ML17353A590

From kanterella
Jump to navigation Jump to search
COLR for Turkey Point Unit 4
ML17353A590
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 03/06/1996
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17353A588 List:
References
NUDOCS 9603120235
Download: ML17353A590 (10)


Text

CORE OPERATING'IMITS REPORT FOR FLORIDA POWER AND LIGHT.COMPANY TURKEY POINT UNIT 4 9SOSii02~5

VeoSOe, PDR ADDCK 05000251!

P PDR

4

~

L-96-050 Attachment Page 1

'CORE OPERATING LIMITS REPORT The COLR for Turkey Point Unit 4 Cycle 16 has been prepared in accordance with the requirements of Technical Specifications 6.9.1.7.

The Technical Specifications affected by this report are:

3.2.1 Axial Flux Difference (AFD) 3.1.3.6 Control Rod Insertion Limits 3/4.2.2 Heat Flux Hot Channel Factor -

F (Z)

The AFD, K(Z), and Rod Bank Insertion Limits have been developed'sing the NRC approved methodology specified'n Technical Specification 6.9.1.7.

The affected curves are provided: in the attached figures.

The All-Rods-Out (ARO) position for Turkey Point Unit 4 Cycle 16 is 228 steps withdrawn.

Ol

. ~VER 8 Rrrrr RQRi'ii84RERARRE maze>rar Erar e r RE arr 4$

R Rar Err pi Rrr Rr R p A

~4 R

E54 R 6 $$

R

. E Rr

.Pi E R rr.

k Rr

)

Q E R R A R arrr R aaa RE)rr r Er a rr

o

/

r t

~

~

~

~

I

~ '

~

~ '

~ I

~ I

i+i

,r

I I I

~ I I I

e I

I I

I I

~

I 0

l

'I 4

4

)

A I