MACTEC Engineering and Consulting, Inc.
Page 1 of 1 Case Method & iCAP Results PDIPLOTVer. 2012.2-Printed: 15-Nov-2013 CLINCH RIVER SMR-CLINCH RIVER MWD (GEORGE A) 5'-6.5 DIEDRICH D.120 (027)
OP: MEH AR:
1.21 inA2 LE:
11.00 ft WS: 16 807.9 f/s CSI:
Max F1 or F2 Compr. Stress CSX: Max Measured Compr. Stress TSX: Tension Stress Maximum VMX: Maximum Velocity FMX: Maximum Force BL#
depth CSI csx ft ksi ksi 10 0.00 27.2 26.3 11 0.00 27.9 26.6 12 0.00 27.3 26.0 13 0.00 27.2 25.8 14 0.00 27.0 25.6 15 0.00 26.5 25.2 16 0.00 27.1 25.7 17 0.00 26.4 25.6 18 0.00 27.1 25.4 19 0.00 26.4 25.3 20 0.00 27.1 25.9 21 0.00 25.6 25.0 22 0.00 26.7 25.6 23 0.00 27.9 26.0 24 0.00 27.6 26.4 25 0.00 26.7 25.6 26 0.00 26.7 25.0 27 0.00 27.7 25.9 28 0.00 27.7 26.0 29 0.00 28.6 26.7 30 0.00 27.4 26.2 Average 27.1 25.8 Time Summary Drive 48 seconds Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-121 of 168 TSX VMX FMX DFN ksi f/s kips in 12.0 22.1 32 1.02 12.1 22.1 32 0.98 12.5 22.2 31 0.77 10.8 22.0 31 1.01 9.7 21.7 31 0.74 9.4 21.6 30 0.97 8.3 21.9 31 1.02 7.6 21.5 31 1.14 8.6 21.7 31 0.94 9.8 21.4 31 0.96 9.9 21.8 31 0.91 10.6 21.4 30 0.65 10.1 21.5 31 0.80 9.4 21.4 31 0.70 10.5 21.3 32 1.14 9.7 21.1 31 0.84 11.6 21.5 30 0.75 11.0 21.4 31 0.80 12.6 22.1 31 0.95 12.8 22.0 32 0.86 12.6 21.9 32 0.97 10.6 21.7 31 0.90 Total number of blows analyzed: 21 11:13:20AM -11:14:08AM (6/6/2013) BN 1-31 DFN:
DMX:
EMX:
ETR:
DMX in 1.02 0.98 0.77 1.01 0.74 0.97 1.02 1.14 0.94 0.96 0.91 0.65 0.80 0.70 1.14 0.85 0.75 0.80 0.95 0.86 0.97 0.90 Test date: 6-Jun-2013 SP:
0.492 klft3 EM: 30,000 ksi JC:
0.00 Final Displacement Maximum Displacement Max Transferred Energy Energy Transfer Ratio EMX ETR k-ft
(%)
0.320 91.5 0.319 91.3 0.310 88.6 0.323 92.3 0.312 89.3 0.323 92.3 0.324 92.6 0.331 94.6 0.323 92.3 0.327 93.5 0.325 92.9 0.306 87.4 0.319 91.2 0.314 89.8 0.336 95.9 0.319 91.0 0.316 90.4 0.322 91.9 0.337 96.2 0.334 95.5 0.330 94.4 0.322 92.1 RCN: CRP-1215.0 Page 11 of 165
MACTEC Engineering and Consulting, Inc.- Case Method & iCAP Results PDIPLOT Ver. 2012.2-Printed: 15-Nov-2013 B
I 0
w 0
7 14 N 21 m
b e
28 35 42 0
0 CSX (ksi) ---
Max Measured Compr. Stress 10 20 I
(
l<
~
I)
I~
10 20 TSX (ksi) ---
Tension Stress Maximum 30 30 CLINCH RIVER SMR-CLINCH RIVER MWD (GEORGE A) 6.5'-8' DFN(in) ---
40 0.00 1.25
(<
\\( ~~ ? 40 0.00 1.00 Final Displacement 2.50 2.00 DMX (in) --- Maximum Displacement 3.75 5.00 0.0 3.00 4.00 0 Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-122 of 168 0.1 25 Test date: 6-Jun-2013 EMX (k-It) --- Max Transferred Energy 0.2 0.3 ( \\ \\ \\ i ~ 50 ETR ((%)) --- Energy Transfer Ratio ~ } / / 75 RCN: CRP-1215.0 Page11 of165 0.4 100
MACTEC Engineering and Consulting, Inc. Page 1 of 1 Case Method & iCAP Results PDIPLOTVer. 2012.2-Printed: 15-Nov-2013 CLINCH RIVER SMR-CLINCH RIVER MWD (GEORGE A) 6.5'-8' DIEDRICH D.120 (027) OP: MEH AR: 1.21 inA2 LE: 12.00 ft WS: 16 807.9 f/s CSI: Max F1 or F2 Compr. Stress CSX: Max Measured Compr. Stress TSX: Tension Stress Maximum VMX: Maximum Velocity FMX: Maximum Force BL# depth CSI csx ft ksi ksi 11 0.00 27.6 25.5 12 0.00 28.1 25.7 13 0.00 27.5 25.2 14 0.00 27.8 25.2 15 0.00 28.1 25.3 16 0.00 26.3 24.3 17 0.00 25.9 24.3 18 0.00 27.4 25.0 19 0.00 26.5 25.5 20 0.00 27.3 24.9 21 0.00 25.7 24.5 22 0.00 26.7 24.9 23 0.00 26.0 24.4 24 0.00 25.8 24.5 25 0.00 25.4 24.2 26 0.00 25.6 24.4 27 0.00 26.5 24.1 28 0.00 25.5 24.2 29 0.00 26.3 24.6 30 0.00 27.4 24.9 31 0.00 27.9 25.7 32 0.00 27.3 25.2 33 0.00 27.4 24.8 34 0.00 26.7 24.9 35 0.00 27.6 24.8 36 0.00 27.1 25.0 37 0.00 27.6 24.9 Average 26.9 24.8 Time Summary Drive 47 seconds Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-123 of 168 TSX VMX FMX DFN ksi f/s kips in 14.7 21.4 31 1.05 14.7 21.5 31 0.93 14.7 21.3 30 0.99 14.6 21.4 30 1.10 14.0 21.3 31 0.69 12.3 21.0 29 0.84 10.4 20.8 29 0.65 12.3 21.6 30 0.61 10.1 20.8 31 0.76 10.7 21.4 30 0.86 10.0 20.4 30 0.85 10.5 21.1 30 0.70 11.6 21.2 29 0.75 10.8 20.2 30 0.77 10.6 20.6 29 0.87 10.7 20.8 29 0.73 11.5 21.1 29 0.77 11.5 20.3 29 0.64 13.1 21.3 30 0.78 14.1 21.2 30 0.89 14.3 21.5 31 0.83 12.4 20.9 31 1.06 12.3 21.2 30 0.78 13.9 21.2 30 0.93 13.2 21.3 30 0.95 15.0 21.4 30 0.75 13.3 21.0 30 0.42 12.5 21.1 30 0.81 Total number of blows analyzed: 27 11:18:52AM -11:19:39AM (6/6/2013) BN 1-38 DFN: DMX: EMX: ETR: DMX in 1.05 0.93 0.99 1.10 0.69 0.84 0.65 0.61 0.76 0.86 0.85 0.70 0.75 0.77 0.87 0.73 0.77 0.64 0.78 0.89 0.83 1.06 0.78 0.93 0.95 0.75 0.51 0.82 Test date: 6-Jun-2013 SP: 0.492 klft3 EM: 30,000 ksi JC: 0.00 Final Displacement Maximum Displacement Max Transferred Energy Energy Transfer Ratio EMX ETR k-ft (%) 0.302 86.2 0.288 82.2 0.295 84.3 0.301 85.9 0.291 83.2 0.291 83.0 0.287 81.9 0.293 83.7 0.294 84.1 0.304 86.7 0.296 84.5 0.293 83.8 0.288 82.3 0.285 81.5 0.294 83.9 0.286 81.7 0.291 83.1 0.287 81.9 0.302 86.3 0.304 86.7 0.301 85.9 0.313 89.3 0.301 85.9 0.302 86.3 0.303 86.4 0.292 83.5 0.279 79.8 0.295 84.2 RCN: CRP-1215.0 Page 120 of 165
MACTEC Engineering and Consulting, Inc.- Case Method & iCAP Results PDIPLOT Ver. 2012.2-Printed: 15-Nov-2013 B I 0 w 0 6 12 N 18 m b e 24 30 36 0 0 10 10 CSX (ksi) --- Max Measured Compr. Stress 20 30 ~~' r l-J I ( \\ ( 20 30 TSX (ksi) --- Tension Stress Maximum CLINCH RIVER SMR-CLINCH RIVER MWD (GEORGE A) 8'-9.5' DFN(in) --- 40 0.00 1.25 (( ~ ) u (~! ,,,~, 40 0.00 1.00 Final Displacement 2.50 2.00 DMX (in) --- Maximum Displacement 3.75 5.00 0.0 3.00 4.00 0 Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-124 of 168 0.1 25 Test date: 6-Jun-2013 EMX (k-It) --- Max Transferred Energy 0.2 50 ETR ((%)) --- Energy Transfer Ratio 0.3 0.4 < < I( ( 11/\\ ~ ~ 75 100 RCN: CRP-1215.0 Page 121 of 165
MACTEC Engineering and Consulting, Inc. Page 1 of 1 Case Method & iCAP Results PDIPLOTVer. 2012.2-Printed: 15-Nov-2013 CLINCH RIVER SMR-CLINCH RIVER MWD (GEORGE A) 8'-9.5' DIEDRICH D.120 (027) OP: MEH AR: 1.21 inA2 LE: 14.00 ft WS: 16 807.9 f/s CSI: Max F1 or F2 Compr. Stress CSX: Max Measured Compr. Stress TSX: Tension Stress Maximum VMX: Maximum Velocity FMX: Maximum Force BL# depth CSI csx ft ksi ksi 10 0.00 31.5 28.8 11 0.00 29.6 28.6 12 0.00 31.2 28.7 13 0.00 30.6 28.2 14 0.00 29.4 28.4 15 0.00 31.7 29.0 16 0.00 31.5 28.8 17 0.00 30.3 28.3 18 0.00 31.2 29.0 19 0.00 32.1 29.0 20 0.00 32.0 29.0 21 0.00 30.1 28.4 22 0.00 31.6 28.8 23 0.00 32.3 29.5 24 0.00 32.0 29.2 25 0.00 31.9 28.5 26 0.00 33.0 29.6 27 0.00 32.9 30.0 28 0.00 33.5 29.9 29 0.00 32.6 29.0 30 0.00 32.3 29.7 Average 31.6 29.0 Time Summary Drive 43 seconds Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-125 of 168 TSX VMX FMX DFN ksi f/s kips in 25.7 24.8 35 0.96 21.9 24.1 35 0.84 25.9 24.5 35 0.91 25.0 24.8 34 1.26 24.3 24.4 34 1.24 26.4 24.6 35 0.86 23.1 23.5 35 0.93 23.6 24.1 34 0.86 23.0 24.0 35 0.96 24.0 24.3 35 0.78 22.7 23.4 35 0.67 17.0 21.4 34 0.69 17.7 21.4 35 0.40 16.0 21.0 36 1.11 15.7 20.9 35 1.04 14.4 20.7 34 0.40 15.4 21.1 36 0.87 14.1 21.0 36 0.89 13.9 20.9 36 1.11 14.3 21.0 35 0.76 15.9 21.2 36 0.91 20.0 22.7 35 0.88 Total number of blows analyzed: 21 11 :23:14 AM - 11 :23:57 AM (6/6/2013) BN 1 - 35 DFN: DMX: EMX: ETR: DMX in 0.97 0.84 0.91 1.26 1.24 0.87 0.93 0.86 0.96 0.78 0.67 0.69 0.49 1.11 1.04 0.46 0.87 0.89 1.11 0.78 0.91 0.89 Test date: 6-Jun-2013 SP: 0.492 klft3 EM: 30,000 ksi JC: 0.00 Final Displacement Maximum Displacement Max Transferred Energy Energy Transfer Ratio EMX ETR k-ft (%) 0.317 90.6 0.308 88.1 0.318 90.8 0.329 93.9 0.323 92.3 0.307 87.6 0.305 87.2 0.311 88.9 0.321 91.6 0.305 87.1 0.315 90.1 0.312 89.2 0.308 88.0 0.338 96.7 0.327 93.5 0.308 88.0 0.324 92.5 0.327 93.5 0.334 95.5 0.328 93.8 0.330 94.3 0.319 91.1 RCN: CRP-1215.0 Page 122 of 165
MACTEC Engineering and Consulting, Inc.- Case Method & iCAP Results PDIPLOT Ver. 2012.2-Printed: 15-Nov-2013 B I 0 w 0 5 10 N 15 m b e 20 25 30 0 0 10 10 CSX (ksi) --- Max Measured Compr. Stress 20 30 ( ( \\ u \\ ) 20 30 TSX (ksi) --- Tension Stress Maximum CLINCH RIVER SMR-CLINCH RIVER MWD (GEORGE A) 9.5'-11' DFN(in) --- 40 0.00 40 0.00 Final Displacement 1.25 2.50 '\\::: ~ \\ ~ /f> 1.00 2.00 DMX (in) --- Maximum Displacement 3.75 5.00 0.0 3.00 4.00 0 Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-126 of 168 0.1 25 Test date: 6-Jun-2013 EMX (k-It) --- Max Transferred Energy 0.2 0.3 0.4 ) ) 50 ETR ((%)) --- Energy Transfer Ratio !( ( ( ( 75 RCN: CRP-1215.0 Page12 of165 100
MACTEC Engineering and Consulting, Inc. Case Method & iCAP Results CLINCH RIVER SMR-CLINCH RIVER MWD (GEORGE A) 9.5'-11' OP: MEH AR: 1.21 inA2 LE: 16.00ft WS: 16 807.9 f/s CSI: Max F1 or F2 Compr. Stress CSX: Max Measured Compr. Stress TSX: Tension Stress Maximum VMX: Maximum Velocity FMX: Maximum Force BL# depth CSI ft ksi 12 0.00 31.5 13 0.00 31.8 14 0.00 30.6 15 0.00 31.4 16 0.00 31.2 17 0.00 31.5 18 0.00 30.7 19 0.00 31.9 20 0.00 31.5 21 0.00 30.2 22 0.00 31.1 23 0.00 30.7 24 0.00 30.2 25 0.00 27.9 Average 30.9 csx TSX VMX ksi ksi f/s 29.8 17.9 20.9 29.9 17.4 20.7 29.4 16.9 19.7 30.2 20.9 22.5 30.1 21.1 22.8 30.3 23.6 23.3 29.6 22.7 23.5 30.4 24.4 24.5 29.5 23.7 23.7 28.8 22.5 23.6 29.9 23.7 23.1 29.6 22.4 22.4 29.2 23.8 22.9 27.1 19.5 21.8 29.6 21.5 22.5 FMX kips 36 36 36 36 36 37 36 37 36 35 36 36 35 33 36 Page 1 of 1 PDIPLOTVer. 2012.2-Printed: 15-Nov-2013 DFN in 0.84 1.07 1.86 0.85 1.05 1.02 1.25 1.23 1.55 1.82 1.17 1.30 1.28 1.36 1.26 DIEDRICH D.120 (027) Test date: 6-Jun-2013 SP: 0.492 klft3 EM: 30,000 ksi JC: 0.00 DFN: Final Displacement DMX: Maximum Displacement EMX: Max Transferred Energy ETR: Energy Transfer Ratio DMX EMX ETR in k-ft (%) 0.84 0.320 91.4 1.07 0.333 95.1 1.86 0.333 95.1 0.85 0.318 90.8 1.05 0.313 89.4 1.02 0.307 87.6 1.25 0.305 87.0 1.23 0.305 87.2 1.55 0.314 89.6 1.82 0.319 91.0 1.21 0.311 88.8 1.30 0.312 89.2 1.28 0.309 88.1 1.37 0.316 90.4 1.26 0.315 90.1 Total number of blows analyzed: 14 Time Summary Drive 46 seconds Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-127 of 168 11:27:45AM -11:28:31 AM (6/6/2013) BN 1-25 RCN: CRP-1215.0 Page 12 of 165
"'C(") ~= t1) ~ m:T N;u Ntl) co"" 0 c -a .... Ill g:;u t1) "'C 0 ~
- u t1)
~ ~ (")
- u 7'
~
- o
-u O ru z <0.. t1) 0 ~;o rv -u Ul, 0 ~ ...., rv a;~ Ul O TABLE2
SUMMARY
OF SPT ENERGY MEASUREMENTS (.ASTM D4633-10) M&W Drilling SPT Energy Measurements (1500 RPM) Oak Ridge, Tennessee AMEC Project No. 6468-13-1072 a me "'0 "'0 C" 0 3: ~ ~ "'0 ~ ,.S: N ~r., ~~ ~ ~ ~ .c- .Q -~ ~E-< I ~C) _§ ~ ~ -~
- '~
e!:
- ~
- ..r-:1
- -o S:!
