B IR &b9 .I ~ I<;Q 1 '5(/)131) rstuc..:l I 8 <..;'f(!) \\ 'Z-1'5) '5\\ l (/>{~ Hses.'=t<tJ I B' (,'~ '- 7-4 I'?>~ '5 \\\\;,tO \\~lo 'i-7;..... 18 lP1:~ \\ -z.. IS~ '52~ UJ41 \\ '5\\lo13 H3 4'1S
    • -z, 4
    \\ <";) '. tS 1..1 31ft t 8\\C.>1'5 18 {.,;:.rt.. \\
    z.,
    1"5~ CO')\\ wcJ' \\~6'\\1... 1\\3 (oi8
    • 7,_
    4.
    • - * *ce;eo~s
    ......... \\ .... *-z. i"s: s1;*3a l8 (t,':q-':J 1 "54. Stn \\.%! \\'Ow-=7<:> IB lP8t.b \\ "l, IS~ CS'~\\ 31P \\ 00(..,~() 1 e <..8'2- "Z, A-IS~ CjSt 1M \\ '3 L>8'l.- 18 ~8'3 \\
    • z.
    4 \\<5 ~ '0'3\\'J>IP \\ '&~l:Y~ t8 G-.~8S '2-- \\~ \\ ~u~cm \\8 toB'S t 8 (;,~(., \\ z..
    • From Preliminary Bortng Layout Survey Fom1 Approved for'Use on Clinch River SMR Project-J. A, Tice, Technical Lead
    • Clinch River Data Report Rev. 4 CRP-'1112.16 Page E.3-115 of 515 214, II
    .:J'? 23S,35 /'2(/) 2 30,,(of; IZ(f) /pt/W,tf$1£ ;!':'LOW Z?.IS,88 J 2 (I} /,UL/l.fi-ASu ~LoW 2.S2,3~ 1'6<:5 ~S\\1\\8 l~S I Nt./2..~As cf_ FLow /
    p';)ll, '7':1 l 4 (/)
    2 '5G:.. c.,:~ 14(/)* I ;:.uc~t rsM.s 11 Pt.:.. ow 2£'..2,'2_5 14'$ Zt.'5, 1B 14S 2(....Z,84. {L\\'S "'2,(.~.45 ~ - - ~-. 1'4-CS: -~*..... Z.{r;Z.,8C# t 4 "5 z.G,:z,&J4 !4%' ?--G. I,.?/3 t4S ~~I4G. \\l\\~ Z4l Vq*L \\tiS &i.to '/3CJr7'<>io"'- VkNJs "" * 't :S, 9 5 Tt">P r~.4.tl$ * ~ z9, 7 ") .an1*. r11(11/P
    • Form Rev 0 - Reviewed by--=-"'-
    J J v __ _ DOUBLE PACKER BOREHOl-Ji PERMEABILITY TEST DATA SHEET. AMEC ENVIRONMSNTAL & INFRASTRUCTURE, INC. Pag~ 1 of2 PROJEC~r NAME: Clinch RlyerSMR Projg~f JOB NO. !lli18-13*1072 DATE: J *
    • I?>
    Boring No MP-401 Borehole Diameter, ln.:}* 8 Total Bortng Depth, Ft. 40¢ Gnd Elev, Fl: 82/5.7
    • Casing. Height above ground, Ft:~5 Elev. Top of Casing, Ft. (Gnd Elev +Casing Height): 8'Z,'~, -:\\;S:. Datum
    • ** $1 r1-r1/11 TEST ID: Mf~41DL..'S.i Test ength:
    z. 5 Test Section Depth (from Datum)
    From 2.'08,3§ To. g4~.. 2.'5 (A) Depth to Water Table From Datum, Ft:~~*
    (B) Surface Gage Height Above Datum, Ft. ~ 'fest Water Tem.p: *q. 8 "'P Bare Pressure, psi: [ :4 * '11-IJJe'-'- . ?':J"'I::: Depth to Center of Test Interval From Datum, Ft: Z>4*~.'.)ctl. (C) Distance Water Table to Center of Test Interval Ft..~ '3 11,4-tO
    • Statlc water pressure at center= (CN62.4/144) + Baro =
    I \\ <... MAXIMUM TEST PRESSURE, Po"' ([A+B*1] + G*0.57). [Po"' 14A J Test Pressure sequence;- 1/3 Po, 2?3 Po, Po, 1/2 ~o, Po Se(Juence ID: A 8 C D E Po VaiLies: 1/3 Po; -ia.,.; ~/3 Po=:~; 1/2 Poe '::f -z.. Add A~propria!e Po value to static pressure at center of test interval - J L'"'.. TEST NO.MP=4QJI c 1 Sequence No. D. Planned Center Pressure: I 8 B Transducer Readings Before Packers lnflatect: Top 2/7, (0 :?. ; *Middle * !l Z
    • SS.i Bottom:
    Ill... * :3 \\4 Transducer Readings After Packers Inflated: Top ~ 7f,1r,t? : Middle l/4 1 7& Bottom: II J, '57:- MP*40'J l z::~ll~ \\11\\1~ Se~l/Gt-4 C..rE 1:') FLOW METER READING, Gallons. .Middle 'Time, FLOW,gpm Transducer Surface Gage REMARKS Minutes Reading, psi Pressurt;t, psi lnltlal Flnal Difference
    BtNtfltu
    • ~\\ <;,"'3\\, f{J(P 1$~'0'5 ZC.ttUS
    !~}2 -/)r!i<:.tU!AS&'.c'L.ow I~'-"';) *:HJ lP I 'Bb~S \\8 G,'91 'Z. 4* BtlS 1:t .( 2'?) \\ \\(.., \\ *~~ ~({)</. '-S~~i* \\~ c'o9'0 \\. z Z48AQJ I "j(J9 "'Dee..t<tfl!.M ;:!(_,()!_,.) \\v', (/)(/}; 3tP \\ t)(o~~ \\B C..'9';) I ~ '2L\\'9ll"l t.:~c~ '\\,(..', ¢l I ~d \\S(o~q \\8 '::f.{/J~ \\ 'Z.. 2,42:,~\\ \\2"£> 'Dt!fc~ariJSJs t:t. ow \\ t... Y 0 H *~lP t B~co

    tj) / 9'5 \\t....> \\ en?;(} \\8'1$'4 18 '::j(/J'Z Zt3,1 Co /::::Jit'C./U'A.,Si{ Pr..aw. \\l,\\ QJ'5 1 f./>IP \\ "D1 ~-z... !8 'l~3 I 'Z.. z (,P'$. (;j ( 83. l"' i 11.1!1!L \\ '2> ~ID~ \\8 :w3 c} '~ Z{(Jf, '38 8~ I.;J/S~t:'M.r ,t:'/.0~.-1 \\.(D\\ ¢4\\ lP<P \\ e,*;:r<l>'5 \\8 ti;J4 I ~. 2(/J/,89- ":f?... \\to\\ 4'4 *, ~w* . I* 8~'\\(tJ4 \\8 ':J(b1 (j <iJ /9/J, 8G. ' -:t-z.

    • ~**
    -~ ....... I ((..\\ *ai6~J(D .. f~*q:Q;~4-t8 7:}(/JS z: I 9$ MP ':f'Z- ~L.\\ (/!~ \\)(/ \\'&"{(bS '18 '::/-@5 C); dJ l9i'f),12- ':lZ \\~\\ 0&.*, (flU 11£:)1(6'5 '18 '1 (/)&.,. I z I '-;)(~ I so '::[*'Z- \\{,\\ f,O(o\\ 3tP I '5 '1. qx, 18 1-QJC.. CP (/) \\ S?lPt::tc ':f2.. I z \\<;>(liAS l \\o: ltl'*i\\ (l}(p \\ 'i:)":J.;(/.1(,. 18 '::f({Jl*
    1~
    d> I ,G"'.i./,1:> \\(...', lP"q 1"3(,/l \\ ~1tP1. r B l-cJr c/J .I 9t~,i~ '::{'7...... ~*From Preliminary Boring Layout Survey f{..J(/)8/1"5 ~:C,77'tJ}-<.. 7/eA,v~ /12, ZZ lt..lli5Bt'5((1 '"t.r.P '7",e..<~.v.s 2.'1-,:-f?* Form Approved for'use on.Clinch River SMR Project* J. A. Tlce, Technical Lead Form Rev 0- Reviewed by ~fk (t.-b/1 7 Clinch River Data Report Rev. 4 CRP;1112.16 Page E.3-116 of 515 I t I I I I I I I I I i ! I I DOUBLE. PACKER BOR~HOLE PERMEABfLITY TEST DATA SHEET. AMEC ENVIRONMENTAL & INFRASTRUCTURE, INC. PROJECT NAME: Clinch River SMR Protect JOB.NO. 6466-13-1072 Borehole Diameter, ln.: *3, 8 Total Boring Depth, Ft. 40Gb Page1of2 DATE; 1*
    • I?>
    Gnd Elev, Ft: 82/5,7 *
    • Casing Height above ground, Ft:....L..]-5 Elev. Top of Casing, Ft. (Gnd Elev + Casing Height): 82.~ 1 £\\:S, Datum
    .*. ~)" ""\\\\1 h? TESTID:t0,f~M>I :e:.l.\\. Testlength;
    z-.'5
    !estSel)tlonDepth(fromDatum): From lf.o~3S To @4(;.,2,S (A) Depth tb Water Table From Datum, F.t: '?,rtJS Test WaterTem'p: 7/-'81/JP. Baro Pressure, psi:.JA.LiJ: 1/.Je~-.~..-. '5 <?>'" P (B) Surfa<;e Gage Height Above Datum, Ft.~ Depth to Center ofT est Interval From Datum, Ft: Z4&!-.S(.ti (C) Distance Water Table to Center of Test Interval Ft. ~ ~ ~.4'5 Static water pressure at center= (C*62.4/144)+ 8aro = I \\*l....t.. MAXIMUM TEST PRESSURE, Po.::: ([A+B*1) + c*0.57) [Po c /A.A I Test Pressure sequence::< 1/3 Po, 213 Po, Po, 1/2 Po, Po Sequence 10: A B C D E Po Values: 1/3 Po= _+/-.a_: 1/3(Po:: ~
    1/2 Poe
    ':::f 'Z. Add Appropriate Po value to static pressure at center of test fnterva!
    14. 11\\l1!'>.
    lEST *No.gP-4(1?1 ;:4 ~equence No.. IE. Planned Center Pressure: Z<a¢ Transducer Readings.Before Packers Inflated: Top 2/':f, <o ':2. ; Middle
    • I ( Z
    • SS i Bottom:
    I I (.p, 3 <.. TransducerReadlngsAfterPackerslntlated: Top Z-=1, '='(/)
    • Middle 114, '-=t(..,: Bottom:
    . 11"3, 5<1- ~')'\\l1\\l' "-iP*4Qll Z:'\\ \\ 11 5E.oL/EEMC.ri! £ FLOW METER READING, Gall.ons 'Time, FLOW,gpm Minutes Initial Final Difference \\(.pi lW I ~

