ML17354A912
| ML17354A912 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 04/23/1998 |
| From: | Peebles T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Plunkett T FLORIDA POWER & LIGHT CO. |
| References | |
| 50-250-98-301, 50-251-98-301, NUDOCS 9805060137 | |
| Download: ML17354A912 (8) | |
Text
April 23, 1998 Florida Power and Light Company ATTN:
Hr. T.
F. Plunkett President
- Nuclear Division P.
O.
Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS AT THE TURKEY POINT NUCLEAR PLANT 250/98-301 AND 50-251/98-301
Dear Hr. Plunkett:
In a telephone conversation on April 8,
- 1998, between Hr. Phil Finegan, Operations Training Supervisor and Mr. George Hopper, License Examiner..
arrangements were made for the administration of licensing examinations at the Turkey Point Nuclear Plant during the.week of August 10.
1998.
Your staff will prepare the proposed examinations in accordance with the guidelines in Interim Revision 8, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."
The NRC regional office will discuss with your staff any examination changes that might be necessary prior administration.
Hr.
Char les
- Payne, (404) 562-4669.
has been assigned as chief examiner for your examination.
It is requested that your staff coordinate with Hr. Payne to determine the appropriate quantity of operating test items necessary to maintain sequestering of candidates to a mutually acceptable level during the exam week.
To meet the above schedule. it will be necessary for your staff to furnish the proposed examination outlines by May 27, 1998.
The proposed written examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 will be due by June 26, 1998.
Any delay in receiving the required reference and examination materials or the submittal of inadequate or incomplete materials may result in the examinations being rescheduled.
In order to conduct the requested written examinations and operating tests. it
. will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402 and to make the simulation facility available on the dates noted above.
In accordance with ES-302, your staff should retain the original simulator performance data (e.g.,
system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that y 8 will be in effect while the written examinations and operating tests are being administered.
9805060i37 'M0423 PDR ADQCK 05000280 V
%C HlfCEIl'BI CSI'Y ~ g'
l
~
FP8L Your staff should submit preliminary reactor operator and senior reactor operator license applications and waiver requests at least 30 days before the first examination date so that the NRC will be able to review the applications and the medical certifications and evaluate any requested waivers.. If the applications are not received at. least 30 days before the examination
- date, a postponement may be necessary.
Signed applications certifying that all training has been 'completed should be submitted at least 14 days before the first examination date.
\\ I This request is covered by'ffice'of Management and Budget (OMB) Clearance Number 3150-0101.
which expires April 30, 2000.
The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response.
including gathering, xeroxing and mailing the required reference material; the estimated average burden to prepare the examinations is 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />.
Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, Hail Stop T-6 F33, Office of Information Resources Management, U.S. Nuclear Regulatory.~Commission, Washington.
D.C. 20555; and to the Paperwork Reduction Project (3150-0101),
Office of Information and Regulatory Affairs. NEOB-10202, Office of Management and Budget.
Washington, D.C. 20503.
Thank you for your cooperation in this matter.
Hr. Finegan has been advised of the policies and guidelines referenced in this letter.
If you have any questions regarding the NRC's examination procedures and guidelines, please contact Hr. George Hopper at (404) 562-4645, or myself at (404) 562-4638, Sincer ely, Docket Nos. 50-250, 50-251 License Nos.
(See page 3}
(Original signed by T. A. Peebles)
Thomas A. Peebles, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety
FPSL 3
cc:
H.
N. Paduano, Manager Licensing II Special Programs Florida Power and Light Company P. 0.
Box 14000 Juno Beach, FL 33408-0420 Plant General'Manager Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344th Street
'lorida City, FL 33035 R. J.
Hovey Site Vice President-Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344th Street Florida City.
FL 33035 G.
E. Hollinger Licensing Manager Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344th Street Florida City, FL 33035 M. S.
Ross, Attorney Florida Power 8'ight P. 0.
Box 14000 Juno Beach, FL 33408-0420 John T. Butler, Esq.
- Steel, Hector and Davis 4000 Southeast Financial Center Miami.
FL 33131-2398 Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 Armando Vidal County Manager of.Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, FL 33128 Joe Myers. Director Division of Emergency Preparedness Department of Community Affairs 21740 Centerview Drive Tallahassee.
FL 32399-2100 Maria L. Lacal Training Manager Turkey Point Nuclear Plant Florida Power and. Light Company 9760 SW 344th Street Florida City. FL 33035 Distribution:
(See page 4)
0
FPSL Distribution:
K. Jabbour NRR B. Schin, RII'.
Hopper. RII PUBLIC Senior Resident Inspector U. S. Nuclear Regulatory Commission P. 0.
Box 1448 Homestead, FL'3090.
OFFICE SIGNATURE RII:DRS GHoppe RII:DRS OL POC RII:DRP BSchin RII:DRS TPcebles DATE 4/ $ /
4/
/98 4/
/98 4/
/98 4/
/98 4/
/98 4/
/98 YES 0
OFFICIAL RE IX'ES ES KO NO YES NO NAKE:
I:~081 I~LA~TUR%98301120.GTH YES NO YES KO
0 l