E-< t:r.l
- S
=u ~
==';.-.. ~ ~ = 0 ~ "'0
- c.
- =
a) Gil z:E o ~ ~ E-< ~ Q a*: ~ ~ ~ ~ ~ t 1:1.0 k" 0 ~ ~ *- 0 ~ < <:::: i> c: *- 1oM./ en c:,) ~ Cll e.o..._....._.. t""""' .,.. ~ ~ 1:1.0 = c.: 0 I:Q c.: C> ~ ~ ~ ~ ~ 8, '-o ~ ~_,'-' en o ~ 1:1.0 j:Q ,~ ~ 0 < S:! ~ -;!. 2 bj z ~ r"'l._, R308 Testhole #8 ll.0-12.5 7-6-5 11 258 73.7% Diedrich ~~: GeorgeA.kins (nearMET 6/6/2013 AW-J 12.5-14.0 6-6-7 13 277 79.1% D-120 g Tower) 14.0-15.5 8-8-11 19 298 85.1% I Average for Rig: I 281.4 I 80.4% I "Measured Energy is energy based on the EFV method, as outlined in ASTM 04633-10, for each blow recorded by the PDA Only blows used to calculate N-values were considered per ASTM 04633-10. In some cases, the initial and/or final one to two blows produced poor quality data, and were not used to calculate the Average Measured Energy. EFV = EMX
- 1000 lbslkip, where EMX equals the transferred energy measured by the PDA (see attached PDA data).
bEnergy Transfer Ratio is the Measured Energy divided by the theoretical SPT energy of350 foot-pounds (140 pound hammer falling 2.5 feet). The average EFV and ETR values may differ slightly and insignificantly from those in the PDIPLOT tables due to roundoff. Prepared By: ~~ Date: Checked By: 9L Date: 1-1 o-\\ vf
MACTEC Engineering and Consulting, Inc.- Case Method & iCAP Results PDIPLOT Ver. 2012.2-Printed: 15-Nov-2013 B I 0 w 0 5 10 N 15 m b e 20 25 30 0 0 CSX (ksi) --- CLINCH RIVER SMR-CLINCH RIVER MWD (GEORGE A) 11'-12.5' DFN(in) --- 10 10 Max Measured Compr. Stress 20 I \\ ( 20 TSX (ksi) --- Tension Stress Maximum 30 30 40 0.00 40 0.00 Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-129 of 168 Final Displacement 1.25 2.50 \\ \\ ~ I \\\\ 1.00 2.00 DMX (in) --- Maximum Displacement 3.75 5.00 0.0 3.00 4.00 0 0.1 25 Test date: 6-Jun-2013 EMX (k-It) --- Max Transferred Energy 0.2 I I 0.3 u \\ 50 ETR ((%)) --- Energy Transfer Ratio I~ 75 RCN: CRP-1215.0 Page 126 of 165 0.4 100
MACTEC Engineering and Consulting, Inc. Case Method & iCAP Results CLINCH RIVER SMR-CLINCH RIVER MWD (GEORGE A) 11'-12.5' OP: MEH AR: 1.21 inA2 LE: 16.00ft WS: 16 807.9 f/s CSI: Max F1 or F2 Compr. Stress CSX: Max Measured Compr. Stress TSX: Tension Stress Maximum VMX: Maximum Velocity FMX: Maximum Force BL# depth CSI ft ksi 9 0.00 25.5 10 0.00 24.9 11 0.00 25.2 12 0.00 25.2 13 0.00 25.7 14 0.00 26.1 15 0.00 25.9 16 0.00 26.7 17 0.00 27.1 18 0.00 26.5 19 0.00 26.5 Average 25.9 csx TSX VMX ksi ksi f/s 23.9 15.7 21.4 23.7 16.2 21.3 23.8 17.2 21.7 24.0 18.6 22.0 23.9 18.4 22.3 24.1 19.5 22.5 24.1 20.6 22.7 24.5 19.5 21.8 24.7 19.3 21.9 24.7 18.6 22.0 24.7 20.4 22.6 24.2 18.5 22.0 FMX kips 29 29 29 29 29 29 29 30 30 30 30 29 Page 1 of 1 PDIPLOTVer. 2012.2-Printed: 15-Nov-2013 DFN in 1.17 1.26 1.12 1.25 1.26 1.10 1.24 1.30 1.46 1.61 1.71 1.32 DIEDRICH D.120 (027) Test date: 6-Jun-2013 SP: 0.492 klft3 EM: 30,000 ksi JC: 0.00 DFN: Final Displacement DMX: Maximum Displacement EMX: Max Transferred Energy ETR: Energy Transfer Ratio DMX EMX ETR in k-ft (%) 1.17 0.249 71.2 1.26 0.253 72.4 1.14 0.243 69.3 1.25 0.247 70.5 1.27 0.253 72.2 1.21 0.247 70.7 1.24 0.255 72.9 1.30 0.263 75.2 1.46 0.270 77.1 1.61 0.281 80.3 1.71 0.279 79.8 1.33 0.258 73.8 Total number of blows analyzed: 11 Time Summary Drive 39 seconds Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-130 of 168 11 :32:49 AM - 11 :33:28 AM (6/6/2013) BN 1 - 19 RCN: CRP-1215.0 Page 12 of 165
MACTEC Engineering and Consulting, Inc.- Case Method & iCAP Results PDIPLOT Ver. 2012.2-Printed: 15-Nov-2013 B I 0 w 0 5 10 N 15 m b e 20 25 30 0 0 CSX (ksi) --- CLINCH RIVER SMR-CLINCH RIVER MWD (GEORGE A) 12.5'-14' DFN(in) --- 10 10 Max Measured Compr. Stress 20 \\ ( 1/ ) I 20 TSX (ksi) --- Tension Stress Maximum 30 30 40 0.00 40 0.00 Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-131 of 168 Final Displacement 1.25 2.50 )) ( / > ( L 1.00 2.00 DMX (in) --- Maximum Displacement 3.75 5.00 0.0 3.00 4.00 0 0.1 25 Test date: 6-Jun-2013 EMX (k-It) --- Max Transferred Energy 0.2 ) ( ( 50 ETR ((%)) --- Energy Transfer Ratio 0.3 ) I? II ( 75 RCN: CRP-1215.0 Page 128 of 165 0.4 100
MACTEC Engineering and Consulting, Inc. Page 1 of 1 Case Method & iCAP Results PDIPLOTVer. 2012.2-Printed: 15-Nov-2013 CLINCH RIVER SMR-CLINCH RIVER MWD (GEORGE A) 12.5'-14' DIEDRICH D.120 (027) OP: MEH AR: 1.21 inA2 LE: 17.00 ft WS: 16 807.9 f/s CSI: Max F1 or F2 Compr. Stress CSX: Max Measured Compr. Stress TSX: Tension Stress Maximum VMX: Maximum Velocity FMX: Maximum Force BL# depth CSI csx ft ksi ksi 8 0.00 31.2 27.9 9 0.00 26.8 25.2 10 0.00 27.5 25.1 11 0.00 28.1 26.0 12 0.00 25.6 24.6 13 0.00 25.5 24.0 14 0.00 25.6 24.1 15 0.00 25.8 23.9 16 0.00 26.0 24.3 17 0.00 25.7 24.4 18 0.00 27.0 24.6 19 0.00 26.5 24.5 20 0.00 26.2 24.0 Average 26.7 24.8 Time Summary Drive 44 seconds Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-132 of 168 TSX VMX FMX DFN ksi f/s kips in 21.6 24.3 34 1.38 23.1 22.4 31 1.49 24.1 22.9 30 1.23 23.8 23.4 31 0.93 20.7 21.7 30 1.22 19.4 20.8 29 0.99 19.7 20.8 29 1.03 20.1 21.2 29 0.99 20.5 21.4 29 1.18 20.5 20.9 30 1.13 20.0 20.9 30 1.08 18.8 20.4 30 1.20 17.5 19.5 29 1.70 20.8 21.6 30 1.19 Total number of blows analyzed: 13 11 :37:33 AM - 11 :38:17 AM (6/6/2013) BN 1 - 20 DFN: DMX: EMX: ETR: DMX in 1.38 1.49 1.23 0.99 1.22 1.00 1.03 0.99 1.18 1.13 1.08 1.20 1.70 1.20 Test date: 6-Jun-2013 SP: 0.492 klft3 EM: 30,000 ksi JC: 0.00 Final Displacement Maximum Displacement Max Transferred Energy Energy Transfer Ratio EMX ETR k-ft (%) 0.284 81.2 0.289 82.6 0.276 78.9 0.272 77.6 0.278 79.4 0.267 76.2 0.267 76.3 0.268 76.6 0.281 80.4 0.276 79.0 0.271 77.4 0.276 78.7 0.290 82.7 0.277 79.0 RCN: CRP-1215.0 Page 12 of 165
MACTEC Engineering and Consulting, Inc.- Case Method & iCAP Results PDIPLOT Ver. 2012.2-Printed: 15-Nov-2013 B I 0 w 0 5 10 N 15 m b e 20 25 30 0 0 CSX (ksi) --- CLINCH RIVER SMR-CLINCH RIVER MWD (GEORGE A) 14'-15.5' DFN(in) --- Max Measured Compr. Stress 10 20 1/ I ) ) 1/ 10 20 TSX (ksi) --- Tension Stress Maximum 30 30 40 0.00 40 0.00 Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-133 of 168 Final Displacement 1.25 2.50 \\ ~. / \\ 0 C! ) > 1.00 2.00 DMX (in) --- Maximum Displacement 3.75 5.00 0.0 3.00 4.00 0 0.1 25 Test date: 6-Jun-2013 EMX (k-It) --- Max Transferred Energy 0.2 50 ETR ((%)) --- Energy Transfer Ratio 0.3 I ~ \\ ( ( ( 75 RCN: CRP-1215.0 Page 1 0 of 165 0.4 100
MACTEC Engineering and Consulting, Inc. Page 1 of 1 Case Method & iCAP Results PDIPLOTVer. 2012.2-Printed: 15-Nov-2013 CLINCH RIVER SMR-CLINCH RIVER MWD (GEORGE A) 14'-15.5' DIEDRICH D.120 (027) OP: MEH AR: 1.21 inA2 LE: 19.00 ft WS: 16 807.9 f/s CSI: Max F1 or F2 Compr. Stress CSX: Max Measured Compr. Stress TSX: Tension Stress Maximum VMX: Maximum Velocity FMX: Maximum Force BL# depth CSI csx ft ksi ksi 10 0.00 28.9 26.9 11 0.00 27.9 26.3 12 0.00 28.3 26.4 13 0.00 27.6 26.0 14 0.00 27.7 26.0 15 0.00 27.5 25.7 16 0.00 27.3 25.8 17 0.00 27.1 25.6 18 0.00 26.6 25.4 19 0.00 26.7 25.3 20 0.00 27.1 25.5 21 0.00 26.6 25.2 22 0.00 26.9 25.7 23 0.00 27.0 25.7 24 0.00 26.8 25.2 25 0.00 27.3 25.6 26 0.00 26.8 25.3 27 0.00 27.2 25.6 28 0.00 26.7 25.2 Average 27.3 25.7 Time Summary Drive 55 seconds Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-134 of 168 TSX VMX FMX DFN ksi f/s kips in 21.4 21.3 32 1.36 20.7 20.9 32 1.04 20.3 20.8 32 1.16 19.7 20.5 31 1.22 19.2 20.5 32 1.46 18.6 20.0 31 0.96 18.3 19.7 31 1.15 18.0 19.4 31 1.30 17.2 19.7 31 0.87 15.8 19.5 31 0.84 14.8 19.8 31 1.06 15.4 19.4 30 1.04 15.1 19.8 31 1.16 13.8 19.7 31 0.95 13.5 19.5 31 0.97 12.7 19.5 31 0.97 11.0 19.4 31 1.04 9.9 19.3 31 1.04 9.3 19.5 30 0.97 16.0 19.9 31 1.08 Total number of blows analyzed: 19 11:42:51 AM -11:43:46AM (6/6/2013) BN 1-28 DFN: DMX: EMX: ETR: DMX in 1.36 1.04 1.16 1.22 1.46 0.96 1.15 1.30 0.88 0.84 1.06 1.04 1.16 0.95 0.97 0.97 1.04 1.04 0.97 1.08 Test date: 6-Jun-2013 SP: 0.492 klft3 EM: 30,000 ksi JC: 0.00 Final Displacement Maximum Displacement Max Transferred Energy Energy Transfer Ratio EMX ETR k-ft (%) 0.308 87.9 0.292 83.5 0.299 85.3 0.298 85.3 0.307 87.7 0.289 82.7 0.295 84.4 0.297 84.7 0.291 83.1 0.289 82.7 0.299 85.5 0.294 83.9 0.305 87.0 0.300 85.8 0.303 86.6 0.301 85.9 0.304 86.9 0.302 86.3 0.298 85.2 0.298 85.3 RCN: CRP-1215.0 Page 1 1 of 165
"'C(") ~= t1) ~ m:T N;u wtl) en"" 0 c -a .... Ill g:;u t1) "'C 0 ~
- u t1)
~ ~ (")
- u 7'
~
- o
-u O ru z <0.. t1) 0 ~;o 8 -:o 0 ~ ...., N a;~ <.n O "0 c .c-s ~
- 0 z~
~2 (/) OD 2 R308 Diedrich D-120 c
- t; 0
OD 2 M&W Drilling TABLE3
SUMMARY
OF SPT ENERGY MEASUREMENTS (ASTM D4633-10) M&W Drilling SPT Energy Measurements (2500 RPM) Oak Ridge, Tennessee AMEC Project No. 6468-13-1072 "0 2:; ~ ~ "0.s ~
- c.
0 ~ 0 z E-< OD OD .E 2
- E
= 0 Col ~ Test hole #8 George Akins I (near MET 1616/2013 Tower) ~ en "0 0 ~ 0 AW-J ~ ~ -
- c.
G,l ~ G,l Q. e = (/) 15.5-17.0 17.0-18.5 18.5-20.0 ~ 0
- C..-..
-~ =-
- =