    ~'0*7.\\o\\\\, \\'6 ':til cb c,b \\<.,q~ ', ~$ \\5~\\\\ \\~

    • ~:t \\'2.
    l. '2, l~.P \\ \\'Z.\\I{Jt/J \\. '0 '1-\\:'Z.. lB ~IL (/) dJ . \\ L.. \\ tZ\\~cfJ \\B":.l-\\:'2... '\\'B -=7T3 l
    z.
    \\(:., \\ \\~ \\fbtb.
    • IB':'.\\\\~
    18 ~l4 .\\ -z.. lls>\\ 1~\\?:,I.P \\8';-Hl\\ lB '::/IS I -z. ~t...\\ \\<\\\\¢& I '0-::Hs IS* ".f/5 (j (j)' \\l.t> \\ \\~\\31P \\S~\\'5 tS ~-l'i-
    • z_
    4- ~(.,\\ \\c.:l\\<l!dl lt$::J.n L\\3 i-Ul t 2 \\.i..o ~ i'5(3l/ \\ 'B'liB \\8 :12.¢ 't. L~ Ll.\\ IL>',0UI . I '8':=~czc; ~8 * ':t'Z/ \\
    2.
      • ~
    ~ (,: \\<.,:.' 1>U -. \\~jii \\B
    ~rzz..
    '2. llt.~ 1":\\\\ /.PCf \\ 8~2."2, I'& 4'2.4
    • z_.
    L\\- H.o\\ 1":{13/fl \\ ~":12.4 qj *1-ZS ~ 't.. tl... ', ~\\3: ~tp \\ 8'::\\'2.~ \\ 8 ::t-20:> \\ 2 llo \\ 18~'~1/) I'B:J-2.<.. iS 1*:2$ Z..
    4.
    Ill>', l ""J ~ ()(/) \\ 8 ~l.Z.S. 18 '.:!Z'? \\ z_ ~*From Prellm1hary Boring Layout Survey Form Approved for' Use on Clinch River SMR Project-J. A. Tice, Tec11nlcal Lead Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-117 of 515 Middle Transducer . surface Gage REMARKS Reading, psi Pressure, psi \\~l?k* Y:f"Z.. '8(!'GIII-' /Ntt.~ASC:. ;C'L<I\\.-> l 9tpJ2f.ff .'1-2 Z ({) IP( (Jf) 82 ~lPl0,3_t\\- 82 /1-.)C../e.I:FA-SQ" .f""(._Qf-) "t,.(/19, 'VA 93 ~~ a.Q.l~ 9'5 /vCJ<litASts- !="Lc::l W IG 13,82.. /(j}S .r 222,3,5 /(/}$ /;LJC_£rGA'S G' /:.'(..e:J<-J.
    t. ~ 2, "3 't)*
    /14 23/.41 l 14 .' JJLte.t;,-4Sii-PLot'-!.- 232-.43 !ZS Z41(ll> l3(tJ /NC.ILtSA':>tl',;<:!(... Q!!::l._ .... i4S.B'1..,.... I A\\ ~............... 2<;59,-;>3 \\A\\ 2 "5 l.t..cP \\'35 {~c!..~CA:>d
    <
    'I... a c..J ZSL/3 I '3 c.o 2'5J",l58 r~&..
    2S'3,Z'Z. J })(,. IPt-~~ASd ,:?t....~LJ
    • Form Rev 0- Reviewed by
    I I DOUBLE. PACKER BOREHOLE PeRMEABILITY TEST DATA SHEET. AMEC ENVIRONMENTAL & INFRASTRUCTURE, INC. Page 1 of2 PROJECT NAME~ Clinch River SMR Prolect JOB NO. 9468-13-1072 DATE: 1* ~ li;,
    • Bar'ing NoM P~40!
    Borehole Oiameter, ln.: -3,8 Total Boring Depth, Ft. 4'2.,(4 Gnd Elev, Ft: 812,15,1* *
    • Casing Height above ground, Ft:_L3.'S Elev. Top of Casing, Ft. (Gnd Elev +Casing Height): 8Z~
    1 4'5= Datum Sf~,.. (!) (I? TEST ID: Mf*?!(D\\ 'l.~ Test length:
    z. 5 Test Section Depth (from Datblm)
    From Z, '08.% To 2>4<-o, & '5 (A) Depth to Water Table From Datum, Ft:~~
    (B) Surface Gage Height Above Datum, Ft. b5 (!; Test Water Tem'p: *-:r-8 "'P Elaro Pressure, psi: /4 * 't, -;:r IJ.h~LI_. "5 ~"' r:: Depth to Center ofTeet Interval From Datum, Ft: ZA~.S U' (C) Distance Water Table to Center of Test Interval Ft. z-3*~.4'5 Statio water pressure at center= (C~62.4/144) + Baro "' I \\ l....t. MAXIMUM TEST PRESSUR~, Po"' ([A+B*1J.+ C"0.57) [Po"' [AA,. 1 Test Pressure sequence:" 1/3 Po, 213 Po, Po, 1/2
    • Po,.Po.
    Sequence 10: A
    • B C
    D E. Po Values: 1/3 Po :0....1:.a_; 2/3 Po=~;
    • 1/2 Po=
    '::t "2. Add Appropriate Po value to statio pressure at center af.test Interval tJ AJ.I /J '..fl-\\""llt1ij' 1-::::; "!/>/'. ~ TES'f NO.Mf'*awl ;::., Sequen& No. Planned Center Pressure: _:..::;;"-'_'-c>;;...¥-1.=....- Transducer ~eadlngs Before Packers Inflated: Top Transducer Readings After Packers Inflated: Top MP*40 I ~ y ~~~~~<;:)L/6'MC~ £ 2/~, (a 9 ; Middle II z' 5% :. Bottom; 2'"1, ";)(./)
    • Middle I 14-,.9<.,.
    Bottom: //&.,34 I I -:3 t'5'9-
    • Ttma, FLOW METER READING, Gallons Middle Minutes Initial FiMI Difference FLOW, gpm Transducer Surface Gage Reading, pst Pressure, psi tlP \\ 1.:0 n(.ll
    .\\ 1S '":.\\ 'Z. <;>* \\'8 ':l3Jl \\ \\<o~ Z¢ \\ ()'({) t'O ~"!J(t} \\e, ~3\\. \\ \\l..i 'ZrP/"31/ I {j"Y~ \\ \\'8 ~:~~ -z_* \\\\g( £..~ \\ ¢(J1 \\~':\\~~ 18 ~~~ '2-tl.>'\\ L.\\\\ ~IP. ~oo*~~~ f'B '::1;~'3 3 ~~...~* 'Z-1.' ft/(jl. tto"~~oc t8 jLVD 2- \\6~ Z-21 ~IP \\ ~';:l,L\\W~
    • l £> 14\\
    \\ HJ>'\\ 2~~.¢tP 1'3 '=t-4! 18 ~AI (/; \\6~ 2:,\\ 3(,8 \\ 8'::\\ll.l l8.:'1-A& ~z. REMARKS ~~~~~~~~--~~~------~--4---r~~.~~~
    • ~ ~~~.1+-__ 1~4~~~----------~
    \\l.>\\ 2..4 ',.(1.1@ \\'i)'::\\;ll.~ .I 8 :J.l\\S
    • z.
    z 4 zsc;,, ~' \\4 "t: ~~~.~~--~~~~--~~~+--------~-------+--~~~+-----~*-*+-----~-----*-*- \\ Lo \\ ZL-1 \\ "i.tl \\ B':::\\-1.\\S t 8 "tL\\1 4 ~SB~~+*.-.. -... ~\\4~.1~-.~.-.... *.-. -.- ._ ----.. -.. ~
    • ~.,;**.
    ~$8;4 \\ \\ L\\ \\ \\c..~ Z '5 \\ <Ab \\ '5";\\-L}, ":\\- 16 '::ft:\\-1) 'Z. \\L.;~ z>sT'Siil -. r~'i.:\\~ * ~8 ':I-'S"- .~.. - --* 1l \\v~ 'l(p: ifllj
    • ~'0~~7-t 8 i-S8.
    • z.
    \\l,l Z..(,.t'W \\~*~~1.\\ l8 '!:ISS \\
      • From Preliminary Boring Layout Survey
    • Fonn Approved for Use on Clinch River SMR Project* J, A. Tics, Technical Lead Form Rev 0 - Reviewed by lJfV I ~k 3 k 'l
    • Clinch River Data Report Rev. 4 CRP-1112.16
    .Page E.3-118 of 515 I I I I !
    r.
    DOUBLE PACKER BOREHOLE PERMEABILITY TEST DATA SHEET Page2 BORING:6/IP~ '4{;)/ DATE: 'Z- /.9- /3 fh 1s* )he~+ "-/fht.1. tv ttV l.11e lt Tt;b ~A COLLECTED BY* To;:; M,G""/ JIM GoT:?oM0 s 'T~SDRE: AJUJ psi 7.n-,, 1t 1 ]!J 'TIME,~ SURFACE GAGE CENTER TRANSDUCER minute PRESSURE psi PRESSURE, psi j /I / \\; {') / // '-/ **"' <:;:;,(") lr~) );\\,, ':1-\\t:l-l:\\ ( EQuiPMENT USED Transducets: MiniTrolSedalNumbers: 33S$9G:. (t.,.~;z~/"5). '31'"5381 (ts~zt1~1'3) /-4Z:I42 (6:. ~ Z¢~/'3) Surface Pressure Gage: M k/~4 t/ M 15,/-'5 ~ /31.'~,CK PLow M {,d ~ 3 ( (.., -i ( -1'3 ) Akr~o6..-t6'"A> Mid~ I I /vi' k.l-z (t., -l/-1'3). Barometric Probe: 1213 I 75" * ( C.O-I Z -rsJ FlowMeter: 88:04 :?88 * (P"ua_J,) CAt.. 7-18~ J'"j ) StopWatch: LZ8<4 (G>-/10**1'3) r:>M '"'..-
    • R
    //- lf!i;i;:. '-' f¥\\<>.", 71£( Date of Callbt*ation: /~/ P4/g(.r'-;l.f7C/a'"S/ 5' LT.C8 ('5-1*-I'?J) Calibration dne: "Po 57 l=i (._.(!,; ::; : tv{,::>~ 4¢1 z4* MP~4Cbl
    c. A M p... L\\01 2:4 M P-4(bl ZL\\-
    )v{ P~ 4CP{ -z4 MP-t\\-(f!l 24 /'vtP-4<t'l z4 f\\)..p-41})1 ~tr M-s 7/;..'t:ft (8) Z(/JJ'j-t}Y1- /9. (6) z i,/)/3.. f/J1 - 19 (T) z t.-113*-tp} - /9 (T) R._(/)13*-(/)1-1'1 (M) c:.J~/3 -@1* ~ I 9 (M) 2@1 3 -clrr -- 19 (L)
    cJ/.F
    S - CPr - I 9 CL)
    ZrPI 3 -{fJ1*- I 9 len.~*-o:~~ \\~,l,~:S,~ 1]- ltLISI-G..XCG!L. Form Approved for Use on Clinch RivarSMR Project. J. A. Tice, Techtiloal Lead Clinch River Data Report Rev. 4 CRP-1112.16 Form Rev 0- Reviewed by 512-t.Z/() /1] Page E.3-119 of 515 PACKER TEST FLOW RATE GRAPHS Boring MP-415 Packer Test Intervals: MP-415 Zone 1: 27.5 feet to 35 feet MP-415 Zone 2: 162.5 feet to 170 feet MP-415 Zone 3: 252.5 feet to 260.0 feet Graphs of flow rate (gpm) vs time (minutes) have been created from Excel sheets containing data from field data sheets. For clarity, individual plots for each sequence within a tested interval are presented. Generally, plots are not provided if the field data sheets indicate no flow during a test sequence. Bechtel Field Instruction forms are provided. AMEC field data sheets are provided following the graphs for each zone. Transducer data file names are listed on the last field data sheet of each test interval. Transducer data files are furnished as electronic files in a data supplement submittal. Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-120 of 515 a me i l ! l I I I I I. I FIF No. 25847 *601*KOI.CYOO*OOQ07.. BECHTEL POWER CORPORATION Project No. 25847 Clinch River CPA Project~.Site.Subsurface lnvestigatiotl FIELD INSTRUCTION FORM . Speclflcatlon Section: Packer Testing in MP 415 Field Instruction-:. The following are the three (3) depth zones In which packer te~tlng will be conducted in botehote MP 415: Zone 1: 27.51o 35 feet below land ~urlaca ( -1: 0.~ ~) ~ ?/y /;.-J Zone 2: 1G2.5to 170 feet below land surface {t o,S'p;) ti~~ ff). Zone 3: 252.5 to 2SOfeet below la~d surface (t os ~* /( f3 The desired pressure ranges that wlH be tesled in each of the three.zones <Ue b~i~sed on the calculation of the te$t pressures as provided ln AMEC Project Procedure.s CRP~$ -Packer Pressure *resting In Boreholes, A-ttachmentS (Bechtel Power infoWorks 25841.. 601N14--CY00-0001 8--006) or latest revi~ion at time of testing. The* test pressures wm be determined just before 1he commencement of the tests by measuring the water level at the start of test. Basls/Justfflcatton for Instruction: ihe depth of the above zc.mes wae selected b,gsed on fracture zones identified from DRAFT geoto9ic core loge, RQD analysis and from the acou$tiC. televiewer logs. The bottom depth limitation is due to the maximum table length of 285 feet The }usttflcati.on ofthe pressure ran~ies that w!U be te$ted will be based on procedure AMEC -Project Procedures CRP<~ - Packer Pressure Testing in :Boreholes, Att~chment B (Bechtel Power lnfoWorks 25847M601* V1:4~CY00-00018~006) or l<;ttest revislon at 1lme of testing. Specification require$ Contractor to provide test depth'S and pressures. Note: This FIF supersede& 258~*6.01~01~. " Prepared By:. ~./':?!YtJ/:t:.J.d:iY: t.. z::-.: .. ~-: ......_,~........, . Na'm'e/ lgna~ r r / Revlewe*d By: r.;.,r;:~At..n /">'::t-~M~ ,v,..~. ::,;t-fl f';t~me l. *, *. plgna#ure !J Approved By: :Jit.