October 6, 1995 Florida Power and Light Company ATTN:
Mr. J.
H. Goldberg President - Nuclear Division P. 0.
Box 14000 Juno
- Beach, FL 33408-0420 SUBJECT'LANT PERFORMANCE REVIEW (PPR) - TURKEY POINT
Dear Mr. Goldberg:
On September 21, 1995, the NRC staff completed the semiannual Plant Performance Review (PPR) of Turkey Point.
The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance.
The results are used by regional management to facilitate planning and allocation of inspection resources.
The PPR for Turkey Point involved the participation of all Regional Technical Divisions and NRR in evaluating inspection results and safety performance information for the period from March 1995.to September 1995.
PPRs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the Turkey Point PPR review.
It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability issues to be resolved in advance of inspector arrival onsite.
The enclosure details our inspection plan for the next 6 months.
The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas.
Resident inspections are not listed due to their ongoing and continuous nature.
We will inform you of any changes to the inspection plan.
If you have any questions, please contact K. Landis at (404) 331-5509.
Sincerely, Orig signed by Ellis W. Merschoff Ellis W. Merschoff, Director Division of Reactor Projects Docket No.:
50-250, 50-251 License No.:
Enclosure:
Inspection Plan cc w/encl:
(See page 2) 95i0i90i92 '75i006 PDR ADOCK 05000250 8
~VUOSG OFFICIAL COPY
FPLL cc w/encl:
H.
N. Paduano, Manager Licensing
& Special Programs Florida Power and Light Company P. 0.
Box 14000 Juno
- Beach, FL 33408-0420 D. f.'ernigan Plant General Manager Turkey Point Nuclear Plant P. 0.
Box 029100
- Hiami, FL 33102 T.
F. Plunkett Site Vice President Turkey Point Nuclear Plant P. 0.
Box 029100
- Hiami, FL 33102 T.
V. Abbatiello Site guality Manager Turkey Point Nuclear Plant P. 0.
Box 029100
- Hiami, FL 33102 E. J.
Weinkam Licensing Manager Turkey Point Nuclear Plant P. 0.
Box 4332
- Miami, FL 33032-4332 J.
R.
- Newman, Esq.
- Morgan, Lewis 5 Bockius 1800 H Street, NW Washington, D.
C.
20036 John T. Butler, fsq.
- Steel, Hector and Davis 4000 Southeast Financial Center Hi ami, FL 33131-2398 Attorney General Department of Legal Affairs The Capitol Tallahassee, FL'2304 cc w/encl:
Continued see page 3
FPSL cc w/encl:
Continued Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 Jack Shreve Public Counsel Office of the Public Counsel c/o The Florida Legislature 111 West Madison Avenue, Room 812 Tallahassee, FL 32399-1400 Joaquin Avino County Manager of Metropolitan Dade County ill NW 1st Street; 29th Floor
- Miami, FL 33128 Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Distribution w encl:
R. Croteau, NRR G. Hallstrom, RII PUBLIC Thomas P.
Johnson Senior Resident Inspector U.S. Nuclear Regulatory Commission P. 0.
Box 1448 Homestead, FL 33090 OFFICE BII SIGNATUBE NAME ELea DATE 10 /
/ 95 COPY?
YES NO Bll KL 10/
l /95 ES NO Bll k~
a CCasto 1
/95 YES NO
/4 /95 ES NO OFFICIAL RECORD COPY OCUMEIIT IIA tiTP.PPR 10/
/95 10/
/95 YES NO YES NO
TURKEY POINT INSPECTION PLAN IP Inspection Procedure TI - Temporary Instruction Core Inspection Minimum NRC Inspection Program (mandatory all plants)
INSPECTION PROCEDURE IP 37700 IP 61726 IP 62703 IP 84750 IP 81700 IP 82701 IP 81700 TITLE/
PROGRAM AREA Design Changes and Modifications Surveillance Observation Maintenance Observation Radioactive Waste Systems, Water Chemistry Confirmatory Measurements and Radiological Environmental Honitorin Physical Security Program for Power Reactors Operational Status of the Emergency Preparedness Pro ram Physical Security Program for Power Reactors NUMBER OF INSPECTORS PLANNEO INSPECTION DATES 10/10-13/95 ll/95 1-week, 01/96 l-week, 03 96 1-week 11/13-17/95 12/11-15/95 12/18-22/95 02/26-03/01/96 TYPE OF INSPECTION - COMMENTS Regional Initiative Emphasis on EDG sequencer modification and CCW safety analysis and corrective actions involving numerous rocedure chan es Core Inspection Core Inspection Core Inspection Core Inspection Core Inspection
INSPECTION IP 86750 TI 2515/109 TITLE/
PROGRAM AREA Radioactive Waste
- Systems, Water Chemistry Confirmatory Heasures and Radiological Environmental
-Honitorin Inspection Requirements for Generic Letter 89-10, Safety-Related Hotor-Operated Valve Testing and Surveillance NUMBER OF PLANNED INSPECTORS INSPECTION DATES 04/01-04/96 1or 2
TBD TYPE OF INSPECTION COMMENTS Core Inspection Area of Emphasis Inspection to close out Generic Letter 89-10