~ 0 u )( 11: *;;; 0 ~ c. E-< ~ (/) 11-10-10 11-10-10 7-8-10 ~ ~ = = 0 ~ 0 0 z 20 20 18 Average for Rig: "Of;;l;c ~r=l (1!1 c.o e: ~!'¢ t'! ~ a.> fl') ""'.,.c ~ > "'i Q <;::: OD'-' '-' ~ ~ ~ 325 308 309 314.2 3Measured Energy is energy based on the EFV method, as outlined in ASTM D463 3-10, for each blow recorded by the PDA. Only blows used to calculate N-values were considered per ASTM D4633-10. In some cases, the initial and/or final one to two blows produced poor quality data, and were not used to calculate the Average Measured Energy. EFV = EMX
- 1000 lbs/kip, where EMX equals the transferred energy measured by the PDA (see attached PDA data).
bEnergy Transfer Ratio is the Measured Energy divided by the theoretical SPT energy of350 foot-pounds (140 pound hammer falling 2.5 feet). The average EFV and ETR values may differ slightly and insignificantly from those in the PDIPLOT tables due to roundoff. Prepared By: V"k.. Date: -l0-1 c.f Checked By: <;k_ Date: Ho-I~ 0
- g~
~ E-< ~ ~., OD
E ~ E-< >.~ OD.:> ~ ';f. ""l'-' 92.9% 88.0% 88.3% -- 89.8%
MACTEC Engineering and Consulting, Inc.- Case Method & iCAP Results PDIPLOT Ver. 2012.2-Printed: 15-Nov-2013 B I 0 w 0 6 12 N 18 m b e 24 30 36 0 0 10 10 CSX (ksi) --- Max Measured Compr. Stress 20 30 I / ( ( ( ~ \\ I 20 TSX (ksi) --- Tension Stress Maximum 30 CLINCH RIVER SMR-CLINCH RIVER MWD (GEORGE A) 15.5'-17' DFN(in) --- 40 0.00 1.25 f>( ~~ (7? I I 40 0.00 1.00 Final Displacement 2.50 2.00 DMX (in) --- Maximum Displacement 3.75 5.00 0.0 3.00 4.00 0 Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-136 of 168 0.1 25 Test date: 6-Jun-2013 EMX (k-It) --- Max Transferred Energy 0.2 50 ETR ((%)) --- Energy Transfer Ratio 0.3 0.4 ) ) \\ \\ V / 75 100 RCN: CRP-1215.0 Page 1 of 165
MACTEC Engineering and Consulting, Inc. Page 1 of 1 Case Method & iCAP Results PDIPLOTVer. 2012.2-Printed: 15-Nov-2013 CLINCH RIVER SMR-CLINCH RIVER MWD (GEORGE A) 15.5'-17' DIEDRICH D.120 (027) OP: MEH AR: 1.21 inA2 LE: 21.00 ft WS: 16 807.9 f/s CSI: Max F1 or F2 Compr. Stress CSX: Max Measured Compr. Stress TSX: Tension Stress Maximum VMX: Maximum Velocity FMX: Maximum Force BL# depth CSI csx ft ksi ksi 12 0.00 31.9 30.0 13 0.00 32.8 30.1 14 0.00 31.9 29.6 15 0.00 32.8 30.3 16 0.00 32.4 30.2 17 0.00 30.5 28.6 18 0.00 31.0 29.0 19 0.00 30.1 28.2 20 0.00 29.7 28.4 21 0.00 29.1 27.9 22 0.00 29.5 27.8 23 0.00 30.8 29.1 24 0.00 29.7 28.1 25 0.00 29.1 27.8 26 0.00 29.5 27.6 27 0.00 28.1 27.1 28 0.00 29.8 28.2 29 0.00 29.0 27.7 30 0.00 29.5 27.7 31 0.00 28.8 27.6 Average 30.3 28.6 Time Summary Drive 36 seconds Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-137 of 168 Test date: 6-Jun-2013 SP: 0.492 klft3 EM: 30,000 ksi JC: 0.00 DFN: Final Displacement DMX: Maximum Displacement EMX: Max Transferred Energy ETR: Energy Transfer Ratio TSX VMX FMX DFN DMX EMX ETR ksi f/s kips in in k-ft (%) 19.5 21.9 36 0.98 0.98 0.323 92.4 19.3 22.2 36 0.77 0.77 0.326 93.2 19.5 22.0 36 0.76 0.76 0.333 95.1 20.1 22.8 37 0.90 0.90 0.332 94.8 18.7 22.2 37 0.65 0.70 0.328 93.7 16.6 21.5 35 0.77 0.77 0.325 92.7 14.3 22.0 35 0.69 0.70 0.328 93.9 13.7 20.7 34 0.70 0.70 0.329 94.0 13.1 21.0 34 0.86 0.87 0.324 92.5 13.0 21.2 34 0.68 0.68 0.322 92.1 11.7 20.6 34 0.58 0.59 0.325 92.9 12.5 21.3 35 0.81 0.81 0.335 95.6 12.0 20.0 34 0.85 0.85 0.330 94.3 12.3 21.1 34 0.81 0.81 0.331 94.6 12.3 20.8 33 0.56 0.61 0.321 91.6 14.4 19.6 33 0.92 0.92 0.320 91.5 12.8 20.6 34 0.81 0.82 0.328 93.7 11.5 19.8 34 0.78 0.78 0.310 88.6 12.3 21.1 34 0.76 0.77 0.327 93.4 13.1 18.6 33 0.78 0.78 0.297 85.0 14.6 21.1 35 0.77 0.78 0.325 92.8 Total number of blows analyzed: 20 11 :48:10 AM - 11 :48:46 AM (6/6/2013) BN 1 - 32 RCN: CRP-1215.0 Page 1 of 165
MACTEC Engineering and Consulting, Inc.- Case Method & iCAP Results PDIPLOT Ver. 2012.2-Printed: 15-Nov-2013 B I 0 w 0 5 10 N 15 m b e 20 25 30 0 0 10 10 CSX (ksi) --- Max Measured Compr. Stress 20 v ) I) I>) ( ( < ~ 20 TSX (ksi) --- Tension Stress Maximum 30 30 CLINCH RIVER SMR-CLINCH RIVER MWD (GEORGE A) 17'-18.5' DFN(in) --- 40 0.00 1.25 \\ \\ 1 J \\ \\\\ 40 0.00 1.00 Final Displacement 2.50 2.00 DMX (in) --- Maximum Displacement 3.75 5.00 0.0 3.00 4.00 0 Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-138 of 168 0.1 25 Test date: 6-Jun-2013 EMX (k-It) --- Max Transferred Energy 0.2 0.3 v < 1\\ 0.4 \\ < r<< 50 ETR ((%)) --- Energy Transfer Ratio 75 RCN: CRP-1215.0 Page 1 5 of 165 100
MACTEC Engineering and Consulting, Inc. Page 1 of 1 Case Method & iCAP Results PDIPLOTVer. 2012.2-Printed: 15-Nov-2013 CLINCH RIVER SMR-CLINCH RIVER MWD (GEORGE A) 17'-18.5' DIEDRICH D.120 (027) OP: MEH AR: 1.21 inA2 LE: 22.00 ft WS: 16 807.9 f/s CSI: Max F1 or F2 Compr. Stress CSX: Max Measured Compr. Stress TSX: Tension Stress Maximum VMX: Maximum Velocity FMX: Maximum Force BL# depth CSI csx ft ksi ksi 10 0.00 30.9 27.1 11 0.00 28.5 25.6 12 0.00 28.1 25.1 13 0.00 30.2 26.5 14 0.00 27.5 26.0 15 0.00 29.0 25.8 16 0.00 30.2 27.0 17 0.00 27.9 25.3 18 0.00 29.1 26.1 19 0.00 28.4 26.2 20 0.00 28.7 26.0 21 0.00 28.7 25.3 22 0.00 27.1 25.4 23 0.00 26.0 24.5 24 0.00 25.8 24.6 25 0.00 27.2 25.4 26 0.00 26.1 24.4 27 0.00 25.5 24.4 28 0.00 26.6 25.4 29 0.00 26.9 24.7 Average 27.9 25.6 Time Summary Drive 34 seconds Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-139 of 168 TSX VMX FMX DFN ksi f/s kips in 19.5 21.8 33 0.86 21.1 20.3 31 0.95 19.2 19.4 30 0.94 20.0 20.5 32 0.89 20.8 19.8 32 0.88 19.9 19.8 31 1.03 21.1 19.9 33 1.21 20.7 19.8 31 1.17 22.7 19.7 32 1.09 20.6 20.8 32 1.17 19.8 19.1 32 0.91 19.4 20.2 31 1.01 17.5 20.3 31 1.00 16.1 19.7 30 1.07 15.3 19.5 30 1.14 16.1 19.6 31 1.21 15.8 19.6 30 1.17 14.2 17.9 29 1.09 16.8 19.8 31 1.20 17.1 19.6 30 1.22 18.7 19.8 31 1.06 Total number of blows analyzed: 20 11:52:44AM -11:53:18AM (6/6/2013) BN 1-29 DFN: DMX: EMX: ETR: DMX in 0.86 0.95 0.94 0.89 0.88 1.03 1.21 1.17 1.09 1.17 0.92 1.01 1.00 1.07 1.14 1.21 1.17 1.09 1.20 1.22 1.06 Test date: 6-Jun-2013 SP: 0.492 klft3 EM: 30,000 ksi JC: 0.00 Final Displacement Maximum Displacement Max Transferred Energy Energy Transfer Ratio EMX ETR k-ft (%) 0.321 91.7 0.298 85.1 0.277 79.2 0.302 86.4 0.299 85.5 0.301 85.9 0.321 91.6 0.305 87.2 0.311 88.9 0.316 90.4 0.301 86.0 0.315 89.9 0.313 89.4 0.310 88.6 0.312 89.1 0.316 90.3 0.314 89.7 0.282 80.6 0.317 90.6 0.334 95.3 0.308 88.1 RCN: CRP-1215.0 Page 1 6 of 165
MACTEC Engineering and Consulting, Inc.- Case Method & iCAP Results PDIPLOT Ver. 2012.2-Printed: 15-Nov-2013 B I 0 w 0 5 10 N 15 m b e 20 25 30 0 0 CSX (ksi) --- CLINCH RIVER SMR-CLINCH RIVER MWD (GEORGE A) 18.5'-20' DFN(in) --- 10 10 Max Measured Compr. Stress 20 30 ( ) l ~> ) r> ) ( ~: ~ 20 TSX (ksi) --- Tension Stress Maximum 30 40 0.00 40 0.00 Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-140 of 168 Final Displacement 1.25 2.50 ) ~ / II 1.00 2.00 DMX (in) --- Maximum Displacement 3.75 5.00 0.0 3.00 4.00 0 0.1 25 Test date: 6-Jun-2013 EMX (k-It) --- Max Transferred Energy 0.2 0.3 l> > ( Vz( 50 ETR ((%)) --- Energy Transfer Ratio I! ! ~ ?' 75 RCN: CRP-1215.0 Page 1 of 165 0.4 100
MACTEC Engineering and Consulting, Inc. Page 1 of 1 Case Method & iCAP Results PDIPLOTVer. 2012.2-Printed: 15-Nov-2013 CLINCH RIVER SMR-CLINCH RIVER MWD (GEORGE A) 18.5'-20' DIEDRICH D.120 (027) OP: MEH AR: 1.21 inA2 LE: 24.00 ft WS: 16 807.9 f/s CSI: Max F1 or F2 Compr. Stress CSX: Max Measured Compr. Stress TSX: Tension Stress Maximum VMX: Maximum Velocity FMX: Maximum Force BL# depth CSI csx ft ksi ksi 8 0.00 29.7 28.0 9 0.00 28.8 27.9 10 0.00 28.7 26.7 11 0.00 28.0 26.4 12 0.00 29.4 27.4 13 0.00 29.2 27.6 14 0.00 28.4 27.2 15 0.00 28.8 26.8 16 0.00 28.8 26.7 17 0.00 28.9 26.9 18 0.00 30.5 27.6 19 0.00 30.3 27.5 20 0.00 29.4 26.9 21 0.00 31.4 28.9 22 0.00 31.2 28.0 23 0.00 32.2 29.2 24 0.00 32.3 29.3 25 0.00 32.4 29.4 Average 29.9 27.7 Time Summary Drive 30 seconds Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-141 of 168 TSX VMX FMX DFN ksi f/s kips in 23.7 19.0 34 1.29 22.9 19.0 34 1.38 23.3 17.1 32 1.26 21.9 16.5 32 1.30 25.0 17.0 33 1.31 21.7 15.5 33 1.25 23.1 14.9 33 1.25 19.1 14.8 32 1.37 23.2 19.4 32 1.16 20.3 16.3 33 1.29 25.0 21.0 33 1.15 20.3 16.5 33 1.01 20.9 17.5 33 0.92 22.2 21.7 35 0.87 16.1 14.2 34 0.83 16.9 15.0 35 0.82 22.3 20.8 35 0.73 18.9 16.7 36 0.74 21.5 17.4 33 1.11 Total number of blows analyzed: 18 11 :57:20 AM - 11 :57:50 AM (6/6/2013) BN 1 - 25 DFN: DMX: EMX: ETR: DMX in 1.29 1.38 1.26 1.30 1.31 1.25 1.25 1.37 1.16 1.29 1.15 1.01 0.92 0.87 0.84 0.82 0.73 0.75 1.11 Test date: 6-Jun-2013 SP: 0.492 klft3 EM: 30,000 ksi JC: 0.00 Final Displacement Maximum Displacement Max Transferred Energy Energy Transfer Ratio EMX ETR k-ft (%) 0.307 87.7 0.327 93.6 0.294 84.0 0.282 80.5 0.313 89.4 0.317 90.5 0.306 87.4 0.312 89.1 0.313 89.3 0.318 90.9 0.317 90.5 0.306 87.3 0.308 87.9 0.328 93.8 0.296 84.6 0.316 90.4 0.300 85.8 0.296 84.7 0.309 88.2 RCN: CRP-1215.0 Page 1 8 of 165
AMEC E&I, Inc. Pile Driving Analyzer CLINCH RIVER MWD (GEORGE A) 15.5'-17' TS: ~ 6.4 TB: 4.0 I wu (SI-0)-1 D (3.94) -- A34 F34 TS: TB: I I 71 @ 110. --,-~ 1.33 ft Project Information Quantity Results PROJECT: CLINCH RIVER SMR CSI 30.8 ksi PILE NAME: CLINCH RIVER MWD (GEORGE A) lCSX-29.1 ksi DESCR: DIEDRICH D.120 (027) TSX 12.5 ksi OPERATOR: MEH VMX 21.3 f/s FILE: CLINCH RIVER MWD (GEORGE A) 15.5'-1FMX0135 kips 6/6/2013 11:48:36 AM DFN 0.81 in Blow Number 22/23 DMX 0.81 in EMX 0.3 k-ft Pile Properties LE 21.00 ft AR 1.21 in"'2 EM 30000 ksi SP 0.492 k/ft3 WS 16807.9 f/s EA/C
- 2. 2 ksec/ft 2L/C 2.52 ms JC
[] Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-142 of 168 ETR 95.6 (%) Sensors F3: [75AW1] 208.84 (1) F4: [75AW2] 209.17 (1) A3: [K3370] 325 mv/5000g's (1) A4: [K0686] 315 mv/5000g's (1) CLIP: OK F3/F4: OK 1.14 V3/V4: OK 1.02
10 January 2014 Mr. Steve Criscenzo AMEC Environment & Infrastructure, Inc. 4021 Stirrup Creek Drive Suite 100 Durham, North Carolina 27703
Subject:
Report of SPT Hammer Energy Measurements M&W Drilling Diedrich D-120 Drill Rig Rig Serial No. 027 Automatic Hammer Clinch River SMR Site AMEC Project No. 6468-13-1072 AMEC Environment & Infrastructure, Inc. (AMEC) is pleased to present the results of Standard Penetration Test (SPT) hammer energy measurements for the subject drill rig at the Clinch River SMR site in Oak Ridge, Tennessee. This report summarizes the field testing activities and presents the results of the hammer energy measurements. SPT Hammer Energy Field Measurements SPT energy measurements were made at the referenced site on June 6, 2013. A separate boring from the planned exploratory borings was used (test hole #7 near MET Tower). Per an approved deviation request, testing was performed at depths shallower than those recommended in ASTM D4633-10 due to the presence of relatively shallow rock at the site. The testing was performed by Michael Hamilton, an AMEC representative, from approximately 9:30AM to 11 :00 AM under cloudy skies and an air temperature of about 64 degrees Fahrenheit. The boring was drilled with personnel and equipment from M&W Drilling. The drilling equipment consisted of a Diedrich D-120 drill rig with an automatic SPT hammer. The drilling tools consisted of AW-J sized drilling rods and a 2-foot long split tube sampler. The drill rig operator during sampling was Gary Akins. Energy measurements were recorded during sampling at the depth intervals shown in Table 1. The energy measurements were performed with a SPT Analyzer (Serial No.3622L) with SPT Analyzer software, accelerometers (Serial Nos. K3370 and K1050) and strain gages (Serial Nos. 75 AW-1 and 75 AW-2). A steel drill rod, 2 feet long and instrumented with dedicated strain gages, was inserted at the top of the drill rod string immediately below the SPT hammer anvil. The inserted rod was also instrumented with two piezoresistive accelerometers that were bolted to the outside of the rod. The instrumented rod insert had a cross-sectional area of approximately 1.21 square inches and an outside diameter of approximately 1.75 inches at the gage location. The drill rods included in the drill rod string were hollow rods in 5-to 1 0-foot long sections, with outside Correspondence: AMEC Environment & Infrastructure, Inc. 2801 Y orkmont Road Suite 100 Charlotte, North Carolina 28208 Tel (704) 357-8600 Fax (704) 357-8638 Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-143 of 168 arnec.com RCN: CRP-1215.0 Page 1 c:D of 165
SPT Energy Measurements-M&W Drilling Diedrich D-120 Drill Rig AMEC Project No. 6468-13-1072 January 10, 2014 Page2 and inside diameters of approximately 1. 75 and 1.375 inches, respectively. Due to the closed hammer system, the hammer lubrication condition could not be observed. Testing was performed with the rig running at multiple engine speeds at the request of the field site manager in order to determine the effects (if any) of engine speed on the energy transfer ratio. The normal operating speed used for this drill rig by the driller is approximately 2,000 RPMs. Engine speeds of approximately 1,500 and 2,500 RPMs were also tested for information purposes only and are presented herein. Calibration Records The calibration records for the equipment associated with this testing are filed in the project record control center. The calibration services were procured and approved in accordance with the commercial grade dedication process as outlined in AMEC's nuclear quality assurance program. Calculations for EFV The work was performed in accordance with ASTM D 4633-10. The strain and acceleration signals were converted to force and velocity by the PDA. The maximum energy transmitted to the drill rod string (EFV), as measured at the location of the strain gages and accelerometers, was calculated by the SPT Analyzer using the equation shown below: EFV = f F(t)
- V(t)
- dt Where: EFV = Transferred energy (EFV equation), or Energy of FV F(t) = Calculated force at timet V(t) = Calculated velocity at time t As recommended by ASTM D 4633-10, the force-velocity method of energy calculation was used. The equation shown above for calculating EFV, integrated over the complete wave event, measures the total energy of the event using both force and velocity measurements. The EFV values associated with each blow analyzed are tabulated in the attached PDIPLOT tables and are also shown graphically in the PDIPLOT charts.
Calculations for ETR The ratio of the measured transferred energy (EFV) to the theoretical potential energy of the SPT system (140 lb weight with the specified 30 inch fall) is the ETR. The ETR values (as a percentage of the theoretical value) are shown in Table 1. Comparison of ETR to Typical Energy Transfer Ratio Range Based on a research report published by the Florida Department of Transportation (FOOT) (Report WPI No. 0510859, 1999), the average ETR measured for automatic hammers was 79.6%. The standard deviation was 7.9%; therefore, the range of ETRs within one standard deviation of the average was reported to be 71.7% to 87.5%. This range of ETRs was also consistent with other research that was cited in the FOOT research paper; however, maximum and minimum ETR values of up to 98% and 56%, Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-144 of 168 RCN: CRP-1215.0 Page 1 D1 of 165
SPT Energy Measurements-M&W Drilling Diedrich D-120 Drill Rig AMEC Project No. 6468-13-1072 January 10, 2014 Page3 respectively, were reported in the literature. The ETR values shown in Table 1 are within the range of typical values for automatic hammers as reported in the literature. Evaluation and Conclusions Based on the field testing results, our evaluation and conclusions from the SPT energy measurements are summarized below: The average energy transferred from the hammer to the drill rods for each individual depth interval ranged from 309 foot-pounds to 340 foot-pounds. These average energy transfers correspond to energy transfer ratios (ETR) of 88% to 97% of the theoretical energy (350 foot-pounds) of the SPT hammer. The average at each depth interval was calculated as the transferred energy for each analyzed blow at the depth interval divided by the total number of hammer blows analyzed. The overall average energy transfer of the SPT system (for all the depth intervals tested) was 331.3 foot-pounds, with an average ETR of 94. 7%. The above measurements are for the hammer running at 2,000 RPMs which is the engine speed under normal operating conditions. Closing Please contact us when we can be of further service or if you have any questions concerning this report. Sincerely, AMEC Environment & Infrastructure, Inc. Mi~~rWw OJlJ Steven E. Kiser Technical Professional Principal Geotechnical Professional Attachments: Page 4 - Record of SPT Energy Measurement-1 Page Page 5-Table 1 -Summary of SPT Energy Measurements (2,500 RPMs) - 1 Page Pages 6 PDIPLOT Output (2,500 RPMs)- 8 Pages Page 14-Table 2-Summary of SPT Energy Measurements (1,500 RPMs)- 1 Page Page 15 PDIPLOT Output (1,500 RPMs)- 4 Pages Page 19-Table 3-Summary of SPT Energy Measurements (2,500 RPMs)- 1 Page Page 20 PDIPLOT Output (2,500 RPMs)- 6 Pages Page 26-Example Force Velocity Plot Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-145 of 168 RCN : CRP-1215.0 Page 1 a1 of 165
a me& 2801 YORKMONT ROAD, SUITE 100 CHARLOTTE, NC 28208 Telephone: (704) 357-8600 I Facsimile: (704) 357-8638 RECORD OF SPT ENERGY MEASUREMENT-ASTM 04633 -10 'GENERAL INFORMATION PROJECT NAME: J 'J. 'iuJ11 !Jl.',.-._r '>.'Ill K... DATE: fil --(p*-; :.r PROJECT NO.: f'ntJ&'R -i3.. -to-'7.2. INSPECTOR:
- tiw*Jf LOCATION:
Vl'Ftf I (l)tptt-WEATHER: Ti I I tt-Cf~ .J-BORING AND DRILL RIG DATA v BORING NUMBER: 'W:?JJ-1/ff/-t...:.1p7
- DRILLING COMPANY:
J/11 R& ) jJ-.,1/,;, /U RIG OPERATOR: G-~r'-1 fllll "'" DRILL RIG MAKE: f); ; Al.-- 'r.in.. *n 117(2 HAMMER OPERATOR:
- J.M(J.-1..
JPrt'~ DRILL RIG MODEL: f) - I?.V PAK SERIAL NO.:. r1 3622L RIG SERIAL NO.: 69.17 INSTR. ROD AREA: ,, 'Zl,~Z. HAMMER TYPE: Automatic ACCEL. SERIAL NOS.: A3: I t :?3ttzfl A4:I/!J~ ROPE CONDITION: N/A
- STRAJN SERIAL NOS.: F3: I~ "?S-/
F4: 1/Jtd-?fhl NO. OF SHEAVES: N/A SPT OBSERVATION ROD ROD SAMPLE SPT OR SIZE LENGTH DEPTH N-VALUE COMMENTS SPT DATA RECORD (AW-J, NW, etc) (feet) (feet) . (bpf} kw n.~ i2;lorc)
- ./Ht&-l.l fl~
- ..3 I~
(:51.'
- J.&'-5'
.?-s~~ J'J;::.. If I f-:.,_ _ _.A .,4--q*~~-cl 0.~ ll---
- '5--
~ "1... 1 e ~ r3 AJ ::::-:.J3 r;-rnd It--l.f iJ.ttti r l{)ll JYJ,,u-fu.J t"'Z. ~.&; ~~' z 1~,~ - 7;z '-Y.'7' J-~ - t3-tl tV-; 7 7 lr',...tJod t~f.;/)~rf
- t.
1'3.5 ~.?. ~ /6.<Ji ti,;-J 5 ~,-:s J1j *= "1<;! ' ',it /'rt:Jf'i t:Y/ ~v r /, lt!IY'k /nu, /(t /(), 7-J/,r-, II - I ~.. *.t:' IV ' ; S r..-eJt>d I 1'7 'I I. l I ito,~ /J. '"l. 6:5-~ tJ;::.g (l J.'lli!P J 11 J I~ ;7. -JLf.? 11...- ~-:-...,.Ah:;. J'l ~(jA. f!i' ;.tP .,-;., Jl 1 <liM. [V' lrJ,..so,i J 7.1 IJLJ.'7~Jr *. 7 {O -(A-'7. fU'"' I~ 172 J(n.'Z...-- 17.~ ltV rV<hJ A.(UtS kJ'.i'h lvrT:Jtv:!f e P ;n iZL ~~.. l-n,t rrn -* 0 -*\\ ( ~ :;:_ 'l.l if~... Arl \\J I Zt.l K.~- (O.Z It.,;._, z. '*N~ '7.,, lc~A...1 J m Ot*r-Z.J.~ It 3 *-14-1 c:, tJ;; 'L~ 1~-otlCIJ REMARKS "~"! 5 (/1 V ~v'nY\\ /).1-5 1).0/7, 3? 8.5 Form 4633 REV.2 (11 1 1) CHECKED BY: DATE:
- ~ linch River Data Report {eo/.14'~!1>1'flF.ls>r Use on Clinch River SMR Project by J. A. Tice, TL J. *~~age 8.2-~46 of 168.
RCN : CRP-1215.0 Page 1 rn of 165 .. \\ I} ll: Ju '(. l
"'C(") ~= t1) ~ m:T N;u ""tl) 0 c -a .... Ill g:;u t1) "'C 0 ~
- u t1)
~ (")
- u 7'
~
- o
-u O ru z <0.. t1) 0 ~;o El "P 0 ~ ...., N a;~ <.n O TABLE I
SUMMARY
OF SPT ENERGY MEASUREMENI'S (ASTM 04633-10) M&W Drilling SPT Energy Measurements (2000 RPM) Oak Ridge, Tennessee AMEC Project No. 6468-13-1072 "0 -e C" 0 ~ Q;>> -e ~ .£ ~ -g ~ ~ ~ ~ ~ ~ e"C;;' ~ =~ c:::: r-- _g <3 ~ ~ -g ~ ~ ~ ~
- .. ~
c "0 ~ c: Eo-- rr.J £i c ':': c: = "' ~ S:l~ Cl'l ~- c:,).~ (IJ\\olo&l .;.g 0~ ~ 0 ~ -g
- g.
0.: ~ ~ Q:l ~ c t: ~rt= o z a) ~ o u;.( a);>' E ~ ~.~ .!:.'l k~ bJ) = Q ~.ii; ~ bJ) ~ ~ ~ ~ ...J ...J c ~ 0 = ~.... Q
- c.
-e> g-rr.J C:::: o Q E ~ c. o ~ ~ .~ ~ ~ [:-. 0 < ~ ~ ~ c::: ~ z r-1 r-1 5.0-6.5 8-10-13 23 340 97.1% 027 Test hole #7 7.2-8.7 13-13-9 22 309 88.3% Diedrich DM_&ll~ GaryAkins (nearMET 6/6/2013 AW-J 8.7-10.2 15-15-13 28 337 96.3% n ma D-120 Tower) 10.2-11.7 ll-10-5 15 340 97.1% I Average for Rig: I 331.3 I 94.7% l aMeasured Energy is energy based on the EFV method, as outlined in ASTM 04633-10, for each blow recorded by the POA. Only blows used to calculate N-values were considered per ASTM 04633-10. In some cases, the initial and/or final one to two blows produced poor quality data, and were not used to calculate the Average Measured Energy. EFV = EMX
- 1000 lbs/kip, where EMX equals the transferred energy measured by the PDA (see attached POA data).
bEnergy Transfer Ratio is the Measured Energy divided by the theoretical SPT energy of350 foot-pounds (140 pound hammer falling 2.5 feet). The average EFV and ETR values may differ slightly and insignificantly from those in the PDIPLOT tables due to roundoff. Prepared By: \\k Date: l - 1 D - I c.\\ Checked By: 9L Date: Ho-ll..j
MACTEC Engineering and Consulting, Inc.- Case Method & iCAP Results PDIPLOT Ver. 2012.2-Printed: 18-Nov-2013 B I 0 w 0 6 12 N 18 m b e 24 30 36 0 0 CSX (ksi) --- Max Measured Compr. Stress 10 20 ( ~ "\\ \\ p ( v I 10 I 20 TSX (ksi) --- Tension Stress Maximum 30 30 CLINCH RIVER SMR-CLINCH RIVER MWD (GARY A) 5'-6.5' DFN(in) --- 40 0.00 1.25 )) ((), ~~ )] \\ \\ 40 0.00 1.00 Final Displacement 2.50 2.00 DMX (in) --- Maximum Displacement 3.75 5.00 0.0 3.00 4.00 0 Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-148 of 168 0.1 25 Test date: 6-Jun-2013 EMX (k-It) --- Max Transferred Energy 0.2 50 ETR ((%)) --- Energy Transfer Ratio 0.3 0.4 ) ) 1\\}, ~ ( ( ) ) \\ \\ 75 100 RCN: CRP-1215.0 Page 145 of 165
MACTEC Engineering and Consulting, Inc. Page 1 of 1 Case Method & iCAP Results PDIPLOTVer. 2012.2-Printed: 18-Nov-2013 CLINCH RIVER SMR-CLINCH RIVER MWD (GARY A) 5'-6.5' DIEDRICH D.120 (027) OP: MEH AR: 1.21 inA2 LE: 10.50 ft WS: 16 807.9 f/s CSI: Max F1 or F2 Compr. Stress CSX: Max Measured Compr. Stress TSX: Tension Stress Maximum VMX: Maximum Velocity FMX: Maximum Force BL# depth CSI csx ft ksi ksi 9 0.00 28.8 28.1 10 0.00 28.2 27.9 11 0.00 29.2 28.6 12 0.00 28.8 28.7 13 0.00 29.1 28.9 14 0.00 29.8 29.3 15 0.00 28.4 28.2 16 0.00 30.3 29.3 17 0.00 31.2 29.2 18 0.00 31.6 29.8 19 0.00 31.2 30.2 20 0.00 30.3 28.8 21 0.00 30.7 29.3 22 0.00 30.3 29.2 23 0.00 30.3 29.1 24 0.00 30.3 29.0 25 0.00 30.0 28.8 26 0.00 29.4 28.5 27 0.00 29.8 28.9 28 0.00 29.2 28.6 29 0.00 28.6 28.1 30 0.00 28.5 27.6 31 0.00 28.5 27.8 Average 29.7 28.8 Time Summary Drive 1 minute 4 seconds Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-149 of 168 TSX VMX FMX DFN ksi f/s kips in 15.6 26.5 34 0.88 15.3 26.7 34 0.70 15.1 25.9 35 0.93 15.4 24.5 35 0.59 19.0 24.8 35 0.53 19.5 25.0 35 0.58 21.4 26.3 34 0.85 15.1 26.6 36 0.76 15.4 24.5 35 1.02 15.6 25.2 36 0.90 15.8 25.6 37 0.88 15.0 25.0 35 0.71 14.6 25.1 35 0.95 14.7 25.5 35 0.86 14.4 25.2 35 0.64 14.0 25.3 35 0.70 14.0 25.4 35 0.71 13.5 25.2 34 0.46 12.8 25.6 35 0.58 11.5 25.7 35 0.61 11.4 25.8 34 0.64 9.7 25.4 33 0.43 9.8 25.2 34 0.54 14.7 25.5 35 0.72 Total number of blows analyzed: 23 9:39:04 AM - 9:40:08 AM (6/6/2013) BN 1 - 34 DFN: DMX: EMX: ETR: DMX in 0.90 0.81 0.93 0.68 0.68 0.68 0.85 0.80 1.02 0.90 0.88 0.73 0.95 0.86 0.65 0.71 0.71 0.62 0.60 0.62 0.64 0.46 0.58 0.75 Test date: 6-Jun-2013 SP: 0.492 klft3 EM: 30,000 ksi JC: 0.00 Final Displacement Maximum Displacement Max Transferred Energy Energy Transfer Ratio EMX ETR k-ft (%) 0.337 96.3 0.342 97.7 0.338 96.6 0.304 86.7 0.309 88.4 0.315 90.0 0.329 93.9 0.360 102.9 0.353 101.0 0.354 101.2 0.360 102.8 0.345 98.6 0.353 100.9 0.355 101.4 0.345 98.4 0.347 99.2 0.345 98.5 0.335 95.7 0.341 97.4 0.345 98.5 0.343 97.9 0.328 93.8 0.334 95.5 0.340 97.1 RCN: CRP-1215.0 Page 146 of 165
MACTEC Engineering and Consulting, Inc.- Case Method & iCAP Results PDIPLOT Ver. 2012.2-Printed: 15-Nov-2013 B I 0 w 0 7 14 N 21 m b e 28 35 42 0 0 CSX (ksi) --- CLINCH RIVER SMR-CLINCH RIVER MWD (GARY A) 7.2'-8.7' DFN(in) --- 10 10 Max Measured Compr. Stress 20 i \\ s ) \\ \\ 20 TSX (ksi) --- Tension Stress Maximum 30 30 40 0.00 40 0.00 Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-150 of 168 Final Displacement 1.25 2.50
- i. )
z ~ '( ~ ) ) 1.00 2.00 DMX (in) --- Maximum Displacement 3.75 5.00 0.0 3.00 4.00 0 0.1 25 Test date: 6-Jun-2013 EMX (k-It) --- Max Transferred Energy 0.2 50 ETR ((%)) --- Energy Transfer Ratio 0.3 I( ( ~~ ~ I I I 75 RCN: CRP-1215.0 Page14 of165 0.4 100