& -UilfJh.jrit-- tJa~s. &p~y-!.di l!A~.p.-;~.::;;..._....._~4-H-~ Name -.rtt t:tik/t'c/ Slgnatur ($M Section !.2 for ft1rlhet instruQtku'll}} Received By AMEC s. . /7 Site Mgr or Proj Mgr: G:t'S ~en _= /f/..c:::: ~ ) Nari1e Signature PAGE.1 OF i ~~-- - Clinch River SMR Project Double Packer Borehole Permeability Test Data Sheet AMEC Environment & Infrastructure, Inc. AMEC Project# 6468*13-1072 Boring: MP-415. Zone: Z1 27.5 feet to 35.0 feet below ground surface Transducer Location: Middle Sequence A (1/3 Po) Sequence B (2/3 Po) Elapsed Time Flow Rate Elapsed Time Time (minutes) Pressure (psi) (gpm) Time (minutes) 16:37:00 0.0 no readlnQ 0:00:00 0.0 16:37:30 0.5 no reading 0:00:30 0.5 16:38:00 1.0 21.75 8 0:01:00 1.0 16:38:30 1.5 22.53 28 0:01:30 1.5 16:39:00 2.0 22.71 40 0:02:00 2.0 16:39:30 2.5 23.36 42 0:02:30 2.5 16:40:00 3.0 23.50 48 0:03:00 3*.0 16:40:30 3.5 23.60 48 0:03:30 3.5 16:41:00 4.0 23.76 32 0:04:00 4.0 16:41:30 4,5 24.58 62 0:04:30 4.5 16:42:00 5.0 26.56 68 0:05:00 5.0 16:42:30 5.5 25.62 80 0:05:30 5.5 16:43:00 6.0 25.59 110 0:06:00 6.0 Flow Rate Pressure (psi) (gpm) NotTested 16:43:30. --* 6;5 - 25.60 *- 70 - -0:06:30 - .. 6.5- -~--- 16:44:00 7.0 25.60 60 0:07:00 7.0 16:44:30 7.6 25.54 50 16:45:00 8.0 25.66 6d 16:45:30 8.5 25.72 80 16:46~00 9:0 26.06 90 16:46:30 9.5 .24.00 60 16:47:00 10.0 no reading no read in~ changed tanks 16:47:30 10.5 no reading no readil}f 16:48:00 11.0 no reading no read In~ 16:48:30 11.5 no reading no readin 16:49:00 12.0 27.02 72 16:49:30 12.5 27.07 70 16:50:00 13.0 27.21 40 16:50:30 13.5 27,33 80 16:51:00 14.0 27.48 60 SequenceD 1/2 Po) Sequence E (Po) Elapsed Time Flow Rate Elapsed Time Time (minutes) Pressure (psi) (gpm) Time 0:00:00 0.0 Not Tested 0:00:00 0:00:30 0.5 0:00:30 0:01:00 1.0 0:01:00 0:01.:30 1.5 0:01:30 0:02:00 2.0 0:02:00 0:02:30 2.5 0:02:30 0:03:00 3.0 0:03:00 0:03:30 3.5 0:03:30 0:04:00 4.0 0:04:00 0:04:30 4.5 0:04:30 0:05:00 5.0 0:05:00 0:05:30 5.5 0:05:30 0:06:00 6.0 0:06:00 0:06:30 6.5 0:06:30 0:07:00 7.0 0:07:30 7.5 0:08:00 8.0 0:08:30 8.5 0:09:00 9.0 0:09:30 9.5 0:10:00 10.0 0:10:30 10:5 0:11:00 11.0 0:11:30 11.5 0:12:00 12.0 0:12:30 12.5 0:13:00 13.0 0:13:30 13.5 0:14:00 14.0 0:14:30 14.5 0:15:00 15.0 0:15:30 15.5 Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-122 of 515 (minutes) 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 Flow Rate Pressure (psi) (gpm) Not Tested Prepared by: Date: Checked by: Date: Sequence C (Po) Elapsed Time Flow Rate Time (minutes) Pressure. (psi) (gpm) 0:00:00 0.0 Not Tested 0:00:30 0.5 0:01:00 1.0 0:01:30 1.5 0:02:00 2.0 0:02:30 2.5 0:03:00 3.0 0:03:30 3.5 0:04:00 4.0 0:04:30 4.5 0:05:00 5.0 0:05:30 5.5 0:06:00 6.0 -~-- --.. - ~--- - -- ~
    • -~~ --- -**-
    DOUBLE PACKER BOREHOLE PERMEABILITY TEST DATA SHE!ET
    • AMEC ENVIRONMENTAL & INFRASrRUCTURE, INC.
    Page*1 of 2 PR<;>JECT NAME: Clinch River SMJ3 ProfeQ). JOB.NO. 6468-13-1072 DATE: ;f-18 ~ /'3 Boring No MP* Zqjz. Borehole Diameter, ln.:~ Total Boring Depth, Ft. 46~ * .Gnd tiE/V, Fl: 8//. ':1
    • Casing Height above ground, Ft:f
    • 23 Elev. Top of.Caslng, Ft. {Gnd Elev + Oaslng Helght):81 R-~3 =Datum TEST ID: fv\\?*albC. ?! 2-Test length;
    z,S Test Section Depth (from Datum)
    From 1'5'4, 2.. 3 To I t.P/, =!'?>
    (A) Depth to Water Table From Datum, Ft: ?J';:J, 2B (B) Suiface GageHelght Above Datum, Pt. -.l..._k.:Q Test Water Temp: BS "'P Sara Pressure, psi: l Ar, 1.\\4 \\ ~'t-':;}8 e:;,.~ . "':!,-\\'~.- n Depth to Canter~fTest Interval From Datum, Ft:+/-g~,~ (C}. Distance Water l'able to Center ofT est Interval Ft..l.Uh_ ':\\CO Static water pressure at center= (C*62.4/144) + Baro "' k Co
    • MAXIMUM TEST PRESSURE, Po"" ([A+8*1J + C*0.57) [Po-= I ct> ~ 1 Test Pressure sequence:= 1/3 Po, 273 Po, Po, 1/2 Po, Po Sequence ID:
    A
    • B.
    C D E Po Values: 1/3 Po ". j(o ; 2/3 Po::...:::t.:;L; 1/2 Po= S 5 Add Appropriate Po value to static pressure at center oftest Interval TEST NO. MP-Z(JIZ. :c;z.sequence No. R:> Planned Center Pressure: I*~~ TransducerReadingsBeforePackerslnflated: Top (9, \\~ : Middle ~S,(b+ :. Bottom: 4-8,8'? Transducer Readings After Packers lhnated: Top I<::>.* '":\\-~*,. Mldd)e (o(o, Z..\\ : Bottom:* Co8,28 p... zrpz .'?., s .. e:<::.v llei-..LC E FLOW METER READING, Gallons
    • rime, FLOW,gpm Minutes Initial Final Difference I~\\ "0~'* {])tp 18S~S
    \\ 4\\ 15'7>\\ ?J(/> 18'5\\ '5 \\£( 51'5 al ([1 1'?.\\IP({I~({)r.U I fD"S\\ '71 H3 5t(o r z 1 c;;, \\ CPIP\\ "btl \\ SS\\i:n lCO 51':} \\ '2.. . 1?1 (/)1 ~ (pi}J I 13S\\~\\-. \\'D <5\\\\l (/) (/J 1'?\\ tPI:~<.J \\ 8_S\\~\\ \\B Sl8 l
    • z...
    ['5 \\ (/)'Z) ())If} tS'S\\S \\S :)I<;} \\ '2. IS' (/}?) ?.{/) ~ '" \\B~l~ \\S '52.(/) l 7_ I S \\ i2>'3 \\ 4'M \\ esz.r; \\B '52/ \\ Z, I'?~ c'P?l~l~ \\ 8S"Z.l IS ?Z2 I
    z.
    \\S1 OJ 4\\ (/)1/J I '852'2. IS '523 I
    2.
    \\S \\ {,114\\ '?:,(,{)' \\SS2'3 \\8 *152.3 (j) ((J \\*~ \\. i~'i>F ~(~.... *xs*c;z;) ""l6 5'i4.
    • -*....... l
    z*...
    ICS( (f)St'3rJ \\'e>C::,(A. lli_ '525 \\ 2.. \\*s. {/){ I (/}(() ( \\B'02S \\~ 1,)*2.'5 (/) <'/) \\ <"-6 \\ IP& l'){(J L8'52S \\8. '02(,. \\
    z.
    LB ~2.":l-
    • l
    '2. IS~ @':f.f i/1(1 18SZ(... l?l /tJ':l / > {) H3S2..l*. tS sz.e _L 2- ~*From Preliminary Boring Layout Survey Form Approved for' Use on Clinch River SMR Pro)P.ct
    • J. A Tlce, Technical Lead Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-123 of 515 Mldclle Transducer Surface Gage
    . REMARKS Reading, psi Pressure, psi /0'3,5~ ';GL:. 'B<If'GI-JA.:r I,~..,u:.A.IF4,f>(;' Ft...aw II(/JJ4'"J
    • ~(;,
    //3, 9{.;
    • o_cs J,uG/l.<t4:lclt 1--<-c::>t...,)
    J J4,4CLJ 5\\ J'?>~,~s ?I 1*'3 L '3 1 5\\ / /.J <.&f<t<<.Y:fl', A'!. ow I ~4,--t:J. 5'::1-I '5~.(>>/ 51- /3~.":3? '5':J I *-n fn, (f}f$ '5"':7- ~l<:>,(ol 5~ \\~{.,.,,{,1... s*:t . ~...
    • ~**
    • o w
    o<J w'O" RR0 00 I o;o(.,,LI '5 "';}. /.v t:.RI!f4 'Jll' A'l..ot.-> /~L,.'3L. '5 7.l
    • 1;3'9"35' 59 l 3::t' '5 '"l..
    '$'? I~ 1~'33 5~ lvu_c...ru_~ t!?~c.H._, J "3 "f.l ct> 5~ Farm Rev 0 - Reviewed by srz... \\ 'L-( 11 It I. I
    • I
    MP~415 Zone 1 120 100. 80 8 Jll M 60 ~ 40 20 d o.o 2.0 4.0 6.0 8,0 Time {minutes) -~1/s Po Prepared by/Date: __
    ...,r..'-"---1-~-t-r--,
    Checked by/Date: _ ___,'~-->"'Y<--H~ Clinch River Data Report Re Page E.3-124 of 515 10.0 12.0 14.0' 16,0 Nolos: Tsst prossurQ measured_ at 1/3 of the tMxlmutn ti;lst praasure (Po), Flow tate typically measured oVer a !IO.sijeond Interval. I' DOUBLE PACKER BOREHOLE PERMEABILITY TEST DATA SHEET AMEC ENVIRONMENTAL & INFRASTRUCTURE, INC. Page 1 of 2 PROJECT NAME: Clinch River SMR Prolect JOB NO. 6468-13-1072 DATE: r$'-13 Boring No MP*41'$ Borehole Diameter, Jn.;... 1.Jl Total Boring Depth, Ft.. 3Z ¢. I Gnd Efev, Ft:.'.J/54, l * *P.o.-rLI "'~ Casing Height above ground, Ft:~ Elev. Top of Casing, Ft. (Gnd Elev +Casing Height}: "'¥84 /..o'B"' 8tt*!t~m- <2 }:::,. *-::r- "5 - 1 s (Z.::J,S*35) TEST iD:t\\P~L\\\\S irloPG l Test length: '1. S Test Section Depth (from Datum): From
    • f.?r.t, '5 To B;;?
    (A} Depth to WaterTabie From Datum, Ft: f'o, t 2. Test Water Temp: '::{.S"'P Baro Pressure, psi: !4.44: . (B) Surface Gage Height Above Datum, Ft. ~~ D'epth to Center of Test Interval From Datum, Ft: '3 I 11 8. ':> (C) Distance Water Table to Center ofTestlnterval Ft. ~ \\.. <08 Statio water pressure at center:= (0*62.41144) + Baro"' iG ~, ~&, MAXIMUM TEST PRESSURE, Po"' ([A+s**11 + 0"0.67) [Po= ;;!.§, ?l ] Test.Pressure sequence= 1/3 Po, 2/3.Po, Po, 172 Po, Po Sequence ID: A B C. D E Po Values: 1/3 Po=..BA:i; 213 *Po" ll¢. <3]-*;.1/2 Po:: )"~..,to S -Add Appropgrte Po value to static pressure at center of test Interval TEST NO.'*..<>,_,G i Sequence No: ~ C?.~-~~;e'd\\ie~ter Pressure: ~ ~l.~- :t -OS"\\.~ Transdueer Readings Before Packers lnHatad: Top ,I ~, 1-~ : Middle 2> I~ f 4 :
    • B,o~tom:
    Z 5, 5 (p TransdLICer Readings After Paokers Inflated: Top \\ ~, ":\\- \\ __ ; Middle Z \\ o~ t '5 : B~ftom: Z '5, S 8 FLOW METER READING, Gallons
    Time, Minutes Initial Final Difference 1 (D ' 1> *::n (j)(~
    8'~92.. ll, ~g. \\l/)(J 8'3~~ ,5'~5)("'
    • 4 ll, \\ ~~ \\'1ll 81':?(..
    gL\\ \\,<Z) \\4 \\(.:..' ?>~\\(/)~.6L\\\\ (b 81\\ ~ctl Zr) l (p '. '7-}~\\ ).ri 'l~~.:i 6-\\'l<P l-~'31 Z.t L~.~.l\\(/)H~(/J 84"5 I 8 *6; ':\\5 2-4* xe ~tP \\ Lo \\ +hiJ.. 84-::f 5 849 ~ ZL\\ . t\\ <<141 \\l..'.. \\~ 84'3':) B'5\\.S \\.( _lt- ',<4\\\\ ~(J 85/S 8%A0
    • ~ ~
    \\ ~ \\ ~:C\\C~q. 854c. 8S5tfl ~4- \\ ~..!>\\ A~3ai 8SB(tJ
    • 8Cc2..C/l A.¢
    <1~~5-~.c. "('3 \\Ln.'~ L:\\ "$ ~(,/)t/1 8-~Zti-? 0 5 s~ \\ "-+>.. A. 1i'; ?,(/) 8{..l "5 81- ~4.) 3S \\~ \\41\\ ~qJ(/) s*:t- \\<!) ~'.:1:.1.</) . '3C/) ll" \\ i\\L\\ )(fl B':lL\\<.b f?:t;CaC:, z.r:s lL. 4 cs (fl !P. ?.:i":ltL.~ ~ 1-<:J s 3¢ \\<....> 4s *-ol) S'.:\\'~~ ~<D*~s 40 Ill).t\\ C. lfJcp f) '51,";) .~~t\\(/) 4S 0 \\<;. 4-t.o ":>tP <.!'BocA $<7H.P ~c/)
    • From Preliminary Boring Layout Survey FLOW, gpm
    <0 7_'l) 4~ 4Z. 4~ L\\ '6 ~"Z.. to"?, (,'2, g(L) I \\ L6
    • ~

