Summary of 990414 Meeting with FP&L Re Status of License Renewal Efforts for Turkey Point Units 3 & 4.List of Meeting Attendees & FP&L Presentation Matls Encl
ML17355A301
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/28/1999
From: Anand R
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9905030301
Download: ML17355A301 (36)


Text

t4 Apt"<1 28, 1999 LICENSEE:

Florida Power and Light Company FACILITY:

Turkey Point Units Nos. 3 and 4

SUBJECT:

SUMMARY

OF MEETING BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION (NRC) STAFF AND FPL REPRESENTATIVES TO DISCUSS THE TURKEY POINT LICENSE RENEWAL PROCESS On April 14, 1999, the U.S. Nuclear Regulatory Commission (NRC) staff met with representatives from Florida Power & Light Company (FPL) to discuss the status of the license renewal efforts for Turkey Point Unit Nos. 3 and 4. FPL described its plans for preparation and submittal of a license renewal application in December 2000. Turkey Point will be the first Westinghouse plant to request a license renewal. A list of meeting attendees is provided in. FPL presentation materials are provided in Enclosure 2.

FPL plans to reference three Westinghouse Owners Group generic technical reports (GTR) on aging management in its renewal application. These GTRs are (1) WCAP-14574, "Pressurizer;"

(2) WCAP-14575, "Class 1 Piping"; and (3) WCAP-14422, "RCS Supports."

GTR WCAP-14577, "Reactor Vessel Internals," will not be referenced in the application, but willbe used to help develop a plant-specific aging management program for reactor vessel internals.

FPL described their support of the Part 51 rulemaking on high-level waste transportation, and asked for a separate meeting with the staff to discuss Severe Accident Mitigation Alternative issues.

A request was made for removal of Environmental Justice reviews from the license renewal process.

Staff suggested that FPL could pursu'e the matter in a petition for rulemaking.

FPL also cited the importance of timely resolution of Priority 1 renewal issues to its application.

Pointing out that Turkey Point is the first Westinghouse nuclear steam supply system plant requesting license renewal, FPL also requested that the NRC provide relief from the Part 170 fees for staff review of its application.

Origfed 8@@i By Raj K. Anand, Project Manager License Renewal and Standardization Branch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251

Enclosures:

As stated cc w/encls:

See next page DISTRIBUTION:

See next page DOCUMENT NAME:G:<WORKINGIANANDLSUMTP.WPD m~y OFFICE NAME RLSB/DRIP:PM RKAnand <

04/

l99 04/Z 7/99 RLSB/DRIP: BC CIGrimes 04/&/99 OFFICIALRECORD COPY 990503030%

990428 PDR ADQCK 05000250 P

PDR

t I

~ I v

Florida Power 8 Light Company Turkey Point Nuclear Plant Mr. Thomas F. Plunkett, President Nuclear Division Florida Power 8 Light Company P. O. Box 14000 Juno Beach, FL 33408-0420 M. S. Ross, Attorney Florida Power 8 Light Company P. O. Box 14000 Juno Beah, FL 33408-0420 Mr. Robert J. Hovey, Site Vice President Turkey Point Nuclear Plant Florida Power 8 Light Company 9760 SW 344'" Street Florida City, FL 33035 County Manager Miami-Dade County 111 NW 1 Street 29'" Floor Miami, FL 33128 Senior Resident Inspector Turkey Point Nuclear Plant U.S. Nuclear Regulatory Commission P. O. Box 1448 Homestead, FL 33090 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin ¹C21 Tallahassee, FL 32399-1741 Mr. Joe Meyers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 Plant Manager Turkey Point Nuclear Plant Florida Power 8 Light Company 9760 SW 344'" Street Florida City, FL 33035 Mr. Steve Franzone Licensing Manager Turkey Point Nuclear Plant 9760 SW. 344'" Street Florida City, FL 33035 Mr. John Gianfrancesco Manager, Administrative Support and Special Projects P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President-Nuclear Engineering Florida Power 8 Light Company P. 0 Box 14000 Juno Beach, FL 33408-0420 Ms. E. A. Thompson Project Manager for License Renewal Florida Power 8 Light Company 9760 SW. 344~ Street Florida City, FL 33035 Mr. Douglas J. Walter Nuclear Energy Institute 1776 I STreet NW Suite 400 Washington, D.C. 20006

0

~

Distribution:

~Hard co PUBLIC

%Docket.File RLSB RF N. Dudley, ACRS - T2E26 E-mail S. Saltine/R. Zimmerman W. Kane D. Matthews S. Newberry C. Grimes C. Carpenter B. Zaicman J. Strosnider R. Wessman E. Imbro W. Bateman J. Calvo H. Brammer T. Hiltz G. Holahan T. Collins C. Gratton B. Boger R. Correia R. Latta J. Moore J. Rutberg R. Weisman M. Zobler M. Mayfield S. Bahadur D. Martin W. McDowell S. Droggitis RLSB Staff S. Peterson K. Jabbour R. Trojanowski L. West C. Patterson C. Julian M. Satorius L. West, Rll

1

/

J

~

ATTENDANCELIST NRC MEETING WITH FLORIDA POWER AND LIGHTCOMPANY FPL LICENSE RENEWAL FOR TURKEY POINT UNITS 3 AND 4 NAME ORGANIZATION 1.

Raj Anand 2.

Kahtan N. Jabbour 3.

Goutam Bagchi 4.

Steve Hoffman 5.

Alice Carson 6.

Wan C. Liu 7.

Barry Zalcman 8.

Chris Grimes 9.

Mitchel Ross

10. Gary Hollinger
11. Jack Hoffman
12. Steve Hale
13. Raj Kundalkar
14. Liz Thompson
15. David Lewis 16.

Rick Edwards

17. Doug Walters 18.

R. H. Wessman

19. David Solorio
20. Steven Vias
21. Caudle Julian (By Telephone)
22. Bruce Mullett (By Telephone)

NRC/NRR/DRIP/RLSB NRC/NRR/DLPM NRC/NRR/DE NRC/NRR/DRIP/RLSB Bechtel Power NRC/NRR/DRIP/RLSB NRC/NRR/DRIP/RG EB NRC/NRR/DRIP/RLS8 Florida Power and Light Company (FPL)

FPL License Renewal FPL License Renewal FPL FPL FPL Shaw Pittman FTL NEI NRC/NRR/DE NRC/NRR/DRIP/RLSB NRC/NRR/DRIP/RLSB NRC/RII/DRS NRC/RII/DRS Enclosure 1

I

Tur ey Point uc ear ant LI K K RK K L PR K T FPL/NRC Interface Meeting April14, 1999 Enclosure 2

I ~

License Renewa ro ect

'icense Renewal is prudent for Turkey Point Low cost electricity producer Excellent station performance

'RC SALP I

'NPO I I

l<<~

Key locationsouth ofMiami

Environmental benefits.zerogreenhouse emissions Precludes need for construction of alternate generating capacity Attractive for customers, employees and FPL

I

License Renewa ro ect

~ Project timingNow is right NRC created stable and efficient regulatory process

~ License Renewal Application Review Strengths Monthly Management Meetings and StaffReview on schedule Effective Site and Telephone Interface forRAIClarifications Staff Acceptance ofInnovative Ideas Spaces Approach Commission Resolution ofAdjudicatory Challenges NRC resources available in 2001

~ No other known applications to be submitted in 2000 First Westinghouse NSSS plant

~ Request for waiver of 10 CFR Part 170 review fees

~

~

License Renewa Pro ect k

~ Resources allocated for application Funding established for application preparation Additional costs expected for NRC application review process Project Manager designated Project staff of20 25 assigned

License Renewa Pro ect NUCLEARDIVISIONORGANIZATION T.F. PLUNKETT PRESIDENT R L WAGE MECTOR NUCLEAR BUSINESS SERVICES LA.STALL VICEPIESIOENT ST.LUCIE R LACOSTA MECTOR NGEARASSURICE R S. IOIOAINR VICE PRESIOENT NUCLEARENGINEERING LR NRTZOG INFORMATION%STEMS MANGER R J.GtMfRAlICESCO, JR AMNSUPPORT &

