ML18003A203

From kanterella
Jump to navigation Jump to search
Rhode Island Department of Health Quarterly Monitoring Conference Call Summary
ML18003A203
Person / Time
Issue date: 11/08/2017
From:
Office of Nuclear Material Safety and Safeguards, NRC Region 1, State of RI
To:
References
Download: ML18003A203 (4)


Text

RHODE ISLAND DEPARTMENT OF HEALTH QUARTERLY MONITORING CONFERENCE CALL November 8, 2017 Nuclear Regulatory Commission Rhode Island Department of Health Attendees Attendees Monica Ford, Region I Mary Bennett, Chief, RI Center for Facilities Regulation Farrah Gaskins, Region I Charma Waring, Supervisor, Radiation Control Program Lance Rakovan, NMSS Bill Dundulis, Risk Assessment Toxicologist Paul Michalak, NMSS Lizette Roldan-Otero, NMSS Littia Mann, VT (visiting Region I)

BACKGROUND During the March 2016 Integrated Materials Performance Evaluation Program (IMPEP) review of the Rhode Island Agreement State Program (the Program), the review team found the States performance satisfactory for four performance indicators, satisfactory, but needs improvement, for one performance indicator, and unsatisfactory for one performance indicator. One recommendation was left open from the 2011 IMPEP review. On June 16, 2016, the Management Review Board (MRB) met to consider the proposed final IMPEP report. The MRB found the Program adequate to protect public health and safety, but needs improvement, and compatible with the U.S. Nuclear Regulatory Commissions (NRC) program. Upon its deliberations the MRB issued two additional recommendations to Rhode Island. Additionally, the MRB directed that Rhode Island continue on monitoring, that calls between the Rhode Island Department of Health (RDH) and NRC staffs be conducted quarterly, and that a periodic meeting take place approximately one year from the 2016 IMPEP review and a second periodic meeting be held approximately 18 months after the first periodic meeting. The first periodic meeting was held with Rhode Island on March 9, 2017 with the MRB held on July 20, 2017.

The MRB determined that quarterly calls should continue and that the next periodic meeting and IMPEP review should be held as scheduled in September 2018 and March 2020 respectively.

This is the first quarterly call since the March 2017 periodic meeting and July 2017 MRB.

DISCUSSION OF PROGRAM STATUS Ms. Waring and led the discussion of the States status for each of the IMPEP performance indicators.

Technical Staffing and Training (2016 IMPEP finding: Satisfactory but needs improvement)

The Program consists of four technical staff positions, a Supervising Radiological Health Specialist (supervisor) position, and a licensing assistant. These positions comprise approximately 4.3 full time equivalents. At the time of this call, the program is fully staffed. Two technical staffers are currently working through their licensing and inspection qualifications.

Rhode Island has a procedure equivalent to the NRCs Inspection Manual Chapter 1248.

Currently qualified staff are continuing to work on obtaining the required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of refresher training every two years.

The MRB for the 2016 IMPEP review generated one recommendation for this performance indicator.

Recommendation 1: The MRB recommends that the Program management take measures to ensure proper documentation of inspection tracking dates and ensure the Programs licensing and inspection files are complete.

Status: After the 2016 IMPEP review, the programs administrative support staff started to go through the all of the programs files and color code them by inspection priority and place them in the correct order. Once the files are in order the Program will begin to review the files to ensure that each file contains the correct documents and is complete (i.e. no missing documents or parts of documents). Additionally, the program supervisor is using a white board along with a master file on a shared drive to track upcoming inspections. Both the white board and file are updated as inspections are completed. The Program reports to the director on a weekly basis regarding the status of upcoming inspections.

Status of the Materials Inspection Program (2016 IMPEP finding: Unsatisfactory) and Technical Quality of Inspections (2016 IMPEP finding: Satisfactory)

At the time of the IMPEP review 11 of 37 Priority 1, 2, and 3 inspections had been completed overdue and no initial inspections were completed overdue. Since then, the Program has had no overdue inspections (Priority 1, 2, 3, and initial). The Programs goal is to issue all inspection correspondence within 30 days. This is usually achieved with the use of a MAT6 which is similar to the NRCs form 591. The Program continues to be attentive to reciprocity inspections and is confident that they have inspected greater than 20% of candidate licensees for reciprocity for calendar year 2016. The Program also stated that they will be above 20% of candidate licensees inspected for calendar year 2017. All supervisory accompaniments were accomplished for calendar year 2016. No supervisory accompaniments have been completed as of this call for calendar year 2017. The Program has accompaniments for all qualified inspectors tentatively scheduled for December 2017.

The 2011 IMPEP team generated one recommendation for the indicator Status of the Materials Inspection Program. This recommendation was kept open as a result of the 2016 IMPEP review.

