ML18003A420
| ML18003A420 | |
| Person / Time | |
|---|---|
| Site: | Clinch River |
| Issue date: | 12/15/2017 |
| From: | James Shea Tennessee Valley Authority |
| To: | Office of New Reactors |
| Fetter A | |
| References | |
| TVACLINCHRIVERESP, TVACLINCHRIVERESP.SUBMISSION.4, CRN.P.PART03, CRN.P.PART03.1 | |
| Download: ML18003A420 (7) | |
Text
{{#Wiki_filter:Clinch River Nuclear Site Early Site Permit Application Part 3, Environmental Report 2.3-B-1 Revision 1 APPENDIX 2.3-B Clinch River Breeder Reactor Project Packer Test Results
Clinch River Nuclear Site Early Site Permit Application Part 3, Environmental Report 2.3-B-2 Revision 1 Table 2.3-B (Sheet 1 of 6) Clinch River Breeder Reactor Project Investigation Packer Test Results Boring Date Test Section (ft bgs) Test Length (ft) Cp (ft 2/ gpm-yr) Flow Q (gpm) Total Head H (ft) Hydraulic Conductivity K (a) (ft/yr) Hydraulic Conductivity K (b) (ft/d) Hydraulic Conductivity K (b) (cm/s) Geologic Horizon (c) Geologic Strata (d) B-26 10/2/1973 24 - 298 274 320 8.9 68.6 42 0.12 4.06E-05 U.A.S.S. Chickamauga Group 9/28/1973 30 - 298 268 325 10.1 64.7 51 0.14 4.93E-05 U.A.S.S. Chickamauga Group 9/28/1973 50 - 298 248 350 8.4 64.7 45 0.12 4.35E-05 U.A.S.S. Chickamauga Group 9/29/1973 70 - 298 228 380 8.6 99.4 33 0.09 3.19E-05 U.A.S.S. Chickamauga Group 90 - 298 208 420 4.9 61.7 33 0.09 3.19E-05 U.A.S.S. Chickamauga Group 10/2/1973 110 - 298 188 450 5.5 67.1 37 0.10 3.57E-05 U.A.S.S. Chickamauga Group 10/2/1973 150 - 298 148 540 7.2 67.1 58 0.16 5.60E-05 A.L.S. Chickamauga Group 10/2/1973 220 - 298 78 920 6.9 67.1 95 0.26 9.18E-05 L.A.S.S. Chickamauga Group B-27 11/8/1973 35 - 245 210 410 3.5 47.6 30 0.08 2.90E-05 A.L.S. Chickamauga Group 11/8/1973 60 - 245 185 460 2.8 47.6 27 0.07 2.61E-05 A.L.S. Chickamauga Group 11/8/1973 80 - 245 165 500 2.3 70.7 16 0.04 1.55E-05 A.L.S. Chickamauga Group 11/8/1973 100 - 245 145 550 1.1 70.7 9 0.02 8.69E-06 A.L.S. Chickamauga Group 11/8/1973 120 - 245 125 620 0.8 70.7 7 0.02 6.76E-06 L.A.S.S. Chickamauga Group B-28 11/13/1973 16 - 25 9 5300 8.7 44.6 1040 (e) 2.85 1.00E-03 U.A.S.S. Chickamauga Group 11/13/1973 19 - 28 9 5300 8.8 41.6 980 (e) 2.68 9.47E-04 U.A.S.S. Chickamauga Group 11/13/1973 27 - 36 9 5300 3.1 55.6 298 (e) 0.82 2.88E-04 U.A.S.S. Chickamauga Group 11/13/1973 50 - 271 221 390 0.47 65.1 2.8 0.01 2.70E-06 U.A.S.S. Chickamauga Group 11/13/1973 90 - 271 181 470 0.96 65.1 6.9 0.02 6.66E-06 U.A.S.S. Chickamauga Group B-29 11/12/1973 30 - 335 305 290 2.5 61.1 11.9 0.03 1.15E-05 U.A.S.S. Chickamauga Group 11/12/1973 40 - 335 295 300 0.21 84.2 0.75 0.002 7.24E-07 U.A.S.S. Chickamauga Group 11/12/1973 50 - 335 285 305 0.76 107.3 2.2 0.01 2.12E-06 U.A.S.S. Chickamauga Group 11/12/1973 80 - 335 255 340 4.45 130.4 11.6 0.03 1.12E-05 U.A.S.S. Chickamauga Group