SPECIAL PROJECTS MANGER F.W.fla MANGER NIEARPROCIIEMENT

&LOGISllCS PROJKT MANGER UCENSE RENEWAL

h

~

License Renewa Pro ect LICENSE RENEWAL ORGANIZATION E.A. THOMPSON PROJECTIVIANAGER GARY HOLLINGER LICENSING MGR JACK HOFFMAN MECHANICALSUPV TLAALEAD ELECTRICAL/I&C CIVILSUPPORT ADMINISTRATIVE COST/SCHEDULING SUPPORT TOM ABBATIELLO ENVIRONMENTAL REPORT LEAD TONY'MENOCAL SCREENING/NON-CLASS I AMR LEAD FIDEL PRIETO ELEC ENGR LEAD ENVIRONMENTAL SUPPORT MECH ENGR EQ ENGR LICENSING ENGR TLAA-CLB MECH ENGR MECH ENGR EQ ENGR MECH ENGR MECH ENGR MECH ENGR ELEC/EQ ENGR l&C/EQENGR STEVE HALE CLASS I AMR/APPLICATION 8 IPASUPPORT LEAD BRUCE BEISLER CIVIL/STRUCTURAL ENGR LEAD MATLS/CLASS I AMRs DRAFTING MECH ENGR FATIGUE/STRESS ANALYSIS CIVIL/STRUCTURAL ENGR MECH ENGR MECH ENGR CIVIL/STRUCTURAL ENGR

icense Renewa ro ect Mobilization Scoping Integrated Plant Assessment (IPA)

Mechanical Electrical / l&C Civil 1 QTR 2 QTR 3 QTR

'99

'99

'99 4 QTR 1 QTR 2 QTR 3 QTR 4 QTR 1 QTR 2 QTR

'99

'00

'00

'00

'00

'01

'01 3QTR 4QTR

'01

'01 Time Limited Aging Analyses (TLAAs)

Equipment Qualification Fatigue Other Environmental Report Communication Plan Application FSAR Supplement/Tech Spec Change Finalize Submittal Submit Application.

License Renewa ro ect W

~ 2 year application preparation schedule Factors in lessons learned from other license renewal efforts Production efforts in parallel

~ Screening

~ TLAAidentification and updates EQ and Class 1 fatigue

~ Class 1 AMRs

~ Preparation of environmental report

~

1 year NRC technical reviewrecent experience Prompt and appropriate handling of adjudicatory challenges, RAIs and SER open items

License Renewa ro ect

~ Application Model after Duke approach

~ Level of detail

~ FSAR supplement format Review and address BGAE and Duke RAIs and responses as appropriate Environmental Report Table ofContents/Organization of sections

~ NEI/NRC establishing jointly Electronic Submittal

~ Definition of electronic requirements

License enewa Pro ect

~ Improvement areas Streamlining Environmental Review Process

~ FPL supports proposed rulemaking on High Level Waste Transportation Change to Category I issue

~ FPL requests NRC consider rulemaking on SAMAs Change to Category I issue

~ FPL requests NRC remove Environmental Justice reviews from ~

the License Renewal Process

License Renewa Pro ect WOG generic technical reports review

~ FPL plans.to reference three GTRs Pressurizer Class 1 Piping RCS Supports

~ NRC review schedule should support FPL application preparation Approval in 1999 requested

T

icense Renewa Pro ect Resolution of Generic Issues

'7 Priority I issues open

'greement on new open items needed Emergent materials issues and research findings Address through existing GSI process and ASME interface

)) GSI 190Environmental Fatigue

'esolutions should be incorporated into staff/industry guidance

'ndustry and NRC should commit to resolve open items appropriately FSAR Supplement content Demonstration ofexisting programs

License Renewa ro ect

~ Demonstration of existing programs Support NEI paper Option for generic program credit report

~ FPL's understanding of level of detail needed System, structure or component Intended function Aging effects Aging management program

>> Application to address program scope and linkto aging effects

icense Renewa ro ect Aging management program information Scope

~ Linkto aging effects

~ Method*

~ Sample size*

~ Frequency*

~ Codes and standards*

~ Acceptance criteria*

~ Corrective actions*

  • Elements only addressed ifchanged from existing program

License Renewa ro ect

~ Conclusion Very important project to FPL e

NRC support requested

~ NEPA rulemaking

~ Reconsideration of environmental justice reviews

~ Westinghouse GTR review

~

1 year technical review of application

~ 10 CFR Part 170 review fee waiver NEI/NRC should work together to resolve open items

~ Improved staff review time through standardization possible

~r

License Renewa ro ect

~ FPL attendance R. S. Kundalkar E. A. Thoinpson G. E. Hollinger J. R. Hoffman S. T. Hale M. S. Ross VP Nuclear Engineering License Renewal Project Manager Licensing Manager Mechanical Supervisor Mechanical Lead Engineer Attorney

-r~

'K 4I