MACTEC Engineering and Consulting, Inc. Page 1 of 1 Case Method & iCAP Results PDIPLOTVer. 2012.2-Printed: 15-Nov-2013 CLINCH RIVER SMR-CLINCH RIVER MWD (GARY A) 7.2'-8.7' DIEDRICH D.120 (027) OP: MEH AR: 1.21 inA2 LE: 12.00 ft WS: 16 807.9 f/s CSI: Max F1 or F2 Compr. Stress CSX: Max Measured Compr. Stress TSX: Tension Stress Maximum VMX: Maximum Velocity FMX: Maximum Force BL# depth CSI csx ft ksi ksi 15 0.00 31.1 27.1 16 0.00 31.4 27.3 17 0.00 31.0 27.0 18 0.00 31.0 27.3 19 0.00 30.9 27.1 20 0.00 31.5 27.4 21 0.00 31.7 27.6 22 0.00 28.9 26.1 23 0.00 31.9 27.9 24 0.00 29.7 26.3 25 0.00 30.8 26.9 26 0.00 30.8 26.8 27 0.00 30.8 26.8 28 0.00 31.0 27.0 29 0.00 31.0 27.1 30 0.00 29.6 26.5 31 0.00 29.8 26.6 32 0.00 30.0 26.5 33 0.00 30.2 26.7 34 0.00 30.8 26.9 35 0.00 29.6 26.1 36 0.00 30.4 26.8 Average 30.6 26.9 Time Summary Drive 1 minute 29 seconds Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-151 of 168 TSX VMX FMX DFN ksi f/s kips in 15.4 23.2 33 1.09 15.1 23.6 33 1.08 15.1 23.1 33 1.19 14.9 23.2 33 1.03 15.6 23.1 33 0.98 14.8 23.1 33 1.49 15.0 23.2 33 1.18 14.5 22.5 32 1.02 14.5 23.4 34 1.53 16.1 23.0 32 0.98 15.9 23.2 32 1.25 16.2 23.1 32 1.12 16.5 23.3 32 1.20 18.0 23.4 33 1.12 18.1 23.6 33 1.18 17.4 23.3 32 0.92 18.2 23.6 32 0.99 17.5 23.4 32 1.07 16.4 23.3 32 1.20 16.0 23.5 33 0.93 15.6 23.0 32 0.87 16.4 23.6 32 1.06 16.1 23.3 33 1.11 Total number of blows analyzed: 22 9:52:4 7 AM - 9:54:16 AM (6/6/2013) BN 1 - 37 DFN: DMX: EMX: ETR: DMX in 1.10 1.08 1.19 1.03 0.98 1.49 1.18 1.02 1.53 0.99 1.25 1.12 1.20 1.12 1.18 1.02 1.02 1.08 1.20 0.94 0.91 1.06 1.12 Test date: 6-Jun-2013 SP: 0.492 klft3 EM: 30,000 ksi JC: 0.00 Final Displacement Maximum Displacement Max Transferred Energy Energy Transfer Ratio EMX ETR k-ft (%) 0.312 89.1 0.312 89.1 0.309 88.2 0.310 88.5 0.303 86.7 0.323 92.2 0.309 88.3 0.302 86.4 0.328 93.8 0.304 86.7 0.316 90.3 0.305 87.0 0.310 88.6 0.305 87.1 0.307 87.7 0.308 87.9 0.309 88.2 0.308 88.0 0.312 89.1 0.301 86.1 0.307 87.8 0.308 88.0 0.309 88.4 RCN: CRP-1215.0 Page 14 of 165
MACTEC Engineering and Consulting, Inc.- Case Method & iCAP Results PDIPLOT Ver. 2012.2-Printed: 15-Nov-2013 B I 0 w 0 8 16 N 24 m b e 32 40 48 0 0 CSX (ksi) --- Max Measured Compr. Stress 10 20 ( ( I" I~ f l> (, il \\ ( 10 20 TSX (ksi) --- Tension Stress Maximum 30 30 CLINCH RIVER SMR-CLINCH RIVER MWD (GARY A) 8.7'-10.3' DFN(in) --- 40 0.00 40 0.00 Final Displacement 1.25 2.50 ~~, lJI ~ )
- 5~
\\ \\ 1.00 2.00 DMX (in) --- Maximum Displacement 3.75 5.00 0.0 3.00 4.00 0 Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-152 of 168 0.1 25 Test date: 6-Jun-2013 EMX (k-It) --- Max Transferred Energy 0.2 50 ETR ((%)) --- Energy Transfer Ratio 0.3 75 0.4 ~ ~ <l / s> \\ \\ 100 RCN: CRP-1215.0 Page14 of165
MACTEC Engineering and Consulting, Inc. Page 1 of 1 Case Method & iCAP Results PDIPLOTVer. 2012.2-Printed: 15-Nov-2013 CLINCH RIVER SMR-CLINCH RIVER MWD (GARY A) 8.7'-10.3' DIEDRICH D.120 (027) OP: MEH AR: 1.21 inA2 LE: 13.50 ft WS: 16 807.9 f/s CSI: Max F1 or F2 Compr. Stress CSX: Max Measured Compr. Stress TSX: Tension Stress Maximum VMX: Maximum Velocity FMX: Maximum Force BL# depth CSI csx ft ksi ksi 16 0.00 30.9 27.0 17 0.00 31.0 27.0 18 0.00 30.4 26.3 19 0.00 29.6 25.7 20 0.00 29.1 25.4 21 0.00 29.1 25.9 22 0.00 28.9 25.5 23 0.00 29.8 26.0 24 0.00 30.4 26.4 25 0.00 28.9 25.3 26 0.00 28.1 25.2 27 0.00 29.2 25.4 28 0.00 27.0 24.6 29 0.00 27.2 24.1 30 0.00 27.4 24.6 31 0.00 27.3 24.5 32 0.00 28.0 24.4 33 0.00 28.0 24.3 34 0.00 28.8 25.0 35 0.00 26.8 23.3 36 0.00 27.8 24.0 37 0.00 25.9 23.2 38 0.00 29.0 24.9 39 0.00 29.4 27.7 40 0.00 30.9 28.1 41 0.00 29.1 27.5 42 0.00 28.3 27.0 43 0.00 29.4 27.2 Average 28.8 25.6 Time Summary Drive 1 minute 5 seconds Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-153 of 168 TSX VMX FMX DFN ksi f/s kips in 9.8 25.0 33 0.39 9.9 25.1 33 0.39 10.5 25.1 32 0.59 9.3 25.3 31 0.64 9.7 25.5 31 0.80 9.1 25.1 31 0.61 10.1 25.1 31 0.52 10.2 25.2 31 0.72 11.9 25.4 32 0.73 11.8 25.4 31 0.82 10.8 25.2 31 0.81 10.6 25.3 31 0.76 12.2 24.7 30 0.83 12.7 24.6 29 0.74 12.5 24.9 30 1.20 12.7 24.9 30 1.14 12.4 25.1 29 1.35 11.1 25.1 29 1.30 12.1 25.2 30 1.18 10.2 24.6 28 1.23 10.4 25.1 29 1.30 9.8 24.7 28 1.30 9.7 24.7 30 1.08 15.4 22.9 33 1.19 15.3 22.8 34 1.04 15.7 22.7 33 1.17 15.8 23.3 33 1.18 16.1 23.5 33 1.23 11.7 24.7 31 0.94 Total number of blows analyzed: 28 9:58:23 AM - 9:59:28 AM (6/6/2013) BN 1 - 45 DFN: DMX: EMX: ETR: DMX in 0.43 0.47 0.59 0.66 0.80 0.61 0.53 0.72 0.73 0.82 0.81 0.76 0.83 0.74 1.20 1.14 1.35 1.30 1.18 1.23 1.30 1.30 1.08 1.19 1.04 1.17 1.18 1.23 0.94 Test date: 6-Jun-2013 SP: 0.492 klft3 EM: 30,000 ksi JC: 0.00 Final Displacement Maximum Displacement Max Transferred Energy Energy Transfer Ratio EMX ETR k-ft (%) 0.336 95.9 0.344 98.3 0.337 96.4 0.336 95.9 0.341 97.5 0.330 94.2 0.330 94.4 0.336 95.9 0.339 97.0 0.341 97.5 0.339 96.9 0.335 95.8 0.330 94.4 0.325 93.0 0.353 101.0 0.347 99.2 0.358 102.2 0.353 100.7 0.347 99.1 0.336 96.0 0.346 99.0 0.338 96.7 0.318 90.9 0.328 93.8 0.323 92.2 0.329 94.1 0.332 94.9 0.333 95.2 0.337 96.4 RCN: CRP-1215.0 Page 150 of 165
MACTEC Engineering and Consulting, Inc.- Case Method & iCAP Results PDIPLOT Ver. 2012.2-Printed: 15-Nov-2013 B I 0 w 0 5 10 N 15 m b e 20 25 30 0 0 10 10 CSX (ksi) --- Max Measured Compr. Stress 20 I ( l I ( I / I 20 TSX (ksi) --- Tension Stress Maximum 30 30 CLINCH RIVER SMR-CLINCH RIVER MWD (GARY A) 10.2'-11.7' DFN(in) --- 40 0.00 40 0.00 Final Displacement 1.25 2.50 (( c~~ \\\\ 1.00 ~/ I 2.00 DMX (in) --- Maximum Displacement 3.75 5.00 0.0 3.00 4.00 0 Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-154 of 168 0.1 25 Test date: 6-Jun-2013 EMX (k-It) --- Max Transferred Energy 0.2 50 ETR ((%)) --- Energy Transfer Ratio 0.3 75 0.4 s s ~ ~ I I 100 RCN: CRP-1215.0 Page 151 of 165
MACTEC Engineering and Consulting, Inc. Page 1 of 1 Case Method & iCAP Results PDIPLOTVer. 2012.2-Printed: 15-Nov-2013 CLINCH RIVER SMR-CLINCH RIVER MWD (GARY A) 10.2'-11.7' DIEDRICH D.120 (027) OP: MEH AR: 1.21 inA2 LE: 16.00 ft WS: 16 807.9 f/s CSI: Max F1 or F2 Compr. Stress CSX: Max Measured Compr. Stress TSX: Tension Stress Maximum VMX: Maximum Velocity FMX: Maximum Force BL# depth CSI csx ft ksi ksi 12 0.00 30.3 28.6 13 0.00 30.6 28.6 14 0.00 29.0 27.8 15 0.00 29.1 27.8 16 0.00 28.8 27.7 17 0.00 29.6 26.8 18 0.00 27.5 26.7 19 0.00 28.1 26.5 20 0.00 27.8 26.0 21 0.00 28.3 25.5 22 0.00 27.1 25.2 23 0.00 25.9 24.4 24 0.00 25.2 24.1 25 0.00 24.9 23.7 26 0.00 24.1 23.1 Average 27.8 26.2 Time Summary Drive 43 seconds Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-155 of 168 TSX VMX FMX DFN ksi f/s kips in 17.4 24.5 35 0.76 16.8 24.5 35 1.01 15.5 24.2 34 0.84 15.3 24.7 34 0.93 15.0 24.8 33 0.81 14.8 24.8 32 0.96 14.3 24.7 32 0.64 15.5 24.8 32 1.45 18.0 24.7 31 1.55 18.6 24.6 31 1.81 17.7 24.7 30 1.50 15.9 24.3 30 1.98 16.2 24.3 29 1.50 17.6 24.7 29 2.12 15.7 24.2 28 2.02 16.3 24.6 32 1.32 Total number of blows analyzed: 15 10:04:31 AM -10:05:14AM (6/6/2013) BN 1 -27 DFN: DMX: EMX: ETR: DMX in 0.76 1.01 0.84 0.94 0.81 0.96 0.64 1.45 1.55 1.81 1.50 1.98 1.50 2.12 2.02 1.33 Test date: 6-Jun-2013 SP: 0.492 klft3 EM: 30,000 ksi JC: 0.00 Final Displacement Maximum Displacement Max Transferred Energy Energy Transfer Ratio EMX ETR k-ft (%) 0.340 97.1 0.350 99.9 0.333 95.2 0.350 99.9 0.345 98.5 0.347 99.2 0.331 94.5 0.350 100.1 0.339 97.0 0.341 97.4 0.329 94.1 0.341 97.4 0.324 92.5 0.346 98.9 0.338 96.7 0.340 97.2 RCN: CRP-1215.0 Page 152 of 165
"tl(") Ill-IC -* ~ ~ IIJ:::r N;:c en~ 0 c
- s-g:;:c
~ "0 0 ~ ~ ~ (")
- tJ
~ ~
- o
"'00 Ql z (Q.. (!) 0 ~;u <.n" 0 0 ~ ..... ~ ~ <.n Ol. <.no "0 c oe
- 4) 0
.c- ~ c ~ ~ c::! _-o t 0 i~ 0
- c.
CD !::If) 0 0: *-
- c::::
~ !::If) C) ~ (JJ b.ll Qi: 027 M&W Diedrich Drilling Gary Akins D-120 TABLE2
SUMMARY
OF SPT ENERGY MEASUREMENTS (ASTM D4633-10) M& W Drilling SPT Energy Measurements (1500 RPM) Oak Ridge, Tennessee AMEC Project No. 6468-13-1072 C' ~ "0 0 ~ ~
- c..-.
~ ~ "0 -~ ~ C)
- 4)
E-< r.n .c §-5 "0 0 CJ
- c.
