L-95-202, Transmits Turkey Point Nuclear Plant Service Water Operational Performance Insp,Self Assessment,Final Rept
| ML17353A254 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 07/14/1995 |
| From: | Bohlke W FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17353A255 | List: |
| References | |
| L-95-202, NUDOCS 9507190048 | |
| Download: ML17353A254 (4) | |
Text
PRIORITY 1 (ACCELERATED RZDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9507190048 DOC.DATE: 95/07/14 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 P
50-251 Turkey Point Plant, Unit 4, Florida Power a d Light C 05000251 AUTH.NAME AUTHOR AFFILIATION BOHLKE,W.H.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
I
SUBJECT:
Transmits "Turkey Point Nuclear Plant Service Water Operational Performance Insp,Self Assessment, Final Rept."
DISTRIBUTION CODE:
A001D COPIES RECEIVED. LTR 1
ENCL J SIZE: P/0 TITLE: OR Submittal:
General Distribution NOTES:
RECIPIENT ID CODE/NAME
'PD2-1 LA CROTEAU,R INTERN ~/~EN~
01 NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 EXTERNAL NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
0 1
1 RECIPIENT ID CODE/NAME PD2-1 PD NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
N NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL
- DESK, ROOM OWFN 5DS (415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 12 ENCL 11
Florida Powar & Light Company, P.O. Box 14000, Juno Beach, FL 33408-0420 JUL 1 't )995 L-95-202 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.
20555 Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Service Water System Operational Performance Ins ection Self Assessment This letter transmits the Final Report for the Turkey Point Units 3 and 4 Service Water System Operational Performance Inspection Self Assessment.
This assessment was conducted at the plant site during the months of March and May of 1995.
FPL intentions to conduct a self assessment, according to the guidance in IP-40501, was provided via L-93-250 on 10/4/93.
A detailed self assessment plan was provided via I 94-152 on 6/28/94.
Conditional approval for the self assessment was granted by the NRC via Albert F.
Gibson to J. H. Goldberg correspondence dated 8/10/94.
An in-process inspection was conducted by the NRC the week of 3/20/95 and was documented on Inspection Reports 50-250/95-08 and 50-251/95-08 on 4/20/95.
Should there be any questions concerning this response, please contact us.
Very truly yours, W. H. Bohlke Vice President Nuclear Engineering and Licensing WHB/st Enclosure cc:
Stewart D. Ebneter, Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant an FPL Group company 9507190048 950714 PDR ADOCK 05000250 p
'V