    (/) Z..!:l,S 1$ (,6 .'2.~,4cJ} ¢. 2.~ii(, (6 zL\\:~e ¢ z.s.sc.,. CfJ
    • z JS, G:z.. _ 1---- 5Ql' 29;,. c;)~
    '1~ z "'5,C.(j) '1;,"':) zs.~ 35 zcs,Si\\ "3S Z<5d.,4._ f-* ~:.2 Z.S,('Z... ?:JS 2.(.,,(/J(., ~ ~~ ~ 4$1¢11 i'3<J*~"i'" ""-' I eo:.t\\*f>! 3!/ '7'>:>. p Wl2'! Rev 4-RCN: CRP,Q414.4 Page 22 of 23 Form Approved for Use on the Clinch Ri~er SMR Project-J.A. Tice Technciai Lead Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-125 of 515 Form Rev 0 - Reviewed by REMARKS 13&."'6!/r-1 'SwAPP~'> "f'AI..JMS' DOUBLE PACKER BOREHOLE PERMEABILITY TEST DATA SHEET 'AMEC ENVIRONMENTAL & INFRASTRUCTURE, INC, Page 1 of2 PROJECT NAME: Clitich Rjver SMR Pro!ect JOB NO. 6468-13*1072 DATE: ':7-;j-13 Bo~lng No /vlf'~ 41'5.
    • Borehole Diameter, ln.:.a.Ji. Total Boring Depth, Ft.;2,~
    Gnd Elev, Ft: 7241 l * *1::> An1 M Casing Height above ground, Ft:~ Elev. Top of Casing, Ft. (Gnd Elev +Casing Height): 784 ;(/d = 9altlffl-Ci ~. -q _ s-t 5 TEST ID:~\\P-l\\\\S ':Co~->~\\ Test length: 1-.5 lest Section Depth (from Datum): From * ~'9, '5 To .;) S (A) Depth to water Table From D~tum, Ft: f'o, 12. . (B) Surface Gage Height Above Datum, Ft.~~ Test Water Temp: 3-'S""P Baro Pr~ssure, psl:..l4A..4:.. Depth to Center ofT est Interval From Datum, Ft: 3 I. ~ ':> (C) Distance Water Table to Center of Test Interval Ft. '2->.l.t.'QB
    • Statl.o water pressure at center"' (C*62.4t144) + Baro"' Z ~, '3&,
    MAXIMUM TEST PRESSURE, Po= ([A+B*1] + cwo.57) [Po= ZS, ~ 1 Test.Pressure sequence= 1/3 l'o, 2/3' Po, Po, 1/2 Po, Po Sequence ID: A 8 C D E Po Values: 1/3 Po= Jl.4d.; 2/3 Po= t lo, ~'1-; 112 Poo: \\ ~. lo <;) Add Appropriate Po value to static pressure at center of test ln!etva1 TEST NO.~<>~ saquenceNo. A-'t~.-~~';'ed\\de;terPressure:.:j~C:(_~, ':t-CS~\\~. Transdueer Readings B~fore Packers Inflated: Top llt>, 1-~ ; Middle £s //1.4 Bottom: 2 S, 5 (p TransducerReadlngsAfterPackerslnf!ated: Top ~,31_; Middle Z\\dJ'5 ;.. Bottom: 2..5,'58 s Pr G t '. j $~" t-z..lt11P _cjiA.IMt-< I 1\\IA., FLOW METER READING, Gallons Middle
    Time, FLOW, gpm
    • Transducer Surface Gage Minutes Reading, psi Pressure, psi Initial Final Difference lt. \\4 ';) ( 4'ffl 8':>\\fP "7 (/) '1 C/!
    IB¢ 1-~ '2. 1*' (/) -:'i 35 \\(,_, ~C\\-~\\ ~,44. CJ<fJ91(J .. '7 '*z.,s ~s ilD Z'i_tjJ 1 ~.s t(g 5 (~ ~ IJ(p 9\\-'Z.S .,l45 ?._(/) L\\ (/J 2.-=J. Z.l 3$ tl6 ~ s~ntP <7}ll\\S '?\\8'5 4c.b ef./J 2~,33 3S
    • t(. \\"1\\.~((JV)
    ~VB'S ~Z.l'S 'o_¢ t.o

    l..\\"r;" L y~:.WATE: ~~ ~-~ *-\\'-o ~-'5-t 3DATA COU,ECTED BY: le>fV-.. ~f\\.c c;_,~,..k J s; ""- G ~ "D 't:::>4/<?D ~ SI!U't -IN' TE:ST PRESSURE: M tp, psi ~'-' ,~,~\\1~/11

    TIME, SURFACE GAGE CENTER TRANSD~~
    minute PRESSURE*, psi PRESSTJRli'-m1 .,....,:Q L--- \\\\,'SO~ \\'-. \\ l..., "'('...:::---- l~~~ ~ ---~ ~"" -*~ EQUIPMENT USED --pc,._.f',.J 1-/DLC!l- <;? h * -;-1: -'5.- I 3 Transducel's: *Level Troll700 Sel'ial Numbers: 335896/R24844 (shallow) 6/12113; 315381/R24039 (iutel*mediate) 6/20/13; 141142/R20367 (deep) 6/20/13.; 315380/~4038.(spare) 612[!!)3 __________ --'-_ Surface Pressure Gage: (Both Wika 2i3.53)- MW~3 (at pump); MW-4 (at totalizer) 6111/13 _____ _ Barometric Probe: (Bat*o Troll) 121315/R22669 6/12/13 Flow Meter: Ma tel' Meter 1344 - 88
    • 4788 field checked 6125113 Stop Watch: (Sportline 220)- L2S6 2786 6!10/13 Date of Calibration: Dates in italfijs after eguipment serial number Calibration due: _Post Testing _ _____ _
    ...1 I....?£' S F o t<
    ".;?;oM cs 1 :, i~P4VS tolo..Ju-1 (1'1\\ ),Z.C/J/'"'5
    • 0"::/ -¢5 lv\\P \\~ ~\\l),...~e;: t (IV\\.) z.ciJ13- <fJ ~(.~(fJS j\\1\\,f' *~ 4\\.~.:;,
    ~Ot-Jts i (5'S) Z,.(/Jt ~ - (/J:'{ - (/)'5 MP-4t~ ::CooG""i (13) Z.¢!'"S ~ C;J?
    • -((.I"S tv\\ p " 4-\\~ ~
    Oi-JG' 1 (T) z (/)/ '3- (/)7(- ~t;P5 . J\\A.P-4\\ C$ ~c:>MG 1 (~c-) Z¢1 ~.., 0=/- 0.1'5 /V\\~ ~4\\"S ~ct)f'-'6' t (L') LC0\\"'5 *~@-;,r. -cps tvtP - L)t? ~o,viiZ" ( (c) Z.(/.)1 ~~ ~ ¢-*7 - ~S tt.... *. ~ 3. (j)~ \\ l..o ** ~;) ' (/)f..u I~
    • CO ';f, t4-
    ~~. S'::/1 14- /ta.St.o ~ (/)9 /G,~~~{/.>9 /4>, S4,.4==1- /Lo I <-Qd.l, I 4 ';:1 Wl21 Rev 4 ~ RCN: CRP-0414.4 Page 23 of 23. D"" C'Cl< c;;-1=> ?~* 7 -?-/3 E lCC.(J; L ~ 5L. IS ';(JC/;fi,_ W$L IE l"C!ft-WSL ExcaL WSL Form Approved for Use on the Clinch River SMR Project-J.A. Tice Techncial ~ead Form Rev 0- Reviewed by Clinch River Data Report Rev. 4 CRP-1112. 16 Page E.3-127 of 515 Clinch River SMR Project Double Packer Borehole Permeability Test Data Sheet AMEC Environment & Infrastructure, Inc. AMEC Project# 6468-13-1072 Boring: MP-415 Zone: 2 162.5 feet to 170.0 feet below ground surface Transducer Location: Middle Sequence A (1/3 Po) Elapsed Time Flow Rate Time (minutes) Pressure (psi) (gpm) 13:56:00 0.0 ' 84.56 13:56:30 0.5 no reading 13:57:00 1.0 no reading 13:57:30 1.5 no reading 13:58:00 2.0 94.03 0 13:58:30 2.5 no reading 13:59:00 3.0 94.40 0 13:59:30 3.5 101.88 0 14:00:00 4.0 102.01 0 14:00:30 4.5 107.71 0 . -*14:01 :00 *-- -. -**...... - 5;0 no-reading**-- 14:01:30 5.5 115.32 0 1.4.:02:00. 6.0 11.7.62 0 14:02:30 6.5 117.45 0 -14:03:00 7.0 j 17.47 0 14:03:30 7.5 117.45 0 14:04:00 8.0 117.42 0 14:04:30 8.5 117.39 0 14:05:00 9.0 117.29 0 14:05:30 9.5 no readinQ 14:06:00 10.0 123.67 0 SequenceD (1/2 Po) Elapsed Time Flow Rate Time (minutes) Pressure (psi) (gpm) 14:27:30 0.0 137.82 14:28:00 0.5 138.21 0 14:28:30 1.0 138.25 0 14:29:00 1.5 135.36 0 14:29:30 2.0 132.33 0 14:30:00 2.5 132.17 0 14:30:30 3.0 131.83 0 14:31:00 3.5 131.79 0 14:31:30 4.0 131.82 0 14:32:00 4.5 132.16 0 14:32:30 5.0 132.00 0 14:33:00 5.5 131.95 0 14:33:30 6.0 131.93 0 14:34:00 6.5 131.84 0 Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-128 of 515 Sequence B (2/3 Po) Elapsed Time Pressure Flow Rate Time (minutes) (psi) (gpm) 14:07:30 0.0 141.05 14:08:00 0.5 141.33 0 14:08:30 1.0 141.20 0 14:09:00 1.5 141.66 0 14:09:30 2.0 141.11 0 14:10:00 2.5 141.03 0 14:10:30 3.0 148.47 0 14:11:00 3.5 149.23 0 14:11:30 4.0 149.33 0 14:12:00 4.5 149.29 0 14:12:30
      • -*5*.o
    - 149:01 -- o Sequence E (Pol Elapsed Time Pressure Flow Rate Time (minutes) (psi) (gpm) 14:39:30 0.0 187.92 14:40:00 .0.5 190.90 0 14:40:30 1.0 187.16 0 14:41:00 1.5 187.99 0 14:41 :30 2.0 186.43 0 14:42:00 2.5 188.46 0 14:42:30 3.0 190.38 0 14:43:00 3.5 191.73 0 14:43:30 4.0 190.02 0 14:44:00 4.5 188.55 0 14:44:30 5.0 185.35 0 14:45:00 5.5 188.66 0 Prepared by: ~t>r Date: 4-'tr /'"/ Checked by: ge-J.. Date: 4 ~8 -' (ft-. Sequence C (Po) Elapsed Time Pressure Flow Rate Time (minutes) (psi) (gpm) 14:16:30 0.0 188.88 14:17:00 0.5 no readinQ 14:17:30 1.0 184.34 0 14:18:00 1.5 183.79 0 14:18:30 2.0 182.64 0 14:19:00 2.5 184.39 0 14:19:30 3.0 187.76 0 14:20:00 3.5 190.00 0 14:20:30 4.0 190.26 0 14:21:00 4.5 190.41 0 14:21 :30 --*
      • 5:0 187:50
    --. 0 14:22:00 5.5 190.45 0 1.4:22:30 6.0 noreadin 14:23:00 6.5 no readinQ I r I* i I
    • ~
    DOUBLE PACKER BOREHOLE! PERMEABILITY TEST DATA SHEET AMEC ENVIRONMENTAL& INFRASTRUCTURE, INC. , Page 1 of2 PROJECT NAME: C!tnch River SMR Prolect JOB NO. 6468-13-1072 . DATE: 7/S".h 3 Boring No Mp~ t./1 $"" . Borehole Diameter, ln.: 3,g Total Borlng Depth, Ft. _320, I. Gnd Elev; Ft: 73{. l t::> n. 7 *,,,u, c'aslng Height above ground>> F\\: 0. ~ t5Jex.)Top of Casing, Ft. (Gnd F::lev +Casing Height):? c>'t.<; 8 "'*BattJm ~~, ::t-l <P- \\ '"3. tjt!)- ~rrn 7 iS/1.:3 t~z...5i<>.::t.Y' TEST ID:Mf*,$1:1tf"?o,11'! 2, Test length: Test Section Depth (fi*om Datum): From lG?, * $'"'~ To. Ji*o, Q (A) Depth to Water Table From Datum, Ft: ~ *z_, :,?9 Test Water Temp: I ~F
    • Baro *Pressure, psi: i ~ 1 Lj '~
    . (B) Surface Gage Height Above Datum, Ft..,_ 0. ~ I,i~ l' Dept~ to Center of Test Interval From Datum, Ft:,,, ~a,S'-. t) 11t-1 7 15"/JJ * *. (C) Distance Water Table to Center ofT est Interval Ft.~£,- Static water pressure at center= (C"62.41144) + Baro"' 1'6, 9 I';$'.e. 1111. '?js-j 1j
      • MAXIMUM TEST PR~SSURE, Po"' ([A+6*1] + cy.57) [Po=*~ J Test Pressure sequence"' 1/3 Po, 2/3 Po, Po, 1/2 Po, Po
    ~?.:i{T1'1-1(')}d -~t;;.?J!ii1/YlrJ .5.:0~'PtA?f>7 1JSequenceiD: A B C D E Po Values: 1/3 Po"'~; 2/3 Po=::::t8... ;.112 Po=~ M<! Appropriate Po value to static pressure at centeroftestlnterva1 TESTNO.Zo-1~,e.. J; SequenceN~.
    • A
    • PlannectCenterPressure:_L\\A*r ~ "J/'S/t':J
    $?i\\ ~A }(PI (j} I I TransducerReadingsBeforePackerslnflated: Top,;)~.0'-{ ; Middle. Qla'"'i'"!d)
    Bottom: a:z*$""7 Transducer Readlngs After Packers lnflated: Top &2., 0 CJ Middle *113, b 8 ' Bottom: 8' "? *,)C FLOW METER READING, Gallons Middle Surface Gage.
    Time,. FLOW,gpm *
    • Transducer REMARKS Minutes Reading, psi Pressure, psi lhitlal Final Dlflerence
    • 15 St.*~(J) s~~\\
    4> . 8L\\,S ":\\ (/) tp t
    • ,";)"i~~
    • I~?</)\\ tfJt.$
    8 )91 3'!~§:0\\ (/) <:}L\\, ~*;s s I fJ.:;)'-) (p (jl 8'~'? I 5~'T>\\ tA ~4.4 '~ '\\;,~"f.,~ 1J{J) 5'?,91 8?>~1 (j \\<P\\~'05 . \\' {/} I A iP¢ (/)f!J s*?l ~~ e*og\\ tl \\ 1/J *z, fill Z(t) \\L\\ {/l(j; *3<P 83'91 g"j'?\\
    • ¢
    ~~ ' '"\\ ~ "E,** I '1:. . '\\ <Plj~ Z(j) \\-A ~l ~a e*~ 8"&9\\ (/J \\ \\c;),, "2. -~¢ l4 f$'Vh~ s*.~~\\ (15 \\ \\ '7:\\.~*z.. ~~
    • \\A $t..:3ti g:,~(
    0 \\ t~:rAS '3-¢1 I 4 cJ; ~ ¢{/) $*c)~J 0 .'*\\1'::\\A~. 3~ ~4.tl3~(/) . ~~*?.>-::H .¢ \\ \\':\\.i\\s; '!?,,'/) .. tjf t4 (/)A. ¢'t.f S~e:>\\ t\\ ':t,*~_.e ~*d) it\\ ¢~$(Jl e39t ¢ ~- 11'1",-:59 3~ 14 1/J~I}A/J 339\\ cj t r;, 29
    • 3¢ 14 rtJv 5~~\\
    ~ - /2'"$, (p t 7>~
    • From Preliminary Boring Layout Survey WI 21 Rev 4-RCN: CRP-0414A Page 22 of 23 l
    Form Approv.ed for use on the Clinch River SMR Project-J.A. Tice Techncial Lead Form Rev 0- Reviewed by <;qZ. l'v/tlf/1. Clinch River Data R~port Rev. 4 CRP-1112.16 Page E.3-129 of 515 DOUBLE PACKER BOREHOLE PERMEABILlTY TEST DATA SHEET Page2 BORING: M"P~4 l S 'r,.owc; ~ S ~(\\! A DATE: 7~ '5 ~ 2?¢13 DATA COLLECTED BY* Tln..... f-1 c:Gn-~.-/;r;M. c;,,O OAti"' t~lbc I SIDJTNIN TEST PRESSURE: psi
    See: -n, 1
    . r,)~ t-t~k~ lr> SURFACE GAGE CENTER TRANSDUC~
    TIME, PRESSURE, psi PRESs~*.
    minute b---: I I .~1./ ---- I A" w.;:.;:-- .J~ ~ EQUIPMENT USED Transducers: Level Troll700 Serial Numbers: 335896/R24844 (shallow) 6112113; 315381/R24039 (intermediate) tf/20/13; 141142/R20367 (deep) 6120/13; 315380/R24038 ~spare) '6120/13 ___________ _ Surface Pressure Gage: (Both Wlka 2i3.53)- MW-3 (at pump); MW-4 (at totalizer) 6/11113_. _;.._._, __ Barometric Ptobe: (Baro 'l't*oll}121315/R22669 6/12/13 Flow Meter: fMaster Meter 1344)- 8824788 field checked 6125113 Stop Watch~ {Sportline 220)- L286/2786 6110/13 Date of Calibration: Dal:es in italics after equigment serial number Calibration due: _Post Testin*t:l.----- Fi Lf!S:S ( -:5 s-~.c..l<lf'PCG s A "Tr~IJeo ua"' H E) ';, MP-41 S ~&o~C: 2. (73) 2 ¢I "$ - t;.J 7 -.C# 5 MP--4\\S *:t; 0 ~d-z.. (15) Z(/)1 '3 *- tiJ'*7'- ~'5 MP--4tS ~ol-...lt:it-' z. ('/) z 1/J 1'3 -* ¢::f - ¢"5 MP-1/ts
    c;
    ~ 10 c::-* z LT) zc;Jt '3-qJ':(-(1)5 14 /5tiJ J ({.) 8 t..U :5 1.-
    14, 5 (/), /L)f.3 ff,N"C6;"(_ 14,48 1 Z~ L<..J S L
    14. 4t3~z~
    dfk.C:(f"L MP-415
    • t: t)/0c;! z.
    (AA..) 'Z'.pI 3 -,p:':( -@'5' 14, ~ '34 j.(.)j' L C(~, "l--;'S*~l5 MP'"-£11'.3 :C.atvG z.. (M) z'r;;t *-s ~ @'7 -¢'5 /4, *Si!,8~ Cf".KC(FL Me*-41'5 Eo,._.c;; c. (6.) c. ():J/ 3.-- (£)? -rllS I 4, ".) Z, '$'2._ G..l;) L Jv\\..(->-4\\CS ~1;!1-.>Cii 2. (L) ~(LJI~- ¢"7- (!5'5 /4, t;)2, s 2. e'XC/:fL WI 21 Rev 4
    • RCN:. CRP-041~.4 Page 23 of 23 v\\(1((1 Form Approved for Use on the Clinch River SMR Project-J.A. T1ce Technc1al Lead Form Rev 0- Rev1ewed by ~~
    • I Clinch River Data Report Rev. 4 CRP-1112.16 Page *E.3-130 of 515
    I I I i* DOUBLE PACKER BOREHOLE PERMEABILITY TEST DATA SHEET AMEC ENVIRONMENTAL & INFRASTRUCTURE, INC, PROJECT NAME: CI/QCh giver SMR Pro[eg JOB NO. 646&*13-1 072 Page 1 of 2 DATE: 7/5"/f 3 Boring NofV!p~t.JI$"'" Borehole Diameter, ln.: :3Jt Total Boring Depth, Ft.,320, I Gnd Elev, Ft: 73'£.{. l PAll{ k Casing Height ~bQ'ie gr:.oun,.d, Ft:,fl*~ Elev. Tqp of Casing, Ft. (Gnd Elev +Casing Height):? 'O'i.(, 8 _ "'-Gai\\!R'l* ~~ "';[.-I 0 - 1 "-S "!IS 71'Ji\\, US IJ \\t.>'Z.,'i;z.'TQJ.'HI.l) TEST ID:f1~.. (:Ui('?o,'\\~.),_Test length; l * ~) Test Section Depth (f(om Datum); From l(,;J.
    • s-To /7 0. 0
    ~ (A) bepth to Water Table From Datum, Ft: \\ "l- * '? 9 Test Water Temp: I ~:::" Bare *Pressure, psi: ~k. . (B) Surface Gage Height Above Datum, Ft..... 0 * '!S I,s--.. l.' Dept~ to Center ofT est Interval From Datum, Ft: f'C *;;!,s-* (. <.Jt 1:) '(nt 7/~h.J... (C) Distance Water Table to Center of Test Interval Ft.~ Static water pressure <t! oenter"' (C*62.4/144) + Saro = 'fl.(). 9_ t£_d.\\;; ~r/1\\ ih"/L3
    • MAXIMUM TEST PR~,SSURE, Po"' ([A+~*1] ~ c:g.57) (fo ""*~.) Test Pressure sequence"' 1/3 Po, 2/3 Po, Po, 1/2 Po, Po
    ,':!, ~~R TIA 1(-;},1,t; t;
    • 7 I~ '7/:i"/IJ
    ,,!:J<f>i:-.P,tqfs1osequence ID: A B C D E Po Values: 113 Po=~; 2/3 Po= :l+/-:::L;.112 Po:::-~ Add Appropriate Po value to statio pressure at center of test Interval TEST NO.Z<'>IV'~ Saquenoo No. B . Planned Center Pressure: t41*1 G> 1WI 1 I s*ln 9:'1\\.P'ffY' 8?J.'1fi' 'VI J TransduCer Readings Before Packers Inflated: Top,;) ~
    • 0 '/ ; Middle TransducerReadings After Packers Inflated: Top 0?2.,* 0 '-( ; Middle
    >>,tr* '<t}_: Bottom: aJ* $" 7 '1' 3" & 8' Bottom: 8" (;11 * ~-, FLOW METER READING, Gallons Middle
    Time, FLOW, gpm
    • Transducer Surface Gage
    'Minutes Reading, psl Pressure, psl h11tla! Final Difference 14-¢131)) 8391 141, f/J5 5'5 \\A. I! t:3 ¢(,1) 8'3 ':) \\ 33~1 (/) 14/, '33 '5'5 \\" ¢8 3cl a~~t 83 :=>I

