Submittal of Periodic Reports
ML17356A098
Person / Time
Site: 05200017
Issue date: 12/14/2017
From: Mark D. Sartain
Dominion Energy Services, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of New Reactors
References
NA3-17-009
Download: ML17356A098 (3)


Text


,

,. \

Dominion Energy Services, Inc.

5000 Dominion Boulevard, Glen Allen, VA 23060 Dominion Energy.com December 14, 2017 a

p Dominion Energy U.S. Nuclear Regulatory Commission Serial No.: NA3-17-009 Attention: Document Control Desk NRA/DEA RO Washington, D. C. 20555 Docket No.: 52-017 License No.: NPF-103 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA UNIT 3 SUBMISSION OF PERIODIC REPORTS The purpose of this letter is to submit periodic reports for North Anna Unit 3 as required by NRC regulations and/or license conditions for a Part 52 combined license holder.

These reports address various annual or semi-annual reporting requirements. The following reports are addressed by this letter:

  • Semi-Annual Departures Report
  • Semi-Annual Changes, Tests, and Experiments Report
  • Semi-Annual Schedule for Implementation of Operational Programs Semi-Annual Departures Report. The design certification rule for the General Electric

- Hitachi Economic Simplified Boiling Water Reactor (10 CFR 52, Appendix E) became effective on November 14,* 2014. Paragraph X.B.3.b of the rule requires the COL holder*

who references the ESBWR Design Certification Document (DCD) to submit semi-annual reports to the NRC that describe plant-specific departures from the DCD. The departures report for North Anna Unit 3 consists of the departures section from the North Anna Unit 3 Combined License Application (COLA), Part 7, Deparlures Report.

An updated departures report was submitted to the NRC most recently by letter NA3-16-050, dated December 16, 2016 (ML16355A182). No departures that were included in the December 16, 2016 letter have been revised or deleted, and no new departures have been identified. Therefore, the previous report continues to be current.

Semi-Annual Changes, Tests, and Experiments Report. There have been no changes, tests, or experiments evaluated under 10 CFR 50.59 since issuance of the COL on June 2, 2017. Future 10 CFR 50.59 reports will be submitted on a semi-annual basis based on the COL issuance milestone.

Semi-Annual Schedule for Implementation of Operational Programs. Pursuant to the North Anna Unit 3 COL license condition 0(11), a schedule for implementation of operational programs is required to be submitted within one year of the date of COL issuance, with subsequent reports submitted on a semi-annual basis until the 10 CFR 52.103(9) finding. The COL issuance milestone occurred on June 2, 2017. Future reports will be submitted based on the COL issuance milestone and the requirements of the license condition.

't Serial No. NA3-17-009 Submission of Periodic Reports Page 2 of 3 If you have any questions regarding this submittal, please contact Ms. Diane E. Aitken at (804) 273-2694.

Very truly yours,

~-

Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support Commitments made in this letter: None

~. ..

Serial No. NA3-17-009 Submission of Periodic Reports Page 3 of 3 cc: (electronic distribution, except where noted)

U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1257 J. J. Shea, Jr., NRC M. A. Eudy, NRC T. S. Dozier, NRC G. Croon, NRC D. Paylor, VDEQ M. K. Brandon, DTE R. J. Bell, NEI