Clinch River Nuclear Site Early Site Permit Application Part 3, Environmental Report 2.3-B-3 Revision 1 Table 2.3-B (Sheet 2 of 6) Clinch River Breeder Reactor Project Investigation Packer Test Results Boring Date Test Section (ft bgs) Test Length (ft) Cp (ft 2/gpm-yr) Flow Q (gpm) Total Head H (ft) Hydraulic Conductivity K (a) (ft/yr) Hydraulic Conductivity K (b) (ft/d) Hydraulic Conductivity K (b) (cm/s) Geologic Horizon (c) Geologic Strata (d) B-30 12/4/1973 11 - 20 9 5300 11.3 39.6 1510 (e) 4.14 1.46E-03 U.A.S.S. Chickamauga Group 12/5/1973 20 - 253.5 233.5 370 14.8 68.1 80 0.22 7.73E-05 U.A.S.S. Chickamauga Group 12/5/1973 65 - 253.5 188.5 450 9.9 68.1 65 0.18 6.28E-05 U.A.S.S. Chickamauga Group 12/5/1973 88 - 253.5 165.5 500 2.2 91.2 12 0.03 1.16E-05 U.A.S.S. Chickamauga Group 12/5/1973 144 - 253.5 139.5 560 0.5 91.2 3.1 0.01 2.99E-06 A.L.S. Chickamauga Group B-31 11/1/1973 82 - 91 9 5300 12.5 89.5 740 2.03 7.15E-04 A.L.S. Chickamauga Group 11/1/1973 92 - 101 9 5300 12 89.5 711 1.95 6.87E-04 A.L.S. Chickamauga Group 11/1/1973 101 - 110 9 5300 12 89.5 711 1.95 6.87E-04 A.L.S. Chickamauga Group 10/21/1973 110 - 252 142 560 1.8 89.5 112 (e) 0.31 1.08E-04 L.A.S.S. Chickamauga Group B-34 10/30/1973 45.5 - 54.5 9 5300 12.2 73.1 885 2.42 8.55E-04 A.L.S. Chickamauga Group 10/30/1973 54.5 - 63.5 9 5300 12.1 82.1 781 2.14 7.54E-04 A.L.S. Chickamauga Group 10/30/1973 56 - 65 9 5300 11.5 83.1 733 2.01 7.08E-04 A.L.S. Chickamauga Group 10/29/1973 92.5 - 248 155.5 520 6 84.1 37 0.10 3.57E-05 A.L.S./L.A.S.S. Chickamauga Group 10/29/1973 105 - 248 143 550 2 84.1 13 0.04 1.26E-05 L.A.S.S. Chickamauga Group 10/29/1973 130 - 248 118 660 1.8 84.1 14 0.04 1.35E-05 L.A.S.S. Chickamauga Group 10/29/1973 165 - 248 83 880 1.6 84.1 17 0.05 1.64E-05 L.A.S.S. Chickamauga Group 10/29/1973 172 - 248 76 950 4.5 84.1 51 0.14 4.93E-05 L.A.S.S. Chickamauga Group B-35 10/27/1973 51.5 - 284 232.5 375 6.2 34.6 67 0.18 6.47E-05 A.L.S./L.A.S.S. Chickamauga Group 10/27/1973 95 - 284 189 450 4.9 41.6 53 0.15 5.12E-05 L.A.S.S. Chickamauga Group 10/26/1973 130 - 284 154 525 4.8 51.6 49 0.13 4.73E-05 L.A.S.S. Chickamauga Group 10/27/1973 169 - 284 115 670 3.3 51.6 42 (e) 0.12 4.06E-05 L.A.S.S. Chickamauga Group 10/27/1973 218 - 284 66 1080 2.7 51.6 57 0.16 5.51E-05 L.A.S.S. Chickamauga Group 10/27/1973 238 - 284 46 1450 2 74.7 39 0.11 3.77E-05 L.A.S.S./Knox Chickamauga Group/Knox Group