    (/J ~~g, &3.9) (/) 14/, II 5? J !f_ I ¢_¢.r1J 8"3~1 t5391 ¢ 141.¢3 _* 5'5 14 1@3(/J ~ *)'?\\ 8':b':>\\ (/> 14~.4':7 ' 4'5 14 II rJH) ~*'¥71 0 s~~{ ¢ I 4 ~_~_'2.'3 a,s (4 I t "3*¢1 a*~~' 8"~<;)\\ 41 ./49~'5~ c~s ILl '*z (/) (/) tn~!>l 8;*~~\\ ¢ IL\\.~ f.. l~ w.-'5 l4 l '2.. '3¢ E:>'~~' g :2.-'7. I (4 \\4~,(/.tl &'S f.----* ILl 1'3 *~¢ 73'o7'ro *i'-A.. I ;e.t.\\N s 01:../C'r:!' r2 :: /L\\: \\4'. T&,.*:>

    • r~~~,....:s
    ~ 1----*
    • From Preliminary Boring Layout Survey WI 21 Rev 4
    • RCN: CRP-0414.4 Page 22 of 23 REMARKS
    . *'8tJ~ I'J? A.) GPJ:;:.. ;5(d<{ (.j. $'9,45 Z2,¢2. Form Approved for Use on the Clinch River SMR Project - J.A. Tice Techncial Lead Form Rev 0- Reviewed by Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-131 of 515 I ! I* I I i DOUBLE PACKER BOREHOLE PERMEABILITY TEST DATA SHEE'I' BORING: M'J::>~4JS' i!oi</a: 2) 5a:~. /3
    • .DATE: 7<'- 5*- 2'¢/ *3 DATACOLLECTED.BY: ?1J4 Mc.6Jnt'...kM. G.JJoD41i?.O SHUT~IN TEST PRESSURE:
    ul~ psi 5""4B't.r h,.., 1 <61-t't~IIJ u' TIME,. SURFACE GAGE minute PRESSURE, psi 1./.,~/..) ----- ..r! t.-* ( :::;::;-- NO_t--- EQUIPMENT USED Page2 CENTERTRAN~* .. PRESSlffi,E===
    • ~
    f-'--* ~ Transducers:. Level Troll700 Serial Numbets: 335896/R24844 (shallow) 6/12113; 315381/R24039 (intel'mediate) 6/10/13; 141142/R20367 (deep) 6/20/13; 315380/R24038.(spare) 6120/13 ____ Surface Pressure Gage: (Both Wikn 2i3,53) ~ MW-3 (at pump); MW-4 (at totalizer) 6111113 _____ _ Barometric Probe: (Baro Troll) 121315/R28669 6112/13 Flow Meter:.(Master Meter 1344)- 8824788 field cJiecked 6125/13 Stop Watch~ (Sportline 220)- L2S6/2786 6/10/13 Date of Calib1*ation: Dates in italics after eguinment sel'ial number* Calibration due: _Post Testin"'-----~-- Wl21 Rev4-RCN: CRP-0414.4 Page23of23 1 ~ t* Form Approved for Use on the Clinch River SMR Project-J.A. Tice Techncial Lead Form Rev 0 *Reviewed by ~ 11 (3 /1 Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-132 of 515
      • t,,
    DOUBLE PACKER BOREHOLE PERMEABILITY TEST DATA SHEET AMEC ENVIRONME::NTAL & INFRASTRUCTURE, INC. Page 1 of 2 PROJECT NAME: Clinch River SMR Project JOB NO. 6468-13-1072 DATE: 7/s/r 3 Boring No{1pw I.J( ~- Borehole Diameter, ln.:3.B Total Boring Depth, Ft. 320, I Gnd Elav, Ft: 78'-<.i
    • t 'b47LJM Casing Hafght,.above. ll roun~, F.it: 0. 3 Elev. Top of Casing, Ft. (Gnd Eiev + Casing Helght)::713[.C, 8'. "'-9arurn~ 9\\. 7 - 1 (/} -i--s os;,;,7i11 7ts ':'.>
    (t~.oz.Sl Test WaterT~mp: I~:;-. Baro *Pressure, psi:_{ Y.y ~ . (B) Surface Gage Height Above Datum, Ft:...... (). 3. I S'~.:tb Deptl} to Center of Test lntervat From Datum, Ft:,,, ',;} s- /1h "7/~/J.J (C) Distance Water Table to Center* of Test Interval Ft.~* Static water pressure at center" (C*62.4/144) ** Saro"' 'f.O, 9 tDo,o ~ffl!t I hi 1.3
    • MAXIMUM TEST PRESSURE, Po" ((A+~~1]. + c~o.57) [Po=< ~J Test Pressure sequ~nce = 1/3 Po, 213 Po, Po, 1/2 Po, Po
    -~=!*A T(ll,. 1(sM.GG *, 7 /1'17/l'/17,i!ttP Ttil '1/lJe!Sequence !D: A B
    • C D
    E Po Values:* 1/3 Po"'~; 2/3 Po, ;u..=; __._.;.112 Po= * .-e> Add Appropriate Po value to static pressure at center of test fnterva1 TEST No.Zo-~~oe.. J Sequence No. C . Planned Center Pressure: I B@. *~ f'l *jfi\\ 7 Js-/IZl 'Kt\\~ ;ro. )o* <lJ Transducer Readings Before Packers Inflated: 'Top..;) a
    • 0 4 : Middle ~
    Bottom: iJI..{, 5" f
    • transducer Readings After Pac~ers Inflated: Top 9?2,, 0 t.{.; Middle 13, (;. ff' Bottom:.t$""'/ ~ s*'
    FLOW METER READING, Gallons Mldd!e Surface Gaga
    Time, FLOW, gpm
    • Transducer REMARKS Minutes Reading, psi Pressure, psi Initial Final Difference
    \\ l\\ \\ L5 '1!'ti ~*'.>9\\ ---*~ IBS\\'0'0
    • 9S
    '18 fif 6? I.A../ r 4 \\1 1£~ 5':>~\\ 5'3<:::>1 l&'\\,;<,4-9s '/ 4 \\ 8 <P<" 8~-so\\ ~'3~\\ \\ 8--s, :.l~
    • ~%
    14 I 8:3¢1 . B"~~\\ ~*3 <;)I 1 az.ut. '-75 J 4-I~ f!J$ 3-~~\\ 8 39( /8439 1¢1/) '13LI"' P a"'* .P..ea*S:IL!I'/!1::- *
    • t4191Jf/J 153~\\
    .f:f39/ 18=1,-:)6 1¢~ 14 ZI/IP'-19 5~~\\ &5'91 ' 19¢1¢¢ . /111'/1 t 4 ZP3fl) s*~~' 83'S' I l9¢.2t,. /{1)(/J 191/{41 1¢~ 14Z/I/)f/J e~~' 8391 ~-- l4 21 "J'(/J B~t:)\\ 8J9/ ld'-15(/) ./ flJ /)1 Jil zz /Ill e~~~\\ 8:$9/ 1914.45 /¢'¢ '(£1Jf.) S!:r~ 2.'1!.. -14 Z;f;. 3 1.1 14 23 ~()
    • From Preliminary Boring Layout Survey Wl21 Rev 4-RCN: CRP-0414.4 Page 22 of 23 (1--{I111J Form Approved for Use on the Clinch River SMR Project* J.A. Tice Techncial Lead Form Rev 0- Reviewed by..!:s{l-.:L-__.!..._j~'-'--1.!.-
    Ciinch River Data Report Rev. 4 CRP"1112.16 Page E.3-133 of 515 I I I I DOUBLE PACKER BOREHOLE PERMEABILITY TEST DATA SHEET BORlNG: /vfP ~ 41'5 coLI <!F ZJ 5e:GJ C.. DATE: f.- '5** 2¢13 DATA COLLECTED BY: r;,,._, /V( ~(J-- /JIM 0~ r->1041<' 1':;:> SHUT~lN TEST PRESSURE:_.......:.;;.tJ+ 'I.:...::~~----Psi -s:~-a-n
    1.
    \\\\1 \\1) e C::.1 Jll
    TIME, SURFACE GAGE minute PRESSl.)RE, psi
    \\\\ s6e --- \\..-r "-/"---- \\'-\\ *:...:---~ ....- ~ -~
        • .~, -q.-s ~ \\~
    EQUIPMENT USED Page2 CENTER TRANSD~ PRESSllJ3.Er-p; ! 1-- Transducers: Level Troll700 Serial Numbers: 335896/R24844 (shallow) 6112113; 315381/Rl4039 (intet*mediate) 6/20113; 141142/R20367 (deep) 6120113; 315380/R24038.(spare) 6120113 ___________ _ Surface Pressure Gage: (Both Wil{a 2i3.53)- MW-3 (at pump); MW-4 (at totalizer) 6/11/13 _____ _ Barometric Probe: C§aro Troll) 12l315/R22669 §112113 Flow Meter: (Master Meter 1344)- 8824788 field checlced 6125/13 Stop Watch: (Sportline 220) -L286/2786 6/10/13 Date of Calibration: Dates in italics after equipment serial number Calibration due: _Post Testin""---- ---- Wl21 R~v4-RCN:. CRP-041~.4 Page 23 of 23 ~ ~~ J Form Approved for Use on the Clinch River SMR Project~ J.A. Tice Techncial Lead Form Rev*O-Reviewed by Cjf'k, 11 Clinch River.Data Report Rev. 4 CRP-1112.1~ Page E.3-134 of 515 i I I ' i DOUBLE PACKER BOREHOLE PERMEABILITY TEST DATA SHEET AMEC ENVIRONMENTAL & INFRASTRUCTURE, INC. Page 1 of 2 PROJECT NAME: CUnch Rjver SMR Prglect JOB NO. 6468*13-1072 DATE: 7/:JU 3 Boring No.me... l/1 s-Sore hole Diameter, ln.: 3,t;> Total Boring Depth, Ft.,32 0, I Gnd Elev, Ft: 7/f<l. l. b~-ru.. 110\\. Casihg Height aboVfl.grpundl F 1 t: 0. 3 Elev. T~p of Casing, Ft (Gnd !::lev+ Casing Height):?~{.(, 8 =.Qalont"' ({ ~~. ":!- ~ (P- \\ ~ '/.IS'7YY!. 7 ~- ~(H.,.'l*':L'r<>._j,.:;:j¢,., ~ TEST ID:{\\'1 ~ *M~'?ooe l. Test length: l* ~. Test Section Depth (from Datum): From -IG?.. 1 S" To 17 0,. 0 (A) Depth to Water Table Fr~m Datum, Ft: ~ *z. ?~ Test Water Temp: I S4::-* Baro *Pressure, psi: _L':h&k . (B) Surface Gage i~elght Above Datum, Ft.'-0. ~ 1 S'l l.l
    • Dept~ to Center of lest IntervaL From Datum, Ft: {'~ * :i.:r""
    t ' ~ Y!11 '1/'S/J.J * (C) Distance Wafer Table to Center of Teet Interval Ft.~ Static water pressure at center= (C*62.4/i44) + Baro = 'fO 1 9 JfX!.-:. Tt/tt 1/<:,"/1:3
    • MAXIMUM TEST PRf;:SSURE, Po"' ([A+FJ'1] + C:fl.67) {Po"'*'(&&~] Test Pressure sequence= 1/3 Po, 2/3 Po, Po, 1/2 Po, Po
    ~~*ArV~- 7{';J*'S /i.(.:..7 IJ!t1IY/*1 s?/:.g 1f.II/51,)Sequence!D: A B C D E Po Values: 1/3 Po.;~: 2/3 Po:: :::u-:=; . ;.112 Po=* Add Appropriate Po value to static pressure at center of test Interval TEST NO,Z;I\\.-e...l Sequence No. '"'D
    • Planned Center Pressure; ~~~I!ZJ: (o. 7g 'T/14 : J.rj 1.3.
    Transducer Readings Before Packers.Inflated: lop.J d. ~ 0 4 : Middle ?$0 ::zB : Bottom: '8 4 * ':> 7 Transducer Readings After Packets Inflated~ Top cQ :{, 0 4
    • Middle
    '"ff 3 ' (r> 1f Bottom: if el* S FLOW METER READING, Gallons Middle Surface Gaga*
    • Time, FLOW,gpm
    • Transducer REMARKS Minutes Reading, psi Pressure, *psi Initial Final Difference r 4-Z.":/ -sq; s*~9t
    -.... ~- I'Y~.8Z 5'¢ 'B <:!$ 611,_J 28 ¢(! B~e;>~ *-** 8321 tP (j t *;sg *z. f
    • St/J
    'Do~\\ S_'3~1 a ¢ 5' tJ;' r z*t=r~¢ J ~8 2S Z9,¢t.P ~-~CJ\\ s*~9\\ ttJ .¢ l"'b~.*3c.. 4-S 'P rl.~PII>tf' 0 ~pA!.~ ~ 29:W 5~~\\ 'B'~_S>l tP ¢ \\ 1,'2., *~ s 4~-* l A- '".-;" ¢(/- 5"'3.~ * \\ e*~~l (j ¢ J *~z, J':'l 4-'5
    r/) '3 (/).
    5~9l 5"?~\\ (/J ¢ \\ -~,,2>*~
    • .:\\,~
    '3l¢'¢ ~-~C)\\ S';)c;)l cit .¢ \\~\\.. "~ A.S
    \\"l.£/>
    ~~~\\ 8~~\\ (/) ¢ .\\ l>t, -a c.. 4-S )>7,.(/;t/i '0?91 5~9,)\\ () ¢ \\'~Z. IJ[P . t..s '17.'3~ ~~~~ 8~~, ¢ cj \\1;2. I (JJU 4S '3~ fjrJ 8"!,~\\ 8"?>'01 ¢ ¢ \\'~\\,~5 L\\CS ~;.,, "?,/) 8~~~ 8'3~) d) .c/) \\'"3\\,~)_. -" 1.\\S \\1\\
    • ~A<M 8~<:>1
    • 8~~l
    . ¢! ¢ \\'~!\\.~ lV5 CA..iD S.t'~. 14 3t...* (/)tJ. B 0'7"71! ~__..... IV$ -* B":f~ ZL\\ J........ I ti..A 1L1 *;.G $ ¢ T~,::> TRAtv$ zz,¢1 - - -~ -
    • From Preliminary Borfng Layout Survey W121 Rev 4-RCN: CRP-0414.4 Page 22 of 23 Form Approved for Use on the Clinch River SMR Project-J.A. Tice Technciat Lead Form Rev 0- Reviewed by 0J1-Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-135 of 515
    DOUBLE PACKER BOREHOLE PERMEABILITY TEST DATA SHEET Page 2
    TIME, SURFACE GAGE CENTERT~---
    minute PRESSURE, psi PRESSU 1 l \\ ~D 1--- \\).':/~ ----- \\ \\ ~ '(' I ----- ~- ~h. i-5*-13 EQUIPMENT USED Transducers: Level Troll700 Serial Numbers: 335896/R24844 (shallow) 6/12113; 315381/R24039 (intermediate) 6/20!13; 141142/R20367 (deep) 6/20113; 315380/R24038 _(spare) 6/20/13_~ . -------------~ Surface P1*essure Gage: (Both Wika 2i3.53)" MW-3 (at pump); MWw4 (at totalizer) 6111113 _____ _ Barometric Probe: (Baro Troll) 121315iR22669 6112/13 Flow Meter: (Mas.ter.Meter 1344)- 8824788 field checked 6/25/13 Stop Watch: (Sportline 220)- L2~618'i86 6110/13 Date of Calib1*ation: Dates in itt~lics after equipment serial number Calibration due: _Post Testin"'--- W! 21 Rev 4-RCN: CRP-0414.4 Page 23 of 23 l J Form Approved for Use on the Clinch River SMR Project~ J.A. Tice Techncial Lead Form Rev 0 - Reviewed by srz.. 1'7/ IJr/J. Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-136 of 515 I I !. I I,., DOUBLE:: PACKER BOREHOLE PERMEABILITY TEST DATA SHEET AMIO:C ENVIRONMENTAL & INFRASTRUCTURE, INC, Pag~ 1 of2 PROJECT NAME: Clinch River SMR Pralect JOB NO. §468*13-1072 . DATE: 7 /W 3 Boring No£Ylt1~ !JI S Borehole Diameter, ln.:3.f!? Total Boring Depth, Ft.,3;(0, l Gnd Elev, Ft: 7&'<.1) P ~7' Lt ""- Casing Height above groul)cjllt: 0. 5 Elev. Top of Casing, Ft. (Gnd Elev +Casing Haight):'? 8[.(, 8 o:*~t>atal"i'l~* ('1.._~ '::(~I¢- J:$. 'IJ'fr"lhl ~fl()i 1::J--r;i, *z, s l ~) y TEST ID:MfQ~ ?0-.e:l., Testlength.: J * ':> Test Section Depth (from Datum): From l(;?.,
    • s-'
    To 17 0. 0 (A) Depth toWat~rTable From Datum, Ft: rz...:;6} T~st Water Temp: I~;;- Baro.Pressure, psi: 11Jl.~ . (13) Surface Gage Height Above Datum, Ft *.,_ 0 * ~ I S~ l.{,. Deptl) to Center of Test Interval From Datum, Ft:k~- ~., *
    • rtn 1/'!i/I.J
    {C) Distance Water Table to Center ofTesttnterval Ft.~ Static water pressure at center= (0*62.4/144} + Baro = 'fu ' 9 tOe>.e. }114._ "7/'S-/13
    • MAXIMUM TEST PRES pURE, Po"' ([A+B~1l + C';9.67) [Po;J!;f-1 Test Pressure sequence =>1/.3 Po, 213 Po, Po, 1/2 Po, Po
    ~-!:R ~~ 7{';)1'1 .~6.-*7 tl'i1/5"/f1
    • '"'1MfJSequenceiD:
    A B c D E Po Values: 1/3 Po"'~ 2/3 Po=~ ; :1/2 Po= Add Appropriate Po value to s~atlc pressure at cent~ro~test interval TEST NO.Z0.11-'1!- l Sequence No. E *
    • Planned Center Pressure:
    I 8¢, ~* Tfll 7 )s /f f '"'~ 0 ll rtl\\ ~~lfo.7'8 ~~~ -7. Transdueer Readings Before Packers Inflated: Top.;J 01 *
    t
    Middle U.IJ~
    Bottom: (} '2 * )
    Transducer Readings After Packers Inflated: Top &2.* 0 'l Middle 1* 3 * (:, 8 Bottom:. 8' "*,) C FLOW METER READING, Gallons Middle Surface Gage'
    Time, FLOW,gpm
    • Transducer REMARKS Minutes Reading, psi Pressure, psi Initial Final Difference l )),.. '""!:>() 3¢ B~~t
    \\ B-=l, ~'L \\ </)¢ 13: 6?/ /..1 tLt. A 0 ()qJ 8~~\\ 839-( \\S)l[J, 9(() ( r(J{I \\b..b.r./)7>¢ T3':S~I 8,~( \\31. \\(,) . ~ <{J uJ l L\\. 4 \\' &.Jyl} . B~~I B~'?l \\ e"=\\."J9 \\ </J c/J
    • 14-4.\\ "341 S)C)I
    ~r~~~ t~w~L\\'3 I ¢(/J lL\\.42..41¢ 8';,~\\ 83~1 \\ B'S.L\\to \\ \\ll y:l U\\.£\\7_ 3<} <8-~~ \\ ~';)9! I~4J.38 \\1/J¢ tL\\ Lr~ tP¢ 83~\\ 839! \\<:;)\\,"::!-:, t </J (/) !L\\- L\\.~J$ g ~':J l '8'391 .\\ '?</), {fl'(_ \\ ttl cP J--~ 1444~ 839'! 8391 1873.'55 lf/Jrl * [L\\ 44-j(() ~'39\\ 83<':}'( 185,35 I.(/) (/) \\A 4.~ ~rt B3~~ 8391 IBf6~CoG /r/J(.) Ef..I'D
    • ~(Fdjl, 14*4t:t.
    73o{ J,. t:.)/-'1 ;;.ell MS 89, z:z 14£/C. 3V'- --r'oto -;;A.us zz, ~I =
    • From Preliminary Boring Layout Survey Wl21 Rev 4
    • RCN: CRP*0414.4 Page 22 of23 l l Form Approved for Use on the Clinch River SMR Project-JA Tice Techncial Lead Form Rev 0 *Reviewed by ~
    L. (1.- jJ ff}
    • Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-137 of 515
    DOUBLE PACKER BOREilOLE PERMEABILITY TEST DATA SHEET BOlUNG: MP-41'5 1 ?:,o;~t!" Z > 564? £ DATE: "f-S-Z.¢)3 DATA COLLECTED BY: /al>-1 SHUT -lNTEST PRESSURE: 5d"e-. 7~"7 1
    TIME, minute
    ~---- EQUIPMENT USED SURFACE GAGE . PRESSURE psi I " \\ c.&.. 4.... \\.> _.?---- ,, \\ o7' --- \\~ ~-- Page2 CENTERT~ PR~§SU Transducers: Level Troll700 Serial Numbers: 335896/R24844 (shallow) 6/12113; 3153811R24039 (intermediate) 6/20/13; 141142/R10367 (deep) 6120/13; 315380/R24038 _(spare) 6120113 ________ __, __ _ Surface Pressure Gage: (Both Wika 2i3.53)- MW-3 (at pump); MW-4 (at totalizer) 6!11113 _____ _ Barometric *Probe: (Baro Troll) 1:21315/R22669 6/12113 Flow Mete.r: (Master Meter 1344)- 8824788 field checked 6125/13 Stop Watch: (Sportline 220)- L2B6/2786 6/10113 Date of Calibration: Dates in italics affel' equipment serial number Calibration due: _Post Testing, ____ ~ Wl21 Rev 4-RCN: CRP-0414.4 Page 23 of23 _/ J Form Approved for Use on the Clinch River SMR Project-J.A. Tice Techncial Lead Form Rev 0 *Reviewed by $\\k I'VJ.{1(/' Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-138 of 515 Clinch River SMR Project Double Packer Borehole Permeability Test Data Sheet AMEC Environment & Infrastructure, Inc. AMEC Project# 6468-13-1072 Boring: MP-415 Zone: Z3 252.5 feet to 260.0 feet below ground surface Transducer Location: Middle Sequence A (1/3 Po) Sequence B (2/3 Po) Elapsed Time Flow Rate Elapsed Time Time (minutes) Pressure (psi) (gpm) Time (minutes) 11 :23:00 0.0 122.92 11:39:00 0.0 11 :23:30 0.5 No Reading 11:39:30 0.5 11 :24:00 1.0 No Reading 11:40:00 1.0 11:24:30 1.5 No Readinq 11:40:30 1.5 11:25:00 2.0 No Reading 11:41:00 2.0 11:25:30 2.5 122.92 0 11:41:30 2.5 11:26:00 3.0 127.00 0 11:42:00 3.0 11 :26;30 3.5 132.95 0 11:42:30 3.5 11:27:00 4.0 137.62 0 11:43:00 4.0 11 :27:30 4.5 163.69 0 11:43:30 4.5 11:28:01 5.0 164.21 0 -11~ 28 :31- -~ --5.5 -~-* - 183.00. -* ~*. - ~- - - 11 :29:01 6.0 183.29 0 11:29:31 6.5 No Reading 11 :30:02 7.0 195.87 0 11:30:32 7.5 175.70 0 1-1:31-:02 8:0 168~12 0 11 :31 :32 8.5 168.26 0 11:32:03 9.0 169.23 0 11:32:33 9.5 168.35 0 11:33:03 10.0 168.66 0 SequenceD (1/2 Po) Sequence E (Po) Elapsed Time Flow Rate Time (minutes) Pressure (psi) (gpm) Time 11 :58:00 0.0 190.67 12:02:30 1'1:58:30 0.5 189.30 0 12:03:00 11:59:00 1.0 189.82 0 12:03:30 11:59:30 1.5 189.70 0 12:04:00 12:00:00 2.0 189.15 0 12:04:30 12:00:30 2.5 189.23 0 12:05:00 12:01:00 3.0 189.30 0 12:05:30 Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-139 of 515 Elapsed lime (minutes) 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Pressure (psi) 219.74 220.43 218.58 217.44 220.36 219.07 219.34 210.93 220.19 218.80 Pressure (psi) 268.42 264.81 264.35 266.03 265.18 264.70 266.63 Flow Rate Prepared by: c! or Checked by: rj_ Sequence C (Po) Date: '7--?-- J <../- Date: .A,.,.4 fl 1J.--( (}_.. (gpm) Elapsed Time Flow Rate (gpm) Time (minutes) Pressure (psi) (gpm) 11 :52:00 0.0 270.30 0 11 :52:30 0.5 269.61 0 0 11 :53:00 1.0 270.59 0 0 11:53:30 1.5 268.93 0 0 11:54:00 2.0 268.00 0 0 11:54:30 2.5 268.02 0 0 0 0 0 -* -~* *****-- -- -. ----'- . ~-~- Flow Rate (gpm) 0 0 0 0 0 0 ---~- -- DOUB!...E PACKER BOREHOLE PERMEABILITY TE!ST DATA SHEET AMEC ENVIRONMENTAL & INFRASTRUCTURE, INC, . Page 1 of 2 PROJECT NAME: Clinch River SMR Protect JOB NO. 5!468-13*1 Oi2 DATE: j/S'" /J j Boring NoM P**ll ~~- Borehole Diameter, ln.:~* 8 Total Boring Depth, Ft..3Jo, I Gnd Elev, Fl: 78t/.[ f,:;:lt,\\ n,; N.. Casing Height a~ova ground, Ft:~ E_>ev. Top of Casing, Ft. (Gno Elev +Casing Helght);181l68 :::.PallHn.. (:;;~~. "*1- ~~~~1-s (Z'5<!o"5 II"<> ~~,..... TEST IO:iljk
    • t(r')" ':?; u*fe.3 Testlength:
    /. ':::> . Teat Section Depth (from Datum): From ;.? S";.:? *. :> To.AJ.f> (), 0 (A) Depth to Water Table From Datum, Ft: 13
    • L\\
    • Test Water Temp; '")~0 Baro Pressure, psi: II./* ~ S
    . (B) *surface Gage Height Above Datum, Ft. -o. 2> Depth to Center ofT est Interval From Datum, Ft: A,$"'(, * ~ s-' (C) Distance Water Table to Center of Test Interval Ft~t.J~.a.s-Static water pressur~ <~t center= (C*62.4/144) +Bare"' JtCJ * '7 MAXIMUM TEST PR~SSURE, Po= ([A+B*1] + C*0.57) [Po= I S"/,{""j Test Pressure sequence= 1/3 Po, 213 Po, Po, 1/4 Po, Po Sequence 10: A B C D E Po Values: 1/3 Po = j(), 5 :. 2/3 Po:: I 0 I. 0; i/2 Po= 'l :i * "JS"" Add Appropriate Po value to static pressure at center of test interval T'EST No.2o:H1e 3 Sequen~ No. A Planned Center Pressure: 17~ e Transducer Readings Before Packers Inflated: Top JQ./ 0
    Middle 119,q 1.
    Bottom: Trans~ucer Readmgs After Packers Inflated: Top _ ;RO. 0 '1 ; Middle !d <./. ~ (..
    Bottom:
    J;{3~'1i 130.f]s-FLOW METER READING, Gallons Middle
    • Time, FLOW, gpm
    • Transducer Surface Gage REMARKS Minutes Reading, psi Pressure, psi Initial Final Difference 11/,C :s*
    8'?:>9(/) 0 13.t!i6f.I)U IZ~. 92-I I/ Z'5,' 3rl 839(/J 83'9~ (6 (pl 1;2Z, -,z. .0 1 l:z~ t f/Ju. 83'?¢ 8>'&'3>G!i v6 0 ' IZ?.f/J cJ II >z...~ ~ '3 (!) .tj~~ 83~¢ d> c6 Ji? <J5' ¢ .fl: 21*\\ 1/)lt B "3i~<.O 5~~(A* ¢ ¢ /J?,k,~ (,5 I\\.\\12.1; 3/tl 8 '~'::)(# 8~90 (/) ¢ I &3, &~ ~ \\\\l 22$~1M 8'b~l8 S:i~<tS cP ¢ ___l__k~l (j W,liZ8::w 8?>~~ 8'5':)({} (,/)
    • ¢ 183.c:J 4>3
    \\ \\ \\Z~' r;<;. ~-~~~ e~~!tY _:_¢ r:j* 185, z"
    • I 0(//
    J}.l$£().'¢(/) B~9$ '5.& '?

