ML17355A453

From kanterella
Jump to navigation Jump to search
Forwards NRC Operator Licensing Exam Repts 50-250/99-301 & 50-251/99-301 (Including Completed & Graded Tests) for Tests Administered on 990830-0916
ML17355A453
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/18/1999
From: Michael B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17355A454 List:
References
50-250-99-301, 50-251-99-301, NUDOCS 9910280154
Download: ML17355A453 (7)


See also: IR 05000250/1999301

Text

October 18, 1999

NOTE TO:

FROM:

NRC Document Control Desk

Mail Stop 0-5-D-24

Beverly Michael, Licensi

Assistant, Operator Licensing and Human

Performance Branch, Division of Reactor Safety, Region II

SUBJECT:

OPERATOR LICENSING EXAMINATIONSADMINISTERED ON

AUGUST 30- SEPTEMBER 16, 1999, AT TURKEY POINT NUCLEAR

PLANT- DOCKET NOS 50-250 AND 50-251

During the period August 30 - September 16, 1999, Operator Licensing Examinations were

administered at the referenced facility. Attached, you willfind the following information for

processing through NUDOCS and distribution to the NRC staff, including the NRC PDR:

Item ¹1 -

a)

Facility submitted outline and initial exam submittal,

designated for distribution under RIDS Code A070.

b)

As given operating examination, designated for distribution under

RIDS Code A070.

Item ¹2 -

Examination Report with the as given written examination attached,

designated for distribution under RIDS Code IE42.

~ Attachments:

As stated

9910280154

991018

PDR

ADOCK 05000250

V

PDR

DIKRIB3TION:

, Pi1e Centex.'~

PDII R/F

BClayton

MEMORANDUMTO:

Rules and Directives Branch

Division of Administrative Services

Office of Administration

FROM:

SUBJECT:

Office of Nuclear Reactor Regulation

TURKEYS PGIHX U5KLS 5 NQ) 4

One signed original of the Federal Register Notice identified below is attached for your transmittal

to the Office of the Federal Register for publication. Additional conformed copies

(

5

) of the

Notice are enclosed for your use.

Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s):

Time for submission of Views on Antitrust matters.

X

Notice of Consideration of Issuance of Amendment to Facility Operating License.

(Call with

30-day insert date).

Notice of Receipt of Application for Facility License(s); Notice of Availabilityof Applicant's

Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice

of Opportunity for Hearing.

Notice of Availabilityof NRC Draft/Final Environmental Statement.

Notice of Limited Work Authorization.

Notice of Availabilityof Safety Evaluation Report.

Notice of Issuance of Construction Permit(s).

Notice of Issuance of Facility Operating License(s) or Amendment(s).

Order.

Exemption.

Notice of Granting Exemption.

Environmental Assessment.

Notice of Preparation of Environmental Assessment.

Receipt of Petition for Director's Decision Under 10 CFR 2.206.

Issuance of Final Director's Decision Under 10 CFR 2.206.

Other:

DOCKET NO.

50-250 aa8 50-251

Attachment(s):

As stated

Contact:

Telephone: pig-~5

DOCUMENT NAME:

To receive a copy of this document, indicate in the bose

'C" ~ Copy without attachment/enclosure

E

a Copy with attachment/onclosure

"N" a No copy

OFFICE

PDII-2

DATE

12/a c

9

OFFICIAL RECORD COPY

J

S

7590-01-P

UNITED STATES NUCLEAR REGULATORYCOMMISSION

FLORIDA POWER AND LIGHTCOMPANY

TURKEY POINT UNIT NOS. 3 AND 4

DOCKET NOS. 50-250 AND 50-251

NOTICE OF PARTIALDENIALOF AMENDMENTTO FACILITYOPERATING LICENSES

AND OPPORTUNITY FOR HEARING

The U.S. Nuclear Regulatory Commission (the Commission) has denied a portion of a

request by Florida Power and Light Co. (licensee), for an amendment to Facility Operating

License Nos. DPR-31 and DPR-41 issued to the licensee for operation of the Turkey Point

Plant, Unit Nos. 3 and 4, located in Dade County, Florida. Notice of Consideration of Issuance

of these amendments was published in the FEDERAL REGISTER on June 2, 1999.

The purpose of the licensee's amendment request was to revise the Technical

1

Specifications (TS) to correct the TS Index, remove inconsistencies,

and make administrative

changes.

The NRC staff has concluded that a portion of the licensee's request, related to the

proposed deletion of dates for approved security plans, cannot be granted.

The basis of the

denial is detailed in the safety evaluation related to Amendment Nos. 203 and 197 dated

December 20, 1999.

By

, the licensee may demand a hearing with respect to the partial denial

described above.

Any person whose interest may be affected by this proceeding may file a

written petition for leave to intervene.

A request for hearing or petition for leave to intervene must be filed with the Secretary of

the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001,

Attention: Rulemakings and Adjudications Staff, or may'be delivered to the Commission's

-2-

Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC, by the

above date.

A copy of any petitions should also be sent to the Office of the General Counsel, U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, and to Mr. Mitchell Ross,

General Counsel, Florida Power and Light Company, P.O. Box 14000, Juno Beach, Florida,

33408-0420, attorney for the licensee.

For further details with respect to this action, see (1) the application for amendment dated

April 26, 1999, (2) Amendment Nos. 203 and 197 to Facility Operating License Nos. DPR-31

and DPR-41, and (3) the Commission's related safety evaluation.

These documents are available for public inspection at the Commission's Public Document

Room, the Gelman Building, 2120 L Street, NW., Washington, DC. Publically available

records will be accessible electronically from the ADAMS Public Library component on the

NRC Web site, htt://www.nrc. ov (the Electronic Reading Room).

Dated at Rockville, Maryland, this

20~day of

Decanber

1999.

FOR THE NUCLEAR REGULATORY COMMISSION

erbert N. Berkow, Director

Project Directorate II

Division of Licensing Project Management

Office of Nuclear Reactor Regulation

t