Mr. Thomas F. Plunkett President - Nuclear Divisi Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420 April 15, l9
SUBJECT:
Dear Mr. Plunkett:
REQUEST FOR ADDITIONALINFORMATIONREGARDING GENERIC LETTER 96-05 PROGRAM - TURKEY POINT PLANT, UNITS 3 AND 4 (TAC NOS. M97112 AND M97113)
On September 18, 1996, the U. S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 96-05, "Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves," to request that nuclear power plant licensees establish a program, or ensure the effectiveness of the current program, to verify on a periodic basis that safety-related motor-operated valves continue to be capable of performing their safety functions within the current licensing basis of the facility.
By letters dated November 6, 1996, and March 11, 1997, Florida Power and Light Company described its response to the recommendations of GL 96-05 for Turkey Point Nuclear Plant, Units 3 and 4. During an NRC inspection at St. Lucie Nuclear Plant on January 11 to 13, 1999, the NRC staff also evaluated the GL 96-05 program being implemented at Turkey Point through review of Turkey Point documentation and discussions with Turkey Point personnel.
In NRC Inspection Report (IR) 50-250 and 251/98-13, the staff documented its evaluation of Turkey Point GL 96-05 program and identified specific areas of the program which required further assessment before the NRC staff can complete its review.
The enclosed request for additional information (RAI), regarding the. remaining areas for review of GL 96-05 program at Turkey Point, has been discussed with Craig Mowrey of your staff. A target date for your response has been agreed upon to be 60 days from your receipt of this RAI. Should a situation occur that prevents you from meeting the target date, please contact me at (301) 415-1496.
Sincerely, Original signefI by:
Kahtan N. Jabbour, Senior Project Manager, Section 2 Project Directorate II, Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251
Enclosure:
As stated cc w/encl: See next page DISTRIBUTION:
CDocket-'File~
Peterson PUBLIC BClayton Turkey R/F KJabbbour JZwolinski/S Black
.OGC HBerkow ACRS 6 1 O05 f-DOCUMENT NAME: G:ttTURKENRAI97112.WPD LWert, Rll ipl.
@VV To receive e co of this document indlcete in the boxr C
sr Co without ettechment/enclosure E
sr Co with ettechment/enclosure N" e No co OFFICE P DII-2/PM P Dll-2/LA PDII-2/S NAME KJabbour / ~
BCla ton eterso'ATE 045<799 04/999 04
/99 04/ /99 04/ /99
'll'tf042i0283 9'tf0415 PDR ADQCK 05000250 p
PDR 5, IALRECORD COPY
h f"
g 4
~
H
~
~gI 8 Cy~
A00 Y/
~O
++**+
Mr. Thomas F. Plunkett President - Nuclear Division Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420 UNITED STATES NUCLEAR REGULATORY COMMISSION
,WASHINGTON, D.C. 20555-0001 Apri1 15, 1999
SUBJECT:
REQUEST FOR ADDITIONALINFORMATIONREGARDING GENERIC LETTER 96-05 PROGRAM - TURKEY POINT PLANT, UNITS 3 AND 4 (TAC NOS. M97112 AND M97113)
Dear Mr. Plunkett:
On September 18, 1996, the U. S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 96-05, "Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves," to request that nuclear power plant licensees establish a program, or ensure the effectiveness of the current program, to verify on a periodic basis that safety-related motor-operated valves continue to be capable of performing their safety functions within the current licensing basis of the facility.
By letters dated November 6, 1996, and March 11, 1997, Florida Power and Light Company described its response to the recommendations of GL 96-05 for Turkey Point Nuclear Plant, Units 3 and 4. During an NRC inspection at St. Lucie Nuclear Plant on January 11 to 13, 1999, the NRC staff also evaluated the GL 96-05 program being implemented at Turkey Point through review of Turkey Point documentation and discussions with Turkey Point personnel.
In NRC Inspection Report (IR) 50-250 and 251/98-13, the staff documented its evaluation of Turkey Point GL 96-05 program and identified specific areas of the program which required further assessment before the NRC staff can complete its review.
The enclosed request for additional information (RAI), regarding the remaining areas for review of GL 96-05 program at Turkey Point, has been discussed with Craig Mowrey of your staff. A target date for your response has been agreed upon to be 60 days from your receipt of this RAI. Should a situation occur that prevents you from meeting the target date, please contact me at (301) 415-1496.