Clinch River Nuclear Site Early Site Permit Application Part 3, Environmental Report 2.3-B-4 Revision 1 Table 2.3-B (Sheet 3 of 6) Clinch River Breeder Reactor Project Investigation Packer Test Results Boring Date Test Section (ft bgs) Test Length (ft) Cp (ft 2/gpm-yr) Flow Q (gpm) Total Head H (ft) Hydraulic Conductivity K (a) (ft/yr) Hydraulic Conductivity K (b) (ft/d) Hydraulic Conductivity K (b) (cm/s) Geologic Horizon (c) Geologic Strata (d) B-36 11/1/1973 36.5 - 274.5 238 365 3.9 123.2 12 0.03 1.16E-05 L.A.S.S. Chickamauga Group 11/1/1973 50 - 274.5 244.5 385 4.4 123.2 14 0.04 1.35E-05 L.A.S.S. Chickamauga Group 11/1/1973 70 - 274.5 204.5 420 3.1 123.2 11 0.03 1.06E-05 L.A.S.S. Chickamauga Group 11/1/1973 90 - 274.5 184.5 460 2.6 123.2 10 0.03 9.66E-06 L.A.S.S. Chickamauga Group 11/1/1973 110 - 274.5 164.5 500 3 123.2 12 0.03 1.16E-05 L.A.S.S. Chickamauga Group B-38 10/4/1973 41 - 47.5 0 0 0 0 B Chickamauga Group 10/4/1973 44.5 - 51 0 0 0 0 B Chickamauga Group 10/3/1973 70 - 380.9 0 0 0 0 B Chickamauga Group 10/3/1973 100 - 380.9 0 0 0 0 B Chickamauga Group 10/3/1973 140 - 380.9 0 0 0 0 U.A.S.S. Chickamauga Group 10/3/1973 170 - 380.9 0 0 0 0 U.A.S.S. Chickamauga Group 10/3/1973 190 - 380.9 0 0 0 0 U.A.S.S. Chickamauga Group B-39 11/9/1973 20 - 29 9 5300 4 87.8 242 (e) 0.66 2.34E-04 U.A.S.S. Chickamauga Group 11/8/1973 28.5 - 329 300.5 290 7.5 64.7 33.5 (e) 0.09 3.24E-05 U.A.S.S. Chickamauga Group 11/8/1973 50 - 329 279 310 5.5 64.7 26.4 0.07 2.55E-05 U.A.S.S. Chickamauga Group 11/8/1973 65 - 329 264 330 5.1 64.7 26.0 0.07 2.51E-05 U.A.S.S. Chickamauga Group 11/8/1973 (f) 85 - 329 244 360 1.03 87.6 4.2 0.01 4.06E-06 U.A.S.S. Chickamauga Group 11/8/1973 (f) 85 - 329 244 360 2.32 110.9 7.5 0.02 7.24E-06 U.A.S.S. Chickamauga Group B-40 9/25/1973 30 - 39 9 5300 9.8 59.6 871 2.39 8.41E-04 A.L.S. Chickamauga Group 9/25/1973 36 - 45 9 5300 5.8 65.6 471 (e) 1.29 4.55E-04 A.L.S. Chickamauga Group 9/25/1973 46 - 55 9 5300 9.1 75.6 637 (e) 1.75 6.15E-04 A.L.S. Chickamauga Group 9/25/1973 57.5 - 66.5 9 5300 2.1 87.1 128 0.35 1.24E-04 A.L.S. Chickamauga Group 9/25/1973 68.5 - 77.5 9 5300 9.5 106.9 470 (e) 1.29 4.54E-04 A.L.S. Chickamauga Group 9/24/1973 81 - 90 9 5300 2 125.2 85 0.23 8.21E-05 A.L.S. Chickamauga Group
Clinch River Nuclear Site Early Site Permit Application Part 3, Environmental Report 2.3-B-5 Revision 1 Table 2.3-B (Sheet 4 of 6) Clinch River Breeder Reactor Project Investigation Packer Test Results Boring Date Test Section (ft bgs) Test Length (ft) Cp (ft 2/gpm-yr) Flow Q (gpm) Total Head H (ft) Hydraulic Conductivity K (a) (ft/yr) Hydraulic Conductivity K (b) (ft/d) Hydraulic Conductivity K (b) (cm/s) Geologic Horizon (c) Geologic Strata (d) B-40 9/24/1973 91 - 100 9 5300 0.5 102.1 26 0.07 2.51E-05 A.L.S. Chickamauga Group 9/24/1973 101 - 110 9 5300 2.1 105.1 108 (e) 0.30 