ML17355A298
| ML17355A298 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 04/16/1999 |
| From: | Wert L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Plunkett T FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17355A299 | List: |
| References | |
| 50-250-99-01, 50-250-99-1, 50-251-99-01, 50-251-99-1, NUDOCS 9904280033 | |
| Download: ML17355A298 (8) | |
See also: IR 05000250/1999001
Text
CATEGORY 2
REGULATORY INFORMATION DZSTRIBUTZON SYSTEM
(RXDS)
ESSION NBR:9904280033
DOC.DATE: 99/04/16
NOTARIZED: NO
CIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C
50-251 Turkey Point Plant, Unit 4, Florida Power and Light C
AUTH.NAME
AUTHOR AFFXLIATZON
WERT,L.D.
Region
2 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
PLUNKETT,T.F.
Florida Power
& Light Co.
SUBJECT:
Forwards insp repts 50-250/99-01
6 50-251/99-01
on
990207-0320.0ne violation occurred
&. being treated
as
non-cited violation consistent with App C of Enforcement
Policy.
DISTRIBUTION CODE: IE01F
COPIES
RECEXVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vio ation Response
NOTES:
DOCKET
05000250
05000251
RECIPIENT
ID CODE/NAME
LPD2-2
INTERNAL: AEOD
ILE CENTER
/DRIP/
RGN2
FILE
01
COPIES
LTTR ENCL
1.
1
1
1
1..
1
1
1
1
1
1
.
1
RECIPIENT
ID CODE/NAME
JABBOUR,K
~
DEDRO
NRR/DIPM/IOLB
NUDOCS-ABSTRACT
OGC/HDS3
COPIES
LTTR'ENCL
1
1
1
1
1
1
1
1
1
1
2
E
RNAL: LMITCO MARSHALL
NRC PDR
1
1
1
1
NOAC
NUDOCS FULLTEXT
1
1
1
1
p
N
NOTE TO ALL "RZDS" RECIPIENTS:
LEASE HELP US TO REDUCE HASTE ~
TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM'DISTRIBUTION LISTS
R REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANZZATZONp CONTACT THE DOCUMENT CONTROL
DESK
tDCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
15
ENCL
15
April 16,
1999
Florida Power 8 Light Company
ATTN: T. F. Plunkett
President - Nuclear Division
P. O. Box 14000
Juno Beach, Florida 33408-0420
SUBJECT:
NRC INTEGRATED INSPECTION REPORT NOS. 50-250/99-01, 50-251/99-01
Dear Mr. Plunkett:
This refers to the inspection conducted on February 7 through March 20, 1999, at the Turkey
Point 3 and 4 reactor facilities. The enclosed report presents the results of this
inspection.'uring
the inspection period, your conduct of activities was generally characterized by safety
conscious operations.
Good preparations for the refueling outage and effective nuclear safety
review committee meetings were noted.
0
Based on the results of this inspection, the NRC has determined that one violation of NRC
requirements occurred.
This violation is being treated as a Non-Cited Violation (NCV),
consistent with Appendix C of the Enforcement Policy. The NCV is described in the enclosed
inspection report.
Ifyou contest the violation or severity level of the NCV, you should provide a
response within 30 days of the date of this inspection report, with the basis for your denial, to
the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-
0001, with copies to the Regional Administrator, Region II, and the Director, Office of
Enforcement, United States Nuclear Regulatory Commission, Washington DC 20555-0001.
ln accordance with t0 CPR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure willbe placed in the NRC Public Document Room.
!/
Sincerely,
( Original signed by L. Wert
)
Leonard D. Wert, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Docket Nos. 50-250, 50-251
, Enclosure: NRC Inspection Report Nos. 50-250/99-01, 50-251/99-01
9904280033 9904i6
ADGCK 05000250
6
cc w/encl:
Plant General Manager
Turkey Point Nuclear Plant
Florida Power and Light Company
9760 SW 344th Street
Florida City, FL 33035
R. J. Hovey
Site Vice President
Turkey Point Nuclear Plant
Florida Power and Light Company
9760 SW 344th Street
Florida City, FL 33035
Steve Franzone
Licensing Manager
Turkey Point Nuclear Plant
Florida Power and Light Company
9760 SW 344th Street
Florida City, FL 33035
John Gianfrancesco,
Manager
Administrative Support & Special Projects
Florida Power & Light Company
P. O. Box 14000
Juno Beach, FL 33408-0420
Rajiv S. Kundalkar
Vice President - Nuclear Engineering
Florida Power & Light Company
P. O. Box 14000
Juno Beach, FL 33408-0420
M. S. Ross, Attorney
Florida Power & Light
P. O. Box 14000
Juno Beach, FL 33408-0420
Attorney General
Department of Legal Affairs
The Capitol
Tallahassee,
FL 32304
William A. Passetti
Bureau of Radiation Control
Department of Health and
Rehabilitative Services
2020 Capital Circle SE, Bin ffC21
Tallahassee,
FL 32399-1741
County Manager
Metropolitan Dade County
111 NW 1st Street, 29th Floor
Miami, FL 33128
Joe Myers, Director
Division of Emergency Preparedness
Department of Community Affairs
2740 Centerview Drive
Tallahassee,
FL 32399-2100
0
FP8 L-
Distribution w/encl:
L. Plisco, Rll
L. Wert, Rll
K. Jabbour, NRR
S. Rudisail, Rll
G. Hopper, Rll
PUBLIC
Senior Resident Inspector
U. S. Nuclear Regulatory Commission
9762 Southwest 344" Street
Florida City, FL 33035
OFFICE
SIGNATURE
NAME
DATE
- DRP
R
Isall
Q /99
R
.
P
CPattorsa
Ii /99
RII. RP
Royos
4/y
99
- DRS
artor
4/
/99
R:DRS
reh
4/I
/99
RII:D
GSalyers
4/(g /99
RII:DRS
ri ht
/99
COPY?
YES
No
E
No
YES
No )
YE
No
No
YES
NO
Es
No
OFFICE
SIGNATURE
NAME
DATE
COPY?
RII:DRP
8Holbrook
4/t
I
YES
N
RII:DRS
Stei
4// /99
YES
0
, NR
.NR
DDosaulnlors
4/ t
/99
NO
A go(aM
4/g
99
Es
No
4/
/99
YES
No
4/
/99
YES
No
4/
/99
YES
No
OFFICIALRECORD COPY
~
OCU
T NAME: GA
P'nREPORTSUR-99%1.WPD