    1% tt;!:;rs- ~-5___ C""('b. ~-:s.. r~ \\\\~ '3l/J 30 g*~s;, <t> "0 ':?> ~ <.t3. ¢ .(>> I =ffj ::J(fJ s*s ( \\'; 3\\ '. cJ(j) s~~ct~ 'B~~q; 0 t'b nB.t<- 45 ~\\\\3L:sf/.l 'B-~~~

    • e*~~Yl
    (/) (/) t~s.z~ 4&5 \\ \\! 3'LIJ!~ g *~~<D 8'3~QJ r/J '0 l(...~.Z'3 4S Y\\ ~ "5 '2..~ 1 ~ ~*~~1/J 8'?9¢. ~ - ¢ t4?8,3"5 4S _l l ' -:; )_~ 4)(j) 8'?/7;>$ g*~CJ<./.l ¢ e£ I G.R.C.t~ 4'5
    • From Preliminary Boring Layout Survey Wl21 Rev 4-RCN: CRP-0414.4 Page 22 of28
    { / Form Approved for Use on t~e Clinch River SMR Project-J.A. Tics Techncial Lead Form Rev 0- Reviewed by Cf}V /l})ff Clinch River Data *Report Rev. 4 CRP-1112.16 Page E.3-140 of 515 I. I I i I I I I I I
    POUBLE PACKER BOREHOLE PERMEABILITY TEST DATA SHEET Page2 2!,c>~t:r* 3 BORING: M:?-4\\$ ve-.-ap
    5cr<'4_ A DATE: J- $*.. 2¢13, DATA COLLECTED BY: Td-1-- Mc.61f.. l. L.JI ~ 6o r-.;'CA.t<: t::>
    SHUT -IN TEST PRESSURE: fJ ('f<. r. psi Scs.~.t *par 1 w-- l'lt~l1k>
    TIME, SURFACE GAGE CENTERT~~-
    minute PRESSURE, psi PRESS 1 l**t~---- --~ ... \\,....,"'( ~
    • \\~
    f-'" ~* EQUIPMENT USED Transducers: Level Troll 700 Serial Numbers: 335896/R24844 (shallow) 6112/13; 315381/R24039 (intermediate) 6/20113; 141142/R20367 (deep) 6/20/13; 315380/R24038.(spare) 6/20/13 ______ ~-~-- Surface Pl*essure Gage: (Both Wika 2i3.53)- MW-3 (at pump); MW-4 (at totalizer) 6111/13 B:trometric Pl'obe: (Baro Troll) 121315/R22669 6112113 Flow Meter: Q.\\!fjstet* Meter 1344)- 8824788 field checked 6/25113 Stop Watch: (Sportline 220)- L2S6/2786 6110/13
    • Date of Calibration: Dates in italics after equipment serial number
    ~alibration due: Post Testing t::iL&-:3 {_ Ve'i~I.JGMCl!'"S -A 7WR.oUC.!tN ~) ~ M P-4\\ s GONG' H~ ( f;3) 2¢13.-(J)?-¢5 IZ. 1'5, 1*1- ' W:SL. lv\\P..,4\\'S
    z:.o,_,& 3 (/3) Zt/J/'3-(r:;--(/}'5 MP-4\\S t';c:H-'G' 3 (T)
    &-¢!JI"$~dJ-;;.-*(/)'5 M1-=>- 41 S ~ o,.._,c::.. 3 ( {) z. rtlt"S ~ m i~m s MP --Ln s ll o """"'. *3 ( L) z.'v:w;. - f/J-:t *~ (/) 5 I 2. 1 I '5, I ':f 1'2,. 13,4"5 IZ., 1"3,47:> 12., 11/J,S(.., WSL CFXC§t.. \\~'-' SL MP~tH 7:5 1\\A.P ~4 \\S ~oucF-3 (L) Z(/)is-0?-*@5 IZ,f$1 %& L~XClFL ( \\..., fl'tc;:: /2.,.@9.--77_ '*'~L ~o~-' u- "3. /'A J c:.... l/){ '3 - t)Y? -v,., J . G- \\I'-'~ "2 "I'~'- '"','/l,... ~ /'/1'7 _//15 I z., ~9, 2:.2. E'X:C&1.. MP*... J.\\\\C.) ~oi-J<>- ~ ""';... __ y.... "" 'P"t' tV WI21Rev4-RCN:CRP-0414.4 Page23of23 ..,),/1 Form Approved for Use on the Clinch River SMR Project-J.A. Tice Techncial Lead Form Rev 0- Reviewed by ~'{Z-I 1 ) 111 Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-141 of 515 I l I. i DOUBLE PACKER BOREHOLE PERMEABILITY TEST DATA SHEET AMEC ENVIRONMENTAL & INFRASTRUCTURE, INC. PROJECT NAME: CllnQh River SMR Project JOB NO.. 6468-13-1072 Page 1 of 2 DAT~: j./S /J:) Boring NoM t>~q !'.>- Borehole Diameter, ln.:'3. 8 Total Bo'rlng Depth, Ft. ~0, l Gnd Elev, !=t: 78L/ *f ]'.;)I.\\ '7'.:'/./Vt Casing Height above ground, Ft:~ Elev. Top or Casing, Ft. (Gnd Elev +Casing Helght)i78t/,f;$ "'~\\l:ll'll* Ci~ 7.1.. I (fJ *1'3 (<>:.~?.*'fl*r, ~<..It>) TE:ST ID:M..r* Lfl<} '2:v*te3 Test length: /. $"" Test Section Depth (from Datum): From ;;?*S";?. S: To~~- (A) Depth to Water Table Frorri Datum, Ft:.lh.,~ Test Water Temp: 75'0 Baro Pressure, psi: 1'-1* ~ S * . (B) Surface Gage Height Above Datum, Ft. -0.,3 Depth to Center of Test Interval From Datum, Ft:.rJ.5:'to * ~ s-(C) Distance Wateri*able to Center ofT~sllhterval F.tr.:24~.B ~- Static water pre~sure at center= (C*62.4/144) +'Baro"' /tCf
    • 7 MAXIMUM TEST PRESSURE, Po"' ((A+B*1] + c*o.57) [Po= lS'IJ'"'I Test Pressure sequence= 1/3 Po, 2/3 Po, Po, 1/2 Po, Po Sequence lD:
    A 8 C b E Po Values: 1/3 Po= 50.5 ;_ 2/3 Po=: I 0 1
    • 0;.112 Po= t:;
    • 7_s-Add Appropriate Po value to statio pressure at center ofle$t Interval.
    TE:ST No.Z'o11e 3 Sequen~ No. B *
    • Planned Center Pressure: ~Zd', 9-Transducer Readings Before Packers Inflated: Top J 0
    • I 0
    Mldc;lla !19 /i J.
    Transducer Readings After Packers Inflated: Top....J2..Q
    • 0 <1 ;. Middle til 4..R (,.
    Bottom: I ;{.31 2 J Bottom: l 3 0 * (] S" FLOW METER READING, Gallons Middle Surface Gage;
    . Time, FLOW, gpm
    • Transducer Minutes Reading, psi Pressure, psi ln!!lal Final Difference 11'~9 a*:,~¢
    '?S ~---- Z.l~.-=tAr H *, *~~\\*~~ ~~~<J 8~~~ (/) ¢ ZZ¢1 4:3 '95~ \\ \\ :L\\.cJ> e~~cp R~'9f.t) ~ as.
    Z.l8,'58 9'S
    \\\\ ~ 4 tti ', 5(/) . s~~Ul ~/t>9\\P (/; ¢ ?i1,4-4 <;)'S
    • \\ \\\\ L\\ \\ U~ct>
    ~3*~(~ 8'51.3<0. (b ~
    • z..ztt, J&.,.
    • "~
    A\\ \\W e *~~t~ e-s~~ (/) dJ '2.19.1/)1 . 9"'5 AZ\\ riiJ ~3";){,6 (j~qrt 1$ (() 21 t),'34 9-~' LIZ\\ *~u 8'3~*(,:11
    • g~'?<P
    ¢
    • ¢ 2 t'~.~.3 9'5 4~\\lP</-
    8~<;Jfb '0'~<31P </; ¢*
    • 22¢,1~
    '-5 R2MARIlCJ ~~ ~ lct~.. ~lf-S**' "3 \\\\\\ 1.\\Lo-1-------1---*~--+--** ---+-----+----+-l\\1'-. *_.O_;'t:., LIE - 0..~ 1!4"t *** *
    • From p'rellmlnary Boring layout Survey WI 21 Rev 4 - RC~ : CRP-0414.4 Page 22 of 28 Form Approved for Use on the Clinch River SMR Project-J.A. Tice Techncial Lead Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-142 of 515 F.orm Rev 0 - Reviewed by
    I - I DOUBLE PACKER BOREHOLE PERMEABILITY TEST DATA SHEET Page2 BORING: 1'-~P *- 415' 'Vt:;GP Sc:r~. 13 DATE:
    • -:r~ 1'5-Z¢/'"3
    . "/VC~Gtii.. L. DATACOLLJ£CTEDBY: li>M A4;::-#. ('"iJ;,.., C-u> o*ntveo SHUT-IN TEST PRESSURE: '1 ~ --.:(-"3* (t, tJjA psi{ I. 5'
    • ~ J_
    tffl-rt-l1\\ I J tstf &?
    TIME, SURFACE GAGE CENTERTRAN~
    minute PRESSURE, psi PRESSTTRE. 1
    • ~
    ~ ...... \\.:.:> ~ \\ l.;,Cl --- \\. *\\..... ""(' ~
    ~

    EQUIPMENT USED. Transducers: Level Troll700 Serial Numbers: 335896/R24844 (shallow) 6/12/13; 315381/R24039 (inte1*mediate) 6120/13; 1'41142/R20367 (deep) 6/20/13; 315380/R24038.(spare) 6/20/13 ___________ _ Surface Pressure Gage: (Both Wika 213.53).- MW~3 (at pump); MW-4 (at totalizer) 6/11/13 _____ _ Barometric Probe: (Dal'O Troll) 121315@2669 6/12113 Flow Meter: (Master Mete** !344)- 8824788 f1e!d checked 6/25/13 Stop Watch: (Sportline 220)- L286/2786 6!10/13 Date of Calibr-ation: Dates iu italics after equipment serial number Calibration due:. _Post Testing, ______ _ WI 21 Rev 4 ~ RCN: CRP-0414.4 Page 23 of 23 Form Approved for Use onthe Clinch River SMR Project-J_.A. Tice Techncial Lead Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-143 of 515 Form Rev 0- Reviewed by ___

    DOUBLE PACKER BOREHOLE PERMEABILITY TEST DATASHE!ET AMEC ENVIRONMENTAL& INFRA~TRUCTURE, INC. Page 1 of2 PROJECT NAME: CUI)cil Rl'ler SMR Proleot JOB NO. 6488-13-1072 DATE:)./:> LJ ~ Boring NoM P-Llf'f" Borehole Diameter, ln.;S.$ Total Boring Depth, Ft.&'{O; ! Gnd Elev, Ft: 78'l*l. tJ 1.\\71../M. Casing Height above ground, F.t:.a.I8 ,,.. ~)lev. Top of Casing, Ft. (Gnd Elev *~Casing Helght);JlN 6? "'*Sffit/m* 0~. '::f-1 (/)- r> .. ~. (z-;;z.s.,, "'c:.,~:f .. t TEST ID:M.f * £11'> Z...:e-3 Test length: /. $'"' Test Section Depth (from Datum): From.;;? $':?. S To dfa (), 0 (A) Depth to Water Table From Datum, Ft: l3

    • 4
    • Test Water Temp: 7 r-o
    • Baro. Pressure, psi: II./* ~ S
    • (B) Surface Gage Height Above Oatum, Ft. -o. 3 Depth to Center of Test interval From Datum, Ft: A-S<> * ~ ~-

    (C) Distance WaterTabie to Center of Test interval ~t.¢?4A

    • 9.')

    Statio water pres~ure at center::: (C*62.4/144} + Baro" {tq,*7 MAXIMUM TEST PRE:SSURE, Po"' ([A+B*1]*~ C*0.67) [Po"' l :,-/,('] Test Pressure sequence= 1/3 Po, 2/3 Po, Po, 1/2 Po, Po. Sequence 10: A B C D E Po Values: 1/3 Po"' j(), 5

    _ 2/3 Po='.!.!!_!_
    .E.;.1/2 Po= 7.) *I!!"' Add Appr*oprlate Po value to static pressure at canter oftest Interval TEST No.zo,1.e. 3 Saquence No._
    • C
    • Planned Center Pressure:

    "Z,;~ \\, 2.. Transdueer Readings Before Packers Inflated: Top ~ 0

    • I 0
    Middle 0 9. q I
    Bottom:

    Transducer Readings After Packers Inflated: Top

    JQ
    • 0 CJ ; Middle !rl Y. ~' : Bottom:

    /;{3.'/,2 t3o.fl~

    • FLOW METER READING, Gallons Middle
    Time, FLOW, gpm
    • Transdueer Surface Gage Minutes Reading, psi Pressure, psi Initial Final Difference t ~ CS"2...

    S~9fJ o..._...,.._ --~.... -z.~cp, )lP \\~? \\ t~~\\1tfJ '$~~!.#' ~"b~ '2.l.1t':),Gd \\~"S \\ll CJ) \\ {t)f/) 8~<;){1) ,S"39c~ ¢ <fj Z.'=/~, 1>'9 \\l\\S \\.\\ ',c.)3 \\ '3 <)...* ~-~'7l'P \\~*:B ~{(J d; G6 z.L&91 \\4-S n:~~wiJl s*.y:,~t~ &~".;>(~ q) ¢ 26.> g I {j)(fJ \\L\\<5. \\\\: '5t\\ : ~f.~. 8:>'U'P 8351(1) dJ ¢ zt..Js ;;c_ 14~

    • From Preliminary Boring Layout Survey REMARKS 73§td!W W121 Rev 4. RCN: CRP;0414.4 Page 22 of 23 l./.