1.04E-04 A.L.S. Chickamauga Group 9/23/1973 110 - 314 204 420 5.5 124 19 0.05 1.84E-05 L.A.S.S. Chickamauga Group 9/23/1973 140 - 314 174 480 6.1 101.6 29 0.08 2.80E-05 L.A.S.S. Chickamauga Group 9/23/1973 184 - 314 130 600 6.1 101.1 36 0.10 3.48E-05 L.A.S.S. Chickamauga Group 9/23/1973 220 - 314 94 800 5.2 106.1 39 0.11 3.77E-05 L.A.S.S. Chickamauga Group 9/23/1973 259.5 - 314 54.5 1250 3.2 106.1 38 0.10 3.67E-05 Knox Knox Group B-42 11/5/1973 60 - 301.5 241.5 360 2.92 101.1 10 0.03 9.66E-06 B Chickamauga Group 11/5/1973 85 - 301.5 216.5 400 0 0 0 0 B Chickamauga Group 11/5/1973 140 - 301.5 161.5 500 1.22 101.1 6 0.02 5.80E-06 B/U.A.S.S. Chickamauga Group 11/5/1973 150 - 301.5 151.5 530 1.54 101.1 8 0.02 7.73E-06 U.A.S.S. Chickamauga Group B-46 11/6/1973 30 - 78.9 48.9 1380 6.24 77.9 111 0.30 1.07E-04 U.A.S.S. Chickamauga Group 11/6/1973 65 - 78.9 13.9 3900 0.15 101 6 0.02 5.80E-06 U.A.S.S. Chickamauga Group B-47 12/4/1973 83 - 92 9 5300 6 83.7 380 1.04 3.67E-04 A.L.S. Chickamauga Group 12/3/1973 89 - 98 9 5300 4.8 83.7 304 0.83 2.94E-04 A.L.S. Chickamauga Group 12/3/1973 98 - 107 9 5300 11.0 83.7 697 1.91 6.73E-04 A.L.S. Chickamauga Group 11/30/1973 108 - 370 262 340 3.7 83.7 15 0.04 1.45E-05 L.A.S.S. Chickamauga Group 11/30/1973 115 - 370 255 340 3.1 106.8 10 0.03 9.66E-06 L.A.S.S. Chickamauga Group 11/30/1973 140 - 370 230 380 1.1 106.8 4 0.01 3.86E-06 L.A.S.S. Chickamauga Group 11/30/1973 150 - 370 220 400 1.2 106.8 4 0.01 3.86E-06 L.A.S.S. Chickamauga Group B-48 9/20/1973 33 - 114 81 900 2.5 52.4 43 0.12 4.15E-05 B Chickamauga Group 9/20/1973 43 - 114 71 1000 1.4 53.1 27 (e) 0.07 2.61E-05 B Chickamauga Group 56 - 114 58 1200 0.7 60.9 14 0.04 1.35E-05 B Chickamauga Group 9/17/1973 85 - 114 29 2000 0.5 68.6 15 0.04 1.45E-05 U.A.S.S. Chickamauga Group
Clinch River Nuclear Site Early Site Permit Application Part 3, Environmental Report 2.3-B-6 Revision 1 Table 2.3-B (Sheet 5 of 6) Clinch River Breeder Reactor Project Investigation Packer Test Results Boring Date Test Section (ft bgs) Test Length (ft) Cp (ft 2/gpm-yr) Flow Q (gpm) Total Head H (ft) Hydraulic Conductivity K (a) (ft/yr) Hydraulic Conductivity K (b) (ft/d) Hydraulic Conductivity K (b) (cm/s) Geologic Horizon (c) Geologic Strata (d) B-49 11/7/1973 57.5 - 144 86.5 860 10.8 94.9 98 0.27 9.47E-05 B Chickamauga Group 11/7/1973 70 - 144 74 980 2.2 118 18 0.05 1.74E-05 B Chickamauga Group 11/7/1973 85 - 144 59 0 0 0 0 B Chickamauga Group 11/6/1973 110 - 144 34 0 0 0 0 U.A.S.S. Chickamauga Group B-50 11/2/1973 78 - 241 163 500 2.7 91.1 15 0.04 1.45E-05 B Chickamauga Group 11/2/1973 90 - 241 151 535 2.6 91.1 15 0.04 1.45E-05 B Chickamauga Group 11/2/1973 100 - 241 141 