0.: E-0 CJ z ~ Q u ~ !::If) .£ ~ *r;; ~ c e:: 'Q. 0 Q ~ 0 Q E .Q:I c. .Q:I (.<! E-(JJ ~ (JJ 13.2-14.7 6-8-9 Test hole #7 14.7-16.2 6-6-7 (near MET 6/6/2013 AW-J Tower) "0 ~ N >. e: c ~ 0 ~ 0 0 z 17 13 - I-- I Average for Rig: I ~ "0~ ~Jil:il = C) !::If) oe ~ "' C) 2: -
- 4).c
- 4) -< '*
!;>()-.._., oe CJ !;>() CJ c ~ 318 344 329.3 "Measured Energy is energy based on the EFV method, as outlined in ASTM D4633-10, for each blow recorded by the PDA. Only blows used to calculate N-values were considered per ASTM D4633-10. In some cases, the initial and/or final one to two blows produced poor quality data, and were not used to calculate the Average Measured Energy. EFV = EMX
- 1000 lbs!kip, where EMX equals the transferred energy measured by the PDA (see attached PDA data).
bEnergy Transfer Ratio is the Measured Energy divided by the theoretical SPT energy of350 foot-pounds (140 pound hanuner falling 2.5 feet). The average EFV and ETR values may differ slightly and insignificantly from those in the PDIPLOT tables due to roundoff. Prepared By: ~~ Date: \\- \\ 0 - l 4 Checked By: 'Ck-Date: \\-10-l"\\ 0 *- ~ 0:: ~ E-< ~ Jil:il CJ !::If) ~ ~ ~ E-< -< !;>()..::> ~ ~ c c ~- I 90.9% I 98.3% I I 94.1%
MACTEC Engineering and Consulting, Inc.- Case Method & iCAP Results PDIPLOT Ver. 2012.2-Printed: 15-Nov-2013 B I 0 w 0 5 10 N 15 m b e 20 25 30 0 0 CSX (ksi) --- Max Measured Compr. Stress 10 20 ( l) ~ ~ ) I 10 20 TSX (ksi) --- Tension Stress Maximum 30 30 CLINCH RIVER SMR-CLINCH RIVER MWD (GARY A) 13.2'-14.7' DFN(in) --- 40 0.00 40 0.00 Final Displacement 1.25 2.50 \\ \\\\ ( '~ ) ( 1.00 2.00 DMX (in) --- Maximum Displacement 3.75 5.00 0.0 3.00 4.00 0 Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-157 of 168 0.1 25 Test date: 6-Jun-2013 EMX (k-It) --- Max Transferred Energy 0.2 0.3 0.4 ( ( ) ( ~( ( ( 50 ETR ((%)) --- Energy Transfer Ratio 75 RCN: CRP-1215.0 Page 154 of 165 100
MACTEC Engineering and Consulting, Inc. Page 1 of 1 Case Method & iCAP Results PDIPLOTVer. 2012.2-Printed: 15-Nov-2013 CLINCH RIVER SMR-CLINCH RIVER MWD (GARY A) 13.2'-14.7' DIEDRICH D.120 (027) OP: MEH AR: 1.21 inA2 LE: 19.00 ft WS: 16 807.9 f/s CSI: Max F1 or F2 Compr. Stress CSX: Max Measured Compr. Stress TSX: Tension Stress Maximum VMX: Maximum Velocity FMX: Maximum Force BL# depth CSI csx ft ksi ksi 8 0.00 26.6 24.2 9 0.00 26.3 23.7 10 0.00 26.3 23.7 11 0.00 26.2 23.3 12 0.00 26.4 23.6 13 0.00 26.7 23.6 14 0.00 26.9 23.8 15 0.00 26.3 23.6 16 0.00 26.1 23.3 17 0.00 24.4 22.5 18 0.00 24.9 24.1 19 0.00 23.7 22.5 20 0.00 25.5 23.7 21 0.00 27.1 26.1 22 0.00 28.1 26.9 23 0.00 28.0 26.9 24 0.00 27.8 26.8 Average 26.3 24.3 Time Summary Drive 50 seconds Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-158 of 168 TSX VMX FMX DFN ksi f/s kips in 13.5 24.9 29 0.87 12.9 24.9 29 0.91 13.1 25.0 29 0.99 12.3 24.7 28 0.89 12.3 24.8 29 0.98 12.2 25.1 29 1.04 11.2 25.0 29 1.10 11.9 25.0 29 1.15 12.6 25.0 28 1.30 13.2 24.5 27 1.20 9.6 23.7 29 1.07 9.5 22.9 27 1.18 14.8 24.6 29 1.61 17.8 23.1 32 1.17 17.7 23.4 33 0.97 17.9 23.3 33 1.16 17.2 23.4 32 1.00 13.5 24.3 29 1.09 Total number of blows analyzed: 17 10:18:09 AM - 10:18:59 AM (6/6/2013) BN 1 - 25 DFN: DMX: EMX: ETR: DMX in 0.88 0.91 0.99 0.89 0.98 1.04 1.10 1.15 1.30 1.20 1.07 1.18 1.61 1.17 1.05 1.16 1.02 1.10 Test date: 6-Jun-2013 SP: 0.492 klft3 EM: 30,000 ksi JC: 0.00 Final Displacement Maximum Displacement Max Transferred Energy Energy Transfer Ratio EMX ETR k-ft (%) 0.320 91.3 0.315 90.1 0.323 92.2 0.309 88.2 0.315 89.9 0.324 92.5 0.319 91.2 0.321 91.6 0.326 93.0 0.308 87.9 0.300 85.7 0.294 83.9 0.339 96.7 0.325 92.8 0.321 91.6 0.328 93.7 0.321 91.6 0.318 90.8 RCN: CRP-1215.0 Page 155 of 165
MACTEC Engineering and Consulting, Inc.- Case Method & iCAP Results PDIPLOT Ver. 2012.2-Printed: 15-Nov-2013 B I 0 w 0 5 10 N 15 m b e 20 25 30 0 0 10 10 CSX (ksi) --- Max Measured Compr. Stress 20 30 I \\ II f ( ( I 20 30 TSX (ksi) --- Tension Stress Maximum CLINCH RIVER SMR-CLINCH RIVER MWD (GARY A) 14.7'-16.2' DFN(in) --- 40 0.00 40 0.00 Final Displacement 1.25 2.50 ~ ~ // <)) \\ ~ 1.00 2.00 DMX (in) --- Maximum Displacement 3.75 5.00 0.0 3.00 4.00 0 Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-159 of 168 0.1 25 Test date: 6-Jun-2013 EMX (k-It) --- Max Transferred Energy 0.2 50 ETR ((%)) --- Energy Transfer Ratio 0.3 75 0.4 \\ \\ ) : ) ) I I 100 RCN: CRP-1215.0 Page 156 of 165
MACTEC Engineering and Consulting, Inc. Page 1 of 1 Case Method & iCAP Results PDIPLOTVer. 2012.2-Printed: 15-Nov-2013 CLINCH RIVER SMR-CLINCH RIVER MWD (GARY A) 14.7'-16.2' DIEDRICH D.120 (027) OP: MEH AR: 1.21 inA2 LE: 21.00 ft WS: 16 807.9 f/s CSI: Max F1 or F2 Compr. Stress CSX: Max Measured Compr. Stress TSX: Tension Stress Maximum VMX: Maximum Velocity FMX: Maximum Force BL# depth CSI csx ft ksi ksi 9 0.00 30.8 28.7 10 0.00 32.1 29.5 11 0.00 30.6 28.5 12 0.00 31.7 28.8 13 0.00 31.1 28.7 14 0.00 29.3 27.4 15 0.00 31.1 27.2 16 0.00 30.6 27.3 17 0.00 31.2 27.5 18 0.00 30.9 27.3 19 0.00 31.4 27.5 20 0.00 30.9 27.2 21 0.00 31.7 27.6 Average 31.0 27.9 Time Summary Drive 34 seconds Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-160 of 168 TSX VMX FMX DFN ksi f/s kips in 21.1 23.1 35 1.31 20.7 23.3 36 1.59 20.6 23.5 35 1.44 20.1 23.9 35 1.27 19.6 23.8 35 1.43 19.7 23.8 33 1.24 19.7 23.8 33 1.13 19.0 23.9 33 1.26 19.6 23.9 33 1.14 19.5 24.2 33 1.40 18.7 23.9 33 1.41 18.7 23.8 33 1.22 18.8 23.8 33 1.40 19.7 23.8 34 1.33 Total number of blows analyzed: 13 10:24:37 AM -10:25:11 AM (6/6/2013) BN 1-21 DFN: DMX: EMX: ETR: DMX in 1.31 1.59 1.44 1.27 1.43 1.24 1.13 1.26 1.14 1.40 1.41 1.22 1.40 1.33 Test date: 6-Jun-2013 SP: 0.492 klft3 EM: 30,000 ksi JC: 0.00 Final Displacement Maximum Displacement Max Transferred Energy Energy Transfer Ratio EMX ETR k-ft (%) 0.342 97.8 0.359 102.6 0.341 97.4 0.352 100.7 0.358 102.3 0.339 96.9 0.335 95.6 0.339 96.8 0.337 96.2 0.344 98.4 0.350 100.0 0.336 96.0 0.334 95.5 0.344 98.2 RCN: CRP-1215.0 Page 15 of 165
"'C(") ~= t1) ~ m:T N;u "'tl) 0 c -a ... Ill g:;u t1) "'C 0 ~
- u t1)
~ ~ (")
- u 7'
~
- o
-uO ru z <0.. t1) 0 ~;o c.n-u D 0 ~ ....,N a;~ (}10 TABLE3
SUMMARY
OF SPT ENERGY MEASUREMENTS (ASTM 04633-10) M&W Drilling SPT Energy Measurements (2500 RPM) Oak Ridge, Tennessee A.MEC Project No. 6468-13-1072 ~ ~ "CC -~.-.. "CC ~ 0 ~ "CC r=.; ~ c::: ~ ~
- c.--
b e~ c:::e-- 0 "0 N ~ ~
- S
~ lioil .Q C) 4> ~ ~ c Cl) OJ) E-o ~ ~ e-; t; en =~ ~~-;__ ~ ~
- l 0
~ ~ 0 "CC
- c.
§ *= ~ ~ 1l ~ ~ z ~ 0
- c.
z e-; ~ Q u ~ ~ ~ en en 0 cu o cu < ;::: en ~ ~ ~ ~ ~ ~ E- < ~ ~ c::: i:i2 Q
- c.
..:: :il 6'ii ""'-' en 0 Q e Ci:lc. 0 ~?Jl en ~ r~ e-; 0 < ~ ~ "$ 0.. = ~ ~ ~ ~ ~ I 17.2-18.7 10-10-11 21 341 97.4% I 027 Test hole #7 18.7-20.2 13-13-12 25 333 95.1% Diedrich DM_& 11'!' Gary Akins (near MET 6/6/2013 AW-J 20.2-21.7 13-14-15 29 353 100.9% n mer D-120 Tower) I Average for Rig: I 343.0 I 98.0% I 3Measured Energy is energy based on the EFV method, as outlined in ASTM D4633-10, for each blow recorded by the PDA. Only blows used to calculate N-values were considered per ASTM D4633-10. In some cases, the initial and/or final one to two blows produced poor quality data, and were not used to calculate the Average Measured Energy. EFV = EMX
- 1000 lbslkip, where EMX equals the transferred energy measured by the PDA (see attached PDA data).
