ML17355A256
| ML17355A256 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/08/1999 |
| From: | Wert L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Plunkett T FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17355A258 | List: |
| References | |
| 50-250-98-13, 50-251-98-13, NUDOCS 9903240249 | |
| Download: ML17355A256 (11) | |
See also: IR 05000250/1998013
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM
(RIDS)
ACCESSION NBR:9903240249
DOC.DATE: 99/03/08
NOTARIZED: NO
~
~
~
~
ACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C
50-251, Turkey Point Plant, Unit 4, Florida Power and Light C
AUTH.NAME
AUTHOR AFFILIATION
WERT,L.D.
Region
2
(Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
PLUNTETT,T.F.
Florida Power
E Light Co.
SUBJEC
- Forwards insp rept 50-250/98-13
S 50-251/98-13
on
981227-990206.No violation or deviations noted.
DISTRIBUTION CODE: IEOlF
COPIES
RECEIVED:LTR
i
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
DOCKET
05000250
05000251
0
T
RECIPIENT
ID CODE/NAME
PD2-3
INTERNAL: AEOD/SPD/RAB
DEDRO
NRR/DRCH/HOHB
NRR/DRPM/PERB
OE DIR
RGN2
FILE
01
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
.1
1"
1
1
1
RECIPIENT
XD CODE/NAME
JABBOUR,K
AEOD/TTC
ENTE
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS3
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
G
0
ERNAL: LMITCO MARSHALL
NRC PDR
1
1
1
1
NOAC
OCS
FULLTEXT
1
1
1
1
,E
N
NOTE TO ALL "RIDS" RECIPIENTS:
t
PLEASE HELP US TO REDUCE WASTE.
TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION
CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
17
ENCL
17
March 8,
1999
Florida Power and Light Company
ATTN:
Mr. T. F. Plunkett
President - Nuclear Division
P. O. Box 14000
Juno Beach, FL 33408-0420
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-250/98-13, 50-251/98-13
Dear Mr. Plunkett:
On February 6, 1999, the NRC completed an inspection at your Turkey Point 3 and 4 reactor
facilities. The enclosed report presents the results of that inspection.
During the inspection period, your conduct of activities was generally characterized
by safety
conscious operations and well executed suiveillance testing activities.
Within the scope of the inspection, violations or deviations were not identified.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this letter, please contact us.
Sincerely,
(Original signed by Leonard
D. Wert)
Docket Nos. 50-250, 50-251
Leonard D. Wert, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
NRC Inspection Report 50-250/98-13, 50-251/98-13
cc w/encl: (See page 2)
9903240249
990308
ADOCK OS000250
6
cc w/encl:
Plant General Manager
Turkey Point Nuclear Plant
Florida Power and Light Company
9760 SW 344th Street
Florida City, FL 33035
R. J. Hovey
Site Vice President
Turkey Point Nuclear Plant
Florida Power and Light Company
9760 SW 344th Street
Florida City, FL 33035
G. E. Hollinger
Licensing Manager
Turkey Point Nuclear Plant
Florida Power and Light Company
9760 SW 344th Street
Florida City, FL 33035
John Gianfrancesco,
Manager
Administrative Support & Special Projects
Florida Power & Light Company
P. O. Box 14000
Juno Beach, FL 33408-0420
Rajiv S. Kundalkar
Vice President - Nuclear Engineering
Florida Power & Light Company
P. O. Box 14000
Juno Beach, FL 33408-0420
M. S. Ross, Attorney
Florida Power & Light
P. O. Box 14000
Juno Beach, FL 33408-0420
Attorney General
Department. of Legal Affairs
The Capitol
Tallahassee,
FL 32304
William A. Passetti
Bureau of Radiation Control
Department of Health and
Rehabilitative Services
2020 Capital Circle SE, Bin ¹C21
Tallahassee,
FL 32399-1741
County Manager
Metropolitan Dade County
111 NW 1st Street, 29th Floor
Miami, FL 33128
Joe Myers, Director
Division of Emergency Preparedness
Department of Community Affairs
2740 Centerview Drive
Tallahassee,
FL 32399-2100
Distribution w/encl:
L. Plisco, Rll
L. Wert, Rll
K. Jabbour, NRR
D. Terao, NRR
T. Scarborough,
S. Rudisail, Rll
G. Hopper, Rll
PUBLIC
Senior Resident Inspector
U. S. Nuclear Regulatory Commission
9762 Southwest 344~ Street
Florida City, FL 33035
- (See previous concurrence)
OFFICE
SIGNATURE
II: RP ~
Rll:DRP
RII:DRP
RII:DRS
NAME
'.
SRudisall
DATE
!
V
3 '99
CPatterson
3/
/99
RReyes
3/
/99
COPY'ES
No
YES
No
YES
No
EGlrard
3/
/99
YES
No
Tscarborough
3/
/99
YES
No
3/
/99
YES
No
3/
/99
YES
NO
OFFICIALRECORD COPY
DOCUMENT NAME: GATURKEYPRREPORTS$ 8-13RPT.WPD
Input Concurrence Form
SPECIAL INSPECTION BRANCH INPUT
Facility:
TURKEYPOINT
Docket / Report No(s).:
50-250, 251/98-13
Inspection Date(s):
JANUARY11-14, 1999
0
IFS FORMS
0
PI M INPUT
SIGNATU
NAME
GI ARD
B
LE
SCARBR
DATE
2/ z ~/99
2/~ /99
2/ N/99
2/
/99
2/
/99
2/
/99
2/
/99
OFFICIAL RECORD COPY
DOCUMENT NAME: SADRS>ebhlNPUTSETPT9813G.WPD
Dist 'butlon uv/encl:
L Plisco, Rll
L. Wert, Rll
K. Jabbour, NRR
D. Terao, NRR
T. Scarborough,
S. Rudisail, Rll
G. Hopper, Rll
PUBLIC
Senior Resident Inspector
U. S. Nuclear Regulatory Commission
9762 Southwest 344~ Street
Florida City, FL 33036
IFFICE
IGNATURE
'ATE
3PYP
Rll:DRP
SRudisail
3l
l88
YES
NO
Rll:DRP
CPatterson
3l
l98
f
No
YES
NO
Rll:DRS
3l
l98
YE6
No
TSearbar ough
3l
l88
YES
NO
sl
l88
YES
No
Jl
l88
YES
NO
OFFICIAI.RECORD CO
DOCUMENTNAME: C IOFFICBWPWINWPOOCSIS8-1$ rpt.vtpd
0