560 2.6 91.1 16 0.04 1.55E-05 B Chickamauga Group 11/2/1973 201 - 241 40 1650 1.4 91.1 25 0.07 2.41E-05 U.A.S.S. Chickamauga Group B-51 11/20/1973 31 - 40 9 5300 1 60.6 91 (e) 0.25 8.79E-05 A.L.S. Chickamauga Group 11/20/1973 36.5 - 45.5 9 5300 0.46 66.1 37 0.10 3.57E-05 A.L.S. Chickamauga Group 11/20/1973 45.5 - 54.5 9 5300 0.11 75.1 8 0.02 7.73E-06 A.L.S. Chickamauga Group 11/20/1973 34.5 - 63.5 9 5300 17.2 82.1 1110 3.04 1.07E-03 A.L.S. Chickamauga Group 11/20/1973 83 - 338.5 255.5 340 2.67 105.2 9 0.02 8.69E-06 A.L.S. Chickamauga Group 11/20/1973 100 - 338.5 238.5 365 1.86 105.2 6 0.02 5.80E-06 A.L.S./L.A.S.S Chickamauga Group B-53 11/29/1973 53 - 200 147 540 0.15 131.7 0.6 0.002 5.80E-07 Knox Knox Group 11/29/1973 90 - 200 110 700 0.15 108.6 1 0.003 9.66E-07 Knox Knox Group B-66 11/29/1973 37 - 101 64 1100 0.12 92.9 1.4 0.004 1.35E-06 Knox Knox Group 11/29/1973 50 - 101 51 1350 0.08 92.9 1.2 0.003 1.16E-06 Knox Knox Group 11/29/1973 73 - 101 28 2200 0.12 92.9 2.8 0.01 2.70E-06 Knox Knox Group B-67 11/17/1973 24 - 33 9 5300 0.08 76.3 5.6 0.02 5.41E-06 Knox Knox Group 11/17/1973 33 - 42 9 5300 0 0 0 0 Knox Knox Group 11/17/1973 42 - 51 9 5300 0 0 0 0 Knox Knox Group 11/17/1973 51 - 60 9 5300 9.1 59.7 807 (e) 2.21 7.79E-04 Knox Knox Group
Clinch River Nuclear Site Early Site Permit Application Part 3, Environmental Report 2.3-B-7 Revision 1 Table 2.3-B (Sheet 6 of 6) Clinch River Breeder Reactor Project Investigation Packer Test Results Boring Date Test Section (ft bgs) Test Length (ft) Cp (ft 2/gpm-yr) Flow Q (gpm) Total Head H (ft) Hydraulic Conductivity K (a) (ft/yr) Hydraulic Conductivity K (b) (ft/d) Hydraulic Conductivity K (b) (cm/s) Geologic Horizon (c) Geologic Strata (d) B-67 11/16/1973 40 - 100 60 1180 9.2 59.7 182 0.50 1.76E-04 Knox Knox Group 11/15/1973 61 - 100 39 0 0 0 0 Knox Knox Group Notes: (a) (b) Hydraulic conductivity in ft/yr converted to ft/d by dividing by 365 and converted to cm/s by multiplying by 9.6590 x 10 -7 (c) Geologic Horizon from Table 24-17 of Reference U.A.S.S. = Upper Unit A Siltstone A.L.S. = Unit A Limestone L.A.S.S. = Lower Unit A Siltstone B = Unit B Limestone Knox = Knox Group (d) Geologic Strata nomenclature used in current investigation (e) Yellow highlighted values indicate discrepancy between values reported on Table 24-17 of Reference and values calculated using the formula shown above (f) Orange highlighted values are duplicate tests-the maximum value is used in hydraulic conductivity analysis
Reference:
Reference 2.3-B-1. Project Management Corporation, "Clinch River Breeder Reactor Project, Preliminary Safety Analysis Report," Volume 2, Amendment 68, May, 1982. H Q C K p =}}