bEnergy Transfer Ratio is the Measured Energy divided by the theoretical SPT energy of350 foot-pounds (140 pound hammer falling 2.5 feet). The average EFV and ETR values may differ slightly and insignificantly from those in the PDIPLOT tables due to roundoff. Prepared By: Date: \\ -\\'C... \\4 Checked By: CJu_ Date: l-lo-lY
MACTEC Engineering and Consulting, Inc.- Case Method & iCAP Results PDIPLOT Ver. 2012.2-Printed: 15-Nov-2013 B I 0 w 0 6 12 N 18 m b e 24 30 36 0 0 10 10 CSX (ksi) --- Max Measured Compr. Stress 20 I ( ( < ) ~ I \\ \\ 20 TSX (ksi) --- Tension Stress Maximum 30 30 CLINCH RIVER SMR-CLINCH RIVER MWD (GARY A) 17.2'-18.7' DFN(in) --- 40 0.00 1.25 I I ( ) " ) / 4 I I 40 0.00 1.00 Final Displacement 2.50 2.00 DMX (in) --- Maximum Displacement 3.75 5.00 0.0 3.00 4.00 0 Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-162 of 168 0.1 25 Test date: 6-Jun-2013 EMX (k-It) --- Max Transferred Energy 0.2 0.3 0.4 I ) z 50 ETR ((%)) --- Energy Transfer Ratio 75 ( I RCN: CRP-1215.0 Page15 of165 j ( 100
MACTEC Engineering and Consulting, Inc. Page 1 of 1 Case Method & iCAP Results PDIPLOTVer. 2012.2-Printed: 15-Nov-2013 CLINCH RIVER SMR-CLINCH RIVER MWD (GARY A) 17.2'-18.7' DIEDRICH D.120 (027) OP: MEH AR: 1.21 inA2 LE: 22.00 ft WS: 16 807.9 f/s CSI: Max F1 or F2 Compr. Stress CSX: Max Measured Compr. Stress TSX: Tension Stress Maximum VMX: Maximum Velocity FMX: Maximum Force BL# depth CSI csx ft ksi ksi 11 0.00 31.7 27.8 12 0.00 31.3 27.5 13 0.00 31.3 27.4 14 0.00 31.5 27.7 15 0.00 31.4 27.5 16 0.00 31.0 27.0 17 0.00 30.6 26.9 18 0.00 32.5 28.2 19 0.00 29.9 25.9 20 0.00 31.0 27.4 21 0.00 31.9 27.8 22 0.00 29.6 25.8 23 0.00 28.8 25.9 24 0.00 28.3 25.8 25 0.00 28.8 25.9 26 0.00 28.2 25.9 27 0.00 30.0 26.2 28 0.00 29.5 26.1 29 0.00 28.7 25.8 30 0.00 30.7 26.7 31 0.00 30.9 27.0 Average 30.4 26.8 Time Summary Drive 46 seconds Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-163 of 168 TSX VMX FMX DFN ksi f/s kips in 18.7 22.7 34 1.15 18.4 22.5 33 1.06 18.9 22.5 33 1.19 18.5 22.6 34 1.18 18.2 22.6 33 1.11 17.5 22.6 33 1.03 18.2 22.6 33 0.99 19.6 22.6 34 1.06 17.5 22.4 31 1.25 19.8 22.7 33 1.20 19.4 22.6 34 1.11 16.8 22.4 31 1.02 14.7 22.5 31 1.03 14.3 22.6 31 0.89 13.3 22.6 31 1.04 13.4 22.7 31 0.95 14.1 23.1 32 1.07 13.9 22.7 32 0.79 13.3 22.7 31 1.02 13.5 23.1 32 0.92 13.8 23.1 33 0.86 16.5 22.7 32 1.04 Total number of blows analyzed: 21 10:39:05AM -10:39:51 AM (6/6/2013) BN 1-32 DFN: DMX: EMX: ETR: DMX in 1.15 1.06 1.19 1.18 1.11 1.03 0.99 1.06 1.25 1.20 1.11 1.02 1.03 0.89 1.04 0.95 1.07 0.80 1.02 0.92 0.86 1.04 Test date: 6-Jun-2013 SP: 0.492 klft3 EM: 30,000 ksi JC: 0.00 Final Displacement Maximum Displacement Max Transferred Energy Energy Transfer Ratio EMX ETR k-ft (%) 0.347 99.2 0.342 97.6 0.346 98.7 0.348 99.4 0.345 98.4 0.339 97.0 0.332 94.8 0.343 98.0 0.340 97.2 0.343 98.0 0.343 98.0 0.333 95.2 0.332 94.9 0.331 94.7 0.336 96.0 0.336 96.0 0.349 99.6 0.337 96.3 0.339 96.8 0.349 99.7 0.346 98.8 0.341 97.4 RCN: CRP-1215.0 Page 160 of 165
MACTEC Engineering and Consulting, Inc.- Case Method & iCAP Results PDIPLOT Ver. 2012.2-Printed: 15-Nov-2013 B I 0 w 0 7 14 N 21 m b e 28 35 42 0 0 CSX (ksi) --- Max Measured Compr. Stress 10 20 J J 1 ( 10 ) ) 20 TSX (ksi) --- Tension Stress Maximum 30 30 CLINCH RIVER SMR-CLINCH RIVER MWD (GARY A) 18.7'-20.2' DFN(in) --- 40 0.00 1.25 i~~ )) )\\ \\\\ 40 0.00 1.00 Final Displacement 2.50 2.00 DMX (in) --- Maximum Displacement 3.75 5.00 0.0 3.00 4.00 0 Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-164 of 168 0.1 25 Test date: 6-Jun-2013 EMX (k-It) --- Max Transferred Energy 0.2 50 ETR ((%)) --- Energy Transfer Ratio 0.3 75 0.4 ) \\ \\ 100 RCN: CRP-1215.0 Page 161 of 165
MACTEC Engineering and Consulting, Inc. Page 1 of 1 Case Method & iCAP Results PDIPLOTVer. 2012.2-Printed: 15-Nov-2013 CLINCH RIVER SMR-CLINCH RIVER MWD (GARY A) 18.7'-20.2' DIEDRICH D.120 (027) OP: MEH AR: 1.21 inA2 LE: 24.00 ft WS: 16 807.9 f/s CSI: Max F1 or F2 Compr. Stress CSX: Max Measured Compr. Stress TSX: Tension Stress Maximum VMX: Maximum Velocity FMX: Maximum Force BL# depth CSI csx ft ksi ksi 14 0.00 31.0 27.3 15 0.00 30.8 27.5 16 0.00 30.8 27.1 17 0.00 29.9 27.0 18 0.00 30.0 26.6 19 0.00 30.8 27.0 20 0.00 29.7 25.9 21 0.00 29.9 26.0 22 0.00 30.1 26.4 23 0.00 30.6 27.1 24 0.00 30.0 26.5 25 0.00 28.5 25.6 26 0.00 30.2 26.5 27 0.00 28.6 25.0 28 0.00 29.0 25.8 29 0.00 28.1 24.9 30 0.00 28.3 25.4 31 0.00 28.0 25.3 32 0.00 30.3 27.1 33 0.00 30.7 27.1 34 0.00 29.5 26.6 35 0.00 28.9 25.1 36 0.00 29.4 25.8 37 0.00 29.1 26.2 38 0.00 29.3 25.5 Average 29.7 26.2 Time Summary Drive 56 seconds Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-165 of 168 TSX VMX FMX DFN ksi f/s kips in 13.8 24.7 33 0.84 13.4 24.8 33 0.62 13.5 24.7 33 0.63 13.5 24.8 33 0.86 12.7 24.4 32 0.58 13.6 24.2 33 0.76 12.6 24.4 31 0.62 12.5 24.2 31 0.75 12.5 24.4 32 0.87 11.9 24.5 33 0.70 11.9 24.3 32 0.70 11.0 24.4 31 0.82 11.5 24.4 32 0.89 11.6 24.1 30 0.73 11.5 24.6 31 0.62 11.6 24.3 30 0.80 11.1 24.5 31 0.87 11.4 24.7 31 0.90 10.8 24.9 33 0.95 11.0 24.5 33 1.01 11.1 24.6 32 1.04 11.6 24.5 30 0.78 11.1 24.5 31 0.84 10.9 24.8 32 0.98 11.1 24.6 31 1.02 12.0 24.5 32 0.81 Total number of blows analyzed: 25 10:46:01 AM -10:46:57 AM (6/6/2013) BN 1 -39 DFN: DMX: EMX: ETR: DMX in 0.84 0.62 0.63 0.86 0.59 0.76 0.62 0.75 0.87 0.70 0.70 0.82 0.89 0.73 0.62 0.80 0.87 0.90 0.95 1.01 1.04 0.78 0.84 0.98 1.02 0.81 Test date: 6-Jun-2013 SP: 0.492 klft3 EM: 30,000 ksi JC: 0.00 Final Displacement Maximum Displacement Max Transferred Energy Energy Transfer Ratio EMX ETR k-ft (%) 0.342 97.8 0.333 95.2 0.334 95.3 0.337 96.2 0.328 93.8 0.334 95.3 0.329 94.0 0.325 92.9 0.334 95.3 0.326 93.2 0.326 93.0 0.328 93.8 0.329 94.1 0.329 94.1 0.326 93.1 0.332 95.0 0.335 95.8 0.339 96.9 0.339 96.8 0.334 95.3 0.340 97.1 0.331 94.5 0.333 95.1 0.338 96.5 0.337 96.3 0.333 95.1 RCN: CRP-1215.0 Page 162 of 165
MACTEC Engineering and Consulting, Inc.- Case Method & iCAP Results PDIPLOT Ver. 2012.2-Printed: 15-Nov-2013 B I 0 w 0 8 16 N 24 m b e 32 40 48 0 0 10 \\ 1 \\ j I 10 CSX (ksi) --- Max Measured Compr. Stress 20 / ~ ? ) 20 TSX (ksi) --- Tension Stress Maximum 30 30 CLINCH RIVER SMR-CLINCH RIVER MWD (GARY A) 20.2-21.7 DFN(in) --- 40 0.00 1.25 I I l~ t~ (( )) 40 0.00 1.00 Final Displacement 2.50 2.00 DMX (in) --- Maximum Displacement 3.75 5.00 0.0 3.00 4.00 0.00 Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-166 of 168 0.1 26.25 Test date: 6-Jun-2013 EMX (k-It) --- Max Transferred Energy 0.2 0.3 52.50 78.75 ETR ((%)) --- Energy Transfer Ratio 0.4 \\ I \\ / r 105.00 RCN: CRP-1215.0 Page16 of165
MACTEC Engineering and Consulting, Inc. Page 1 of 1 Case Method & iCAP Results PDIPLOTVer. 2012.2-Printed: 15-Nov-2013 CLINCH RIVER SMR-CLINCH RIVER MWD (GARY A) 20.2-21.7 DIEDRICH D.120 (027) OP: MEH AR: 1.21 inA2 LE: 26.00 ft WS: 16 807.9 f/s CSI: Max F1 or F2 Compr. Stress CSX: Max Measured Compr. Stress TSX: Tension Stress Maximum VMX: Maximum Velocity FMX: Maximum Force BL# depth CSI csx ft ksi ksi 15 0.00 30.3 27.2 16 0.00 29.0 25.6 17 0.00 30.6 27.4 18 0.00 29.9 26.2 19 0.00 28.1 25.0 20 0.00 29.7 26.7 21 0.00 27.9 25.1 22 0.00 29.8 26.2 23 0.00 31.2 27.5 24 0.00 29.3 25.8 25 0.00 29.9 26.9 26 0.00 29.8 26.1 27 0.00 29.5 25.8 28 0.00 28.9 25.2 29 0.00 30.0 26.5 30 0.00 29.9 26.2 31 0.00 27.9 24.8 32 0.00 29.5 25.5 33 0.00 28.8 24.8 34 0.00 29.3 25.5 35 0.00 27.2 24.2 36 0.00 28.6 25.5 37 0.00 28.8 24.7 38 0.00 28.6 24.5 39 0.00 28.5 24.7 40 0.00 28.5 24.7 41 0.00 29.6 25.8 42 0.00 29.3 25.5 43 0.00 27.8 24.6 Average 29.2 25.7 Time Summary Drive 1 minute 5 seconds Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-167 of 168 TSX VMX FMX DFN ksi f/s kips in 7.4 25.4 33 0.71 7.7 24.9 31 0.76 7.2 25.4 33 0.80 7.2 24.7 32 0.66 7.7 24.6 30 0.63 7.9 24.9 32 0.84 7.9 24.6 30 0.71 8.1 25.1 32 0.88 7.4 25.4 33 0.85 8.7 24.4 31 0.56 8.1 24.8 33 0.87 8.6 24.7 32 0.81 8.8 24.4 31 0.54 8.5 24.3 31 0.79 8.6 24.3 32 0.67 9.2 24.2 32 0.82 9.5 23.7 30 0.65 9.8 24.4 31 0.95 9.9 23.8 30 0.86 9.5 24.0 31 0.83 8.7 23.7 29 0.88 9.2 24.5 31 0.81 9.3 23.8 30 0.76 9.0 23.8 30 0.80 9.4 23.9 30 0.79 8.9 23.8 30 0.87 8.2 23.4 31 0.83 7.7 23.7 31 0.85 7.1 23.3 30 0.75 8.5 24.3 31 0.78 Total number of blows analyzed: 29 10:51 :39 AM - 10:52:44 AM (6/6/2013) BN 1 - 44 DFN: DMX: EMX: ETR: DMX in 0.71 0.76 0.81 0.66 0.63 0.84 0.71 0.88 0.85 0.58 0.87 0.81 0.55 0.79 0.67 0.82 0.65 0.95 0.86 0.83 0.88 0.81 0.76 0.80 0.79 0.87 0.83 0.86 0.75 0.78 Test date: 6-Jun-2013 SP: 0.492 klft3 EM: 30,000 ksi JC: 0.00 Final Displacement Maximum Displacement Max Transferred Energy Energy Transfer Ratio EMX ETR k-ft (%) 0.354 101.2 0.357 101.9 0.358 102.4 0.351 100.4 0.352 100.5 0.362 103.5 0.358 102.2 0.364 104.0 0.367 104.7 0.346 99.0 0.364 103.9 0.355 101.4 0.349 99.6 0.355 101.4 0.350 100.1 0.353 100.8 0.346 98.9 0.356 101.8 0.352 100.5 0.353 100.8 0.350 99.9 0.353 100.9 0.348 99.6 0.348 99.4 0.350 99.9 0.350 100.0 0.346 98.8 0.349 99.8 0.342 97.6 0.353 100.9 RCN: CRP-1215.0 Page 16 of 165
AMEC E&I, Inc. Pile Driving Analyzer CLINCH RIVER SMR CLINCH RIVER MWD (GARY A) 18. 7'-20.2' v TS: G_ 6.4 TB: 4.0 A34 F34 wu (s_o_)~~:~~~~--------------------------------------------1 D ( 3. 9 4) - '- -- TS: TB: 50 @ 12.09 ft -~, 1.01 n l Project Information Quantity Results PROJECT: CLINCH RIVER SMR CSI 30.6 ksi PILE NAME: CLINCH RIVER MWD (GARY A) 18. :CSXl.27. 2 ksi DESCR: DIEDRICH D.120 (027) TSX 10.1 ksi OPERATOR: MEH VMX 25.0 f/s FILE: CLINCH RIVER MWD (GARY A) 18. 7'-20.2FMX11 33 kips 6/6/2013 10:46:57 AM DFN 1.05 in Blow Number 38/39 DMX 1.05 in EMX 0.3 k-ft Pile Properties LE 24.00 ft AR 1.21 in"'2 EM 30000 ksi SP 0.492 k/ft3 WS 16807.9 f/s EA/C
- 2. 2 ksec/ft 2L/C 2.86 ms JC
[] Clinch River Data Report Rev. 4 CRP-1112.16 Page 8.2-168 of 168 ETR 97.6 (%) Sensors F3: [75AW1] 208.84 (1) F4: [75AW2] 209.17 (1) A3: [K3370] 325 mv/5000g's (1) A4: [K0686] 315 mv/5000g's (1) CLIP: OK F3/F4: OK 1.10 V3/V4: OK 1.13}}