L-95-075, Forwards ISI Third Ten Yr Summary Program for Revised Relief Request 9

From kanterella
(Redirected from ML17352B084)
Jump to navigation Jump to search
Forwards ISI Third Ten Yr Summary Program for Revised Relief Request 9
ML17352B084
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/27/1995
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-95-075, L-95-75, NUDOCS 9504040142
Download: ML17352B084 (3)


Text

P R.IC3R.I EY'CCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 9504040142 DOC. DATE: 95/03/27 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant;, Unit 4, Florida Power and ight C

AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET 05000250 05000251 P

SUBJECT:

Forwards ISI third ten yr summary program for revised relief request 9'.

DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code GL-89-04 NOTES:

RECIPIENT ID CODE/NAME PD2-2 LA CROTEAU,R INTERNAL: AEOD/SPD/RAB NRR/DE/EMCB NUDOCS-ABSTRACT RES/DSIR/EIB EXTERNAL: LITCO BROWN,B NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-2 PD ILE=-CENTER=-01 NRR/DE/EMEB OGC/HDS3 LITCO RANSOMEi C NRC PDR COPIES LTTR ENCL 1

1 1.

1 1

1 0

1 1

1 1

D O.

C N

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENTCONTROL DESK,'ROOM Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAMEFROM DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 13

MAR 27 1995 L-95-075 10 CFR 50.55a U.S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20555 Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Inservice Inspection Third Ten Year Summary Program Revised Relief Re u t No.

9 By letter L-93-220, dated September 9,

1993, Florida Power and Light Co.

(FPL) submitted a summary of the Inservice Inspection (ISI) Program and relief requests for the third ten year interval at Turkey Point Units 3 and 4.

The ISI Program details how FPL will implement Inservice Inspection requirements at Turkey Point during the third ten year interval.

By letter L-94-118, dated May 31r 1994r FPL provided additional information regarding the ISI

Program, as requested by NRC letter dated April 4, 1994.

As a result of questions raised during NRC's review of Relief Request No.

9, and as discussed during several telephone conversations with the NRC, attached is the revised Relief Request No.

9, Alternative Scheduling of Examinations.

Should there be any questions concerning this submittal, please conta us.

V y

yours, Z.

S" 4o fP F. Plunk Vice President Turkey Point Plant OIH Attachment cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC T.

P.

Johnson, Senior Resident Inspectorr USNRC n n.Qg 9504040142 9503i7 PDR ADOt.K 05000250 g

.PDR an Fpl Group company

0 J

g 4

a

~

ti 4',l Q~g 0

e