Notice of Partial Denial of Amends 173 & 167 to Licenses DPR-31 & DPR-41 & Opportunity for Hearing.Request Re Footnote Allowing Certain Airlocks to Be Open During Core Alterations Cannot Be Granted
ML17352B164
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/11/1995
From: Matthews D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17352B162 List:
References
NUDOCS 9505180336
Download: ML17352B164 (2)


Text

UNI ED STATES NUCLEAR REGULATORY COMMISSION F ORIDA POWER AND LIGHT COMPANY TU E

POINT UNIT NOS.

3 AND 4 DOC E

OS.

50-250 AND 50-251 0

AM D

T TO FAC I

0 ND OPPORTUNITY FOR HEARING

. The U. S. Nuclear Regulatory Commission (NRC) has denied a portion of an amendment request by the Florida Power and Light Company (FPL or the licensee) for an amendment to Facility Operating License Nos.

DPR-31 and DPR-41, issued to the licensee for operation of the Turkey Point Plant, Units 3 and 4, located in Dade County, Florida.

Notice of Consideration of Issuance of this amendment was published in the FEDERAL REGISTER on November 9, 1994 (59 FR 55869).

The purpose of the licensee's amendment request was to revise the Technical Specification (TS) to revise the definition of core alterations, allow the personnel airlocks to be open during core alterations and revise a

footnote pertaining to opening of certain valves.

The NRC staff has concluded that the portion of the licensee's request regarding the footnote allowing certain valves to be open during core alterations cannot be granted for the reasons stated in letter dated Ma 11 1995.

The licensee was notified of the Commission's denial of the proposed change by letter dated Ma 11 1995.

By 1995, the licensee may demand a hearing with respect to the denial described above.

Any person affected by this proceeding may file a written petition for leave to intervene.

9505i8033b 9505ii PDR ADQCK 05000250 P

PDR

A request for hearing or petition for leave to intervene must be filed with the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC, 20555, Attention:

Docketing and Service Branch, or may be delivered to the Commission's Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC 20555, by the above date.

A copy of any petitions should also be sent to the office of the General

Counsel, U.S.

Nuclear Regulatory Commission, Washington, DC 20555, and to J.

R.

Newman, Esquire,
Horgan, Lewis 8 Bockius, 1800 H Street, NW., Washington, DC 20036, attorney for the licensee.

For further details with respect to this action, see (1) the application for amendments dated October 20,

1994, and (2) the Commission's letter to the licensee dated May 11,

, 1995.

These documents are available for public

. inspection at the Commission's Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC 20555 and at the Florida International University, University Park, Hiami, Florida 33199.

A copy of Item (2) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, DC 20555, Attention:

Document Control Desk.

Dated at Rockville, Haryland this llehday of May

, '994.

FOR THE NUCLEAR REGULATORY COHHISSION David B. Hatthews, Director Project Directorate II-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation