May 18, 1995 Florida Power and Light Company ATTN:

Mr. J.

H. Goldberg President

- Nuclear Division P. 0.

Box 14000 Juno

Beach, FL 33408-0420

SUBJECT:

PLANT PERFORMANCE REVIEW -

TURKEY POINT

Dear Mr. Goldberg:

On March 16,

1995, NRC managers met to review recent performance at the Turkey Point facility to determine if our present planned inspection effort for the rest of the current SALP cycle should be revised before its end date of August 31, 1996.

The purpose of this letter is to advise you of the results of that review.

At Turkey Point we noted that there were no indications of declining performance.

Changes in the currently scheduled inspection program were not being considered.

The enclosure is a list of planned inspection activities for the remainder of the SALP cycle.

It is our intent to continue semiannual performance reviews in addition to SALP and advise you of the results.

Please understand that the planned actions and dates are subject to change.

We will verbally communicate changes as each activity approaches.

Should you have any questions concerning this

letter, please contact us.

Sincerely, Orig signed by Kerry D. Landi,s Docket Nos.:

50-250, 50-251 License Nos.:

DPR-31, DPR-41 Kerry D. Landis, Acting Chief Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Plans cc w/encl:

H.

N. Paduano, Manager Licensing 5 Special Programs Florida Power and Light Company P. 0.

Box 14000 Juno

Beach, FL 33408-0420 ronne.,

9505300if6 9505i8 PDR ADOCK 05000250 6

PDR OFFICIAL COPY

VEPCO cc w/encl:

Continued D.

E. Jernigan Plant General Manager Turkey Point Nuclear Plant P. 0.

Box 029100

Miami, FL 33102 T.

F. Plunkett Site Vice President Turkey Point Nuclear Plant P. 0.

Box 029100

Miami, FL 33102 T. V. Abbatiello Site equality Manager Turkey Point Nuclear Plant P. 0.

Box 029100

Miami, FL 33102 E. J.

Weinkam Licensing Manager Turkey Point Nuclear Plant P. 0.

Box 4332

Miami, FL 33032-4332 J.

R.

Newman, Esq.
Morgan, Lewis 5 Bockius 1800 H Street, NW Washington, D.

C.

20036 John T. Butler, Esq.

Steel, Hector and Davis 4000 Southeast Financial Center
Miami, FL 33131-2398 Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 cc w/encl:

See page 3

VEPCO cc w/encl:

Continued Jack Shreve Public Counsel Office of the Public Counsel c/o The Florida Legislature 111 West Hadison

Avenue, Room 812 Tallahassee, FL 32399-1400 Joaquin Avino County Hanager of Hetropolitan Dade County 111 NW 1st Street, 29th Floor
Hiami, FL 33128 Joe Hyers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Distribution w encl:

R. Croteau, NRR K, Landis, RII G. A. Hallstrom, RII PUBLIC Thomas P.

Johnson Senior Resident Inspector U.S. Nuclear Regulatory Commission P. 0.

Box 1448 Homestead, FL 33090 N

TOPU C

UM NT 0

OFFICE SIGNATURE NAME KLs is YS NO 05/I /95 YES NO DATE 05 /

/95 ES NO 05 /

/95 YES NO COPY)

OFFICIAL O COPY OOCUIIENT IIAIIE: G:iTP-PPR.LTR 05/

/95 05/

/95 YES NO YES NO 05 /

/95 YES NO

TURKEY POINT SCHEDULED INSPECTIONS SALP CYCLE 13 Three Resident Inspectors (one RI on six month temporary assignment to NRC Headquarters, April 1 to October 1, 1995)- Routine monthly inspections in plant operations (71707), surveillance (61726) and maintenance (62703).

Some other Resident inspection activities include,plant support activities (71750), on-site engineering (37551), evaluation of licensee self-assessment capability (40500),

and refueling (60710).

Other Inspections Activities:

Seismic Inspection

- 11/13/95 and 12/04/95 81700 Physical Security Program for Power Reactors

- 7/95, ll/95, 7/96 82701 Operational Status of the Emergency Preparedness Program - ll/27/95 83750 Occupational

Exposure, Shipping and Transportation

- 09/ll/95 84750 Radioactive Waste Systems; Water Chemistry; Confirmatory Measurements and Radiological Environmental Monitoring - 7/21/95 OSRE Followup - 06/20/95 TI 2515/118, Revision 1

Service Water System Operational Performance Inspection (SWSOPI)

TBD TI 2515/122 Evaluation of Rosemount Pressure Transmitter Performance and Licensee Enhanced Surveillance Programs TBD TI 2515/123 Implementation of the Revised 10 CFR Part 20 -

06/26/95 TI 2515/126 Evaluation of On Line Maintenance TBD Enclosure