ML17354B210
| ML17354B210 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 12/09/1998 |
| From: | Wert L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Plunkett T FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17354B211 | List: |
| References | |
| 50-250-98-11, 50-251-98-11, NUDOCS 9812230316 | |
| Download: ML17354B210 (10) | |
See also: IR 05000250/1998011
Text
CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM
(RIDS)
SSION NBR:9812230316
DOC.DATE: 98/12/09
NOTARIZED: NO
DOCKET
ACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C
05000250
50-251 Turkey Point Plant, Unit 4, Florida Power and Light C
05000251
AUTH.NAME
AUTHOR AFFILIATION
WERT,L.D.
Region
2 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
PLUNKETT,T.F.
Florida Power
& Light Co.
SUBJECT:
Forwards insp repts 50-250/98-11
& 50-251/98'-ll on 981004-
1114.No violations identified. Activities at Turkey Point
generally characterized
by safety-conscious
operations
strong health physics
&. engineering
support.
DISTRIBUTION CODE:
IEOIF
COPIES
RECEIVED:LTR
(ENCL i
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
E
INTERNAL:
RECIPIENT
ZD CODE/NAME
PD2-3
AEOD/SPD/RAB
DEDRO
NRR/DRCH/HOHB
NRR/DRPM/PERB
OE DIR
RGN2
FILE
01
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
'
1
1
1
1
1
RECIPIENT
ID CODE/NAME
JABBOUR,K
A
E
C
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS3
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
O.
EXTERNAL: LZTCO BRYCE,J H
NRC PDR
1
1
1
1
NOAC
NUDOCS FULLTEXT
1
1
1
1
LQ~EG FROM
PHC78GMC Hk2
M
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED'ROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
17
ENCL
17
~
~
0
December 9, 1998
Florida Power and Light Company
ATTN:
Mr. T. F. Plunkett
President - Nuclear Division
P. O. Box 14000
Juno Beach, FL 33408-0420
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-250/98-11, 50-251/98-11
Dear Mr. Plunkett:
On November 14, 1998, the NRC completed an inspection at your Turkey Point 3 and 4 reactor
facilities, The enclosed report presents the results of that inspection.
During the six-week period covered, by this inspection, your conduct of activities at Turkey Point
was generally characterized by safety-conscious operations and strong health physics and
engineering support, specifically during the Unit 3 outage.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure willbe placed, in the NRC Public Document Room (PDR).
Should you have any questions concerning this letter, please contact us.
Sincerely,
Docket Nos. 50-250, 50-251
( Original signed by L. Wert )
Leonard D. Wert, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosures: Inspection Report 50-250/98-11, 50-251/98-11
cc w/encl: (See page 2)
98i22303i6 9'8i209
ADGCK 05000250
8
cc w/encl:
Plant General Manager
Turkey Point Nuclear Plant
Florida Power and Light Company
9760 SW 344th Street
Florida City, FL 33035
R. J. Hovey
Site Vice President
Turkey Point Nuclear Plant
Florida Power and Light Company
9760 SW 344th Street
Florida City, FL 33035
G. E. Hollinger
Licensing Manager
Turkey Point Nuclear Plant
Florida Power and Light Company
9760 SW 344th Street
Florida City, FL 33035
J ohn Gianfrancesco,
Manager
Administrative Support & Special Projects
Florida Power & Light Company
P. O. Box 14000
Juno Beach, FL 33408-0420
Rajiv S. Kundalkar
Vice President - Nuclear Engineering
Florida Power & Light Company
P. O. Box 14000
Juno Beach, FL 33408-0420
M. S. Ross, Attorney
Florida Power & Light
P. O. Box 14000
Juno Beach, FL 33408-0420
Attorney General
Department of Legal Affairs
The Capitol
Tallahassee,
FL 32304
William A. Passetti
Bureau of Radiation Control
Department of Health and
Rehabilitative Services
2020 Capital Circle SE, Bin ¹C21
Tallahassee,
FL 32399-1741
2
County Manager
Metropolitan Dade County
111 NW 1st Street, 29th Floor
Miami, FL 33128
Joe Myers, Director
Division of Emergency Preparedness
Department of Community Affairs
21740 Centerview Drive
Tallahassee,
FL 32399-2100
0
Distribution w/encl:
L. Plisco, Rll
L. Wert, Rll
K. Jabbour, NRR
S. Rudisail, Rll
G. Hopper, Rll
PUBLIC
Senior Resident Inspector
U. S. Nuclear Regulatory Commission
P. O. Box 144S
Homestead,
FL 33090
- (See previous concurrence)
RII:DRP
R'P
OFFICE
SIGNATURE
NAME
DATE
COPY?
Isail
Msykes
12/$ /98
12//'98
YES
YES
OFFICIALRECORD COPY
IR:DRP
~ gr
p.g
Rll:DRS
RRoyos 'r
DForbos
r~ ~q.y
12/<
/98
12/
/98
YES
No
12/
/98
YES
No
YES
rN
OCUMENT NA E: GATURKEYPl%EPORTS$ 811RPT.WPD
12/
/98
YES
No
12/
/98
YES
No
ZG'd 'lU3.0l
nw
L. Plisco, Rll
L. Wert, RII
K. Jabbour, NRR
S. Rudisall, Ril
G, Hopper, Rll
PUBLIC
Senior Resident Inspector
U. S. Nuclear Regulatory Commission
P. 0, Box 1448
Homestead,
FL 33090
OFFlCIA1. RECORD COPY
DOCUMENTNAME: PNS11RPT.WPO
0
~'d
TZC6568t'K
331993
J.HAMI S38
381fHDW
VISED COPY
Input Concurrence Form
PLANT SUPPORT INPUT
Facility:
Docket / Report Nos.:
Inspection Dates:
Turkey Point Units 1 and 2
50-250/98-11 and 50-251/98-11
October 5-9, 1998
IFS FORMS
PIM INPUT
ATURE
Rjj:DRS
DForbes
I:D
Kharr
RII:DRS
10/
/98
10/
/98
10/
/98 10/
/98 10/
/98
YES
OPPZCIAL RECORD COPY
YES
YES
YES
YES
DOCEFNT NZI=-:
G: iZZRZNPUT.PSBXTurkeyPoirt9811. ibad
YES