Recommendation 2: The review team recommends that the State take appropriate measures to conduct Priority 1, 2, and 3 inspections and initial inspections in accordance with the inspection priority in IMC 2800.

Status: The Program has completed all Priority 1, 2, 3, and initial inspections in accordance with the inspection priority in Inspection Manual Chapter 2800 since the last IMPEP review. The Program has a master file spreadsheet on a shared drive which tracks all of the Programs inspections. Additionally, the program supervisor is tracking upcoming inspections with the use of a white board in her office. The Program briefs upper management on the status of inspections on a weekly basis.

Technical Quality of Licensing (2016 IMPEP finding: Satisfactory)

The Program has approximately 43 specific licensees. The Program takes all received licensing actions and places them in a computer tracking system and assigns them a log number. This database is very generic and does not contain any security related information.

All licensing actions are reviewed by a senior staff member before being signed by the Program Director. All licensing actions received by the Program are in progress. One outlying action has been with the Program approximately fourteen years and is a renewal. The licensee associated with this action has made several major changes to its program over the years and the Program is currently waiting on additional information that it requested from the licensee before it can complete this renewal. The Program is hopeful that this action will be completed by the end of the year. All other actions have been in house for one year or less. The Programs licenses are on a 10 year renewal cycle.

The MRB for the 2016 IMPEP review generated one recommendation for this performance indicator.

Recommendation 3: The MRB recommends that Program management develop and implement an action plan to reduce the licensing renewal backlog.

Status: At the time of the 2016 IMPEP review the Program had 13 renewals needing to be completed that had been with the Program between 1 month and 14 years. Currently the Program has four renewals that need to be completed. All of the renewals are in progress and are awaiting additional information from the licensee. While the Program has not yet developed and implemented a specific action plan the Program is actively working on the remaining renewals.

Technical Quality of Incidents and Allegations (2016 IMPEP finding: Satisfactory)

The Program is aware of the need to maintain an effective response to incidents and allegations. The Program uses a system called Aspen Complaints Tracking System (ACTS).

Incidents are quickly reviewed for their effect on public health and safety and staff is dispatched to perform onsite investigations when necessary. The Program communicates reportable incidents to the NRC Operations Center and Region I. The Program has received no events or allegations since the 2016 IMPEP review.

Compatibility Requirements (2016 IMPEP finding: Satisfactory)

In 2016 Rhode Island enacted state statute 42-35-5 into its General Laws. Section (b) states the following:

(b) The secretary of state shall oversee the publication of an updated code of state regulations. The code of state regulations shall be compiled and published in a format and medium prescribed by the secretary of state. Upon completion of the updated code, it shall be made available on the secretary of state's website. The rules of an agency shall be published and indexed in the code of state regulations. Agencies must resubmit all existing rules with the secretary of state for publication into the code of state regulations by December 31, 2018. All rules shall be written in plain language. To promote the efficient development of a code of state regulations, the office of regulatory reform is authorized to coordinate and direct agencies in the

effort to develop a regulatory code. The office of regulatory reform shall establish a phased approach which requires agencies to submit portions of regulatory content prior to December 31, 2018. Any rule that is not resubmitted by December 31, 2018, and is not published in the code of state regulations, shall not be enforceable until the rule appears in the code of state regulations. The secretary of state shall make the code of state regulations available for public inspection and, for a reasonable charge, copying.

This statute requires that the Program must recodify all of their rules into the new format as described by the Rules and Regulations Formatting and Filing Manual by December 31, 2018 or they will not be able to enforce against them. The Program stated that they will need to ensure that the regulations are with the Secretary of State by August 2018 in order to ensure that they are adopted in final by the deadline. Due to the new regulatory format requirements, the Program plans to adopt NRC regulations by reference. The Program is planning to promulgate adoption by reference regulations in the required format and submit those by the deadline. This could cause the Program to adopt a total of five regulation amendments overdue

[one is already currently overdue, (Regulation Amendment Tracking System (RATS) ID 2013-2 due August 2016) and four coming due at various times in 2018]. However, it should make it easier for the Program to ensure timely adoption of regulations in the future. In most cases, they will just need to change the date of the Code of Federal Regulations they are adopting against in their regulations.

The Programs regulations are subject to sunset requirements. The Program must refile their regulations every five years. The Program completed this refiling in January 2017. The next refiling is scheduled for 2022.

Conclusion The Program is working on taking actions on the recommendations that were made during the 2016 IMPEP review. The Program is fully staffed and is working on qualifying the newly hired staff. The Program has made inspection timeliness a priority and continues to work on completing the outstanding licensing renewals. The Program has one regulation amendment overdue for adoption and will address this as part of a major overhaul of its regulations to change to adoption by reference. This effort will be completed by the end of calendar year 2018.

Next Quarterly Call: February 2018