Sincerely, Docket Nos. 50-250 and 50-251 Kahtan N. Jabbour, Senior Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/encl: See next page
IL
RE VEST FOR ADDITIONALINFORMATION GENERIC LETTER 96-05 TURKEY POINT PLANT UNITS 3 AND 4 DOCKET NOS. 50-250 AND 50-251 In U. S. Nuclear Regulatory Commission (NRC) Inspection Report (IR) Nos. 50-250 and 251/98-13, the NRC staff discussed its evaluation of the motor-operated valve (MOV) program being established at Turkey Point Plant, Units 3 and 4, in response to Generic Letter (GL) 96-05, "Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves." In IR 98-13, the NRC staff identified three areas of the licensee's MOV program which required further assessment before the NRC staff can complete its review. With respect to one area, the licensee had not committed to implement the generic industry program developed by the Joint Owners'roup (JOG) in response to GL 96-05 and, therefore, could not rely on the JOG program to establish applicable degradation rates for the potential increase in valve thrust or torque operating requirements for the GL 96-05 MOVs at Turkey Point. The NRC staff found that the licensee had not correlated in-plant valve tests with the individual MOV groups at Turkey Point to ensure that representative dynamic test data were obtained for each MOV in the Turkey Point GL 96-05 program in order to establish applicable degradation rates for its GL 96-05 MOVs. Further, the licensee had not presented the available margins as part of the GL 96-05 program to justify that each MOVwould continue to be capable of performing its safety functions despite potential degradation during performance of the dynamic testing program at Turkey Point. Therefore, the NRC staff was not able to determine whether the licensee's planned testing would be sufficient to identify valve age-related degradation for each GL 96-05 MOV or whether the capability margins of each MOVwould be sufficient during the period while testing was being performed to establish degradation rates.
The licensee should provide (a) the MOV capability margins, (b) representative MOVs to be tested for each valve group in the GL 96-05 program at Turkey Point, and (c) the dynamic testing schedule to establish applicable degradation rates for the potential increase in valve thrust or torque operating requirements, for each GL 96-05 MOV at Turkey Point.
With respect to the second area of the licensee's GL 96-05 program noted in IR 98-13 as requiring further review, the NRC staff found that the licensee's guidance for MOV trending and monitoring did not provide details of the monitoring of MOV parameters to verify specific aspects of MOV performance, including MOV motor actuator output and degradation trends.
The licensee should describe its process for monitoring and evaluating MOV parameters to identify degradation trends.
With respect to the third area of the licensee's GL 96-05 program noted in IR 98-13 as requiring further review, the licensee stated that it planned to update its MOV risk ranking methodology during spring 1999 to reflect an accepted generic industry methodology.
The NRC notes that the licensee may elect to apply insights from the guidance provided in the Westinghouse Owners Group (WOG) Engineering Report V-EC-1658-A (Revision 2, dated August 13, 1998), "Risk Ranking Approach for Motor-Operated Valves in Response to Generic Letter 96-05," and the NRC safety evaluation dated April 14, 1998, on the WOG methodology for risk ranking MOVs at ENCLOSURE Westinghouse-designed pressurized-water reactor nuclear plants (such as Turkey Point). The licensee should describe the updated methodology used for risk ranking MOVs at Turkey Point, including application of an expert panel in evaluating the safety significance of its GL 96-05 MOVs, and comparison of the high-risk MOVs at Turkey Point to those at other'Westinghouse-designed PWR nuclear plants.
/
I
Mr. T. F. Plunkett Florida Power'and Light Company TURKEYPOINT PLANT CC:
M. S. Ross, Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Robert J. Hovey, Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL 33035 County Manager
'Miami-Dade County 111 NW 1 Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 1448 Homestead, Florida 33090 Mr. William A. Passetti, Chief Department of Health Bureau ofRadiation Control 2020 Capital Circle, SE, Bin ¹C21 Tallahassee, Florida 32399-1741 Mr. Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL 33035 Mr. Steve Franzone Licensing Manager Turkey Point Nuclear Plant 9760 SW. 344th Street Florida City, FL 33035 Mr. John Gianfrancesco Manager, Administrative Support and Special Projects P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
~
~