Notification of Action Completion for Confirmatory Order EA-17-077 - Items A.1 and A.2
ML17363A217
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 12/21/2017
From: Gerald Bichof
Dominion Nuclear Connecticut
To: Dan Dorman
NRC Region 1
References
17-465A, EA-17-077
Download: ML17363A217 (5)


Text

Dominion Nuclear Connecticut, Inc.

5000 Dominion Boulevard, Glen Allen, VA 23060 Web Address: www.dorn.com December 21, 2017 U.S. Nuclear Regulatory Commission Serial No. 17-465A

  • Daniel H. Dorman MPS LicffFO RO Regional Administrator, Region I Docket Nos. 50-336 2100 Renaissance Blvd, Suite 100 50-423 King of Prussia, PA 19406-2713 License Nos. DPR-65 NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNITS 2 AND 3 NOTIFICATION OF ACTION COMPLETION FOR CONFIRMATORY ORDER EA-17-077 - ITEMS A.1 AND A.2 On November 21, 2017, the Nuclear Regulatory Commission (NRG) issued Confirmatory Order EA-17-077 to Dominion Energy Nuclear Connecticut, Inc. (DENG) 1.

Section V of the Confirmatory Order requires DENG to complete Items A.1 and A.2 within thirty days of issuance of the Confirmatory Order, and to notify the NRG in writing that the actions are complete. within thirty days after the completion of the action. DENG completed Item A.1 on December 5, 2017, and Item A.2 on December 11, 2017. A summary of the completed actions for Confirmatory Order EA-17-077, Items A.1 and A.2 is provided as an attachment to this letter.

If you have any questions concerning this matter, please contact Michael Whitlock at (804) 273-3123.

Sincerely, L~?li-6 Vice President Nuclear Operations - Fleet Performance Dominion Energy Nuclear Connecticut, Inc.

Attachment:

Summary of Completed Action for Confirmatory Order EA-17-077 Commitments made in this letter: None l({ptJD I

{2-()AJ-l 1

In a letter dated June 15, 2017 (ML17171A232), Dominion Nuclear Connecticut, Inc. notified the NRC that the company was changing its name to Dominion Energy Nuclear Connecticut, Inc. and requested that the NRC amend the Millstone operating licenses to reflect the name change. The amendment request is currently under review by the NRC.

Serial No. 17-465A Docket Nos. 50-336/423 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Richard V. Guzman Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C 2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station

Serial No. 17-465A Docket Nos. 50-336/423 ATTACHMENT

SUMMARY

OF COMPLETED ACTION FOR CONFIRMATORY ORDER EA-17-077 MILLSTONE POWER STATION UNITS 2 AND 3 DOMINION NUCLEAR CONNECTICUT, INC.

Serial No. 17-465A Docket Nos. 50-336/423 CO EA-17-077: Summary of Completed Action Attachment, Page 1 of 2

SUMMARY

OF COMPLETED ACTION FOR CONFIRMATORY ORDER EA-17-077 On November 21, 2017, the Nuclear Regulatory Commission (NRG) issued Confirmatory Order EA-17-077 to Dominion Energy Nuclear Connecticut, Inc. (DENC)1.

Section V of the Confirmatory Order requires DENG to complete Items A.1 and A.2 within thirty days of issuance of the Confirmatory Order, and to notify the NRG Region I Administrator in writing that the actions are complete within thirty days after the completion of the action. DENG completed Item A.1 on* December 5, 2017, and Item A.2 on December 11, 2017. A summary of the actions taken is provided below:

Item A.1:

Within 30 days of the date of the Confirmatory Order, Dominion shall prepare a full inventory of all in-service and out-of-service weapons on-site. Within 30 days of completing this action, Dominion shall inform the NRG that the action is complete by sending a letter to the Region I Administrator and shall make the inventory list available to the NRG for review during an inspection.

Summary of Actions Taken for Item A.1:

A full inventory of the in-service and out-of-service weapons was completed on December 5, 2017. The weapons were accounted for and weapon serial numbers were verified with the Security Inventory Management System (SIMS) weapons database. A SIMS weapons database inventory list was created showing the inventory of in-service and out-of-service weapons as of December 5, 2017. A copy of the inventory list is available to the NRG for review during an inspection.

Item A.2:

Within 30 days of the date of the Confirmatory Order, Dominion shall prepare a report of the maintenance status of all in-service weapons that are on-site as of the date of the Confirmatory Order. The report shall specify the dates on which each weapon was last test-fired, cleaned, serviced, and inspected. Within 30 days of completing this action, Dominion shall inform the NRG that the action is complete by sending a Jetter to the Region I Administrator and shall make the report available to the NRG for review during an inspection.

1 In a letter dated June 15, 2017 (ML17171A232), Dominion Nuclear Connecticut, Inc. notified the NRC that the company was changing its name to Dominion Energy Nuclear Connecticut, Inc. and requested that the NRC amend the Millstone operating licenses to reflect the name change. . The amendment request is currently under review by the NRC.

Serial No. 17-465A Docket Nos. 50-336/423 CO EA-17-077: Summary of Completed Action Attachment, Page 2 of 2 Summary of Actions Taken for Item A.2:

A report of the maintenance status of the in-service weapons that were on site as of the date of the Confirmatory Order (November 21, 2017) was developed from the SIMS weapons database. This report specifies when each weapon was last test-fired, cleaned, serviced, and inspected. A copy of the report is available to the NRC for review during an inspection.