    Form Approved for use on the Clinch River SMR Proje~t-J.A. Tice Techncial Lead Form Rev 0- Reviewed by gtL-* 1~/ J~J Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-144 of 515

    DOUBLE PACKER BOREHOLE PERMEABILITY TEST DATA SHEE'l' Page2 BORING: ly(P~ 415 ~btfifP. Str~ c. DATE:_? < ~/3 DATA COLLECTED BY:,/ot-.ot. IVfc Gn:.. L /,77M. 6 oDZ:::,4/£0 SHU'T-IN TEST PRESSURE: f-11'A psi s&-t:F.. ~1 i 14\\f \\"t ]->JI:S

    TlME,
    • S.URFACE GAGE minute PRESSURE, psi

    ~ \\ ~e ---- t\\ """ '-/---- \\~ ~ EQUIPMENT USED CENTER TRANS~~ PRESS'QR}i:,.- Transducers: Level Tt*on 700 Serial Numbers: 335896/R24844 (shallow) 6/12/13; 315381/R24039 (intermediate) 6/20!13; 141142/R20367 (deep) 6120/13; 31538(}/R24038 _(spare) 6120/13 _______ --...,..--'---- Surface Pressure Gage: (Both Wih:a 2i3,53)- MW*3 (at pump); MW-4 (at totalizer) 6/l.l/13 _____ _ Barometric Probe: (Baro Troll) 121315/R22669 6/12113 FlowMeter: (Master Meter 1344) -8824788 field checl~ed 6/25/13 Stop Watch: (SportUne 2.20)- L286/2786 6(10/13 Date of Calibration: Dates in italics after eguipment serial number Calibration due: _yost Testing__ _____ _ WI 21 Rev 4-RCN: CRP*0414.4 Page 23 of 23 Form Approved for Use on the Clinch River SMR Project-J.A. Tlce Technclal Lead Clinch River Data Report Rev. 4 GRP-1112.16 Page E.3-145 of 515 Form Rev 0- Reviewed by

    i t i I I I [ ~ I - --1 i I OOUB!..E PACKER BOREHOLE: PERMEABILITY TEST DATA SHEET AMEC ENVIRONMENTAL & INFRASTRUCTURE, INC, Page 1 of 2 PROJECT NAME: Qlinch RlverSMR Protect JOB NO, §468-13*1072 DATE: )/.:r /1 j Boring Nol>'lP~t[ IJ Borehole Dlameter,ln.;"3.8 Total Boring Depth, Ft.a.:/0. I Gnd Etev,Ft: 78'1..l_ 'C/.4.7~'""' Casing Height above ground, Ft~ Elev)Top ~fCaslhg, Ft. (Gnd Ele~ +Casing Helght):7lN68 t=.Qall:lffl- ~ *. q-I<P --n ~ (2:.'52-t'? "1:<'.;... ;~-~ TEST ID :M.f~ LIJS '2: o*ld Testlength: I* :::> Test Section Depth (from Datum): From &2 S'P?. 5" To dfo O. 0 (A) Depth to Water Table From Datum, Ft:.l~ Test Water Temp: 75"0 Sara Pressure, psi: II./.IJ S . (8) Surface Gage.HelghtAbove Datum, Ft. ~o. 3 Depth to Oenterof.Test"lnterval From Datum, Ft: ~S"C. * ~ s-(C) Dlstl:lnce Water Table to Center ofl"est'lnterval FtO?L[~.9S Stallcwater pressure at center= (0"62.4/144) + Baro"' II '1..'] MAXIMUM TEST PRESSURE, Po= ([A+B*1.] + C*0.67) [Po,. l S'/.'.)] Test Pressure s~quence = 113 Po, 2/3 Po, Po, 1/2 Po, Po. Sequence 10: A. B C D E Po Values: 1/3 PQ =_50_._5_:. 2/3 Po= _t_o_t-._O;.1/2 Po., 7:J.75 Add Appropriate Po value to stattc pressure atcenteroftestinterva1 TEST No.:Zo,-te. 3 Sequen~ No. __.~l"')....L.~---: .

    • Planned Center Pressure:

    I ~5.4 <6 Transducer Readings 8efore Packers Inflated: Top ~ 0./ 0

    Middle J) 9
    • q J.

    Transducer Readings*After Packers Inflated: Top Q?O. 0 q ;. Middle '*lJ Y..R C.

    Bottom:.J.-;(3,) ;i
    Bottom: 130.~S""
    • FLOW METER READING, Gallons Middle Surface Gage.
    Time, FLOW, gpm
    • Transdueer Minutes Reading, psi Pressure, psi IJ'litial Final Difference t\\, rs~*\\ (p'J_

    ~1'~~¢ .\\ '7(/).~ 't l..o5 \\\\ ~ S'Br3t1 8~c;,(ft . '8~'7t;b fb ¢ \\ -~ ~. "1(/J. 6..5 \\. *S"J' tbi.b -'-I I <n.~~w s~ "9.(d ~ (/> \\ 8~. '62. e;s \\\\ ', Sll;:)\\~t!J

    • 8'3~~

    S"59(,A ¢ c6 \\ e;~ ~'=1(/J c~s l* '2.\\(~(/)W</l 6'!J'?~ 5~~()1. (/; yj l 'B~, 1$ (b$ t :z.~ ¢r/J', 3c{J. s*~~~ 83<?!f)

    • ¢ (6

    IS.'::>\\ ':Z.3 ~s 12.: ¢i I'<¢¢ S~C;)/6 e-~~~ ¢ rt> .. I g~,*1i¢ ~~~ 'S

    • From Preliminary Boring Layout Survey
    • REMARKS 73(f{u,IJJ Wl21 Rev 4-RCN: CRP-0414.4 Page 22 of 28 Form Approved for Use on the Clinch River SMR Project-J.A. Tice Techncial Lead Form Rev 0- Reviewed by 5 52-Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-146 of 515

    i I I i i I I I I I \\ I I DOUBLE J>ACKER BOREHOLE PERMEABILITY TEST DATA SHEET BORlNG: I'-1P~ 415 t;)4EC4fP Sc!S'~ Z) DATE:

    • ~l ~* $ ~ Z¢1 *:;

    DATACOLLECTEDBY: 70~ 1-A..:Gn.. ~.-/.;r;""' C!I *~OO.ti/C?.b sHuT~ IN TEsT PREssuRE: 1-1 Ia I ' psi '5'1!E&t* 7-t:, 1 \\1-\\11 IJ

    TIME, SURFACE GAGE minute PRESSURE, psi Page 2 CENTERT~~-----

    PRESSU 1 . \\ \\.;:.Gs'~ ~ \\ ""(' v::.,._--- \\"-\\:;---- \\' '\\ '\\* ... ~ EQUIPMENT USED Transducers: Level Troll700 Serial Numbers: 335896/R24844 (shallow) 6112113; 3'15381/R24039 (intennediate) 6120/13; l41142/R2~367 (deep) 6120/13; 315380/R24038. (spare) 6/20113 ___________ _ Surface Pressure Gage: (Both Wika 2i3.53)- MW-3 (at pump); MW-4 (at totalizer) 6111/13 _____ _ Bar~metric Probe: (Baro Troll) 121315/R22669 6/12113

    • Flow Meter: (Mastel' Meter 1344)- 8824788 field cliecked 6/25113 Stop Watch: (Sportline 220)- L286/2786 6/10/13 Date of Calibration:* Dates in italics after equipment sel'ial number Calibration due: ]ost Testino.......--~---

    Wl 21 Rev 4 ~ RCN: CRP-0414.4 Page 23 of 23

    1. L Form Approved for Use on the Clinch River SMR Project-J.A. Tice Techncial Lead Form Rev 0- ReViewed by <;f2.-. l~fflfLJ Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-147 of 515

    I I I DOUBLE! PACKER BOREHOLE PERMEABILITY TEST DATA SHEET AMEC ENVIRONMENTAL & INFRASTRUCTUm:, INC. ,page 1 of 2 PROJECT NAME:.Cltnch River SMR ProJect JOB NO. 6468-13-1072 DATE: J fj- /Jj Boring No/l1 P~~ I) ' ~orehole Diameter, ln.;3.$ Total Bortng Depth, Ft;.);(), l

    • Gnd Elev, Ft: 78<:.(.[ T::;JI)., rt..f.l<-'\\

    .Casing Height above ground, Ft:l2J:8

    • Elev. Top of Casing, Ft. (Gnd Ele~ +Casing Helght):18t/1.)8 "' blatum
    • 7 ~ f.t{J
    • I '3 ~.\\..

    (z:.s*~.s "r"'*e.c..!] 'it'~ TEST ID:M.~* lj 1-f Z a.:e.3 Test length:

    7. ) _Test Section Depth (from Datum): From ::l Q. £ To dfo O. ()

    (A) Depth to Water Table From Datum, Ft:~Ll., Test Water Temp: 7r0 Baro Pressure, psi: I L/. ~ r . (6) Surface Gage Height Above Datum, Ft.-() *.?, Depth to Center of Test Interval From Datum, Ft: A.S"'<., 0? s-'. (C) Distance Water Table to Center of Test Interval Ft.o? 4~.9 :':>-. Static water pressure at cent~r"' (C*62.4/1~4) + Bare"' II 'f *

    • 7 it

    .(, MAXIMUM TEST PRESSURE, Po:: ((A+B*1] + c*0.57) [Po= tS"'/.'S'""] Test Pressure sequE!nc~ = 1/3 Po, 2/3 P~, Po, 1/2' Po, Po ~ Sequence ID; A 13 C D E .Po Values: 1/3 Pl;l =50. 5 ; 2/3 Po= I 0 t. 0; 1/2 Po= 7 :i

    • 7!'" Add Appropriate Po value to static pressure at ce11ter opastln\\erva1 TEST NO.Zo11e 3 Sequen~ No.

    E.

    • Planned Center Pressure: ~f I
    • Z.

    Transducer Readings Before Packers Inflated: Top ~ 0./ 0

    Middle I) 9
    • q I.
    Bottom: I Pl3 ~ '7 J Transducer Readings After Packers lnfla!ed: Top flQ. 0 q ;. Middle ld 4 *

    .~I;.

    Bottom: I 30
    • fS.$"'
    • FLOW ~ETER READING, Gallons FLOW,gpm MJ.~dle Surface Gage

    .. I

    Time,
    • Transducer REMARKS Minutes Reading, psi Pressure, psi Initial Final Difference

    \\ '2- ¢1*z 7> *(f) 8~':)(() --~ '"Z(...'B,L\\1.. .\\\\\\V1

    • it.Yetm 11-/

    tZ:¢'3 r(Jtf; 'i:Y~9~ f3:5~P 'ljil*w-*: ZCJ,t\\,fJt \\4tJ , j 'if. r : ~ I'Z \\ @ '3 +;'3 Cl 8 '~'7)~ B10()) ~. "' ZCc4.*~s * \\ 4-dl . \\ 2'. t/!4 \\fb(P .5~~~ B?,~U) zt,;tn, 16'3 \\4*¢ \\ *Z.li; tV, ~lfi '*'* 3'~9/P B '3 ':1 (A] 2&'5, t s' \\4*(~' rz

    9.

    ',¢<!$;: ¢¢': ~~/A§;~ 8~~¢ 839¢" Zeit~, :((l) \\L\\(/} ~\\\\. 7:/~ S" 13 ~. --=-- I z. \\ IP5\\ ~f/) 8'3~lf) ~i:Q*~,~ Z~"*,&.3 \\L\\(.1)

    • i~,~-1)'

    /f;l. ' ~,jl " - -- - -~ ~- r

    • From Preliminary Boring Layout Survey t

    WI 21 Rev 4 - RCN: CRP-0414.4 Page 22 of 23 ~prm Approved' for Use on the ~linch River S~R Project-J.A. Tice Techncial Lead. Form Rev 0 *Reviewed by C,fl Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-148 of 515

    I ' I .... *.;rc - -.-*.... ----... ,..,2( ~...... ~~~~7 7ff~!~** :.? ~- ~-~.~...... :,. f.( <o;'"t.- . "":;(: ?IX * ,1:1" .. ?':;::*.. ~. ', */~. . Page 2** DOUBLE PACKER BOREHOLE PERMEABILITY TEST DATA SHEET . *.. :: \\: '.'1:. BORING: AdP*415.-f.JfYtirP ~I!"~ [;;. DATE: 7 ~ 5'- 201,1 DATA COLLECTED B'Y: -'-'"""'"':.....;.,..;;...;.....;;~'-='+-';;;........;...;..,-= SHUT~IN l.:-' 5 - I '3.. 'f;. EQUJPMENTtJSED / -, TI~ansducers: Level Troll700 Serial Numbers: 335896/R24844 (shallow) 6112113; 315381/R24039 (intennediate) ~-\\~~ 6/20113; 141142/R20367 (deep) 6/20/13; 315380/R24038.(spnre) 6/20113 . -:~ Surface Pressure Gage: (Both Wil<a 2.13,53) ~ MW.:.3 (at pump); MW-4 (at totalizer) 6/11/13 _____ _ Barometric Probe: (Baro Troll) 121315/R22669 6/12113 Flow Meter: !Master Meter 1344) -8824788 field ciiecl<ed 6/25/13..

    • {1, Stop Watch: (Sportline 220)- 1286/2786 6!1011$

    Date of Cnlibi*ation: Dates in italics aftel' eguipment serial number Calibration due:.Yost Testint:>.-...-----~- --- 1 * -----------------------------------~ . 1' I I,*

      • * '., :: 1&~~\\
    '. ';l.:i:,~_L

    _**.:~*.*_:*~.;:.:::***~:,;.~_,:_*.<... t

    • >!~

    l l

    i.
    • ,:X'f';J:.. -......

    II-:: \\::~~j~t\\

    • /:*

    \\ I X-

    • ~*>. I I

    WI* 21 Rev'-.4.- RCN: CRP-0414.4 Page 23 of 23 Form Approved for Use on the Clinch River SMR ProJe~t-J.A. Tice Technclal Lead Form Rev 0- Reviewed bY,~ f'v{f1/IJ Clinch River Data Report Rev. 4 CRP ~~J.1~.1~~.. Page E.3-149 of 515 -~-~~~~.~* ~*:l~(*J *:>.**;

    PACKER TEST FLOW RATE GRAPHS Boring MP-416 Packer Test Intervals: (below ground surface) (below top of casing) MP-416 Zone 1: 75.0 feet to 82.5 feet Not Tested MP-416 Zone 2: 89.0 feet to 96.5 feet: 89.79 feet to 97.29 feet MP-416 Zone 3: 109.0 feet to 116.5 feet: 109.79 feet to 117.29 feet MP-416 Zone 4: 205.0 feet to 212.5 feet: 205.79 feet to 213.29 feet Graphs of flow rate (gpm) vs time (minutes) have been created from Excel sheets containing data from field data sheets. For clarity, individual plots for each sequence within a tested interval are presented. Generally, plots are not provided if the field data sheets indicate no flow during a test sequence. Bechtel Field Instruction forms are provided. AMEC field data sheets are provided following the graphs for each zone. The AMEC field data sheets use top of casing as a field measurement reference. Assigned test interval depths below ground surface were converted to depths below top of casing by adding the casing height to the assigned test interval depths. Transducer data file names are listed on the last field data sheet of each test interval. Transducer data files are furnished as electronic files in a data supplement submittal. Clinch River Data Report Rev. 4 CRP-1112.16 Page E.3-150 of 515 a me}}