Notification of Significant Meeting W/Util in Atlanta,Ga Re Plant Operating Plan & Util Engineering
ML17352A606
Person / Time
Site: Turkey Point, Saint Lucie  NextEra Energy icon.png
Issue date: 05/13/1994
From: Landis K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 9406020056
Download: ML17352A606 (4)


Text

NOTICE OF SIGNIFICANT MEETINGS Name of Licensee:

Florida Power and Light Company Name of Facility:

St.

Lucie and Turkey Point Docket Numbers:

50-335, 50-389, 50-250, and 50-251 Date and Time of Meetings:

May 23, 1994, at 10:30 a.m.

and 1:00 p.m.

Location of Meetings:

NRC Region II Office, Atlanta, GA Purpose of Meetings:

Licensee presentations on:

St.

Lucie Operating Plan and Florida Power and Light Company (FPL) Engineering RII Cognizant Division:

Division of Reactor Projects Attendees for 10:30 a.m.

Presentation on St.

Lucie 0 eratin Plan:

NRC:

S.

D. Ebneter, Regional Administrator, Region II (RII)

E.

W. Merschoff, Acting Deputy Regional Administrator, RII H.

N. Berkow, Director, Project Directorate II-2, DRP-I/II, Office of Nuclear Reactor Regulation (NRR)

A. F. Gibson, Director, Division of Reactor Safety (DRS), RII J.

R. Johnson, Acting Director, Division of Reactor Projects (DRP), RII J.

P.

Jaudon, Acting Deputy Director, DRP, RII D.

M. Verrelli, Chief, Reactor Projects Branch 2,

DRP, RII K. D. Landis, Chief, Reactor Projects Section 2B (RP2B),

DRP, RII J.

A. Norris, Senior Project

Manager, Project Directorate II-2, NRR S.

A. Elrod, Senior Resident Inspector, St.

Lucie L. Trocine, Resident Inspector, Turkey Point R.

P. Schin, Project Engineer,

RP2B, DRP, RII Licensee:

D. A. Sager, Vice President, St. Lucie L. L. McLaughlin, Licensing Manager, St.

Lucie O~CC32 940b02005b 940513 PDR ADOCK 05000250 P

PDR

Attendees for 1:00

.m. Presentation on FPL En ineerin NRC:

S.

D. Ebneter, Regional Administrator, Region II (RII)

E.

W. Merschoff, Acting Deputy Regional Administrator, RII H.

N. Berkow, Director, Project Directorate II-2, DRP-I/II, Office of Nuclear Reactor Regulation (NRR)

A. F. Gibson, Director, Division of Reactor Safety (DRS), RII J.

R. Johnson, Acting Director, Division of Reactor Projects (DRP), RII B.

S. Hallett, Deputy Director, Division of Radiation Safety and Safeguards (DRSS), RII J.

P.

Jaudon, Acting Deputy Director, DRP, RII D. H. Verrelli, Chief, Reactor Projects Branch 2, DRP, RII C. Casto, Acting Chief, Engineering
Branch, DRS, RII J. J.

Blake, Chief, Materials and Processes Section (HPS),

DRS, RII P. J. Kellogg, Chief, Operational Programs Section (OPS),

DRS, RII K. D. Landis, Chief, Reactor Projects Section 2B (RP2B),

DRP, RII J.

A. Norris, Senior Project Manager, Project Directorate II-2, NRR S.

A. Elrod, Senior Resident Inspector, St.

Lucie L. Trocine, Resident Inspector, Turkey P'oint R.

P. Schin, Project Engineer,

RP2B, DRP, RII G. A. Hallstrom, Reactor Inspector,
MPS, DRS, RII J.

L. Shackelford, Reactor

Engineer, OPS, DRS, RII Licensee:

W.

H. Bohlke, Vice President, Engineering and Licensing, FPL H.

N.

Paduano, Manager, Licensing and Special'Programs, FPL D.

C. Poteralski,

Manager, Nuclear Fuels, FPL R.

S. Kundalkar, Engineering

Manager, Turkey Point B. J.

Denver, Acting Engineering

Manager, St. Lucie D,

R. Powell, Technical

Manager, Turkey Point D.

H. West, Technical

Manager, St. Lucie D. A. Culpepper, Chief, Engineering Assurance, FPL W. A. Skelly, Supervisor, Reliability and Risk Assessment, FPL L. L. HcLaughlin, Licensing Manager, St. Lucie NOTE:

Attendance by NRC personnel at this meeting should be made known by 4:00 p.m.,

Hay 20, 1994, via telephone call to K. D. Landis, (404) 331-5509.

Distribution: See page 3

K. D.

andis, Chief Reactor Projects Section 2B Division of Reactor Projects

ve'3 1994 Distributi on:

W.

L.

S.

H.

J.

R.

L.

T. Russell, Director, Office of Nuclear Reactor Regulation (NRR)

L. Hilhoan, Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research L. Thompson, Jr.,

Deputy Executive Director for Nuclear Materials Safety, Safeguards and Operations Support A. Reyes, Acting Associate Director for Projects, NRR A. Varga, Director, Division of Reactor Projects I/II, NRR N. Berkow, Director, Project Directorate II-2, NRR A. Norris, Senior Project Manager, St. Lucie, NRR P. Croteau, Project Manager, Turkey Point, NRR R. Plisco, Regional Coordinator, EDO bcc:

S.

D. Ebneter E.

W. Herschoff A. F. Gibson J

~

P. Stohr J.

R. Johnson J.

P.

Jaudon D. H. Verrelli K. D. Landis S.

A. Elrod, SRI, St.

Lucie T.

P. Johnson, SRI, Turkey Point R.

P. Schin V. H. Wilson B. Uryc K. H. Clark All NRC Attendees Docket File RII:DRP RII:DRP qP~

RSchin Landis 5/<~/94 5/i~/94 RI

D P

RII:DRP""

DVer elli J

o n on 5/

94 5/

94 I:DRS AGi on 5

4 RII:DRS JS o r

/ /